Variant Configuration

What is the Purpose of variant Configuration


Variant configuration is for manufacturing complex products in
which customer determines the features of the product. Objective
of variant configuration is to react quickly to customers
requirements.
Here it needs not to create separate material for each variant of a
product. When companies introduce variant configuration this
often goes beyond a business process re-engineering project.
Variant configuration offers an opportunity to restructure product
structures for which then processes are defined. This has a direct
impact to the core areas such as marketing and product data
management

Slide Number 2
2008 Capgemini

What is the Use of variant Configuration


It is tool which helps to simplify the complex manufacturing of final
product more varieties and variation of the input material
To ensure right choice is delivered
Easy for the sales person to select & Communication is fast and clear
Ensures production of right item
New products can be configured immediately by the system itself and all
changes in the costs of production, pricing for the new product are taken
into account by the system automatically.
This session will walk you through the steps of building a simple VC
model.
Slide Number 3
2008 Capgemini

Who Should Use Variant Configuration?

Slide Number 4
2008 Capgemini

Variant Configuration

Configurable profile
Class

Configurable material

Dependency

Characteristic
Value1

Value3
Value2

Slide Number 5
2008 Capgemini

RAM
1GB
2GB
3GB

HDD
120 GB
160 GB
280 GB

Color
Silver
Black
Blue

Processor
Intel
AMD

Slide Number 6
2008 Capgemini

Creating characteristics

Slide Number 7
2008 Capgemini

Steps For creating Characteristics


Menu Path :Logistics Central Functions variant Configuration
Environment Classification Master Data CT04-Charecterstics.
1) Enter Characteristics Name and Select Create Button
2) Enter Description in Basic data Tab, Enter data type (Character Format),
Enter Number of Characters , Select Multiple Value radio button and Enter
Characteristics values and Save it.
3) If we want to Create Another Characteristic Repeat the same procedure
4) Also create the characteristic for Price. Specify the values of all
Characteristics in Values tab. And In the addition data Tab enter Table name
SDCOM and Field name VKOND, Select Not Ready for Input option.

Slide Number 8
2008 Capgemini

Create Characteristics
Select Create Button

Select Basic Data Tab

Slide Number 9
2008 Capgemini

Create Characteristics (Continued)


Enter Description

Status must be set


to Released
Select Character Format

Select Multiple
Values

Slide Number 10
2008 Capgemini

Create Characteristics (Continued)

Select the Values Tab &


Give the Characteristic
values with description

Slide Number 11
2008 Capgemini

Creating Price Characteristic

Slide Number 12
2008 Capgemini

Creating Price Characteristic (Continued)

Enter the Field


Name VKOND

Select the table


Name SDCOM

Select Not Ready


for Input

Slide Number 13
2008 Capgemini

Steps Creating Class


Menu Path :Logistics Central Functions Variant Configuration Environment
Classification Master Data CL02 Class
In Variant Configuration we use the Class to Group the Characteristics that Describe the
Configurable Material. We need to link the Class to the Configurable Material so that we
allow that Material to be Configured by using the Characteristics of the Class.
We can use a Class in the Variant Configuration if the Class has a Class Type that
Support the Variant Configuration.
1) Enter Class name and enter Class Type = 300 (Variants)
2) Select the Icon Create, Basic data Tab enter Description and status must be Set to
Release
3) Select the Tab Characteristic and enter the Characteristics and Save.

Slide Number 14
2008 Capgemini

Create Class
Enter the Class
Description

Select the
create Button

Enter Class type 300

Slide Number 15
2008 Capgemini

Create Class (Continued)

Enter Class description

Status must be set to


Released

Indicates not to check similar


characteristic values

Slide Number 16
2008 Capgemini

Add Characteristics to the Class


Select Characteristic Tab
and enter the Characteristics
and Save it.

Slide Number 17
2008 Capgemini

Creating a Configurable Material


A material with different features or characteristics and options is known as
configurable material. Example: PC, Car.
Configurable materials are either created in a material type that allows the
configuration (n the standard system, the material type KMAT) or they are
given the indicator Configurable in the material master record.
Specify the Industry sector is Mechanical Engineering & Material type is
Configurable Material
Item category group is 0002
In basic data 2 tab we need to select the check box configurable material
Class type is 300

Slide Number 18
2008 Capgemini

Creating Configurable Material


Enter The Class

Select the
Characteristics
Slide Number 19
2008 Capgemini

Configuration Profile CU41


Menu Path :Logistics Central Functions variant Configuration
Configuration ProfileCU41 Create
Each configurable object must have a configuration profile. The configuration
profile for a material controls the configuration process in the sales order
We maintain the configuration profile for the configurable objects to define the
central settings for the configuring the objects we can control all the settings that
effect the display options and the scope of the characteristics on the value
assignment screen.
Select the Object Material, Specify the required material and press enter Now
specify Priority, Profile name and Class type (300).Select the Profile and from
the main menu select Goto Profile detail select the tab configuration initial
screen in process field tab select the sales order. And specify the BOM explosion
SD01 and save it.
Slide Number 20
2008 Capgemini

Configuration Profile (Continued)

Enter the Class


Type 300

Enter the Priority &


Profile Name

Slide Number 21
2008 Capgemini

Configuration Profile (Continued)

Select
Characteristic
values

Slide Number 22
2008 Capgemini

Configuration Profile (Continued)

Select Sales order

Select the application SD01

Slide Number 23
2008 Capgemini

Dependency's
It describes the inter dependency's between the characteristics and
characteristic values and it controls which components are to be selected from
the Bill of Material.
Use : In Variant Configuration, we use dependencies to control combinations of
variants. This prevents combinations of options that are not allowed.
Dependencies also select exactly the right BOM components and operations to
produce a variant.
In two ways we can create the dependencys
Menu Path Logistics Central Functions Variant Configuration
Dependency Single Dependency CU01 Create
We can create directly the dependency in the characteristic itself

Slide Number 24
2008 Capgemini

Creating Dependencys (continued)


Go to the transaction CT04 and Enter the Characteristic Name
Go to the Tab Values and select the line of characteristic value form the main
menu Go to Extras Object dependencys Editor.
Now select the option Procedure press enter and In the ABAP/4 Line command
(Below line) write the code $SELF.ZPRICE= '1 GB' and check for the Syntax
Error. And Save it.
Repeat the same for all other characteristic values.

Slide Number 25
2008 Capgemini

Creating Dependencys For Characteristics (Continued)

Open the characteristic in


change mode and select a
character for which the
dependency is to be created

Slide Number 26
2008 Capgemini

Creating Dependencys (Continued)

Enter the dependency


(follow the Dependency syntax)

Slide Number 27
2008 Capgemini

Creating Dependencys (Continued)

Check for the Syntax Error and Save It

Slide Number 28
2008 Capgemini

Creating Dependencys (Continued)

Check for the Syntax Error and Save it

Slide Number 29
2008 Capgemini

Variant condition Pricing procedure and maintaining Condition records

In the Transaction Code V/08 Pricing procedure we need to add the


Condition type VA00 with the requirement 2 (Item with pricing).
In the Transaction Code VK11 we need to maintain the Condition
Record for Basic Price of the Material for the condition Type PR00.
In the Transaction Code VK11 we need to maintain the Condition
Records for all Characteristic Values. In the condition type VA00.

Slide Number 30
2008 Capgemini

Variant Conditions In Pricing Procedure

Slide Number 31
2008 Capgemini

Condition Record for Base price

Maintaining the
Condition Record for
Base Price

Slide Number 32
2008 Capgemini

Condition Records for Variant Conditions


Condition records are
created for sales
organization, distribution
channel and material

Enter prices associated with


variants.

Enter the variants

Slide Number 33
2008 Capgemini

Creating the Sales Order BOM


Create the Material masters for All the Components
Go to the Transaction Code CS01.And Enter the Material ZLAPTOP ,
Enter the Plant and Enter the BOM Usage is 5.

In the Initial Screen of the BOM enter all the Components and Quantity
Select the Line and Go to the Main menu select Extras Object
Dependencies Editor there write the dependencies Syntax.
Repeat the Procedure for all BOM Components and Save.

Slide Number 34
2008 Capgemini

Creating BOM (Continued)

Enter all the Components and


Quantities

Slide Number 35
2008 Capgemini

Creating BOM (Continued)

Enter the Dependency


Syntax

Slide Number 36
2008 Capgemini

Process flow
Create the Sales Order with the Tcode VA01 the Standard Document type is
OR, standard item category is TAC and Schedule line category is CP.
For Consuming the Components against to sales order Use T code MB1A with
Movement type 231
The sales order is make To Order Scenario so In the Stock posting Screen select
the Movement Type 521 (Receipt w/o production order into unrestricted sales
order) and Special stock indicator (E).
Create the Delivery document with the Tcode VL01N Standard Document type
is LF.
Create the Billing document with the Tcode VF01 Standard document type is
F2.

Slide Number 37
2008 Capgemini

Creating the sales order

Enter the Configurable


Material and Quantity
Slide Number 38
2008 Capgemini

Value Assignment Screen

Select the Values from


the Value Assignment
Screen

Slide Number 39
2008 Capgemini

Pricing Calculation

Pricing is Calculating as per


the Condition Records
maintained

Slide Number 40
2008 Capgemini

MB1A For Consuming the Components


Enter the Sales
Order

Enter the
Components &
Quantity

Slide Number 41
2008 Capgemini

MB1C - For Maintaining The Sales Order Stock

Special Stock
Indicator E & Enter
Sales Order
Enter the Configurable
Material & Quantity

Slide Number 42
2008 Capgemini

Creating Delivery

Select the Sales Order Stock & do


the PGI

Slide Number 43
2008 Capgemini

Creating Billing Document


Create the Billing Document

Slide Number 44
2008 Capgemini

Document Flow

Slide Number 45
2008 Capgemini

Thank You

Variant Configuration with Production Planning

Create Sales Order

Slide Number 48
2008 Capgemini

Select Configuration Profile

Slide Number 49
2008 Capgemini

Slide Number 50
2008 Capgemini

Slide Number 51
2008 Capgemini

Assign values to characteristics

Slide Number 52
2008 Capgemini

Slide Number 53
2008 Capgemini

Slide Number 54
2008 Capgemini

Sales Order in requirement list before running MRP

Slide Number 55
2008 Capgemini

Planned Order created after MRP run

Slide Number 56
2008 Capgemini

Create Production Order W. R. T. Planned Order

Slide Number 57
2008 Capgemini

Backflush the components & save order

Slide Number 58
2008 Capgemini

Slide Number 59
2008 Capgemini

Production Order Confirmation

Slide Number 60
2008 Capgemini

Slide Number 61
2008 Capgemini

Confirm Order

Slide Number 62
2008 Capgemini

Create Delivery

Slide Number 63
2008 Capgemini

Select Sales Order Stock

Slide Number 64
2008 Capgemini

Do Picking & PGI

Slide Number 65
2008 Capgemini

Create Invoice

Slide Number 66
2008 Capgemini

Thank You

You might also like