You are on page 1of 11

SAP S/4HANA PP Practice Questions

Study online at quizlet.com/_6yd098

1. A) 40 - You produce your material based on a 6. A) BOM Before a user can add multiple production
Planning forecast derived from historical sales and status versions in a material master, what information
with-final- expect it to be in inventory when your D) Validity should be collected? (3)
assembly customer orders. If customers order more dates A) BOM status
than the foretasted quantity, you want to E) Lot sizes B) Work center hierarchy
increase production to try to meet the extra C) Task list group number
demand. D) Validity dates
Which is the appropriate planning strategy to E) Lot sizes
use? (1)
7. A) By How does the new Inventory Management
A) 40 - Planning with-final-assembly
eliminating Data model contribute to the reduction of the
B) 50 - Planning without final assembly
fields for data footprint? (3)
C) 20 - Make to order production
different A) By eliminating fields for different stock
D) 10 - Anonymous make-to-stock
stock types types
2. A) A Which material master setting is required to B) By B) By eliminating inventory history tables
repetitive use the repetitive planning table for eliminating C) By eliminating hybrid tables
manufacturing production with production orders? (1) inventory D) By eliminating material master tables
profile must A) A repetitive manufacturing profile must be history E) By eliminating inventory tables
be assigned assigned on the MRP4 view tables
on the MRP4 B) The selection method must be set to "2 E) By
view Selection by production version". eliminating
C) At least one valid production version must inventory
exist on the MRP4 view tables
D) An overall profile be assigned on the work
8. A) Capacity A resource was created in SAP S/4HANA
scheduling view
Category PP/DS through the internal CIF integration and
3. A) Bill of You are using the document management named "W1904_1000_001". What does the suffix
Material system (DMS). Where should the DMS 001 in the resource name represent? (1)
D) Material document links be assigned, to have them A) Capacity Category
Master automatically copied to production orders? B) Available capacity version
(2) C) Number of individual capacities
A) Bill of Material D) Work center category
B) Work Center
9. A) Capacity Which advanced functionality has been
C) Routing Header
Planning embedded in SAP S/4HANA? (3)
D) Material Master
B) Available- A) Capacity Planning
4. A) BOM, in In which of the following master data objects to-promise B) Available-to-promise
the item for can you define the production order default D) C) Demand Planning
the material storage location for a material component? Backorder D) Backorder processing
B) Routing, in (2) processing E) Supply Network Planning
the A) BOM, in the item for the material
10. A) Changed Which functional capabilities does the
component B) Routing, in the component allocation
planned Detailed Scheduling Board have? (2)
allocation C) Material master of the finished product
order A) Changed planned order quantities
D) Work center, in the production supply area
quantities B) Change sales order quantities
5. A) BOM, in In which of the following master data ojects C) Undo for C) Undo for drag and Drop planning activities
the item for can you define the production order default drag and D) Enter time-ticket confirmation for
the material storage location for a material component? Drop production orders
C) Routing, in (Choose 2) planning
the A) BOM, in the item for the material activities
component B) Work center, in the production supply area
allocation C) Routing, in the component allocation
D) Material master of the finished product
11. A) Contract For which data objects do you have to set up 17. A) It is a simplified form What are some of the
C) CIF integration models in S/4HANA to use of production control advantages of using Kanban? (2)
Production them in advanced planning? (2) C) Replenishment are A) It is a simplified form of
plant A) Contract created close to the production control
B) Material Master actual need B) It is mostly accomplished by
C) Production plant manual postings
D) Work Center C) Replenishment are created
close to the actual need
12. A) Which data model changes have been
D) Replenishments are based on
Elimination implemented in Sales and Distribution? (3)
centralized planning
of status A) Elimination of status tables
tables B) Elimination of document index tables 18. A) It links receipts from The pegging situation was
B) C) Elimination of output condition tables an alternative location in changed because of an MRP
Elimination D) Elimination of LIS tables for rebates case of a shortage in the heuristic run. What is a capability
of E) Elimination of customer master tables default location of dynamic pegging? (Choose 1)
document A) It links receipts from an
index alternative location in case of a
tables shortage in the default location
E) B) It propagates changed sales
Elimination order priorities to the pegged
of customer planned orders
master C) It enables the propagation of
tables network alerts across the bill of
materials structure
13. A) Which of the following objects can you release
D) It replaces fixed pegging
Individual so that the business transactions for process
relationships unless they have
phases order execution and process management can
been created for stock
C) be executed? (2)
Individual A) Individual phases 19. A) It was created for What are attributes of the SAP
operations B) Individual process instructions better planning and S/4HANA Simplification list? (3)
C) Individual operations estimation of your way A) It was created for better
D) Individual control recipes to S/4HANA planning and estimation of your
B) It details transaction way to S/4HANA
14. A) The pegging situation was changed because of
and solution capabilities B) It details transaction and
Individual an MRP heuristic run. What is a capability of
at a functional level solution capabilities at a
phases dynamic pegging? (2)
C) It can have a business functional level
C) A) Individual phases
and technical impact C) It can have a business and
Individual B) It enables the propagation of network alerts
technical impact
operations across the BOM structure
D) It is only a grouping of
C) Individual operations
related technical simplifications
D) It replaces fixed pegging relationships
E) It contains references to the
unless they have been created for stock
relevant training material
15. A) What is SAP's strategic solution to perform
20. A) Lock-free inventory What are the main innovations in
Integrated Sales and Operations planning when you use
movements manufacturing in SAP S/4HANA?
Business SAP S/4HANA Manufacturing? (1)
B) Material Coverage (3)
Planning A) Integrated Business Planning
Fiori App A) Lock-free inventory
B) PP Standard Sales and Operations Planning
D) Monitor Production movements
C) Flexible Planning
Ordrs Fiori App B) Material Coverage Fiori App
D) APO Demand Planning
C) Flow manufacturing
16. A) In the Where can you maintain consumption mode D) Monitor Production Ordrs
MRP group and consumption periods for planning Fiori App
D) In the strategies? (2) E) Rough-cut capacity planning
material A) In the MRP group
master B) In the requirements class
C) In the plant parameters
D) In the material master
21. A) Lock-free What are the main innovations in 27. A) Only the What are the drawbacks of the separation
inventory manufacturing in SAP S/4HANA? (Choose 3) OLAP system of the OLTP and OLAP? (Choose 4)
movements A) Lock-free inventory movements has a A) Only the OLAP system has a predefined
C) Monitor B) Rough-cut capacity planning predefined subset of the data
Production C) Monitor Production Orders Fiori app subset of the B) Only the OLAP system has the latest
Orders Fiori D) Material Coverage Fiori app data data
app E) Flow Manufacturing C) The OLAP C) The OLAP system needs to write back
D) Material system needs the data to the OLTP system
Coverage to write back D) Batch process are required to keep
Fiori app the data to the OLTP and OLAP in sync
OLTP system E) Multiple copies of the data exist
22. A) Low When do you recommend the use of
D) Batch
product repetitive manufacturing? (2)
process are
complexity A) Low product complexity
required to
C) High B) High product complexity
keep OLTP and
product C) High product stability
OLAP in sync
stability D) Low product stability
E) Multiple
23. A) Maintain How can you avoid order proposals for copies of the
adjustment planned independent requirements with dates data exist
parameter in in the past? (choose 2)
28. A) Operation A warehouse manager likes to streamline
the MRP A) Maintain adjustment parameter in the MRP
control key the goods receipt (GR) process for
group Group
D) Production production orders. Where can you enable
D) B) Use a planning strategy with requirements
scheduling the automatic GR? (Choose 2)
Reorganize consumption
profile A) Operation control key
planned C) Set the requirements reduction indicator in
B) Scheduling margin key
independent the requirements class
C) Confirmation profile
requirements D) Reorganize planned independent
D) Production scheduling profile
requirements
29. A) Operation Which reports can you access via the
24. A) Material Which data object can be updated with the
list order and resource reporting transaction in
Master scheduling results of a routing? (1)
B) Production advanced planning? (Choose 3)
A) Material Master
overview A) Operation list
B) MRP profile
C) WIP list B) Production overview
C) Production scheduling profile
C) WIP list
D) Production version
D) Production list
25. A) Material You re using the document management E) Planning file entries
Master system (DMS). Where should the DMS
30. A) Pick Parts To ensure that the warehouse operator
B) Bill of document links be assigned, to have
only stages large components in the exact
Material automatically copied to production orders?
required quality for each production
(Choose 2)
warehouse material staging method would
A) Material Master
you recommend? (Choose 1)
B) Bill of Material
A) Pick Parts
C) Routing header
B) Release Order Parts
D) Work center
C) Create Parts
26. A) What are some of the SAP Fiori user types? D) Kanban
Occasional (Choose 3)
31. A) Production Which reports can you access via the
C) Expert A) Occasional
overview order and resource reporting transaction in
E)Developer B)Business Partner
C) Operation advanced planning? (Choose 3)
C) Expert
list A) Production overview
D) Employee
E) WIP list B) Planning file entries
E)Developer
C) Operation list
D) Production list
E) WIP list
32. A) Purchase orders Which elements are included in the 38. A) The requirements At the end of the MRP run you receive
C) Transfers from structure of the batch where-used list? dat occurs before the exception message "Reschedule In
batch to batch (3) that of a firmed Operation" What caused the message
D) Stock transfers A) Purchase orders planned receipt to be generated? (1)
B) Planned orders A) The requirements dat occurs before
C) Transfers from batch to batch that of a firmed planned receipt
D) Stock transfers B) The requirement no longer exists
E) Collective orders C) The requirements date occurs that
of a firmed planned receipt
33. A) Queue time Your customer complains about
D) The firmed planned receipt cannot
B) Move time incorrect duration for production order
be rescheduled
C) Floating time operations. What time elements could
cause the issue? (3) 39. A) The viability of In the Manage Shortage view of the
A) Queue time the proposed new SAP Fiori app "Monitor Material
B) Move time solution Coverage", What do the stars
C) Floating time indicate? (1)
D) Tear down time A) The viability of the proposed
E) Processing time solution
B) The presence of firmed planned
34. A) Routing What is the equivalent in SAP
orders
B) Production S/4HANA of the Production Data
C) The presence of production orders
Version Structure in PP/DS? (3)
D) The priority of the proposed
C) Bill of Material A) Routing
solutions
B) Production Version
C) Bill of Material 40. A) Work Center For which planning-relevant data
D) Engineering Change Record C) Material objects do you set just one indicator
to include then in PP/DS? (2)
35. A) SAP Fieldglass Which SAP solutions are part of the
A) Work Center
B) SAP Hybris Digital Value Network portfolio?
B) Plant
E) Concur (Choose 3)
C) Material
A) SAP Fieldglass
D) Production Version
B) SAP Hybris
C) SAP Human Capital Management 41. A) Work Scheduling In which material master views can
D) SAP Visual Enterprise B) Purchasing you select the batch management
E) Concur checkbox? (Choose 2)
A) Work Scheduling
36. A) System What are the three transition scenarios
B) Purchasing
conversion for an S/4HANA implementation ? (3)
C) Basic Data 1
B) New A) System conversion
D) MRP 4
implementation B) New implementation
C) Landscape C) Landscape transformation 42. B) Allowed material What does the bill of material usage
transformation D) System activation type (BOM usage) control at the BOM item
E) System upgrade D) Max allowed level? (2)
low-level code A) Default values for the item status
37. A) The definition of Which of the following apply to MRP
B) Allowed material type
the planning scope Live? (2)
C) Default unit of measure
is more flexible A) The definition of the planning scope
D) Max allowed low-level code
D) The sequence of is more flexible
planning materials B) THe BAdIs for classical MRP also 43. B) Allowed material What does the bill of material usage
is calculated across apply to MRP Live type control at the BOM item level? (2)
plants C) Planned orders need to be D) Maximum A) Default unit of measure
converted to purchase requisitions for allowed low-level B) Allowed material type
externally procured materials code C) Default values for the item status
D) The sequence of planning materials D) Maximum allowed low-level code
is calculated across plants
44. B) Creating a The material master of your finished 49. B) In the stock The production plan is being
planned order product contains MRP type "PD". You set a requirements list, set disrupted by last minute demands
within the manual firming date in the stock a manual firming that are entered in the system.
planning time requirements list. Which of the following fence for a date Which is the most efficient way to
fence will firm planned orders? (2) based on the handle last minute demands and
D) Setting a A) Assigning a production scheduling replenishment lead protect the current production
planning time profile time of the material plan? (2)
fence in the B) Creating a planned order within the D) Manually firm all A) In the material master record, set
Material planning time fence planned orders for MRP type to P4 and a planning time
Master Record C) Manually changing the quantity of a materials within the fence on the replenishment lead
planned order replenishment time of time of the material
D) Setting a planning time fence in the the material B) In the stock requirements list, set
Material Master Record a manual firming fence for a date
based on the replenishment lead
45. B) Define In which customizing activity do you set up
time of the material
order-type- automatic routing selection for the
C) In the material master record, set
dependent production orders? (Choose 1)
MRP type to P1 and a planning time
parameter A) Define production scheduling profile
fence on the replenishment lead
B) Define order-type-dependent parameter
time of the material
C) Define selection profiles
D) Manually firm all planned orders
D) Define scheduling parameters for
for materials within the
production orders
replenishment time of the material
46. B) Expected Which warehouse management functions
50. B) Material master -> The settings for MRP can be
goods receipt are available in SAP EWM but NOT in SAP
MRP Group -> Plant maintained at different levels. If
C) Labor WM? (3)
Settings settings have been maintained in
Management A) Handling Unit Management
different places, in which sequenece
E) Slotting B) Expected goods receipt
does the system search for the MRP
C) Labor Management
settings? (1)
D) Yard Management
A) Material Master ->Plant Settings -
E) Slotting
> MRP Group
47. B) Filters Which of the following are capabilities of B) Material master -> MRP Group ->
C) Sort multidimensional reporting in SAP Plant Settings
D) Drilldown S/4HANA embedded analytics? (Choose 3) C) MRP Group -> Material Master ->
A) Forecast Plant Settings
B) Filters D) Plant Settings -> MRP Group ->
C) Sort Material Master
D) Drilldown
51. B) Material Master On which of the following levels
E) Scheduling
D) MRP controller can you influence the availability
48. B) Float before Which times are used for Basic Date check for the components of
and float after Scheduling of manufacturing planned production orders? (2)
production orders in MRP? (2) A) Production controller
D) Setup time A) Goods receipt processing time B) Material Master
B) Float before and float after production C) Production order type
C) Opening period D) MRP controller
D) Setup time
52. B) Mixed MRP In order to use strategy 70 -
indicator Planning at assembly level, what
order field must be set besides the
planning strategy? (1)
A) Dependent Requirements
indicator
B) Mixed MRP indicator
C) Individual/Collective Indicator
D) Storage Location MRP indicator
53. B) Nominate Which capabilities does the Alert 59. B) Receiver-sender What are prerequisites for using
time-dependent monitor have? (3) relationships batch derivation? (2)
substitutes for a A) Automatically predict alerts in future D) Batch where-used A) Batch determination selection
planner planning cycles list conditions
C) Generate B) Nominate time-dependent substitutes B) Receiver-sender relationships
alerts base on for a planner C) Process instructions
defined threshold C) Generate alerts base on defined D) Batch where-used list
values threshold values
60. B) Replenishments are What are some of the advantages
D) Automatically D) Automatically send alerts with Alert
created close to the of using Kanban? (Choose 2)
send alerts with Notification Engine
actual need A) It is mostly accomplished by
Alert Notification E) Automatically reschedule in case of
C) It is a simplified manual postings
Engine overload alerts
form of production B) Replenishments are created
54. B) Optimization What steps are possible in a PP/DS control close to the actual need
C) Detailed production planning run? (3) C) It is a simplified form of
scheduling A) Backorder processing production control
functions B) Optimization
61. B) Resource Selection Which process order function uses
D) Heuristics C) Detailed scheduling functions
a resource network? (1)
D) Heuristics
A) Capacity leveling
E) Demand consumption
B) Resource Selection
55. B) outbound Which document is skipped when SAP C) Capacity Planning
delivery request EWM is embedded in SAP S/4HANA? (1) D) Resource scheduling
A) Warehouse task
62. B) SAP Best Practices What are the pillars of SAP
B) outbound delivery request
D) Guided Activate? (2)
C) Outbound delivery order
Configuration A) Premium engagement
D) Warehouse order
B) SAP Best Practices
56. B) Parts Which automotive-specific functionality C) SAP MaxAttention
interchangeability is embedded in SAP S/4HANA? (3) D) Guided Configuration
C) Enhanced A) Equipment and Tools Management
63. B) SAP S/4HANA on Which options are available for an
Kanban B) Parts interchangeability
premise SAP S/4HANA deployment?
Processing C) Enhanced Kanban Processing
C) SAP S/4HANA (Choose 2)
D) Packaging D) Packaging logistics
private cloud A) SAP S/4HANA Enterprise
logistics E) Enhanced characteristics based
Management cloud
processes
B) SAP S/4HANA on premise
57. B) Production The procurement type for your material C) SAP S/4HANA private cloud
version is set to "E" for In-house production. D) SAP S/4HANA Professional
Which of the following is valid to services cloud
determine a source of supply in SAP
64. B) Shop floor Which of the following data
S/4HANA? (1)
information system objects are updated when a user
A) Contract
confirms an operation? (1)
B) Production version
A) Production order header status
C) Selection Method
B) Shop floor information system
D) Purchasing Info Record
C) Production order total order
58. B) Purchasing info Which material-specific information can quantity
records be transferred to a transportation lane in D) Warehouse transfer order status
C) Special PP/DS? (3)
65. B) Strategic Analysis What capabilities does SAP
procurement A) Quota arrangement
C) Real time decision S/4HANA embedded analytics
keys B) Purchasing info records
support provide? (2)
D) Outline C) Special procurement keys
A) Automatic update of story
agreement D) Outline agreement
boards
E) Production versions
B) Strategic Analysis
C) Real time decision support
D) Comparison of current data with
historical data to identify trends
66. B) The checking Your customer wants to incldue 70. B) They can be A customer is considering switching from
rule from the restricted-use stock as a potential applied to order-related settlement to product-
business application receipt in the existing ATP check for make-to-stock related settlement. What are capabilities
D) The checking component availability. production of cost collectors? (2)
group from the Which information is required to order A) They can be created automatically
material master implement this change request in the D) They can be during month end process
scope of check? (2) used for B) They can be applied to make-to-stock
A) The ATP category for restricted-use repetitive production order
stock manufacturing D) They can be used for repetitive
B) The checking rule from the business manufacturing
application
71. B) Use During planning you are facing an
C) The checking control for the order
Optimization overload situation on a resource. Which
type
with respect to activities do you consider to create a
D) The checking group from the
set-up times feasible production plan? ( choose 3)
material master
D) Use DS A) Use a bucket-oriented capacity check
67. B) The code is What are properties of MRP Live? heuristic B) Use optimization with respect to set-up
writer in SQL Script (Choose 2) "Schedule times
D) It is executed on A) It uses the same BAdis as classic Sequence C) Use multilevel MRP run for the
the database server MRP E) Use products on the resource
B) The code is writer in SQL Script rescheduling D) Use DS heuristic "Schedule Sequence"
C) Data is read sequentially from the with an E) Use rescheduling with an alternative
database tables alternative mode
D) It is executed on the database mode
server
72. B) Use During planning you are facing an
68. B) The requirements At the end of the MRP run you recieve optimization overload situation on a resource. Which
date occurs before the exception message "Reschedule In with respect to activities do you consider to create a
that of a firmed Operation". What caused the message set-up times feasible plan? (3)
planned receipt to be generated? (1) D) Use DS A) Use a bucket-oriented capacity check
A) A firmed planned receipt cannot be heuristic B) Use optimization with respect to set-up
rescheduled "Schedule times
B) The requirements date occurs Sequence" C) Use multilevel MRP run for the
before that of a firmed planned receipt E) Use products on the resource
C) The requirement no longer exists rescheduling D) Use DS heuristic "Schedule Sequence"
D) The requirements date occurs that with an E) Use rescheduling with an alternative
of a firmed planned receipt alternative mode
mode
69. B) They can be A customer is considering switching
applied to make- from order-related settlement to 73. B) When you When would you use reporting point
to-stock production product-related settlement. What are need to backflush in repetitive manufacturing? (2)
order capabilities of cost collectors. (2) determine the A) You require an up-to-date inventory for
D) They can be A) They can be created automatically work in components
used for repetitive during month end process. progress B) When you need to determine the work
manufacturing B) They can be applied to make-to- C) When goods in progress
stock production order issues can wait C) When goods issues can wait for the
C) They can be used for for the final final confirmation
manufacturing with collective orders confirmation C) For production lines with short lead
D) They can be used for repetitive times
manufacturing
74. C) ABAP Managed What new technology is used in 78. C) By providing HOw can Production Planning and
Core Data Services SAP S/4HANA Embedded replenishment Detailed Scheduling (PP/DS) enhance
(CDS) Analytics? (Choose 1) proposals with the standard planning functionality? (1)
A) Smart Business Cockpit exact times A) By providing multilevel material
B) Multidimensional Reporting requirements planning
Client (MDRC) B) By providing future demand from
C) ABAP Managed Core Data demand figures in the past
Services (CDS) C) By providing replenishment
D) HANA LIve proposals with exact times
D) By providing cross-plant planning
75. C) A user trigger Which of the following functions
and deployment
printing of shop floor can be performed when the
paper manually production order has the status 79. C) Contract For which data objects do you have to
(transaction CO02) "Created" (CRTD)? (1) D) Production set up CIF integration models in
A) A user can schedule a plant S/4HANA to use them in advanced
background job to realease planning? (2)
production orders (Transaction A) Work center
COOIS) B) Material Master
B) A user trigger material C) Contract
availability check via mass D) Production plant
processing (T Code: COHV)
80. C) Control cycle Which Kanban master data object
C) A user trigger printing of shop
controls the relationship between the
floor paper manually (transaction
supply and demand source? (1)
CO02)
A) Production supply area
D) A user can trigger material
B) Kanban container
staging via mass processing (T
C) Control cycle
Code: COHV)
D) Rate routing
76. C) Big and affordable Which technological advances
81. C) Define order- In which customizing activity do you
memory enabled the development of SAP
type-dependent set up automatic routing selection for
D) Capability to add to S/4HANA as the digital core? (3)
parameter production orders? (Choose 1)
server landscape and A) Wide adoption of web
A) Define production scheduling for
scale standards such as Service oriented
production orders
E) Multi core architecture
B) Define scheduling parameters for
processors enabling B) Advances in the three-tier
production orders
parallelism of tasks architecture approach
C) Define order-type-dependent
C) Big and affordable memory
parameter
D) Capability to add to server
D) Define selection profiles
landscape and scale
E) Multi core processors enabling 82. C) In-House The SAP Kanban procedure could be
parallelism of tasks production used to trigger which of the following
D) Stock transfer kinds of replenishment?
77. C) By enhancing the How can you enhance the system
A) Subcontracting
system status statuses of a production order
B) Vendor consignment
customizing table with scenario with user statuses? (1)
C) In-House production
user statuses A) By activating the user statuses in
D) Stock transfer
status and action management
B) By creating a user profile and 83. C) Maintain How can you avoid order proposals for
assigning it to the production adjustment planned independent requirements with
scheduling profile parameter in the dates in the past? (2)
C) By enhancing the system status MRP group A) Use a planning strategy with
customizing table with user D) Reorganize requirements consumption
statuses planned B) Set the requirements reduction
D) By defining a status profile and independent indicator in the requirements class
assigning it to the order type requirements C) Maintain adjustment parameter in the
MRP group
D) Reorganize planned independent
requirements
84. C) MRP areas What must be used in the system to plan the 89. C) Posting of When the goods receipt for a finished product
requirements for different subcontractors production is posted during confirmation on a
separately? (1) costs to cost manufacturing environment, which of the
A) Production versions collector following actions are also performed by
B) Storage locations D) Archiving default? (2)
C) MRP areas of backflush A) Staging of components for the next order
D) Planning plant documents in the sequence
B) Reduction of the capacity requirements
85. C) MRP Live Which of the following is an advantage of
C) Posting of production costs to cost
can propose MRP Live and NOT available in classical
collector
alternative MRP? (2)
D) Archiving of backflush documents
solutions A) MRP Live can prioritize demand from
D) MRP Live sales orders 90. C) In which data object is the production line
can create B) MRP Live can plan materials with recursive Production (Repetitive manufacturing relevant work
production BOMs Version center( maintained? (Choose 1)
orders C) MRP Live can propose alternative A) Bill of Material
automatically solutions B) Cost Collector
D) MRP Live can create production orders C) Production Version
automatically D) Repetitive manufacturing profile
86. C) Net Which of the following is used by the MRP 91. C) Quota You are using heuristic SAP_ERP_001. Which of
change Live Planning run in SAP S/4HANA? (1) arrangement the following criteria are included in the
planning A) Parallel processing across servers automatic source determination logic when a
B) MRP List planned order is created? (1)
C) Net change planning A) Delivery Date
D) Planning horizon B) Costs
C) Quota arrangement
87. C) Periodic The setup time on the production line is to
D) Component availability
lot sizing produce a material is extensive. You would
E) Vendor Rating
like to avoid multiple setups and limit the
production of the material based on a 92. C) Rate Which task list types can have parallel
planning calendar. routings (R) sequences? (2)
Which type of lot size procedure should you D) Routings A) Master recipes (s)
use to accomplish this? !1) (N) B) Reference operation sets (S)
A) Min Lot sizing C) Rate routings (R)
B) Exact Lot sizing D) Routings (N)
C) Periodic Lot sizing
93. C) SAP Which options are available for an SAP
D) Fixed lot sizing
S/4HANA S/4HANA deployment? (2)
88. C) Planning You want to procure your material private A) SAP S/4HANA Enterprise Management
without final components based on a Forecastof the cloud cloud
assembly finished material derived from historical D) SAP B) SAP S/4HANA Professional services cloud
(50) sales. When customers order, you produce S/4HANA C) SAP S/4HANA private cloud
the finished product and reserve it for that on premise D) SAP S/4HANA on premise
particular order.
Which is the appropriate planning strategy to
use? (1)
A) Planning with final assembly (40)
B) Make-to-Order production (20)
C) Planning without final assembly (50)
D) Production by lot size (30)
94. C) Settlement Which of the following are included as 100. D) By How can Production Planning and Detailed
Management SAP S/4HANA Sales Simplification? (3) Providing Scheduling (PP/DS) enhance the standard
replaces ERP SD A) SAP order Fulfillment replaces ERP replenishment planning functionality? (Choose 1)
Rebates SD Availability Checking proposals with A) By providing multilevel material
D) SAP GTS B) SAP Sales support replaces SAP exact times requirements planning
replaces ERP SD CRM B) By providing future demands from
Foreign Trade C) Settlement Management replaces demand figures in the past
E) SAP Revenue ERP SD Rebates C) By providing cross-plant planning and
Accounting D) SAP GTS replaces ERP SD Foreign deployment
replaces ERP SD Trade D) By Providing replenishment proposals
Revenue E) SAP Revenue Accounting replaces with exact times
Recognition ERP SD Revenue Recognition
101. D) Finite A planner wants to interactively resolve an
95. C) Setup time Which times are used for Basic Date resource and overload situation on a resource using
D) Float before Scheduling of manufacturing planned finite strategy advanced planning tools without any
and float after orders in MRP? (2) automatic rescheduling activity by the
production A) Opening period system.
B) Goods receipt processing time Which combo of settings for resource and
C) Setup time detailed scheduling strategy are required to
D) Float before and float after receive related alerts? (Choose 1)
production A) Finite resource and infinite strategy
B) Infinite resource and finite strategy
96. C) Setup Times Which times are used for Basic Data
C) Infinite resource and infinite strategy
D) Float before Scheduling of manufacturing planned
D) Finite resource and finite strategy
and float after orders in MRP? (2)
production A) Opening period 102. D) Full What Kanban status automatically posts
B) Goods receipt processing time good receipt with reference to the
C) Setup Times procurement element? (1)
D) Float before and float after A) Empty
production B) Wait
C) In Use
97. C) Solution Which of these are layers in SAP Best
D) Full
packages Practice content? (3)
D) Building blocks A) Configuration guides 103. D) Net What is the first step in the MRP run?
E) Scope items B) Process diagrams requirements (Choose 1)
C) Solution packages calculation A) Lot size calculation
D) Building blocks B) Source determination
E) Scope items C) BOM explosion
D) Net requirements calculation
98. C) Stock Transfer The SAP Kanban procedure could be
D) In-house used to trigger which of the following 104. D) Prepare, What is the correct sequence of the
production kinds of replenishments? (2) Explore, following Activate methodology phases?
A) Vendor consignment Realize, (1)
B) Subcontracting Deploy A) Validate, Realize, Test, Deploy
C) Stock Transfer B) Prepare, Validate, Test, Go-Live
D) In-house production C) Prepare, Realize, Iterate, Continuous
Improvement
99. D) By assigning How can you limit the number of
D) Prepare, Explore, Realize, Deploy
different materials master data objects to be created when
to the same the manufacturing process is the same
routing for many different products? (1)
A) By creating routings with parallel
sequences
B) By assigning the same production
version to different materials
C) By creating routings with alt
sequences
D) By assigning different materials to
the same routing
105. D) Process order, Control recipe, PI sheet, In a first step you have created master recipes. In which sequence are the
Process message additional objects created? (D)
A) Process order, Control recipe, process message, PI Sheet
B) Control Recipe, Process Order, Process Message, PI sheet
C) Control Recipe, Process Order, PI sheet, Process message
D) Process order, Control recipe, PI sheet, Process message
106. D) The planning strategy of the finished product In Make-to-order production, which field controls whether the components will
be planned as sales order specific stock? (1)
A) The item category of the component in the BOM
B) The MRP Type of the component
C) The Individual/Collective indicator of the component D) The planning
strategy of the finished product
107. D) The production operator cannot enter A planner updated a production order status from partially confirmed "PCNF"
additional confirmations to technically completed "TECO" by mistake.
What impact would this have to other users for this specific production order?
(1)
A) The buyer can still see component reservations
B) The production manager can still see the capacity requirements
C) The warehouse clerk still carry out goods issue transactions
D) The production operator cannot enter additional confirmations
108. D) With respect to defined separate key dates How is the BOM exploded when you use a BOM explosion number? (1)
for product and each assembly A) With respect to a defined separate change status for product and each
assembly
B) With respect to a common key date for product and each assembly
C) With respect to a common change status for product and each assembly
D) With respect to defined separate key dates for product and each assembly

You might also like