Professional Documents
Culture Documents
Project - Monthly Safety Program-Model
Project - Monthly Safety Program-Model
Activities
Responsibility
A.1
Planning Reviewing
Monthly Safety Program
A.2
A.3
A.4
A.5
Performing
Safety Walk through
A.6
HSE Advisor
A.7
HSE Advisor
A.8
HSE Advisor
A.9
HSE Advisor
A.10
HSE Advisor
HSE Advisor
A.12
HSE Advisor
A.13
HSE Advisor
A.14
HSE Manager
A.15
HSE Advisor
A.16
A.17
Performing
Gate Meeting
A.18
Performing
Tool Box Meeting
A.19
HSE Advisor
A.20
Checking the
Safe Conditions of the Site
HSE Advisor
A.21
HSE Advisor
A.22
Prog.
Location: Salalah
6
10
11
12
13
19
20
21
22
23
24
25
26
27
28 29 30
31
No of
Prog
Actual
%
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
ACTUAL
1
ACTUAL
1
ACTUAL
1
27
PLAN
27
ACTUAL
PLAN
ACTUAL
27
PLAN
27
0
0
0
0
ACTUAL
PLAN
ACTUAL
Planned Program by
Legend :
Notes
0.00
PLAN
ACTUAL:
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
0.00
PLAN
40.00
PLAN
0.00
PLAN
40.00
PLAN
0.00
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
PLAN
ACTUAL
20.00
1
T
Avg
%
Weight
%
Actual Program by
Tentative Date
Overall Performance % :
PLAN:
100.00
3.This Form duly filled with Actual Program and the same to be recorded.
Actual Date
HSE MANAGER
Date:
Holiday
HSE Manager
Date: