You are on page 1of 2
Appendix 1 ‘SIEMENS Algerian Energy Company Projet Skikda CCPP - 2x1S.V94.3A Programme for Scheduled Inspections Gor Full Operation Maintenanes Combined Cycle Power Plant 2x1S.94.3A Skikda Time of Operation** Year after PAC z = = = z. z ‘Systems con | Te s00-ot 25, soe} sooows] 56500 | eso] 75 Gas turbine VO43A 1 ae at Generator 1 & H i Generator 2 © i i ‘Steam turbine 1 ! i ‘Steam turbine 2 Heat recovery steam gen. 11 Heat recovery steam gen. 12 ‘Steam, water cycles Cooling system Fuel supply ‘Water supply 1&G, electrical equipment i d ‘Auxiliary, ancillary systems 4) This figures tobe reduced by num ber of EOH accumula before PAC Duration of Maintenance Offer”) Statutory inspections: Type of inspection © =Minor inor inspection @ = Major = Initial inspection © = Medium inspection @ = Hot gas path inspection Major inspection ‘Sere Power Garaion Dept 014/758 il No ALGZ (1202) 016-0 *) The indeated number is the approx duration ef shut-down, valid wth the folowing condone: + 6 working days por week “10 hours por shift + we shits, whore necessary =) with average 8 00 EOH per year 1.06: nsposten Schwa OBMate 150-208 eae: 1.08

You might also like