Responsibilities Matrix For

Libyana GPRS Roaming


Solution

Share of Responsibilities
This document summarizes the tasks to be performed for the Project Implementation. It
includes supply, delivery, installation, supervision and commissioning of the works
included in the scope of the project as well as related services and procedures to be
fulfilled to ensure the proper implementation within the planned time schedule.
Main parties involved in the project are Libyana and ZTE. If another party will be
involved as subcontractor or supplier, the responsibility of related supply/task remains
with the main party Libyana or ZTE who requires the involvement of this other party.
R Responsibility for performing the Deliverables and Operational Procedures
A Prior approval to be given by LIBYANA or ZTE
S Support to be given
I Information to be given

ZTE Confidential Proprietary

2012 ZTE Corporation. All rights reserved.

Responsibilities Matrix
Table 1

3
4
5

Responsibilities Matrix for Libyana GPRS Roaming Project

1. System debugging, commissioning and integration

ZTE software function opening & debug

1.1

8
R

Network new switches and new links installation &

11

12

1.2

debug

13 14

Provide public IP for reconstruction, GRX connection,

15

16

1.3

and signal links to other operators.

17 18

Reconstructing Libyana IP addresses and configures

19

20

1.4

SGSN and GGSN as public IP.

21 22

Change users mobiles APN name

23

24

28

10

1.5

25 26

Guarantee roaming SGSN supports CAMEL3 protocol

27

1.6

and triggers CAMEL3 service in home SCP.

29 30

Provide FTP location and connection, CDR definition

31

1.7

(ZTE proposes using SCDR of SGSN or G-CDR of


GGSN.) for SGSN and GGSN in case of postpaid
settlement

33 34

Connect with GRX and billing system for GRX to test

1.8

the service connection and CDR format for settlement. S

37 38

Test with operators (Visited PLMN) SGSN/GGSN/SCP

39

40

1.9

for protocols and interfaces and also CDR format.

41 42

Service Test

43

44

1.10

45
46

2. Primary Acceptance & Finally Acceptance

32
R

35

36

47 48

Document preparation

49

2.1

51 52

R
PAT Plan Making

2.2

55 56

PAT Teams Preparation

2.3

59 60

50

Function Test Acceptance

2.4

53

54

57

58

61

62

63 64

Issue Primary Acceptance Certification & Finally

65

66

2.5

Acceptance Certification

67 68

Commercial Running

69

70

2.6

71