Course Title

BIRLA INSTITUTE OF TECHNOLOGY & SCIENCE, PILANI


WORK INTEGRATED LEARNING PROGRAMMES
Digital
Part A: Content Design
PROJECT MANAGEMENT

Course No(s)

MM ZG523

Credit Units

Credit Model
Content Authors

ARUN MAITY

Course Objectives
No
CO1

To understand the need of project management and deciding the right organization structure.

CO2

To understand the market and demand , technical and financial analyses for the selection and
prioritization of projects

CO3

To define the project scope, work breakdown structure and development of project network.
Loading, Scheduling and Allocation of Resources. Optimization of cost-time schedule and
monitoring the performance of the projects using earned value analysis.

CO4

To identify the project risks, contingency plans and change management system. To understand
the risk analysis methods and decision making.

CO5

To understand the process of outsourcing of project work, types of contracts and enterprise
contact management

CO6

To understand the project audit methods, project closure procedure and retrospectives. To
understand the project quality dimensions and methods of improving quality.

Text Book(s)
T1
Clifford F Grey. Erik W Larson, Gautam V Desai, Project Management: The Managerial
Process Mc Graw Hill Education (India) Private Limited, New Delhi, Sixth Edition, 2014.
T2

Prasanna Chandra, Projects: Planning, Analysis, Selection, Financing, Implementation &


Review, Mc Graw Hill Education (India) Private Limited, New Delhi, 8 th Edition, 2014.

Reference Book(s) & other resources


R1
Kerzner Harold, Project Management: A Systems Approach to Planning, Scheduling and
Controlling, Wiley Student Edition, Tenth Edition, 2013.
R2

Saxena Anuj, Enterprise Contract Management: A Practical Guide to Successfully


Implementing an ECM Solution, Cengage Learning, First Edition, 2008.

R3

Adedeji Bodunde Badiru, Project Management in Manufacturing and High Technology


Operations, Wliey Interscience, Second Edition 1996.

Content Structure
1.
Module Title : Integrated Project Management
1.1.
Project and Importance of Project Management
1.1.1.
What is Project?
1.1.2.
Project of Manufacturing
1.1.3.
Project Management Approach
1.1.4.
Why do Projects Fail?
1.2.
Project Life Cycle
1.2.1.
Life Cycle Definitions
1.2.2.
Project Life Cycle for various industries
1.3.
Role and Responsibilities of Project Manager
1.3.1.
Project Manager and Project Team
1.3.2.
Interactions with Boss, Peers and Subordinates
1.3.3.
Decision Making & Problem Solving
1.4
Project Integration Management
1.4.1
Current drivers of Project Management
1.4.2
Alignment of Projects with Organizational Strategy
1.4.3
Socio Technical Approach
2.

3.

Module Title : Project Management Structures


2.1.
Organization Structures
2.1.1.
Functional Organization
2.1.2.
Dedicated Project Team / Projectized Organization Structure
2.1.3.
Matrix Organization
2.2.
Right Project Management Structures
2.2.1.
Organization Considerations
2.2.2.
Project Considerations
2.3.
Organization Culture
2.3.1.
What is Organizational Culture?
2.3.2.
Identifying Cultural Characteristics
Module Title : Market and Demand Analyses
3.1.
Market Analysis
3.1.1.
Situational Analysis
3.1.2.
Collection of Secondary Information
3.1.3.
Conduct of Market Survey and Characterization
3.2.
Demand Forecasting
3.2.1.
Least Square Method
3.2.2.
Exponential and Moving Average Method
3.3.
Technical Analysis
3.3.1.
Manufacturing Process / Technology
3.3.2.
Project Clearances

4.

Module Title : Financial Analysis


4.1.
Financial Estimates and Projections
4.1.1.
Cost of Project
4.1.2.
Means of Finance
4.2.
Projected Cash Flow Statement and Balance Sheet
4.2.1.
Estimates of Sales and Production
4.2.2.
Cost of Production
4.2.3.
Working Capital Management
4.2.4.
Project Cash Flow Statement
4.2.5.
Projected Balance Sheet

5.

Module Title : Project Portfolio Management


5.1.
Organization Strategy
5.1.1.
Need to Understand Organization
5.1.2.
Strategic Management Process

5.2.

Portfolio Management System


5.2.1.
Need for Project Portfolio Management System
5.2.2.
Classification of Project

6.

Module Title : Project Selection


6.1.
Criteria for Project Selection
6.1.1.
Financial Criteria
6.1.2.
Non-Financial Criteria
6.1.3.
Applying Selection Model
6.1.4.
Managing the Portfolio System
6.2.
Cost of Capital and Investment Criteria
6.2.1.
Calculating Cost of Capital
6.2.2.
NPV and modified NPV
6.2.3.
IRR and MIRR
6.2.4.
Payback and Discounted Payback

7.

Module Title : Project Scope Statement


7.1.
Defining the Project Scope
7.1.1.
Project Scope Checklist
7.1.2.
Establishing Project Priorities
7.2.
Creating Work Breakdown Structure
7.2.1.
WBS Hierarchy, Benefits and Development
7.2.2.
Integrating WBS with the Organization
7.2.3.
Process Breakdown Structure
7.3.
Responsibility Matrix and Communication Plan
7.3.1.
Responsibility Matrices
7.3.2.
Project Communication Plan

8.

Module Title : Project Cost & Time Estimation


8.1.
Quality of Estimates and Guidelines
8.1.1.
Factors influencing Quality of Estimates
8.1.2.
Estimating Guidelines for Times, Costs and Resources
8.2.
Methods for Estimating Project Times and Costs
8.2.1.
Top-Down Approach
8.2.2.
Bottom-Up Approach
8.2.3.
Range Estimating and Hybrid Phase Estimating
8.3.
Project Costs
8.3.1.
Types of Project Costs
8.3.2.
Refining Estimates

9.

Module Title : Project Planning


9.1.
Developing a Project Plan
9.1.1.
Developing a Project Network
9.1.2.
Constructing a Project Network
9.1.3.
AON and AOA Diagram
9.2.
CPM Calculations
9.2.1.
Forward Pass & Backward Pass Calculations
9.2.2.
Determination of Slack, Critical Path
9.2.3.
Time Scale Network
9.3.
PERT Calculations
9.3.1.
Project Activity Times
9.3.2.
Probability of Completion

10.

Module Title : Project Resource Scheduling


10.1.
Resource Scheduling
10.1.1.
Type of Resource Constraints
10.1.2.
Resource Loading
10.1.3.
Resource Leveling
10.2.
Resource Allocation
10.2.1.
Heuristics
10.2.2.
Under Limited Resources
10.3.

Multiple Project Resource Schedules


10.3.1
Multi-Project Environment
10.3.2
Time Phased Budget Baseline

11.

Module Title : Project Cost Schedule Optimization


11.1.
Reducing Project Duration
11.1.1.
Rationale for Reducing Project Duration
11.1.2.
Options for Accelerating Project Completion
11.2.
Project Cost Duration Graphs & Optimization
11.2.1.
Direct and Indirect Costs
11.2.2.
Crash Times
11.3.
Decisions on Time and Cost Reductions
11.3.1.
Time Reduction
11.3.2.
Cost Reduction

12.

Module Title : Project Information Management


12.1.
Project Monitoring Information System
12.1.1.
Structure of PMIS
12.1.2.
Project Control Process
12.1.3.
Monitoring Time Performance
12.2.
Developing Status Reports
12.2.1.
Baseline Development
12.2.2.
Updating Status Report
12.3.
Earned Value Analysis
12.3.1.
Definition and Glossary of terms
12.3.2.
Variance Analysis
12.3.3.
Percent Completion Indexes
12.3.4.
Performance Indices
12.3.5.
Forecasting Final Project Cost

13.

Module Title : Project Risk Management


13.1.
Risk Management Process
13.1.1.
Risk Breakdown Structure
13.1.2.
Risk Identification and Assessment
13.1.3.
Risk response Development
13.2.
Contingency Planning
13.2.1.
Handling Risks
13.2.2.
Contingency Funds and Time Buffers
13.3.
Change and Control Management
13.3.1.
Risk Response Control
13.3.2.
Change Control Management

14.

Module Title : Project Contract Management


14.1.
Outsourcing Project Work
14.1.1.
Advantages and Disadvantages
14.1.2.
Best Practice
14.2.
Contracts

14.2.1.
14.2.2.
14.2.3.
14.2.4.

Procurement: Planning and Conducting


Types of Contracts
Contract Administration and Closure
Art of Negotiating

15.

Module Title : Project Audit and Closure


15.1.
Project Audit Process
15.1.1.
Types of Audit
15.1.2.
Managing Audit
15.2.
Project Closure Procedure
15.2.1.
Types of Project Closure
15.2.2.
Wrap-up Closure Procedure
15.2.3.
Post Implementation Evaluation
15.3.
Retrospectives
15.3.1.
Need for Retrospectives
15.3.2.
Managing Retrospectives

16.

Module Title : Project Quality and Agile Management


16.1.
Project Quality Dimensions
16.1.1.
Quality Dimensions
16.1.2.
Benchmarking
16.1.3.
Kaizen
16.2.
Agile Project Management
16.2.1.
Traditional Vs. Agile Methods
16.2.2.
Scrum Meetings
16.2.3.
Applications and Limitations

Learning Outcomes:
No

Learning Outcomes

LO1

Identify Projects in a project driven and non-project driven organization

L02

Prioritize Projects, Select Projects and Prepare Project Scope Statement

L03

Identify the sources of finance, prepare projected cash flow statement and balance sheet

L04

Project Planning, Scheduling and Control of Projects

LO5

Carry out work breakdown structure, assign responsibilities and prepare communication plan

LO6

Identify Project Risks and prepare contingency plans

L07

Identify the quality dimensions, benchmark and carry out kaizen activities

Part B: Learning Plan


Academic Term
Course Title
Course No
Lead Instructor

FIRST SEMESTER 2016-2017


PROJECT MANAGEMENT
MM ZG523
ARUN MAITY

Contact Hour 1
Type

Content Ref.

Pre CH

Topic Title

Study/HW Resource Reference

Identify Different Projects in your


Industry

Own Organization

During
CH

1.1, 1.2

Project and Importance of Project


Management
Project Life Cycle

T1: Chapter 1

Post CH

Appendix 1.1,
1.2. 1.3

Project and Program, Project Life


Cycle, Project Management
Processes

T1: Page 20 - 36

Content Ref.

Topic Title

Study/HW Resource Reference

Job Description of a Project


Manager and Skills required

Own Organization

Contact Hour 2
Type
Pre CH
During
CH

1.3, 1.4

Role and Responsibilities of


Project Manager;
Project Integration Management

T1: Chapter 1

Post CH

Appendix 1.2

Project Integration Management


Case 1.2 Coal Fired Boilers
Project

T1: Page 37 -46, 48-53

Content Ref.

Topic Title

Study/HW Resource Reference

Draw the organization structure

Own Organization

Contact Hour 3
Type
Pre CH
During
CH

2.1, 2.2

Organization Structure
Right Project Management
Structure

T1: Chapter 3

Post CH

Exercise 2, 3

L.L. Company, Barbara


Electronics

T1: Page 138

Type

Content Ref.

Topic Title

Study/HW Resource Reference

Pre CH

Case 3.1

Moss and Mc Adams Accounting


Firm

T1: Page 141-144

Contact Hour 4

During
CH

2.3

Organization Culture
Case 3.1 Discussion

T1: Chapter 3

Post CH

Case 3.1

Views on Q 1 to 4 on Discussion
Forum

T1: Page 144

Content Ref.

Topic Title

Study/HW Resource Reference

Collection of Secondary
Information regarding Market and
Demand of Main Product

Own Organization

Contact Hour 5
Type
Pre CH

During
CH

3.1, 3.2

Market Analysis
Demand Forecasting

T2: Chapter 4

Post CH

Problem 1, 4,
5

Least Square Method, Elasticity

T2: Page 4.29

Content Ref.

Topic Title

Study/HW Resource Reference

Prepare a note on Technology


Used, Technical Collaboration,
Plant Capacity, Inputs and
Utilities, Product Mix for Main
Product

Own Organization

Technical Analysis

T2: Chapter 5

Carry out technical analysis of ongoing project

Own Organization

Topic Title

Study/HW Resource Reference

Identify Sources of Finance for a


Industrial Project

Own Organization

Contact Hour 6
Type
Pre CH

During
CH

3.3

Post CH

Contact Hour 7
Type

Content Ref.

Pre CH
During
CH

4.1

Financial Estimates and


Projections

T2: Chapter 6, Page 6.1 6.10

Post CH

4.1

Working Capital Requirement and


Financing

T2: page 6.10

Content Ref.

Topic Title

Study/HW Resource Reference

Go through Balance Sheet from


Annual Report

Own Organization

Projected Cash Flow Statement


and Projected Balance Sheet

T2: Chapter 6, Page 6.11 6.19


T2: Chapter 6.28

Contact Hour 8
Type
Pre CH
During
CH

4.2

Examples and Problems


Post CH

Practice Problems

Contact Hour 9
Type

Content Ref.

Topic Title

Study/HW Resource Reference

Vision and Mission Statement,


Thrust Areas

Own Organization

Strategic Management Process

T1: Chapter 2

Identify Organization Strategies


for achieving Goals

Own Organization

Content Ref.

Topic Title

Study/HW Resource Reference

During
CH

5.2

Portfolio Management System

T1: Chapter 2

Post CH

Appendix 2.1

Classify the projects


Request for Proposals

Own Organization
T1: Page 86-88

Content Ref.

Topic Title

Study/HW Resource Reference

Project Selection Method Used

Own Organization

Criteria for Project Selection

T1: Chapter 2

Classify Projects selected as per


financial and non-financial criteria

Own Organization

Topic Title

Study/HW Resource Reference

Time Value of Money

T2: Chapter 7 Page 7.1 to 7.8

Cost of Capital and Investment


Criteria
Examples and Problems

T2: Chapter 8,
T2: Chapter 10, Page 10.1-10.2

Practice Problems 2, 3, 6, 7

T2: Pag3 8.29-8.30

Pre CH
During
CH

5.1

Post CH

Contact Hour 10
Type
Pre CH

Contact Hour 11
Type
Pre CH
During
CH

6.1

Post CH

Contact Hour 12
Type

Content Ref.

Pre CH
During
CH
Post CH

6.2

Contact Hour 13
Type

Content Ref.

Pre CH
During
CH

7.1

Post CH

Topic Title

Study/HW Resource Reference

Project Scope Statement

T1: Chapter 4, Page 152-153

Defining the Project

T1: Chapter 4

Project Scope Statement

T1: Page 196 - 200

Topic Title

Study/HW Resource Reference

List all the activities of Project


handled by you

Own Organization

Contact Hour 14
Type

Content Ref.

Pre CH
During
CH

7.2, 7.3

Work Breakdown Structure


Responsibility Matrix and
Communication Plan

T1: Chapter 4

Post CH

Case 4.3

Process Development at Union


Chemicals

T1: Page 201-207

Content Ref.

Topic Title

Study/HW Resource Reference

Estimate the time of each activities


for a project

Own Organization

Estimating of Project Costs and


Time

T1: Chapter 5

Carryout Bottom-Up approach for


a project

Own Organization

Contact Hour 15
Type
Pre CH
During
CH

8.1, 8.2

Post CH

Contact Hour 16
Type

Content Ref.

Topic Title

Study/HW Resource Reference

Pre CH

Case 5.1

Read Case 5.1 Sharp Printing, AG

T1: Chapter 5, Page 258-259

During
CH

8.3
Case 5.1

Project Costs
Sharp Printing AG

T1: Chapter 5
T1: Page 258 - 259

Post CH

Appendix 5.2

Project Cost Management

T1: Page 238 - 257

Content Ref.

Topic Title

Study/HW Resource Reference

Identify the relationship between


various activities

Own Organization

Project Planning, CPM

T1: Chapter 6

Contact Hour 17
Type
Pre CH
During

9.1, 9.2

CH

Calculations
Examples and Problems

Post CH

Prepare a Project Plan in Project


Management Software

Own Organization

Topic Title

Study/HW Resource Reference

Understand Normal Distribution


Table

Statistical Tables

PERT Calculations

T1: Chapter 6

Practice Problems of CPM and


PERT

T1: Page 313-318, 376 - 377

Topic Title

Study/HW Resource Reference

Contact Hour 18
Type

Content Ref.

Pre CH
During
CH

9.3

Post CH

Contact Hour 19
Type

Content Ref.

Pre CH
During
CH

Revise Time Scale Network


10.1

Post CH

Resource Scheduling
Examples

T1: Chapter 8

Problems 1, 2, 3

T1: Page 451-453

Topic Title

Study/HW Resource Reference

Contact Hour 20
Type

Content Ref.

Pre CH
During
CH

Revise Time Scale Network


10.2, 10.3

Post CH

Resource Allocation, Multi-project


Resource Schedules
Examples

T1: Chapter 8

Problems 4, 5

T1: Page 454-455

Topic Title

Study/HW Resource Reference

Contact Hour 21
Type

Content Ref.

Pre CH
During
CH
Post CH

Revise CPM Calculation


11.1, 11.2

Reducing Project Duration


Examples

T1: Chapter 9

Problems 1 - 4

T1: Page 494 - 496

Contact Hour 22
Type

Content Ref.

Pre CH
During
CH

Topic Title

Study/HW Resource Reference

Revise CPM Calculations


11.3

Post CH

Reducing Cost

T1: Chapter 9

Problems 5 -8

T1: Page 497 - 499

Topic Title

Study/HW Resource Reference

Data collection for monitoring


project progress

Own Organization

Project Management Information


System

T1: Chapter 13

Prepare a schedule and track the


project against Plan In MS Project

Own organization

Topic Title

Study/HW Resource Reference

Glossary of Terms used in Earned


Value Analysis

T1: Page 676

Earned Value Analysis


Examples

T1: Chapter 13

Problems 3 -8

T1: page 698 - 712

Topic Title

Study/HW Resource Reference

List various risks in any one


project

Own Organization

Risk Management Process

T1: Chapter 7

Draw Risk Breakdown Structure


and prepare a risk profile for one
project

Own Organization

Topic Title

Study/HW Resource Reference

Risk Assessment for one project


Read Case 7.1

Own organization
Page 394-395

Contact Hour 23
Type

Content Ref.

Pre CH
During
CH

12.1, 12.2

Post CH

Contact Hour 24
Type

Content Ref.

Pre CH
During
CH

12.3

Post CH
Contact Hour 25
Type

Content Ref.

Pre CH
During
CH

13.1

Post CH

Contact Hour 26
Type
Pre CH

Content Ref.

During
CH

13.2, 13.3

Risk Response and Change


Management
Case 7.1 Discussion

T1: Chapter 7

Post CH

Appendix 7.2

Project risk management

T1: page 377 -393

Content Ref.

Topic Title

Study/HW Resource Reference

List the part of project outsourced


and the basis

Own organization

Contact Hour 27
Type
Pre CH
During
CH

14.1

Outsourcing of Project Work

T1: Chapter 12

Post CH

Case 12.1

Shell Case Fabricators

T1: Page 661-663

Content Ref.

Topic Title

Study/HW Resource Reference

Go through contract document of


any project

Own Organization

Contact Hour 28
Type
Pre CH
During
CH

14.2

Contract Management

T1: Chapter 12

Post CH

Appendix 12.2

Project Procurement Management

T1: Page 650-661

Content Ref.

Topic Title

Study/HW Resource Reference

Study Audit Process of any


Project/ Product

Own Organization

Project Audit and Closure

T1: Chapter 14

Prepare Audit Checklist for any


one project

Own Organization

Topic Title

Study/HW Resource Reference

Identify any old project and list


what went wrong and what went
right in the project

Own Organization

Retrospectives

T1: Chapter 14

Prepare a Project Close-out


checklist for one project

Own Organization

Contact Hour 29
Type
Pre CH
During
CH

15.1, 15.2

Post CH

Contact Hour 30
Type

Content Ref.

Pre CH

During
CH
Post CH

15.3

Contact Hour 31
Type

Content Ref.

Pre CH
During
CH

16.1

Post CH

Topic Title

Study/HW Resource Reference

List the quality parameters for a


project

Own organization

Project Quality Management

T1: Chapter 14 Page 765 - 776

Identify the benchmarking


parameters and kaizen activities

Own Organization

Topic Title

Study/HW Resource Reference

Exercise 1

T1: page 846

Project Agile Management

T1: Chapter 17

Exercise 4

T1: Page 846-848

Contact Hour 32
Type

Content Ref.

Pre CH
During
CH
Post CH

16.2

Evaluation Scheme:
Legend: EC = Evaluation Component; AN = After Noon Session; FN = Fore Noon Session
No
Name
Type
Duration Weight Day, Date, Session, Time
EC-1
Quiz-I/ Assignment-I Online
5%
September 1-10, 2016
Quiz-II
Online
5%
October 1-10, 2016

EC-2
EC-3

Quiz-III/ Assignment-II Online

5%

October 20-30, 2016

Mid-Semester Test
Closed Book 2 hours
Comprehensive Exam Open Book 3 hours

35%
50%

25/09/2016 (AN) 2 PM TO 4 PM
06/11/2016 (AN) 2 PM TO 5 PM

Syllabus for Mid-Semester Test (Closed Book): Topics in Session Nos. 16


Syllabus for Comprehensive Exam (Open Book): All topics (Session Nos. 1 to 32)
Important links and information:
Elearn portal: https://elearn.bits-pilani.ac.in
Students are expected to visit the Elearn portal on a regular basis and stay up to date with the latest
announcements and deadlines.
Contact sessions: Students should attend the online lectures as per the schedule provided on the Elearn portal.
Evaluation Guidelines:
1. EC-1 consists of either two Assignments or three Quizzes. Students will attempt them through the course
pages on the Elearn portal. Announcements will be made on the portal, in a timely manner.
2. For Closed Book tests: No books or reference material of any kind will be permitted.
3. For Open Book exams: Use of books and any printed / written reference material (filed or bound) is
permitted. However, loose sheets of paper will not be allowed. Use of calculators is permitted in all
exams. Laptops/Mobiles of any kind are not allowed. Exchange of any material is not allowed.
4. If a student is unable to appear for the Regular Test/Exam due to genuine exigencies, the student should
follow the procedure to apply for the Make-Up Test/Exam which will be made available on the Elearn
portal. The Make-Up Test/Exam will be conducted only at selected exam centres on the dates to be
announced later.
It shall be the responsibility of the individual student to be regular in maintaining the self study schedule as given
in the course handout, attend the online lectures, and take all the prescribed evaluation components such as
Assignment/Quiz, Mid-Semester Test and Comprehensive Exam according to the evaluation scheme provided in

the handout.

You might also like