You are on page 1of 1

NOTES:

1.
2.

SECTION A - A

ALL DIMENSIONS ARE IN METERS


DIMENSIONS AND REINFORCEMENT AS PER DETAIL DESIGN

0.40

PORTAL WALL
WING WALL

LEGEND:
7.40

3.00

0.75

8.09

TOP OF GROUND IN FRONT OF PORTAL


+1.00

60" PIPE

FUTURE
60" PIPE

LONGITUDINAL SECTION
ORIGINAL TERRAIN
SEALING SHOTCRETE
PROTECTION OF PORTAL PIT
BACK FILL
CONSTRUCTION CANOPY
DRAINAGE TRENCH

WALL FOUNDATION
8.60

0.50

0.50

0.50

-3.56

PORTAL STRUCTURE
WING WALL

0.40

2.10

BACK FILL
PORTAL STRUCTURE
DRAINAGE TRENCH
PORTAL WALL

+1.00

PLAN VIEW

+1.24

DRAWING No.:

DRAWING TITLE

QP10-Q-6410

PIPE LINE TUNNEL - TYPICAL CROSS SECTION

SPRING LINE

-0.39
60" PIPE

WING WALL

-2.95
0.50

ENGINEER'S STAMP

TUNNEL DRAINAGE

CONTRACTOR'S STAMP

4.00

MIN. 3.0%
0.50

MIN. 3.0%

0.5

0
0.5

13.60
0
REV

ISSUE FOR TENDER DOCUMENTS

JIRICNY

SABATA

25.03.2016

DESCRIPTION

DRAWN

CHECKED

DATE

WALL FOUNDATION

SALINE WATER CONVERSION CORPORATION


KINGDOM OF SAUDI ARABIA

.50

12

.50

ARAFAT - TAIF
WATER TRANSMISSION SYSTEM

17

2016 i:\atibk_projects\h140\6_cae\66_split of tender\2. arafat - taif wts\dwg\6. pipeline tunnel\andere\qp10-q-6413-000 pipeline tunnel - west portal structure.dwg

REFERENCE DRAWINGS

ILF - TECON & PARTNERS


ENGINEERING PSC

1.5
0

ARAFAT - TAIF PIPELINE SYSTEM

LOCATION:

DRAWING TITLE:

M 1 : 100
DRAWING No.:

SCALE:

5m

5m

10m

PIPELINE TUNNEL
WEST PORTAL STRUCTURE
MAKKAH

1:100

QP10-Q-6413

SHEET

REV.

You might also like