You are on page 1of 2

ANNA UNIVERSITY: CHENNAI-600 025

B.E/B.Tech DEGREE EXAMINATIONS, NOV/DEC 2014


Regulations-2013
Third Semester
Civil Engineering
CE6311 Survey Practical I

Time: 3 Hours

Maximum marks: 100

1. Calculatethe includedangles andarea of theclosedtraverse usingPrismatic compass

2. LocatethegivenpointsandfindouttheareabyPlaneTablesurveyingusing radiation method.

3. Locatethegivenpointsandfindthedistancebetweentwounknownpointsby
PlaneTablesurveyingusingintersection method.

4. Locatetheinstrument station bysolvingtwo pointproblem

5. Determinetheinstrumentstationonthegroundbymeansofobservationtothree well defined points.

6. Locatetheinstrument station bytwo point problem.

7. DeterminetheReduced Levels(RL)ofthegivenpointsusingtheHeightof collimation method


using Dumpy level

8. DeterminetheReduced Levels(RL)ofthegivenpointsusingRiseandFall method.

9. Draw the profile of L.S and C.S of the given ground.

10. Plot a contour map for the given area.

11. Calculate the area for a closed traverse using chain surveying.

12. Determinethearea enclosed bythepolygon using themethod of cross staff surveying.

13. Determine the included angle for a closed traverse using prismatic compass.

14. Determine the reduced levels of the given area by fly levelling.

15. Conduct longitudinal and cross sectional levelling for the given area and plot the profile.

16. Locate the given points and find the distance between two unknown points by Plane Table
surveying using Traverse method.

17. Determinetheinstrumentstationonthegroundthree point problem( Resection method)

18. Perform chaining ranging and aligning for the given area and calculate the area.

Allotment of marks:
Aim and

Formula and

Apparatus

tabulation

Procedure

Results

Viva

Total

25

25

10

100

required
20

20

You might also like