GENERAL CIVIL
COKE HANDLING SYSTEM
PACKAGE
BPCL-IREP
SECTION: C-1.7
A307-0ID16-47-SOW-7000
Rev. 3
Page 5 of 13
HFL/LFL. The maximum water level of the pond can be tentatively considered as 2.0 M RL
which shall be verified at site by contractor during detailed engineering.
2.2
APPROACH ROADS
Approach roads from main roads to the coke handling area, control room & substation
shall be provided to suit operation and maintenance requirements. CONTRACTOR
based on the crane movement shall decide the width of the approach road. However
the min. width of the approach road shall be 6.0 m
Any additional approach roads to facilitate crane movement or any other vehicle
movement during construction shall be in contractors scope of work. Crossings for all
services shall be in the scope of work. Any culverts, pipe way bridges,
electrical/instrumentation road crossings, road crossings for U/G pipes, etc. coming
below the main roads and approach roads shall be in Contractors scope of work.
All roads shall be made good while handing over after completion of the construction
activity. Any new roads required during detail engineering shall be in the contractors
scope. Any strengthening/ widening of existing main roads for crane movement for
erection shall be in the scope of the contractor.
Minimum cross section requirements for roads shall be as per the sectional drawing
enclosed with the bid. Contractor to note that the drawings enclosed with bid are
showing the minimum requirements and are conceptual in nature.
Approach road shall be provided by Coke Handling System Package Contractor from
nearest main road for Coke Storage Yard (dome structure), Truck/ rail Loading Silos,
sub-station cum Control Room building, pump sheds for Dust Suppression system, &
Sanitary Sewer pumping station/ system, approach for settling pond, approaches for
Fire Water Monitor around Coke Storage Yard.etc.
2.3