SAMPLE BOQ - GENERAL ITEMS ( PIPE LAYING )


BILL NO: 02 - GENERAL ITEMS FOR PIPE LAYING
Description
Unit
Qty. Rate
Rs: Cts:
Allow for all costs and expenses
for complying with the General
Conditions of contract and
Specification.
Note : Any Services not
specially provided for will be
deemed to be included in the
rates of items in the Bill of
Quantities.
CLASS A : GENERAL ITEMS

0.01 A 120/ Provision for


all insurances provisional
A130 under the contract.
sum
Total of Page No. / carried to
Summary in Page No. /

2-1

Amount
Rs: Cts:

Item CESM
Description
No
M3
Code
### A 279 Safety of contractor's employees,
Engineer's staff ( Helmets,
Gumboots, dust filters etc.) and
site safety barricades including
open trench round up with
barrigates and luminous tape,
danger sign boards etc.

Unit

sum
###
###

A 279
A 390

Night lighting and all associated


work .
Provision for keeping the site
clean during the construction
period and removal debris at the
completion to the satisfaction of
Engineer.

sum

sum

Total of Page No. / carried to


Summary in Page No. /
###

###

###

###

A 420

A 900

A 900

A 900

Provision for providing two sets


of hard copy and a soft copy of
the as built drawings on the
completion of contract.

sum

Provision for carrying out trial


pits in order to determine the
underground utilities etc..
Provision for cleaning and
applying all exposed pipes and
specials with two coats of black
colour
enamel
paint after
completion of laying.
Provision for dust controlling
during construction period as
directed.

nr

sum

sum

Total of Page No. / carried to


Summary in Page No. /

2-2

Qty.

Rate
Rs: Cts:

Amount
Rs: Cts:

SUMMARY OF BILL NO. 01

Page Number

Amount
Rs.

Cts.

Page No. 1/1


Page No. 1/2
Page No. 1/3

Total of Page No. 1/3 Carried to


Summary in Page No. S

Point Pedro WSS

1/3

Summary -01

ANNEX 1
Specialised Service

Man Months

Rate

Total