Professional Documents
Culture Documents
CCNA Routing and Switching Routing and Switching E
CCNA Routing and Switching Routing and Switching E
Scenario
The network administrator has asked you to implement IPv4 and IPv6 static and
default routing in the test environment shown in the topology. Configure each static
and default route as directly attached.
Requirements
1. Use the address space 10.10.16.0/24 to design an addressing scheme.
Subnet 1: 10.10.16.0/25
Subnet 2: 10.10.16.128/25
subnet: 10.10.16.0
mask: 255.255.255.128
Configure an IPv4 summary route on R1 for the internal LANs. Use the exit
interface.
Configure an IPv6 summary route on R1 for the internal LANs. Use the exit
interface.