The Contractor :
- CV. Unggul Cipta Kreasi
2. Make an environmental analysis :
1. Where is the site of the project?
2. How is the access to get there?
Answer :
1. The project was in batam city , with condition of the street is very good so that
the street to the location is easy.
2. The location of the project away , so the price of mobilization is high.
3. List threats and opportunities:
1. What threats might prevent you to complete the project?
2. What opportunities might help you completing the project?
Answer :
1. Threats :
Because its time for a long time so that this project will be on dry and
rainy
season. And threats can make this project , because of all the
heavy equipment cant run away from the rain and the worker can
work optimally.
2. Opportunities :
- the condition of the road well can carry out mobilization with
-
maximaly.
The heavy equipment easy to rent. Because the heavy equipment in
use can hired in every city.