You are on page 1of 3

English

Espaol

Franais

Portugus

Norsk

Search NOV

You are here: NOV.com > Solutions > Drilling > Drill Bits > Advanced Drilling Solutions

SOLUTION CATEGORIES

DRILL BIT ECONOMICS

Advanced Drilling Solutions

Drill Bit Economics

More Ways to Browse


By Brand

Contact Us
By Brand
By Solution
By Location
General Inquiry
After Hours On-Call List

Description

Careers/Human Resources

myNOV

Drill Bit Economics

Sign In
Drill bit economics consists of drilling curves, cost-per-interval and breakeven
analysis; all of w hich possess significant differences.

There are tw o types of drilling curves:


1. Depth vs. Time
2. Depth vs. Costs

Drilling costs are comprised of three different components:

Time
Rotating Time
Drilling / on bottom time
Non-drilling
Reaming / back reaming
Non-Rotating Time
Connections
Tripping
Circulating
Running Casing
Logging
Maintenance / Repair
Fishing
Bit Cost
Dow nhole Tool / BHA Costs
Standby Charges
In-Hole Costs
Up-Front Charges
Indirect Costs
Borehole Quality
Trajectory
Shape
Open-Hole Risk
Borehole Integrity
Formation Damage
Pressure Risk
W ireline and Cement Unit Rentals

converted by Web2PDFConvert.com

Basic Cost-Per-Interval

CI = RR x (HR + TT) + (DT x HR) + BC


INT

CI = Cost-Per-Interval (Currency)
RR = Rig Rate (Hourly)
HR = Drilling Time (Hours)
TT = Trip Time (Hours)
BC = Bit Cost (Currency)
INT = Interval Drilled (feet or meters)

Historical Versus Projected Cost-Per-Interval

Historical
Uses information from an actual w ell or w ells
Cost-Per-Interval is actual
Projected
Used for selection and comparison
Calculated based on planned or target w ell
Calculated based on projected hours and interval drilled

Breakeven Analysis

Breakeven analysis demonstrates rate of penetration or interval required to


meet or exceed offset cost-per-interval.

Assumed Footage
ROP BE = RR / CL O [((R(TT)) + BC) / INT]

Assumed Penetration Rate


INTBE = [RR (TT) + BC] / [CL O (RR / ROP)

ROP BE
INTBE

ABOUT
NOV

C orporate Overview
Brands
Investor Relations
Training
insideNOV: News
C areers

= Breakeven Penetration Rate


= Breakeven Interval

CL O

= Offset Cost-Per-Interval (Currency)

RR

= Rig Rate (Hours)

TT

= Trip Time (Hours)

BC

= Bit Cost (Currency)

ROP

= Assumed Rate of Penetration

INT

= Assumed Interval Drilled

TECHNOLOGY
SOLUTIONS

Downhole
Drilling
Engineering & Project
Management
Industrial
Lifting & Handling

Production
Supply C hain
Tubular & C orrosion
C ontrol
Well Service &
C ompletion

CONTACT
NOV

C ontact Us
Facility Locator
24 HR On-C all List
Investor Relations
C areers

converted by Web2PDFConvert.com

Featured Technology

Lifting & Handling

C ompletion

Your Privacy Rights | Acceptable Use Policy and Visitor Agreem ent | Copyright Notices | Contact Us | 2011 National O ilwell Varco

All rights reserved.

converted by Web2PDFConvert.com

You might also like