You are on page 1of 50

DAFTAR HARGA UPAH DAN BAHAN

Pekerjaan

: Pembuatan 1 Kamar Kos

Lokasi

: LEDUG

T.Anggaran

: 2014

Luas Bangunan

: 16 m2

NO.

SATUAN

A. UPAH
1
OH
2
OH
3
OH
4
OH
5
OH
6
OH
7
OH
8
OH
9
OH
10
OH
11
OH
12
OH
11
OH
12
OH
13
OH
14
OH
NO.

SATUAN

1
2
B. BAHAN
001
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Kg
Bh
M3
Kg
M3
M3

KODE

L.001
L.002
L.003
L.004
L.005
L.006
L.007
L.008
L.009
L.010
L.011
L.012
L.021
L.022
L.023
L.024

JENIS UPAH

Tukang Batu
Tukang Kayu
Tukang Besi
Tukang Cat
Tukang Dempul
Tukang Plistur
Kepala Tukang
Pekerja
Pekerja Bongkar / Siram
Mandor
Tukang Las
Operator Mesin Poles
Operator Alat Berat
Pembantu Operator
Sopir
Pembantu Sopir

KODE

JENIS BAHAN

M.001
M.001a
M.001b
M.001c
M.001d
M.001e
M.001e1
M.001f
M.001f1
M.001f2
M.001f3
M.001f4
M.001g
M.001h
M.001i
M.001i1
M.001i2
M.001i3
M.001i4
M.001j
M.001k
M.001l
M.001m
M.001n

Pasir Beton
Pasir Pasang
Pasir Urug / Timbun
Tanah Urug
Kapur Pasang
Sirtu
Agregat Klas C
Batu Kali Belah
Batu belah 15 / 20 cm
Batu belah 10 / 15 cm
Batu pecah 5 / 7 cm
Batu pecah 3 / 5 cm
Batu Pecah 2/3 cm (Koral beton)
Batu Pecah Mesin 2/3 cm
Batu Pecah Mesin 1/2 cm
Batu pecah 0,5 - 1 cm
Batu pecah 0,2 - 0,50 cm
Abu Batu
Filler
Batu Bata
Batu Blonos
Tali Ijuk
Batu Bata
Batu Kerikil

M3
Kg
Bh
Bh

M.001o
M.001o.1
M.001p
M.001q

Ijuk
Ijuk
Batako / Hollow block
Rooster Krawang

002

Zak
Kg
Kg

M.002
M.002a
M.002b

Portland Cement 50 Kg
Portland Cement
PC Warna

003

Kg
Kg
Kg
Kg
Kg
Bh
Kg
Kg
Kg
Kg
Kg

M.003
M.003a
M.003b
M.003b1
M.003c
M.003d
M.003d2
M.003e
M.003f
M.003g
M.003h

Besi Beton ( Polos )


Bindrat
Besi Siku
Besi Propil Kanal C
Besi Beton ( Ulir )
Begel ( Besi Strip )
Baja Strip
Kawat Bronjong 4 mm
Mur, baud
Besi Baja IWF
Besi Plat Baja

004

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
M2

M.004
Keramik Lantai 20 x 20 cm (klas A : mulia, arwana)
M.004a Keramik Lantai 20 x 20 cm (klas B : Asia tile, picaso)
M.004b Keramik Lantai 20 x 20 cm (klas C : Roman)
M.004c Keramik Lantai 33 x 33 cm (klas C : Roman)
M.004d Keramik Lantai 40 x 40 cm (klas A : mulia,arwana, garuda,venesia)
M.004e Keramik Lantai 40 x 40 cm (klas B : Asia tile, picaso)
M.004e.1 Keramik Lantai 40 x 40 cm (klas C : platinum)
M.004e.2 Keramik Lantai 40 x 40 cm (klas D : Roman)
M.004g.2 Keramik Lantai 30 x 30 cm (klas D : Roman)
M.004g.3 Granit 60 x 60
M.004j.2 Keramik Lantai 40x40 cm Anti Slip (klas D : Roman)
M.004l.2 Keramik Lantai 30 x 30 cm Anti Slip (klas D : Roman)
M.004o.3 Keramik Dinding 20 x 25 cm (Klas D : roman)
M.004o.4 List Keramik Artistik 7 x 20 cm
M.004r
Lembaran Granit lokal
M.004s Lembaran Granit Import
M.004t
Batu Candi
M.004u Batu Koral Hitam

005

M3
M3
M3
M3
M3
M3
M3
M3
M3
M2
M'
M3
Btg
M3

M.005
M.005a
M.005f
M.005f1
M.005f2
M.005f3
M.005n
M.005p
M.005p1
M.005p2
M.005r
M.005s
M.005t
M.005u

Glugu Tua
Kayu albasia
Kayu Jati Balok (lokal)
Kayu Jati Balok (Kw. Eksport) uk. Khusus 30/30, 18/25, 20/20, 14/20,
16/16,
14/14,
12/12
: 5-8 m' uk. Khusus 8/15, 8/12, 6/15, 6/12, 5/10 P :
Kayu Jati
Balok
(Kw.P Eksport)
5-8 m'
Kayu Jati Balok (Kw. Eksport) Bukan Khusus P : 2-4 m'
Papan Jati
Papan Jati (lokal)
Papan Jati (Kw. Eksport)
Parquet Jati
Lis kayu kruing
Usuk 5/7 kayu kruing
Usuk 5/7 kayu tahun - 3 m'
Kayu Perancah

006

Kg
Kg
Kg
Kg
Bj
Bj
Btg
Bj
Kg
Kg

M.006
M.006a
M.006b
M.006c
M.006d
M.006e
M.006f
M.006g
M.006h
M.006i

Paku Biasa ( 2" - 5")


Paku Eternit, Lis
Paku Kait
Paku Seng ( 1/2" - 1")
Paku Payung
Paku Sumbat
Bambu
Skrup 3.5"
Skrup
Paku beton 5 cm

usuk,reng,plafon

007

Lbr
M2
Lbr
Lbr

M.007
M.007a
M.007b
M.007c

Eternit Kerang Super


Harplek 4 mm
Gypsum board tb. 9 mm
Akustik uk. 60 x 120 cm

008

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

M.008
M.008a
M.008b
M.008c
M.008d
M.008e
M.008f
M.008g
M.008h
M.008i

Kaca Bening 3 mm
Kaca Bening 5 mm
Kaca Polos 8 mm
Kaca Cermin 5 mm
Kaca Rayban 3 mm
Kaca Rayban 5 mm
Kaca Es 3 mm
Kaca Es 5 mm
Kawat burung
Kawat nyamuk

009

Lbr
Lbr
Lbr
Lbr

M.009a
M.009b
M.009c
M.009d

Triplek 3 mm 0,9 x 2,1 m


Multiplek 9 mm 1,2 x 2,4 m
Teakwood 3 mm 1,2 x 2,4 m
Teakwood 3 mm 0,9 x 2,1 m

010

Bj
Bj
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Psg
M2

M.010k
M.010k1
M.010l
M.010m
M.010n
M.010o
M.010p
M.010q
M.010r
M.010s
M.010t
M.010u

Genteng Plentong
Genteng Nok Plentong
Seng Gelombang BJLS 20 ( 0,90 x 1,80 )
Seng Gelombang BJLS 30 ( 0,90 x 1,80 )
Seng Plat BJLS 30 ( 0,90 x 1 m )
Fiber semen Gelombang 4 mm ( 3,00 x 1,05 ) x 4 mm
Fiber semen Gelombang 4 mm ( 2,70 x 1,05 ) x 4 mm
Fiber semen Gelombang 4 mm ( 2,40 x 1,05 ) x 4 mm
Fiber semen Gelombang 4 mm ( 2,10 x 1,05 ) x 4 mm
Fiber semen Gelombang 4 mm ( 1,50 x 1,05 ) x 4 mm
Nok Still Asbes Gelombang
Aluminium Foil / Sisalation

011

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Ltr
Ltr

M.011
M.011a
M.011a.1
M.011a.2
M.011d
M.011e
M.011e1
M.011f
M.011g
M.011h
M.011m
M.011n

Cat Kayu setingkat AVIAN


Cat Kayu setingkat DULUX Super Gloss
Cat Tembok untuk interior (sekualitas Mowilex)
Cat Tembok untuk exterior (sekualitas Mowilex)
Cat Tembok (sekualitas Maxilite)
Cat Genteng (sekualitas Tamitex) Warna Muda
Cat Genteng (sekualitas Tamitex) Warna Tua
Cat Meni
Minyak Cat
Meni Besi
Curing Compound
Minyak Bekisting

Ltr

M.011o

Air Kerja

012

Kg
Kg
Kg
Lbr
Kg
Kg
Kg
Kg
Kg
Ikat
ltr
ltr
Kg
Kg
Bh
Ltr
Ltr
set
Kg
Glg
Bh
Kg

M.012
M.012a
M.012b
M.012c
M.012d
M.012e
M.012f
M.012g
M.012h
M.012i
M.012j
M.012k
M.012l
M.012m
M.012n
M.012o
M.012p
M.012q
M.012r
M.012s
M.012t
M.012u

Batu Kambang / Apung


Plamir Tembok
Plamir Kayu
Amplas
Dempul Lilin
Dempul Kayu
Kapur sirih / Labur / Gamping
Lem Kayu
Politur
Alang-alang
Tir Kayu
OlI
Soda api
Politur sek. Mowilex
Kuas
Resin warna
Cairan coating
Batu grenda poles
Obat poles
Kain poles
Kain pel
Semir lantai sek. MAA

013

M2
M2
M2
M2
M2
M2
M2

M.013
M.013a
M.013b
M.013c
M.013d
M.013e
M.013f

Paving Blok Natural 6 cm


Paving Blok Warna 6 cm
Paving Blok Sek.Aldas t : 8 cm K - 400
Paving Blok Sek.Aldas t : 8 cm K - 300
Paving Blok Sek.Aldas t : 6 cm K - 400
Paving Blok Sek.Aldas t : 6 cm K - 300
Batu Andesit 20/20 cm (ex. Baseh)

014

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
M2
M2
Bh
tube
Bh
M'
M2
M2

M.014
Kunci tanam antik
M.014a Kunci tanam biasa sek. Yalle
M.014b Kunci tanam kamar mandi
M.014c Engsel pintu
M.014d Engsel jendela kupu-kupu
M.014e Engsel angin
M.014f
Kait Angin model lipat
M.014f.1 Kait Angin model antik
M.014g Door Closer
M.014h Kunci slot
M.014i
Pegangan Pintu / Door Holder
M.014j
Door Stop
M.014k Rel Pintu Dorong
M.014l
Grendel Pintu
M.014l1 Grendel Jendela
M.014m Folding Gate 0,4
M.014m1 Folding Gate 0,5
M.014m2 Folding Gate 0,8
M.014n Rolling Door Besi tb. 0,8
M.014o Rolling Door Allumunium tb. 0,8
M.014p4a Skrup fixer type M.8
M.014p5 Sealant
M.014p7 Ramset
M.014p8 Profil Allumunium T
M.014q Venetions Blinds
M.014q1 Vertical Blinds 90 mm standart

015

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

M.015
M.015a
M.015b
M.015c
M.015d
M.015d.1
M.015e
M.015f
M.015g
M.015h
M.015h.1
M.015i
M.015j

Kloset duduk sek. Toto (lengkap asesories)


Kloset jongkok sek. Toto
U r i n o i r sek. Toto
W a s t a f e l sek. Toto
Bak Mandi Fiberglass
Bak tangki air Fiberglass kap 500 ltr
Bath tube
Bak Cuci Piring Stainless 1 ruang
Water drain + asesories
Kran air 3/4" (stainless steel )
Kran air 1/2" (stainless steel )
Seal tape
Floor Drain (stainless steel )

016

M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'

M.016
M.016a
M.016b
M.016c
M.016d
M.016e
M.016f
M.016g
M.016h
M.016i
M.016j
M.016k
M.016l
M.016m

Pipa Galvanis 1/2" med. B


Pipa Galvanis 3/4" med. B
Pipa Galvanis 1" med. B
Pipa Galvanis 1 1/2" med. B
Pipa Galvanis 2" med. B
Pipa Galvanis 3" med. B
Pipa Galvanis 4" med. B
Pipa PVC 1/2"
Pipa PVC 3/4"
Pipa PVC 1"
Pipa PVC 1 1/2"
Pipa PVC 2"
Pipa PVC 3"
Pipa PVC 4"

017

Kg
Ltr
Ltr
Ltr
Ltr
M3

M.017
M.017a
M.017b
M.017c
M.017d
M.017e

Aspal penetrasi 60/70


Bensin
Solar
Minyak Pelumas / Olie
Kerosene / Minyak tanah
Kayu bakar

018

Bh
Bh
M'
m'
cm3
M'
kg
M'

M.018
M.018a
M.018b
M.018c
M.018d
M.018e
M.018f
M.018g

Plat Rambu
Reflector
Rel Pengaman (Guard Rail)
Expantion Joint KW 1
Karet Elastomer Bearing
Karet delatasi
Kawat las
Tiang Pancang

019

Jam
Jam

E.019
E.019a

Mesin Las
Alat-alat Perakitan

20

unit
unit

Pintu dan Jendela Gendong


Jendela dan Kusen Kayu

type AW
type AW
type AW
type AW
type AW
type AW
type AW

R HARGA UPAH DAN BAHAN

HARGA SATUAN
UPAH (Rp)
60,000.00
65,000.00
60,000.00
60,000.00
60,000.00
60,000.00
65,000.00
50,000.00
50,000.00
65,000.00
60,000.00
55,000.00
75,000.00
55,000.00
65,000.00
50,000.00
HARGA SATUAN
BAHAN (Rp)
5
174,010.00
173,220.00
121,460.00
90,000.00
326,240.00
129,280.00
129,280.00
176,610.00
169,500.00
169,500.00
175,580.00
165,550.00
126,960.00
199,890.00
212,040.00
212,040.00
212,040.00
171,180.00
140.00
650.00
118,550.00
9,110.00
335,470.00
44,970.00

364,650.00
4,500.00
3,090.00
3,000.00
75,000.00
1,500.00
10,330.00
11,750.00
19,440.00
11,540.00
14,160.00
10,330.00
17,920.00
11,540.00
13,200.00
20,250.00
11,850.00
11,850.00
2,060.00
2,090.00
3,070.00
9,230.00
9,200.00
9,060.00
11,530.00
13,110.00
6,850.00
125,000.00
15,530.00
7,470.00
3,600.00
8,500.00
251,600.00
1,337,050.00
123,370.00
80,040.00
2,064,720.00
1,828,300.00
18,000,000.00
45,000,000.00
30,000,000.00
23,000,000.00
14,180,820.00
18,000,000.00
22,000,000.00
275,910.00
5,000.00
5,600,000.00
18,840.00
978,470.00

15,800.00
20,660.00
29,200.00
26,740.00
180.00
540.00
14,780.00
600.00
36,500.00
30,380.00
10,000.00
18,230.00
95,000.00
24,310.00
56,520.00
99,250.00
200,550.00
194,480.00
74,140.00
106,140.00
82,040.00
103,310.00
18,630.00
13,400.00
39,900.00
114,650.00
91,160.00
72,930.00
2,500.00
4,500.00
44,560.00
70,490.00
42,540.00
86,470.00
75,020.00
66,730.00
58,420.00
42,000.00
23,890.00
31,600.00
42,180.00
70,490.00
53,500.00
81,100.00
13,370.00
18,530.00
45,000.00
26,810.00
22,680.00
41,930.00
7,900.00
48,620.00

320.00

27,340.00
10,730.00
18,810.00
3,030.00
28,560.00
16,810.00
4,950.00
10,330.00
47,590.00
2,500.00
8,200.00
37,070.00
72,930.00
59,550.00
8,090.00
97,240.00
53,060.00
382,880.00
126,410.00
11,000.00
9,510.00
18,230.00
47,800.00
50,000.00
115,220.00
110,360.00
85,350.00
81,700.00
300,220.00
401,110.00
108,780.00
35,850.00
150,000.00
125,000.00
65,000.00
35,000.00
50,000.00
303,870.00
350,000.00
450,000.00
38,890.00
316,030.00
75,000.00
65,000.00
401,110.00
425,420.00
546,970.00
303,870.00
334,260.00
650.00
32,210.00
1,820.00
10,330.00
233,370.00
300,220.00

1,653,080.00
173,810.00
1,531,530.00
347,630.00
210,000.00
772,450.00
4,315,020.00
224,850.00
30,990.00
36,460.00
20,050.00
2,430.00
36,460.00
16,280.00
20,930.00
27,770.00
40,530.00
53,050.00
68,500.00
84,720.00
3,000.00
4,600.00
6,000.00
11,000.00
14,000.00
32,730.00
54,220.00
8,710.00
6,090.00
5,500.00
46,490.00
7,040.00
103,830.00
433,930.00
25,000.00
929,860.00
650,000.00
200.00
200,000.00
29,460.00
310,000.00
19,000.00
65,800.00
1,000,000.00
570,000.00

DAFTAR ANALISA PEKERJAAN


Pekerjaan

: Pembuatan 1 Kamar Kos

Lokasi

LEDUG

T.Anggaran

: 2014

Luas Bangunan

: 16 m2

KODE ANALISA

JENIS & URAIAN PEKERJAN

KOEFISIEN SAT.
3

HARGA BORONGAN
HRG SAT(Rp)
6

A. PEKERJAAN PERSIAPAN
SNI - A.6.4a
M.005a
M.006
M.005a
L.008
L.002
L.007
L.010
L.008
L.010

Pengukuran dan Pemasangan Bouwplank (Kayu Albasia)

M'

Usuk 5/7 kayu Albasia


Paku Biasa ( 2" - 5" )
Papan kayu Albasia 3/20
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Pekerja
Mandor

M3
Kg
M3
OH
OH
OH
OH
OH
OH

1,828,300.00
15,800.00
1,828,300.00
50,000.00
65,000.00
65,000.00
65,000.00
50,000.00
65,000.00

M3

SNIB.6.1

0.0120
0.0200
0.0070
0.1000
0.1000
0.0100
0.0050
0.1000
0.0500

B. PEKERJAAN TANAH
SNI - B.6.1
L.008
L.010
SNI - B.6.9
L.008
L.010
SNI - B.6.11
M.001b
L.008
L.010

Galian Tanah Biasa Sedalam 1 meter


Pekerja
Mandor

0.7500 OH
0.0250 OH

Urugan Kembali
Pekerja
Mandor

M3
0.2500 OH
0.0083 OH

Urugan Pasir
Pasir urug
Pekerja
Mandor

M3
1.2000 M3
0.3000 OH
0.0100 OH

50,000.00
65,000.00
SNIB.6.9
50,000.00
65,000.00
SNIB.6.11
121,460.00
50,000.00
65,000.00

C. PEKERJAAN PONDASI BATU BELAH


SNI - C.6.3
M.001f
M.002a
M.001a
L.008
L.001
L.007
L.010
SNI - C.6.9
M.001f
M.001b
L.008
L.001
L.007
L.010

Pas. Pondasi Batu Belah 1 PC : 5 Psr


Batu Kali Belah
Portland Cement
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

M3
1.2000
136.00
0.5440
1.5000
0.7500
0.0750
0.0750

Pas. Pondasi Batu Kosong


Batu Kali Belah
Pasir Urug
Pekerja
Tukang Batu
Kepala Tukang
Mandor

M3
Kg
M3
OH
OH
OH
OH
M3

1.2000
0.4320
0.7800
0.3900
0.0390
0.0390

M3
M3
OH
OH
OH
OH

SNIC.6.3
176,610.00
1,500.00
173,220.00
50,000.00
60,000.00
65,000.00
65,000.00
SNIC.6.9
176,610.00
121,460.00
50,000.00
60,000.00
65,000.00
65,000.00

D. PEKERJAAN DINDING
SNI - D.6.18
M.001p
M.002a
M.001a
L.008
L.001
L.007
L.010

Dinding 1/2 Bata 1 PC : 5 PP


Bata
Portland Cement
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

M2
70.0000
22.7400
0.1020
0.6500
0.2000
0.0200
0.0300

Bh
Kg
M3
OH
OH
OH
OH

SNID.6.18
650.00
1,500.00
173,220.00
50,000.00
60,000.00
65,000.00
65,000.00

E. PEKERJAAN PLESTERAN
SNI - E.6.16
M.002a
M.001a
L.008
L.001
L.007
L.010

Plesteran 1 PC : 5 PP tb. 2 cm + Acian


Portland Cement
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

M2
6.9120
0.0350
0.4000
0.2000
0.0200
0.0220

Kg
M3
OH
OH
OH
OH

SNIE.6.16
1,500.00
173,220.00
50,000.00
60,000.00
65,000.00
65,000.00

G. PEKERJAAN BETON
SNI - G.6.13
M.002a
M.001
M.001g
L.008
L.001
L.007
L.010
SNI - G.6.25a
M.003
M.003a
L.008
L.003
L.007
L.010
M.010f
M.009b
M.009c

Membuat Beton Cor 1 PC : 2 Ps : 3 Kr


Portland Cement
Pasir Beton
Koral Beton ( Batu pecah 2/3 cm )
Pekerja
Tukang Batu
Kepala Tukang
Mandor

M3
336.00
0.5400
0.8100
2.0000
0.3500
0.0350
0.1000

Pembesian dengan Besi Beton Polos


Besi Beton Polos
Kawat Beton ( Bindrat )
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Kawat las listrik
Solar
Minyak pelumas

Kg
M3
M3
OH
OH
OH
OH
Kg

1.0500
0.0150
0.0070
0.0070
0.0007
0.0004
0.4000
0.3000
0.0400

Kg
Kg
OH
OH
OH
OH
Kg
Liter
Liter

SNIG.6.13
1,500.00
174,010.00
126,960.00
50,000.00
60,000.00
65,000.00
65,000.00
SNIG.6.25
11,750.00
19,440.00
50,000.00
60,000.00
65,000.00
65,000.00
29,460.00
5,500.00
46,490.00

H. PEKERJAAN ATAP
SNI - H.6.30
M.010k
L.008
L.002
L.007
L.010

Pas. Atap Genteng Plentong


Genteng Plentong
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

M2
21.0000
0.2000
0.1000
0.0100
0.0010

Bh
OH
OH
OH
OH

SNIH.6.2
2,500.00
50,000.00
65,000.00
65,000.00
65,000.00

I. PEKERJAAN LANGIT - LANGIT


SNI - I.6.21
M.007b
M.006h
L.008
L.002
L.007
L.010

SNI - I.6.20c
M.005s
M.006
M.006a
M.007
L.008
L.002
L.007
L.010

SNI - I.6.19a
M.005r
M.006a
L.008
L.002
L.007
L.010

Pas. Langit-langit Gypsum Board Tb. 9mm


Gypsum Board (120x240)cmx9mm
Paku Skrup
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

M2
0.3640
0.1100
0.1000
0.0500
0.0050
0.0050

Pas Langit-Langit Eternit (100x100) Rangka Ky Kruing


Usuk Meranti 5/7
Paku Plafond
Paku Eternit, Lis
Eternit ( 1,00 x 1,00 ) m
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

95,000.00
36,500.00
50,000.00
65,000.00
65,000.00
65,000.00

M2
0.012
0.06
0.01
1.1
0.18
0.32
0.032
0.009

Pas. Lis Langit-Langit Ky Kruing


Lis Kayu
Paku Eternit, Lis
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Lbr
Kg
OH
OH
OH
OH

SNII.6.21

M3
Kg
Kg
Lbr
OH
OH
OH
OH

5,600,000.00
15,800.00
20,660.00
10,000.00
50,000.00
65,000.00
65,000.00
65,000.00

M'
1.1
0.01
0.05
0.05
0.005
0.003

M'
Kg
OH
OH
OH
OH

5,000.00
20,660.00
50,000.00
65,000.00
65,000.00
65,000.00

L. PEKERJAAN LANTAI
SNI - L.6.44b
M.004b
M.002a
M.001a
M.002b
L.008
L.001
L.007
L.010

Pas. Lantai Keramik uk. ( 20 x 20 ) cm


Ubin Keramik 20 x 20 cm
Portland Cement
Pasir Pasang
Semen Warna
Pekerja
Tukang Batu
Kepala Tukang
Mandor

M2
25.0000
10.4000
0.0450
1.6200
0.7000
0.3500
0.0350
0.0350

Bh
Kg
M3
Kg
OH
OH
OH
OH

SNIL.6.44a
3,070.00
1,500.00
173,220.00
10,330.00
50,000.00
60,000.00
65,000.00
65,000.00

M. PEKERJAAN PENGECATAN
SNI - M.6.14
M.012a
M.011a
M.011a
L.008
L.004
L.007
L.010
SNI - M.6.14a
M.012a
M.011a.1
M.011a.1
L.008
L.004
L.007
L.010

Pengecatan Tembok Baru( 1 lps plamir, 1 lps cat dasar, 2 lps


cat penutup ) Sek. Mowilex untuk interior

M2

Plamir Tembok
Cat dasar ( sek. Mowilex )
Cat Penutup 2 kali ( sek. Mowilex )
Pekerja
Tukang Cat
Kepala Tukang
Mandor

Kg
Kg
Kg
OH
OH
OH
OH

0.1000
0.1000
0.2600
0.0200
0.0630
0.0063
0.0025

Pengecatan Tembok Baru( 1 lps plamir, 1 lps cat dasar, 2 lps


cat penutup ) Sek. Mowilex untuk Exterior

M2

Plamir Tembok
Cat dasar ( sek. Mowilex )
Cat Penutup 2 kali ( sek. Mowilex )
Pekerja
Tukang Cat
Kepala Tukang
Mandor

Kg
Kg
Kg
OH
OH
OH
OH

0.1000
0.1000
0.2600
0.0200
0.0630
0.0063
0.0025

SNIM.6.14
10,730.00
53,500.00
53,500.00
50,000.00
60,000.00
65,000.00
65,000.00
SNIM.6.14a
10,730.00
81,100.00
81,100.00
50,000.00
60,000.00
65,000.00
65,000.00

D. PEKERJAAN PENGECATAN
BOW - K.6+23b
M.011d
L.004
L.007
L.008
L.010

Pengecatan plapond 3x ( sek. Mollex )


Cat Tembok ( sek. Mollex)
Tukang Cat
Kepala Tukang
Pekerja
Mandor

M2
0.4000
0.1875
0.0188
0.1250
0.0062

Kg
OH
OH
OH
OH

BOWK.623b
13,370.00
60,000.00
65,000.00
50,000.00
65,000.00

E. PEKERJAAN BETON
BOW - F.8

Cetakan Beton Kayu Albasia

M.005a
M.006
L.002
L.007
L.008
L.010
L.009

Kayu Albasia
Paku Biasa ( 2" - 5")
Tukang Kayu
Kepala Tukang
Pekerja
Mandor
Pekerja Bongkar / Siram

0.0400
0.4000
0.5000
0.0500
0.2000
0.0100
0.4000

M2

BOWF.8

M3
Kg
OH
OH
OH
OH
OH

1,828,300.00
15,800.00
65,000.00
65,000.00
50,000.00
65,000.00
50,000.00

R ANALISA PEKERJAAN

HARGA BORONGAN
HARGA (Rp)
7=3X6
47,528.70
21,939.60
316.00
12,798.10
5,000.00
6,500.00
650.00
325.00
5,000.00
3,250.00

39,125.00
37,500.00
1,625.00
13,039.50
12,500.00
539.50
161,402.00
145,752.00
15,000.00
650.00

639,913.68
211,932.00
204,000.00
94,231.68
75,000.00
45,000.00
4,875.00
4,875.00
331,872.72
211,932.00
52,470.72
39,000.00
23,400.00
2,535.00
2,535.00

145,028.44
45,500.00
34,110.00
17,668.44
32,500.00
12,000.00
1,300.00
1,950.00

51,160.70
10,368.00
6,062.70
20,000.00
12,000.00
1,300.00
1,430.00

830,578.00
504,000.00
93,965.40
102,837.60
100,000.00
21,000.00
2,275.00
6,500.00
28,764.20
12,337.50
291.60
350.00
420.00
45.50
26.00
11,784.00
1,650.00
1,859.60

69,715.00
52,500.00
10,000.00
6,500.00
650.00
65.00

47,495.00
34,580.00
4,015.00
5,000.00
3,250.00
325.00
325.00
111,819.60
67,200.00
948.00
206.60
11,000.00
9,000.00
20,800.00
2,080.00
585.00
11,976.60
5,500.00
206.60
2,500.00
3,250.00
325.00
195.00

177,429.50
76,750.00
15,600.00
7,794.90
16,734.60
35,000.00
21,000.00
2,275.00
2,275.00

25,685.00
1,073.00
5,350.00
13,910.00
1,000.00
3,780.00
409.50
162.50
35,621.00
1,073.00
8,110.00
21,086.00
1,000.00
3,780.00
409.50
162.50

24,469.75
5,348.00
11,250.00
1,218.75
6,250.00
403.00

145,852.00
73,132.00
6,320.00
32,500.00
3,250.00
10,000.00
650.00
20,000.00

DAFTAR HARGA SATUAN PEKERJAAN (HSP)

NO

KODE ANALIS

SATUAN

JENIS PEKERJAAN

A.
2
3
4
5
6

PEKERJAAN PERSIAPAN
SNI - A.6.4a
M'
SNI - A.6.10
Bh
SNI - A.6.11
M2
SNI - A.6.13
M3
SNI - A.6.14
M3

Pengukuran & Pas.Bouwplank Kayu Albasia


Pemb. Bak Adukan Uk.(40x50x20)cm Ky.Albasia
Pembuatan Steger dari Bambu
Bongkaran Beton Bertulang
Bongkaran Dinding Tembok Bt.Merah

B.
1
2
5
6
7
8
9

PEKERJAAN TANAH
SNI - B.6.1
SNI - B.6.2
SNI - B.6.9
SNI - B.6.10
SNI - B.6.11
SNI - B.6.15
Up+SNI - B.6.15

Galian Tanah Biasa Sedalam 1 M


Galian Tanah Biasa Sedalam 2 M
Urugan Kembali
Pemadatan Tanah (per 20 cm)
Urugan Pasir
Urugan Sirtu
Urugan Tanah

M3
M3
M3
M3
M3
M3
M3

C. PEKERJAAN PONDASI BATU KALI


1 SNI - C.6.3
M3
Pas. Pondasi Batu Belah 1 PC : 5 Psr
2 SNI - C.6.9
M3
Pas. Pondasi Batu Kosong
D.
16
20
21

PEKERJAAN DINDING
SNI - D.6.18
M2
SNI - D.6.22
M2
SNI - D.6.23
M2

Dinding 1/2 Bata 1 Pc : 5 Pp


Dinding terawang (roster) uk.(12x11x24 cm), 1 PC : 3 PP
Dinding terawang (roster) uk.(12x11x24 cm), 1 PC : 4 PP

E. PEKERJAAN PLESTERAN
1 SNI - E.6.16
M2
2 SNI - E.6.20
M'

Plesteran 1 PC : 5 PP tb. 2 cm
Plesteran Skoneng 1 PC : 2 PP lebar 1 cm

F.
1
10
13
14
43

PEKERJAAN KAYU
SNI - F.6.1
SNI - F.6.5
SNI - F.6.6
SNI - F.6.7
SNI - F.6.29

M3
M2
M2
M2
M'

Pas. Kusen pintu dan Jendela Ky.Kalimantan


Pas. Pintu Panil Kayu Jati
Pas. Pintu dan Jendela Kaca Ky. Jati
Pas. Pintu dan Jendela Jalusi Ky. Jati
Pas. Lisplank woodplank 30

G.
1
3
4

PEKERJAAN BETON
SNI - G.6.1
SNI - G.6.7
SNI - G.6.13

M3
M3
M3

Membuat Beton Tumbuk 1Pc:3Ps:5Kr


Membuat Beton Cor 1Pc:2Ps:2,5Kr
Membuat Beton Cor 1Pc:2Ps:3Kr

5
9
10
19
20
25

SNI - G.6.25
SNI - H.6.10
SNI - H.6.11a
SNI - H.6.38
SNI - H.6.39
SNI - H.6.42

H. PEKERJAAN ATAP
1 SNI - H.6.30
2 SNI - H.6.30a

Kg
M2
M'
M2
M2
M2

Pembesian dengan Besi Beton Polos


Pas. Atap Genteng Keramik sek. KIA / m. Class
Pas. Atap Genteng Nok Keramik sek. KIA / m. Class
Pas. Atap Seng Gelombang BJLS 30
Pas. Atap Nok Seng
Pas. Aluminium Foil / Sisalation

M2
M'

Pas. Atap Genteng Beton


Pas. Atap Genteng Nok Beton

I.
14
15
16
17
J.
1
2
4
10
12
19
20
21
23
24
25
26
28
29

PEKERJAAN LANGIT - LANGIT


SNI - I.6.21
M3
SNI - I.6.24
M2
M'
SNI - I.6.19a
M2
SNI - I.6.20c
PEKERJAAN SANITASI
SNI - J.6.1
Bh
SNI - J.6.2
Bh
SNI - J.6.5
Bh
SNI - J.6.17
Bh
SNI - J.6.19
M'
SNI - J.6.25
M'
SNI - J.6.26
M'
SNI - J.6.27
M'
SNI - J.6.29
M'
SNI - J.6.31
M'
SNI - J.6.32
M'
SNI - J.6.33
Bh
SNI - J.6.35a
Bh
SNI - J.6.36
Bh

K.
2
4
5
8
9
10
15
16

PEKERJAAN KUNCI DAN KACA


SNI - K.6.2
Bh
SNI - K.6.5
Bh
SNI - K.6.6
Bh
SNI - K.6.9.a
Bh
SNI - K.6.10
Bh
SNI - K.6.11
Bh
SNI - K.6.17
Bh
SNI - K.6.18
Bh

Pasang Kunci Tanam Biasa


Pasang Engsel Pintu
Pasang Engsel Jendela Kupu-kupu
Pasang Kait Angin model antik
Pasang Door Closer
Pasang Kunci Selot
Pasang Kaca tb. 5mm
Pasang Kaca tb. 8mm

L.
7
8
9
11
14
15
16
17
18
19
23
28
32
38

PEKERJAAN LANTAI
SNI - L.6.42
SNI - L.6.43
SNI - L.6.43a
SNI - L.6.43c
SNI - L.6.44b
SNI - L.6.47
SNI - L.6.47
SNI - L.6.47a
SNI - L.6.47b
SNI - L.6.47c
SNI - L.6.47d
SNI - L.6.47h
SNI - L.6.48d
SNI - L.6.48h
SNI - L.6.68e

Lantai Parquet Jati


Pas. List Keramik Artistik 7 x 20 cm
Pas. Plint Keramik (10 x 20) cm
Pas. Plint Keramik (10 x 40) cm
Pas. Lantai Keramik 20 x 20 cm (Klas C)
Pas. Lantai Keramik 33 x 33 cm (Klas C)
Pas. Lantai Granit 60 x 60
Pas. Lantai Keramik 40 x 40 cm (Klas A)
Pas. Lantai Keramik 40 x 40 cm (Klas B)
Pas. Lantai Keramik 40 x 40 cm (Klas C)
Pas. Lantai Keramik 40 x 40 cm (Klas D)
Pas. Lantai Keramik 30 x 30 cm (Klas D)
Pas. Lt.Keramik Anti Slip 40x40 cm (Klas D)
Pas. Lt.Keramik Anti Slip 30x30 cm (Klas D)
Pas. Dinding Keramik 20x25 cm (Klas D)

M.
11
12
23
24

PEKERJAAN PENGECATAN
SNI - M.6.14
M2
SNI - M.6.14a
M2
SNI - M.6.7
M2
BOW - K.6+23c
M2

M1
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

Pas. Langit-langit Gypsum Board Tb. 9mm


Langit-langit Gypsum board tb.9mm
Pas Lis Langit-Langit Ky Kruing
Langit-langit Eternit
Pasang Kloset Duduk / Monoblok
Pasang Kloset Jongkok Porselen
Pasang Wastafel
Pas. Bak Kontrol pas.Bt.Bata uk.(45x45)cm T:50 cm
Pasang Pipa Galvanis diam. 1/2" med. B
Pasang Pipa PVC diam. 1/2" type AW
Pasang Pipa PVC diam. 3/4" type AW
Pasang Pipa PVC diam. 1" type AW
Pasang Pipa PVC diam. 2" type AW
Pasang Pipa PVC diam. 3" type AW
Pasang Pipa PVC diam. 4" type AW
Pasang Bak Cuci Piring Stainless Steel
Pasang Kran diameter 1/2"
Pasang Floor Drain

Mengecat Tembok Baru utk interior(sek.Mowilex)


Mengecat Tembok Baru utk exterior (sek.Mowilex)
Mengecat Kayu (Avian/setara)
Mengecat Genteng (Tamitex/setara)

M.
1
2
7
8
9
10
20
21
22
23

PEKERJAAN BESI DAN ALUMUNIUM


SNI - N.6.1
Kg
Memasang 1 kg besi profil
SNI - N.6.2
Kg
Memasang 1 kg rangka kuda-kuda baja IWF
SNI - N.6.7
M2
Memasang 1 m2 pintu rolling door besi
SNI - N.6.8
M2
Memasang 1 m2 pintu lipat (Folding door) 0,4
SNI - N.6.8a
M2
Memasang 1 m2 pintu lipat (Folding door) 0,5
SNI - N.6.8b
M2
Memasang 1 m2 pintu lipat (Folding door) 0,8
SNI - N.6.14
M2
Memasang 1 m2 venetions blinds (tirai)
SNI - N.6.14a
M2
Memasang 1 m2 vertical blinds (tirai)
SNI - N.6.15
M2
Memasang 1 m2 teralis besi strip (2 x 3) mm
SNI - N.6.16
M2
Memasang 1 m2 kawat nyamuk
ANALISA BOW

A. PEKERJAAN PAVING
3 BOW - KPU.IVc
M2
7 BOW - KPU.IVg
M2

Pas. Paving Blok Sek. Aldas T = 8cm K-400


Pas. Batu Andesit 20/20 cm (ex. Baseh) T= 6 cm

B. PEKERJAAN KAP BESI


1
BOW - I.a
Kg

Pekerjaan Kap Besi

C. PEKERJAAN KAYU
31
BOW - F.36s

M2

Jendela Kaca 5 mm Kayu Jati tebal 3 cm

M2

PEKERJAAN PENGECATAN
Mengecat Plapond 3x jadi ( Sek. Maxilite )

D.
3

BOW - K.6+23b

PEKERJAAN BETON
E. PEKERJAAN BETON
1
BOW - F.8
F.
1
2
3
4
5
6
7
8
11
12
13
1
2
3
4
5
6
7
8
11

M2

Cetakan beton Kayu Albasia


PEKERJAAN PASANGAN BATU GRANIT
PEKERJAAN PEMASANGAN BATU GRANIT
BOW-G.13
M3
Perekat camp. 1 Pc : 1 Psr
BOW-G.14
M3
Perekat camp. 1 Pc : 2 Psr
BOW-G.69
M3
Upah Pasang Tegel
BOW-G.77
M2
Upah Pasang Lembaran Batu Granit
BOW-Supl.IVa
M2
Pasang lantai Batu Granit
BOW-Supl.IVb
M2
Pasang Pelapis Dinding Batu Granit
BOW-Supl.IVc
M2
Pelapisan Coating 3x ( sebelum dipasang )
BOW-Supl.IVd
M2
Pelapisan Coating 1x ( setelah dipasang )
BOW-Supl.IV.e
M2
Pemolesan Lantai Batu Granit ( sampai mengkilap )
BOW-Supl.IVg
M2
Penyemiran Lantai
BOW-Supl.IVh
M2
Pasang Tegel Batu Candi
BOW-Supl.IVi
M2
Pasang Koral Sikat
PEKERJAAN LAIN - LAIN
Up.SNI-H.6.1
M2
Upah Pas. Genteng lama
Ls.01
Bh
Pas. Grendel pintu
Ls.02
Bh
Pas. Grendel jendela
Ls.03
Bh
Pas. Tarikan jendela
Ls.04
Daun
Pas. Kaca Nako 5 mm + Tralis
Ls.05
Kg
Pas. Besi, Doog, Angkur
Ls.06
Kg
Pas. Begel
Ls.07
M'
Pas. Tutup Lisplank Kayu Kruing Lapis Seng
Ls.11
Titik
Pas. Instalasi Titik Cahaya / Lampu

12
13
14
15
16
17

Ls.12
Ls.13
Ls.14
Ls.15
Ls.16
Ls.16.a

Titik
Titik
Unit
Unit
Unit
Unit

Pas. Instalasi Stop Kontak


Pas. A r d e
Biaya Administrasi Sambungan Listrik ( PLN ) 900 watt
Biaya Administrasi Sambungan Listrik ( PLN ) 450 watt
Biaya Administrasi Sambungan Listrik ( PLN ) 1300 watt
Biaya Administrasi Sambungan Listrik ( PLN ) 2200 watt

18
19
20
21
22
23
24
25
26
27
28
29
30
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

Ls.17
Ls.18
Ls.19
Ls.20
Ls.21
Ls.22
Ls.23
Ls.24
Ls.25
Ls.26
Ls.27
Ls.31
Ls.32
Ls.34
Ls.35
Ls.36
Ls.37
Ls.38
Ls.39
Ls.40
Ls.41
Ls.42
Ls.43
Ls.44
Ls.45
Ls.46
Ls.47
Ls.51

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M'
M'
M'
M'
M2
Unit
Unit
Bh
Bh
Btg
Bh
Bh
Bh
Bh
Bh
Bh
set
Unit

47
48
49
50
51
57
59
60
61

Ls.54
Ls.54a
Ls.54b
Ls.54c
Ls.54d
Ls.58
Ls.59a
Ls.59b
Ls.59c

M2
M2
M2
M2
M2
M'
M2
M2
M2

Pas. Shock 1/2" PVC


Pas. Shock 3/4" PVC
Pas. Shock 2" PVC
Pas. Shock 3" PVC
Pas. Shock 4" PVC
Pas. Kenie 1/2" PVC
Pas. Kenie 3/4" PVC
Pas. Kenie 2" PVC
Pas. Kenie 3" PVC
Pas. Kenie 4" PVC
Pas. Saluran U 20 dengan buis beton
Pas. Papan Sanggan Talang 2 x 20 cm kayu kruing
Pas. Papan Suri - suri 2 x 20 cm Kayu Kruing
Pas. Kawat Duri
Pengrosokan Halaman tebal 7 cm
Pas. Lampu TL 20 watt sek. Phillips
Pas. Lampu TL 40 watt sek. Phillips
Pas. Lampu Pijar sek. Phillips
Pas. Lampu SL 18 watt
Pas. Talang PVC U 20 sek. Maspion
Pas. Tutup Talang PVC U
Pas. Hak Talang PVC U
Pas. Kenie Talang PVC U
Pas. Corong Talang PVC U
Pas. Sarangan Stainless steel
Step nosing/ plint tangga
Pas. pintu PVC uk. 70 cm lengkap
Bongkar pasang dastang
Rangka Atap Baja Ringan Galvanis / Zincallum
Penutup Atap Genteng Metal dg Bentang < 7 m'
Penutup Atap Genteng Metal dg Bentang 7 m' X 9 m'
Penutup Atap Genteng Metal dg Bentang 9 m' < X 11 m'
Penutup Atap Genteng Metal dg Bentang 11 m' < X 13 m'
Penutup Atap Genteng Metal dg Bentang 13 m' < X 15 m'
Talang Datar + Rangka
Pasang Atap Galvalum Tebal 0,30 mm
Pasang Atap Galvalum Tebal 0,35 mm
Pasang Atap Galvalum Tebal 0,40 mm

Purwokerto,

RGA SATUAN PEKERJAAN (HSP)

HRG SATUAN (Rp)

47,528.70
104,020.30
31,637.50
354,995.00
335,495.00

39,125.00
47,925.00
13,039.50
28,250.00
161,402.00
169,261.00
122,125.00

639,913.68
331,872.72

145,028.44
139,168.04
135,187.70

51,160.70
34,361.86

19,636,580.00
1,472,915.00
937,299.00
2,192,915.00
71,348.00

632,265.40
818,642.60
830,578.00

28,764.20
69,715.00
50,180.00
42,406.80
26,791.60
44,775.00
69,715.00
50,180.00

47,495.00
47,495.00
11,976.60
111,819.60
1,993,729.80
432,442.20
563,327.80
376,046.40
35,674.00
10,557.00
13,037.00
15,207.00
30,560.50
59,592.00
97,335.00
277,387.50
27,585.75
43,935.00
142,755.00
161,523.75
136,523.75
61,523.75
342,282.50
365,365.00
120,698.75
233,279.50

356,453.50
58,347.91
18,836.41
19,368.11
177,429.50
189,664.50
472,364.50
161,764.50
160,784.50
178,074.50
189,134.50
180,149.40
206,074.50
187,508.80
186,958.16

25,685.00
35,621.00
23,199.80
32,621.75

20,456.00
20,812.50
444,060.00
453,800.00
478,110.00
599,660.00
275,315.00
342,165.00
352,309.02
79,780.54
ANALISA BOW
162,282.00
352,142.00

24,544.00

216,000.00

24,469.75
PEKERJAAN BETON
145,852.00

RJAAN PASANGAN BATU GRANIT


1,870,154.00
1,338,959.00
43,250.00
585,500.00
897,689.17
1,503,345.98
29,202.00
18,548.00
211,841.20
12,245.70
257,414.12
222,799.12
PEKERJAAN LAIN - LAIN
13,415.00
6,500.00
5,000.00
5,000.00
20,000.00
7,500.00
7,500.00
15,000.00
180,000.00

180,000.00
180,000.00
900,000.00
700,000.00
1,150,000.00
1,600,000.00

2,000.00
2,500.00
4,000.00
7,000.00
12,500.00
2,500.00
3,000.00
5,000.00
12,500.00
25,000.00
98,249.68
60,000.00
30,000.00
3,500.00
3,250.00
72,000.00
94,000.00
4,500.00
36,000.00
85,000.00
3,000.00
4,250.00
3,650.00
8,500.00
25,000.00
12,000.00
325,000.00
300,000.00
161,100.00
168,000.00
185,400.00
191,900.00
200,100.00
153,300.00
72,000.00
78,000.00
84,000.00

Purwokerto,
2014
Dibuat Oleh :
CV. GITA KARYA INDAH

SUDODO
Direktur

RENCANA ANGGARAN BIAYA


Pekerjaan
Lokasi
T.Anggaran
Luas Bangunan

NO.

A.

: Pembuatan 1 Kamar Kos Ukuran 4X4


: LEDUG
: 2014
: 16m2

MACAM PEKERJAAN

PEKERJAAN PERSIAPAN
1 Pengukuran & Pas.Bouwplank Kayu Albasia

ANALISA

VOLUME

SNI - A.6.4a

16.00

SAT.

M'

SUB TOTAL PEKERJAAN PERSIA


B.

PEKERJAAN TANAH
1 Galian Tanah Biasa Sedalam 1 M
2 Urugan Tanah kembali
3 Urugan Pasir Bawah Pondasi

SNI - B.6.1
SNI - B.6.9
SNI - B.6.11

12.80
0.80
0.56

M3
M3
M3

SUB TOTAL PEKERJAAN TA


C.

PEKERJAAN PONDASI BATU KALI


1 Pas. Pondasi Batu Belah 1 PC : 5 Psr
2 Pas. Pondasi Batu Belah Kosong

SNI - C.6.3
SNI - C.6.9

6.40
1.68

M3
M3

SUB TOTAL PEKERJAAN PONDASI BATU K


D.

PEKERJAAN DINDING
1 Pasang Dinding 1/2 Bata 1 Pc : 5 Pp

SNI - D.6.18

48.00

M2

SUB TOTAL PEKERJAAN DIND


E.

PEKERJAAN PLESTERAN
1 Plesteran 1 PC : 5 PP tb. 2 cm

SNI - E.6.16

96.00

M2

SUB TOTAL PEKERJAAN PLESTE


F.

PEKERJAAN BETON
1 Sloof 15/20
Pembesian
Membuat Beton Cor 1Pc:2Ps:3Kr
Cetakan beton Kayu Albasia

Ls
SNI - G.6.13
BOW - F.8

86.51
0.48
6.40

Kg
M3
M2

2 Kolom 15/15
Pembesian
Membuat Beton Cor 1Pc:2Ps:3Kr
Cetakan beton Kayu Albasia

Ls
SNI - G.6.13
BOW - F.8

61.73
0.27
7.20

Kg
M3
M2

3 Ring Balk 15/20


Pembesian
Membuat Beton Cor 1Pc:2Ps:3Kr
Cetakan beton Kayu Albasia

Ls
SNI - G.6.13
BOW - F.8

86.51
0.48
6.40

Kg
M3
M2

SUB TOTAL PEKERJAAN BE


G.

PEKERJAAN LANTAI DAN KERAMIK


1 Pas. Lantai Keramik uk. ( 20 x 20 ) cm

SNI - L.6.44b

16.00

M2

SUB TOTAL PEKERJAAN LANTAI DAN KERA


H.

PEKERJAAN PINTU DAN JENDELA


1 Pas. Pintu dan Kusen
2 Pas. Jendela

Ls
Ls

1.00
1.00

unit
unit

SUB TOTAL PEKERJAAN PINTU DAN JEND

NO.

I.

MACAM PEKERJAAN

PEKERJAAN ATAP
1 Pas. Konstruksi Rangka Atap Baja Ringan dan Genteng

ANALISA

Ls

VOLUME

20.47

SAT.

M2

SUB TOTAL PEKERJAAN A


J.

PEKERJAAN LANGIT - LANGIT


1 Pas. Langit-langit Gypsum Board Tb. 9mm
2 Pas Langit-Langit Eternit (100x100) Rangka Ky Kruing
3 Pas. Lis Langit-Langit Ky Kruing

SNI - I.6.21
SNI - I.6.20c
SNI - I.6.19a

16.00

M2

16.00

M2

16.00

M'

SUB TOTAL PEKERJAAN LANGIT-LAN


K.

PEKERJAAN PENGECATAN
1 Mengecat Tembok Luar (Mowilex/setara)
2 Mengecat Tembok Dalam (Mopwilex/setara)
3 Mengecat Plapond 3x jadi ( Catylac/Setara )

SNI - M.6.14a
48.00
M2
SNI - M.6.14
48.00
M2
BOW - K.6+23b
16.00
M2
SUB TOTAL PEKERJAAN PENGECA

A ANGGARAN BIAYA

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

47,528.70

760,459.20

SUB TOTAL PEKERJAAN PERSIAPAN :

760,459.20

39,125.00
13,039.50
161,402.00

500,800.00
10,431.60
90,385.12

SUB TOTAL PEKERJAAN TANAH :

601,616.72

639,913.68
331,872.72

4,095,447.55
557,546.17

SUB TOTAL PEKERJAAN PONDASI BATU KALI :

4,652,993.72

145,028.44

6,961,365.12

SUB TOTAL PEKERJAAN DINDING :

6,961,365.12

51,160.70

4,911,427.20

SUB TOTAL PEKERJAAN PLESTERAN :

4,911,427.20

28,764.20
830,578.00
145,852.00

2,488,506.00
398,677.44
933,452.80

28,764.20
830,578.00
145,852.00

1,775,556.54
224,256.06
1,050,134.40

28,764.20
830,578.00
145,852.00

2,488,506.00
398,677.44
933,452.80

SUB TOTAL PEKERJAAN BETON :

10,691,219.48

177,429.50

2,838,872.00

SUB TOTAL PEKERJAAN LANTAI DAN KERAMIK :

2,838,872.00

1,000,000.00
570,000.00

1,000,000.00
570,000.00

SUB TOTAL PEKERJAAN PINTU DAN JENDELA :

1,570,000.00

HARGA SATUAN
(Rp)

JUMLAH HARGA
(Rp)

175,000.00

3,582,250.00

SUB TOTAL PEKERJAAN ATAP :

3,582,250.00

47,495.00

759,920.00

111,819.60

1,789,113.60

11,976.60

191,625.60

SUB TOTAL PEKERJAAN LANGIT-LANGIT :

2,740,659.20

35,621.00
25,685.00
24,469.75
SUB TOTAL PEKERJAAN PENGECATAN :

1,709,808.00
1,232,880.00
391,516.00
3,334,204.00

JUMLAH :
PPN 10% :
JUMLAH TOTAL :
DIBULATKAN :

42,645,066.64
4,264,506.66
46,909,573.30
46,909,000.00

REKAPITULASI ANGGARAN BIAYA


Pekerjaan
: Pembuatan 1 Kamar Kos
Lokasi
: LEDUG
T.Anggaran
: 2014
Luas Bangunan : 16 m2

NO.

JUMLAH HA
(Rp)

MACAM PEKERJAAN

PEKERJAAN PERSIAPAN

PEKERJAAN TANAH

PEKERJAAN PONDASI BATU KALI

PEKERJAAN DINDING

PEKERJAAN PLESTERAN

PEKERJAAN BETON

PEKERJAAN LANTAI DAN KERAMIK

PEKERJAAN PINTU DAN JENDELA

PEKERJAAN ATAP

10 PEKERJAAN LANGIT - LANGIT


11 PEKERJAAN PENGECATAN

JUMLAH :
PPN 10 %
JUMLAH TOTAL :
DIBULATKAN :

Rp.
Rp.
Rp.
Rp.

ASI ANGGARAN BIAYA

JUMLAH HARGA
(Rp)

760,459.20
601,616.72
4,652,993.72
6,961,365.12
4,911,427.20
10,691,219.48
2,838,872.00
1,570,000.00
3,582,250.00
2,740,659.20
3,334,204.00

42,645,066.64
4,264,506.66
46,909,573.30
46,909,000.00

2 kamar

ukuran

3X4

2 unit

LUAS BANGUNAN

9x9
8

24.00 m2

pondasi
jml sisi

0.5

0.5

22

5.50 m3

0.3

0.15

22

0.99 m3

0.8

22

17.60 m3

batu kosong

galian

urugan kembali
5.87 m3
Urugan Pasir
0.05

0.5

22

1.96 m3

21

67.20 m2

dinding
3.2
plessteran
134.40 m2
Sloof 15/20
pembesiandim.12

koefisien besi dim.12


10.7
22

4 0.891667

78.47 kg

begel dim,8
3m

20

0.35

0.395

2.77
5.53

8m

54

0.35

0.395

7.47
14.93

jumlah

koefisien besi dim.8


4.74

20.46 kg

cetakan beton
0.15

22

0.15

0.2

3.30

beton cor
22

0.66 m3

Kolom 15/15
pembesian dim 10

koefisien besi dim.10


7.4
3

0.617
6 kolom

7.40
44.40

begel dim 8
20

0.3

0.395

2.37

6 kolom

14.22

Jml

58.62 kg

cetakan kayu
0.15

0.45
6 kolom

2.70 m2

beton cor
0.15

0.15

3
6 kolom

Keramik lantai
uk.20x20
1 kamar
2 kamar

0.07
0.41 m3

2.7
2.7

3.7
3.7

9.99
9.99
19.98 m2

2.7
2.7

3.7
3.7

9.99
9.99
19.98 m2

24.00 m2

2.7
3.7

3
3

2
2

16.20
11.10
27.30

2.7
3.7

3
3

2
2

16.20
22.20
29.16

Plafon
1 kamar
2 kamar

Baja Ringan

pengecetan
dalam
kamar 1

kamar 2

jml

56.46 m2

2 muka

24.00
48.00

2 muka

9.00
18.00

Jml

66.00 m2

Luar
3

LIS GYPSUM

2 KAMAR

25.6

25.60 M'

koefisien besi dim.12


12

0.892

koefisien besi dim.8


12

0.395

koefisien besi dim.10


12

0.617