A. BAHAN ATAP
37 Nok Genteng Surya, pjg 80 cm
38 Nok Genteng Sakura, pjg 80 cm
39 Genteng Metal Multi Roof Kasar pjg. 77, lb. 100 cm
44 Genteng Metal Sakura Kasar pjg 77 lb, 80 cm
45 Genteng Metal Star Licin pjg 77 lb. 80 cm
46 Seng BWG 33 BJLS 0,20 MM
47 Seng BWG 28 BJLS 0,35 MM
48 Seng Gelombang bjls 0,35 (6 Kaki)
49 Seng Gelombang bjls 0,30 (6 Kaki)
50 Seng Gelombang bjls 0,25 (6 Kaki)
51 Seng Gelombang bjls 0,20 (7 Kaki)
52 Seng Gelombang bjls 0,20 (10 Kaki)
53 Seng Plat bjls 0,35 (6 KK)
54 Seng Plat bjls 0,30 (6 KK)
55 Seng Plat bjls 0,20 (6 KK)
B. BAHAN DASAR
1 Batu Kali
2 Batu kali Belah
3 Batu Gunung
4 Batu gunung Belah 10 - 15 cm
5 Batu Pecah 7 - 10 cm
6 Batu Pecah 5 - 7 cm
7 Batu Pecah 3 - 5 cm
8 Batu Pecah 2 - 3 cm
9 Batu Pecah 1- 2 cm
10 Batu Pecah 0,5 - 1 cm
D 'BAHAN BESI
1 Angker Mur Baut Kecil
2 Angker Baut Tinggi 70 cm
3 Baut Diameter 12 mm x 10 cm (stainless) wf 150
4 Baut Diameter 12 mm x 12,50 cm (stainless)
5 Baut Diameter 12 mm x 18 cm
6 Baut Diameter 12 mm x 20 cm
7 Baut Diameter 12 mm x 25 cm
8 Baut Diameter 12 mm x 30 cm
9 Baut Skrup
10 Baut Baja
11 Besi Streep 30 x 3 mm
12 Besi Hollow 40.60.1,2 mm P = 6 m
13 Besi Hollow 40.60.1 mm P = 6 m
14 Besi Hollow 40.40. 2 mm P = 6 m /40.40. 1,8 P = 6
15 Besi Hollow 40.40.1,5 mm P = 6 m
16 Besi Hollow 40.20.2 mm P =6 m40.1,6 mm P =6 m
17 Besi Hollow 40.20.1,5 mm P =6 m
18 Besi Hollow 40.20.1,2 mm P = 640.20.1 mm P = 6
19 Besi Hollow 20.20.1,5 mm P = 6 m
20 Plat Besi Kembang 2,3 mm
21 Besi Metal Stud L. 76 mm
22 Besi Siku L. 30.30.3/ 2,8 mm
23 Besi siku L. 40.40.4/ 3,8 mm
24 Besi siku L. 50.50.5/ 4,8 mm
25 Besi Siku L. 60. 60. 6/ 5,8 mm
26 Besi Siku L. 70. 70. 7 / 6,8 mm
27 Besi Siku L. 70.70.6 / 5 mm
28 Besi Siku L.100.100.10
29 Besi Beton Polos 6 mm ( 0, 22 kg / M' ) (5,7)
30 Besi Beton Polos 8 mm ( 0,39 kg / M' ) (7,8)
31 Besi Beton polos 10 mm ( 0, 62 kg / M' ) (9,8)
32 Besi Beton Polos 12 mm ( 0, 89 kg / M' ) (11,8)
33 Besi Beton 14 mm ( 1, 21 kg / M' ) (13,8)
34 Besi Beton 16 mm ( 1, 39 kg / M' ) (15,8)
35 Besi Beton 19 mm ( 2, 23 kg / M' )
36 Besi Beton 20 mm ( 2, 46 kg / M' )
37 Besi Beton Ulir Dia 8 mm ( 0, 39 kg / M' ) ulir 10 full
38 Besi Beton Ulir Dia. 16 mm SNI
39 Besi Plat 1,5mm 1,2 mm
40 Besi Plat 2 mm (1,8)
41 Besi Plat 2,5mm
42 Besi Plat 3 mm (2,8)
43 Besi Plat 3,5mm
44 Besi Plat 4 mm
45 Besi Plat 4,5mm
46 Besi Plat 5 mm (4,8)
47 Besi Plat 5,5mm
48 Besi Plat 6 mm (5,8)
49 Besi Plat 8 mm (7,8)
50 Besi Plat 9 mm 10 mm (9,8)
51 Besi Plat T = 12 mm Ukr. 120x240
52 Besi Plat T = 16 mm Ukr. 120x240
53 Besi Plat T = 18 mm Ukr. 120x240
54 Baja Tulangan ( Polos ) U24 ᶲ 6
55 Baja Tulangan ( Polos ) U24 ᶲ 8
56 Baja Tulangan ( Polos ) U24 ᶲ 10
57 Baja Tulangan ( Polos ) U24 ᶲ 12
58 Baja Tulangan ( Polos ) U24 ᶲ 16
59 Baja Tulangan ( Polos ) U24 ᶲ 16
60 Baja Tulang ( Ulir ) D32, D39 16
61 Baja Tulang ( Ulir ) D32, D39 18
62 Besi Profil H 200x200 P = 12 meter
63 Besi Profil H 100x100 P = 12 meter
64 Besi IWF 300 P = 12 meter
65 Besi IWF 200 P = 12 meter
66 Besi UNP 100 P = 6 meter
67 Beugel kap V Plat Besi
68 Kawat Ikat Beton 1 roll 20 Kg
69 Kawat Dul ( 1 Roll = M ')
70 Kawat Ram Lubang 3,0 cm ( Rang Armonika )
71 Kawat Nyamuk plastik Rang 1 cm L. 1,20 Rang 2 cm
72 Kawat Nyamuk Aluminium
73 Kawat Nyamuk Baja
74 Kawat Las 2,6 nikko
75 Kawat Saringan Pasir / Ayakan
76 Kawat Bronjong
77 Karet Untuk Pintu dan Jendela Aluminium PVC
78 Door Closer Set
79 Kanopi Polycarbonite + Rangka Besi Tempa Biasa 400 per roll
80 Kanopi Polycarbonite + Rangka Besi Tempa Biasa 500
81 Lem Kayu Dan Karet ( Fox ) Besar ( 800 gr )
82 Lem Karet ( Fox ) Besar 450 10 kg
83 Lem Seng
84 Lembaran Atap Ploycarbonite untuk Kanopi Tebal 6 mm
85 Lembaran Atap Ploycarbonite untuk Kanopi Tebal 5 mm
86 Paku Campuran ( 5-10 cm )
87 Paku Asbes dan Karet
88 Paku 5 cm 7 cm 10 cm
89 Paku ( 1 1/2 - 2 1/2 cm ) ( setara Paku 2-3 cm )
90 Paku 4 cm
91 Paku 2-3 cm
92 Paku Sirap ( Setara Paku 2-3 cm )
93 Paku Seng ( 1 kg/ Dos )
94 Paku Skrup 5 cm
95 Paku Skrup Besi Hollow - 1000 Biji Per dos ( bdrilling 450 b = 4,5 cm )
96 Paku skrup Gyapsum - 500 biji per dos bungkus
97 Paku Jembatan
98 Paku Beton 5 cm
99 Paku Beton 6 cm
100 Paku Beton 7 cm - 10 cm
101 Paku Payung Berulir ( 1 kg/ Dos )
102 Paku Asbes Berulir
103 Paku Asbes Biasa
104 Paku Tripl ( Setara Paku 2-3 cm)
105 Paku Eter ( Setara Paku 2-3 Cm )
106 Paku Ripet
107 Skamp ( Paku Tembak Hollow alumunium )
108 pagar Jadi Besi ( Tinggi 1 M )
109 Pagar Pracetak - 5 panel
110 Pagar Pracetak - 6 panel
111 Pagar Pracetak - 7 panel
112 Tiang Beton untuk 5 Daun
113 Tiang Beton untuk 6 Daun
114 Tiang Beton untuk 7 Daun
115 Rangka Baja Ringan 0,75
116 Spandek 0,25 silver
117 Spandek 0,35 silver
118 Spandek 0,4 silver
119 Spandek 0,45 0,35
120 Nok Spandek
121 Hollow Aluminium Rangka Plafond 0,25 (2x4)
122 Hollow Aluminium Rangka Plafond 0,3 2x4/4x4
123 Hollow Aluminium Rangka Plafond 40 X 20 X 2 mm
124 Hollow Aluminium Rangka Plafond 40 X 40 X 2 mm
125 Hollow Aluminium Rangka Plafond 40 X 20 X 8 mm
126 Kawat Penggantung Hollow Aluminium
127 Aluminium 4'' Brown - 6 Meter
128 Aluminium 3'' Brown - 6 Meter
129 Aluminium Slimar 4'' Brown Untuk Daun Jendela
130 Aluminium Slimar 3'' Brown Untuk Daun Jendela
131 Pas. Kusen Aluminium 4'
132 Pas. Daun Jendela Alumunium + Kaca Tabel 5 mm + Karet dan Sealent
133 Pas. Daun Pintu Aluminium panil Kaca Tebal 5 mm ( Lengkap Accessories )
134 Pintu KM/WC Alumunium ( lengkap Accessories ) lebar 6 cm
135 Pintu KM/WC PVC kw.1( lengkap Accessories ) lebar 10 cm
136 Pintu fiberglass KM/WC
137 Pintu KM/WC bahan PVC Lengkap Accessories ex MASPION star
E. BAHAN FINISHING :
1 Cat Minyak Afduner 1kg
2 Cat Kayu Ex Avian (0,9 kg)
3 Cat Minyak Ex Emco
4 Cat kKayu Ex Mowilex 1kg
5 Cat Minyak
6 Cat Minyak Super klg
7 Cat Kayu Dulux 1kg
8 Cat Dasar 3,5 kg
9 Cat Dasar Meni 3,5 Kg
10 Cat Meni Glatik 3,5 kg
11 Cat Tenner
12 Cat Genteng Cap Belmas 1kg
13 Cat Genteng yoko 4kg
14 Cat Genteng Biasa AGA (4 kg)
15 Cat Genteng Minyak Nippon 2,5 liter
16 Cat Residu/ cloter (10 kg) 30.000/ kg
17 Cat seng Nippon (2,5 kg)
18 Cat Tembok Sahara / Kembang / Postek Aries (25 Kg)
19 Cat Tembok Wintex / Maxilite (5kg)
20 Cat Tembok ICI
21 Cat Tembok Mowilex (Cat Dalam ) 2,5 Kg soff
22 Cat Tembok Mowilex (Cat Luar ) 2,5 Kg gelap & terang
23 Cat Tembok Aries 5kg
24 Cat Minyak Avian
25 Cat Tembok Kimex (5kg)
26 Cat Tembok Dulux (luar) 2,5 kg
27 Cat Tembok Warna Kuning , Hitam ,Merah (Belmax)
28 Vernis/Plitur (24 Klg)
29 Cat Altex
30 Cat Anti Lumut (Aquaseal) (Klg 20kg) Nodrop 20 kg
31 Cat Anti Lumut (No drop) (Klg 20 kg)
32 Cat Dasar Glatik kembang 1 kg
33 Plamur Tembok Boyo Dan Setara (5kg)
34 Minyak Cat (aff Dunner)
35 Dempul Kayu Cap Kucing / Merah (1 Kg) klg
36 Dempul Ex Impra
37 Dempul Ex Isamu
38 Tenner A ( Ex Avian) super
39 Minyak Te Botol
40 Kertas Gosok
41 Pewarna Natural
42 pewarna brown
43 Pewarna Ex Impra
44 Wood Filler Ex Impra
45 Clear
46 Clear ex Impra
47 Sending
48 Sending ex Impra
49 Cat Kayu Ex Dullux Mengkilap
50 Melamin Ex Impra
51 Cat Air Untuk Genteng, Bataco, Paving Block (AGA)
52 Cat Minyak Untuk Genteng, Bataco, Paving Block (AGA)
53 Kuas 2" (Eterna)
54 Kuas 3" (Eterna)
55 Kuas 4" (Eterna)
56 Bahan Anti Karat
57 Comice - 20 kg (dingding eksterior )
58 Comice - 20 kg (dingding interior)
59 Lem Fox Kaleng
60 Lem Efoxi
61 Perban Conpon
62 Bubuk + air pelarut Ex Aqugart untuk Waterproofing
63 Cat Waterproof eks aquaproo- kw.1
64 Cat waterproof- biasa
65 Cat Marka Jalan (aries gold 5kg)
65 Aluminium Composite Panel (Alucopan/ACP) 1220x2440x4 mm, Skin 0,21 mm
65 Aluminium Composite Panel (Alucopan/ACP) 1220x2440x4 mm, Skin 0,30 mm
65 Aluminium Composite Panel (Alucopan/ACP) 1220x4880x4 mm, Skin 0,30 mm
F BAHAN KAYU
G BAHAN PENGGANTUNG
1 Engsel Baja
Engsel Baja (Dumont)
2 Engsel Kuningan 4 Lubang
Engsel Kuningan 4 Lubang (Dumont)
3 Engsel Stainless Steel
4 Engsel H3 Lubang
5 Engsel Kupu-kupu
6 Engsel antik jendela
7 Engsel Pintu Biasa (Merk 777)
Engsel Pintu Biasa (Dumont)
8 Engsel Pintu Lemari Biasa
Engsel Pintu Lemari Biasa (Dakson)
9 Engsel Jendela Biasa (Merk 777)
Engsel Jendela Biasa (Dumont)
10 Engsel Jendela Kuningan (merk Kuningan)
Engsel Jendela Kuningan (Dakson)
11 Engsel Pintu 4" (SES)
Engsel Pintu 4" (Dumont)
12 Engsel Jendela 3"(SES)
Engsel Jendela 3"(Dumont)
13 Engsel Pintu Kuningan SES
Engsel Pintu Kuningan (Dumont)
14 Gagang Pintu Lemari
Gagang Pintu Lemari (Dakson)
15 Grendel jendela Kuningan
Grendel jendela Kuningan (Dakson)
16 Grendel Pintu Biasa
Grendel Pintu Biasa (Dumont)
17 Grendel Pintu Kuningan/ Vertikal
18 Grendel Pintu Besar
19 Grendel Pintu Tanam (Expanyolet)
20 Kunci Tanam Yale 1 x Putar
21 Kunci Tanam Yale 2 x Putar
22 Kunci Tanam Pintu 2 x Putar Besar Biasa
23 Kunci Tanam Pintu 2 x Putar kecil Biasa
24 Kunci Tanam Pintu 2 x Putar SES
25 Hak Angin Kecil Antik
26 Hak Angin Besar
Hak Angin Besar (Dumont)
27 Hak Angin Kecil
Hak Angin Kecil (Dumont)
28 Kait angin Jendela Alumunium Kualias 1
Kait angin Jendela Alumunium (Dumont)
29 Kait angin Jendela Alumunium biasa
Kait angin Jendela Alumunium (Dumont)
H BAHAN KACA
1 Kaca Bening 3 mm
2 Kaca Bening 5 mm
3 Kaca Bening 6 mm
4 Kaca Bening 8 mm
5 Kaca Bening 10 mm
6 Kaca Ryben Tebal 5 mm
7 Kaca Ryben Tebal 6 mm
8 Kaca Ryben Tebal 3 mm
9 Kaca Ryben Tebal 8 mm
10 Kaca Ryben Tebal 10 mm
11 Jendela Nako (Rangka+ Kaca Tebal 5mm) 0,8 m x 0,2 m 4 lbr terpasang + Stand
12 Kaca Es Buram 5 mm/ 10 mm
13 Kaca Lembaran Bening Tidak Berwarna FL Tebal 2 MM
14 Kaca Lembaran Bening Tidak Berwarna FL Tebal 3 MM
15 Kaca Lembaran Bening Tidak Berwarna FL Tebal 5 MM
Ukuran (1221 x 153)
Ukuran (200 x 90)
Ukuran (200 x 100)
Ukuran (213 x 122)
Ukuran (183 x 122)
Ukuran (244 x 183)
Kaca Lembaran Bening Tidak Berwarna FL Tebal 10 MM
16 Kaca Bening 12 mm
L BAHAN LAIN-LAIN
60 Topi Uskup T = 6 cm
61 Topi Uskup T = 8 cm 3 Bh/M'
62 Tali Nilon
63 Aspal Emulsi
64 Aspal Bitumen
65 Aspal Curah (ton)
66 Aspal Drum 1 Drum. 155 kg / Drum
67 Aspal cement
68 B.0
69 Solar Non Industri
70 Solar Industri
71 Minyak Pelumas
72 Bensin
73 Minyak bakesting
74 Mortar
75 Filler/abu batu M3
76 Kerosen/Minyak Tanah
M ALAT BANTU PEMELIHARAAN
1 Sekop
2 Gerobak Dorong Artco
3 Betel
4 Palu
5 Sendok Semen
6 Sikat Baja
7 Cerek Aspal
8 Garu
9 Sapu Lidi
10 Drum Pemasak Aspal
11 Kayu Bakar
12 Cangkul
13 Gergaji Kayu Cap Mata
14 Sekop Sampah Merk VTR
15 Sekop Cap Mata
16 Palu / Martil Uk. 1,5 inci
N BAHAN PIPA DAN SUMUR BOR
1.A PIPA PRALON PVC 1/2 Inci - 4 M
( SII ) 3/4 Inci - 4 M
1 Inci -4M
1 1/4 Inci - 4 M
1 1/2 Inci - 4 M
2 Inci -4M
2 1/2 Inci - 4 M
3 Inci -4M
3" -6M S - 10
S - 10
S - 12.5
S - 12.5
4" -6M S - 10
S - 10
S - 12.5
S - 12.5
-6M S-8
S - 10 MOF
S - 12,5
1/2" S - 6,3
S-8
S - 10
-6M S - 12,5
3/4" S - 6,3
S-8
S - 10
-6M S - 12,5
1" S - 6,3
S-8
S - 10
S - 10
-6M S - 10 Mof
1 1/4" S - 6,3
S-8
S - 10
-6M S - 10 Mof
S - 12,5
1 1/2" S - 6,3
S-8
S - 10
-6M S - 10 Mof
S - 12,5
-6M S - 12,5 Mof
S - 16
2" S-8
S-8
S - 10
-6M S - 10 Mof
S - 10
-6M S - 10 RR
S - 12,5
-6M S - 12,5 Mof
2 1/2" S-8
S-8
S - 10
-6M S - 10 Mof
S - 10
-6M S - 10 RR
S - 12,5
-6M S - 12,5 Mof
S - 12,5
-6M S - 12,5 RR
S - 16
S - 16
3" S-8
S-8
S - 10
-6M S - 10 Mof
S - 10
-6M S - 10 RR
S - 12,5
-6M S - 12,5
-6M S - 12,5 RR
S - 16
S - 16
4" S-8
S-8
S - 10
-6M S - 10 Mof
S - 10
-6M S - 10 RR
S - 12,5
-6M S - 12,5 Mof
S - 12,5
-6M S - 12,5 RR
S - 16
S - 16
14" -6M S - 10 RR
-6M S - 12,5 RR
16" -6M S - 10 RR
-6M S - 12,5 RR
18" -6M S - 10 RR
-6M S - 12,5 RR
20" -6M S - 10 RR
-6M S - 12,5 RR
24" -6M S - 10 RR
-6M S - 12,5 RR
6 Pipa Beton
ᶲ 40 Panjang 110 cm, tebal 7 cm NRCP
ᶲ 40 Panjang 110 cm, tebal 7 cm RCP
ᶲ 60 Panjang 110 cm, tebal 8 cm NRCP
ᶲ 60 Panjang 110 cm, tebal 8 cm RCP
ᶲ 80 Panjang 110 cm, tebal 9 cm NRCP
ᶲ 80 Panjang 110 cm, tebal 9 cm RCP
ᶲ 100 Panjang 110 cm, tebal 10 cm NRCP
ᶲ 100 Panjang 110 cm, tebal 10 cm RCP
6 TEE 1/2"
3/4"
7 V. KNIE 3/4"
1"
8 V NEPLE 3/4"
1"
P MATERIAL POMPA
1 Pompa Air Shimiznu130 ( 125 Watt )
2 Pompa Air Shimizu 230 ( 200 Watt )
3 Pompa Air Panasonik 130 Jak ( 125 Watt )
4 Pompa Air Panasonik 200 Jak
5 Pompa Air Sanyo 137 AC
6 Pompa Air Sanyo PH 130 AC
7 Pompa Air Wasser 139 EA
8 Pompa Air Lakoni 129 A
9 Pompa Air Inoto I Hp + Kabel 50 Meter
10 Pompa Air Evak I Hp
11 Pompa Air Franklin I Hp
12 Pompa Wasser 60 Ea
13 Pompa Wasser 169 EA
14 Pompa Air Tsutumi 3
15 Mesin Las Hambatan dari Logam Otomatis (Las Listrik Yanmar TS 155 C 13 H
16 Generator SET ABB Mesin Diesel 8,5 PK Yanmar
17 Generator SET ABB Mesin Diesel 8,5 PK Kubota
S UPAH KERJA
1 Mandor Lapangan
2 Kepala tukang
3 Kepala Tukang Listrik
4 Tukang Batu /Cat
5 Tukang Kayu / besi
6 Tukang pasang paving
7 Pembantu Sopir
8 Pembantu Mekanik
9 Pembantu Tukang Listrik
10 Pembantu Operator
11 Mekanik
12 Operator Terlatih
13 Pekerja
14 Sopir Terampil
15 Biaya Pasang Canstein
16 Biaya Pasang Paving
HARGA SATUAN BAHAN & UPAH KERJA
TAHUN ANGGARAN 2019
SATUAN
BAHAN/
JA TOKO SURYA UTAMA BANGUNAN TOKO FAJAR MAS
UPAH
KERJA
3 4 5
Buah
Buah
7, lb. 100 cm Lembar
Lembar
Lembar
kaki
kaki
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Sinar Bangunan
M3 Rp 114,285.71
M3
M3
M3
M3
M3
M3
M3
M3
M3
Sinar Bangunan Persada
Biji Rp 500.00 Rp 430.00
M3
M2
Biji
Biji
Biji
M3
Sinar Bangunan Persada
M3 Rp 125,000.00 Rp 142,857.14
M3
M3
M3
M3
M3
M3
Persada
Sak
Sak Rp 47,000.00
Zak Rp 45,000.00
Zak
Zak
Sak
Sak
Kg
M2
kg
M2
M3
Batang
Batang
Batang
Batang
Ikat
Buah
Buah
Buah
Buah
Bh
Bh
Batang/Biji
Batang
Batang
Batang
Batang
Batang
Bh
Bh
M'/ Btg
Btg
Btg
m /40.40. 1,8 P = 6 Btg
Btg Rp 140,000.00
40.1,6 mm P =6 m Btg
Btg Rp 120,000.00
40.20.1 mm P = 6 Btg Rp 90,000.00
Btg
M2
Btg
Btg Rp 65,000.00
Btg Rp 85,000.00
Btg Rp 105,000.00
Btg
Btg
Btg
Btg
Btg Rp 20,900.00 Rp 32,000.00
Btg Rp 37,050.00 Rp 52,000.00
Btg Rp 58,900.00 Rp 73,000.00
Btg Rp 84,500.00 Rp 110,000.00
Btg Rp 114,950.00
Btg Rp 132,050.00
Btg Rp 211,850.00
Btg Rp 233,700.00
Btg Rp 37,050.00
Btg
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
Lembar
Lembar
Lembar
Batang Rp 279,644.00
Batang Rp 49,715.00
Batang Rp 77,676.00
Batang Rp 111,857.00
Batang Rp 198,858.00
Batang Rp 198,858.00
Batang Rp 198,858.00
Batang Rp 251,679.00
Batang
Batang
Batang
Batang
Batang
kg
kg Rp 17,500.00 Rp 20,000.00
Roll Rp 19,000.00 Rp 19,000.00
M' Rp 20,000.00
M Rp 20,000.00 Rp 25,000.00
M Rp 20,000.00 Rp 25,000.00
M Rp 25,000.00
Dos Rp 20,000.00 Rp 135,000.00
M Rp 20,000.00 Rp 20,000.00
kg
M'/Roll Rp 2,000.00
Unit Rp 125,000.00 Rp 170,000.00
M2
M2
Tube Rp 45,000.00 Rp 17,000.00
Tube Rp 150,000.00 Rp 160,000.00
M Rp 18,000.00 Rp 7,000.00
Roll
Roll
Kg Rp 16,000.00 Rp 20,000.00
Kg Rp 50,000.00
Kg
Kg Rp 25,000.00 Rp 22,000.00
Kg Rp 20,000.00 Rp 20,000.00
Kg
Kg Rp 25,000.00
Kg Rp 50,000.00 Rp 50,000.00
Biji Rp 650.00 Rp 500.00
Dos/ Bgks
Dos/ Bgks Rp 32,500.00 Rp 110,000.00
Kg
Dos Rp 12,000.00 Rp 20,000.00
Dos Rp 15,000.00 Rp 20,000.00
Dos Rp 22,000.00 Rp 20,000.00
Kg Rp 50,000.00
Dos
Dos
Kg Rp 25,000.00
Kg Rp 25,000.00
Biji Rp 300.00
Bh
M'
M'
M'
M'
Buah
Buah
Buah
M2/ 6 Rp 85,000.00
M Rp 39,000.00
M Rp 49,000.00
M Rp 52,000.00
M Rp 59,000.00
M
Btg
Btg
Btg Rp 22,000.00
Btg Rp 27,000.00
Btg
Kg
Btg
Btg
Btg
Btg
M'
M2
Unit
Unit
Unit
Lembar
Unit
Biji
Biji
Psg Rp 20,000.00 Rp 30,000.00
Psg
Psg Rp 25,000.00 Rp 25,000.00
Psg Rp 5,000.00 Rp 20,000.00
Psg Rp 5,000.00 Rp 10,000.00
Psg Rp 8,000.00 Rp 8,000.00
Psg Rp 8,000.00 Rp 5,000.00
Psg
Psg Rp 5,000.00 Rp 5,000.00
Psg
Psg Rp 5,000.00
Psg
Psg Rp 20,000.00 Rp 8,000.00
Psg
Bh Rp 45,000.00 Rp 20,000.00
Bh
Bh Rp 30,000.00 Rp 18,000.00
Bh
Psg Rp 45,000.00 Rp 15,000.00
Psg
Bh Rp 6,000.00
Bh
Bh Rp 12,500.00 Rp 7,000.00
Bh
Bh Rp 10,000.00
Bh
Bh Rp 25,000.00
Bh Rp 45,000.00 Rp 20,000.00
Bh Rp 125,000.00 Rp 45,000.00
Bh Rp 75,000.00
Bh Rp 150,000.00
Bh Rp 125,000.00
Bh Rp 75,000.00
Bh Rp 500,000.00
Bh Rp 5,000.00 Rp 15,000.00
Bh Rp 12,500.00 Rp 20,000.00
Bh
Bh Rp 5,000.00 Rp 10,000.00
Bh
Bh Rp 30,000.00
Bh
Bh Rp 15,000.00
Bh
M2 Rp 100,000.00 Rp 130,000.00
M2 Rp 180,000.00 Rp 160,000.00
M2
M2
M2
M2 Rp 185,000.00
M2
M2 Rp 150,000.00
M2
M2
ng + Stand M2
M2 Rp 250,000.00
M2
M2 Rp 150,000.00
M2 Rp 180,000.00
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
M2
M2
Unit
Unit Rp 1,500,000.00
Unit Rp 2,300,000.00
Unit Rp 2,700,000.00
Bh Rp 250,000.00
Bh Rp 375,000.00 Rp 450,000.00
Bh Rp 1,100,000.00 Rp 370,000.00
Bh Rp 1,300,000.00 Rp 400,000.00
Bh Rp 25,000.00 Rp 30,000.00
Unit Rp 850,000.00
Unit Rp 1,700,000.00
Bh Rp 600,000.00
Bh Rp 10,000,000.00
Bh Rp 450,000.00
Bh Rp 750,000.00
Bh Rp 1,200,000.00
Bh Rp 3,500,000.00
Bh Rp 45,000.00 Rp 45,000.00
Bh Rp 20,000.00
Bh Rp 65,000.00 Rp 25,000.00
Bh Rp 45,000.00
Bh Rp 250,000.00 Rp 190,000.00
Bh Rp 75,000.00 Rp 70,000.00
Bh Rp 5,000.00 Rp 5,000.00
Unit Rp 4,500,000.00 Rp 120,000.00
Bh Rp 115,000.00
Rol
M
Bh Rp 600,000.00
Bh Rp 450,000.00
Unit
Unit
Lembar Rp 125,000.00
Lembar Rp 50,000.00 Rp 51,000.00
Lembar Rp 65,000.00 Rp 65,000.00
Lembar
Lembar Rp 75,000.00 Rp 75,000.00
Lembar Rp 85,000.00
Lembar
Lembar Rp 225,000.00 Rp 225,000.00
Lembar
Lembar
Lembar Rp 125,000.00
Lembar
Lembar
Lembar
Lembar
Lembar
Gpyro Lembar Rp 70,000.00 Rp 67,000.00
Lembar Rp 65,000.00
Lembar Rp 25,000.00
Lembar
Batang Rp 20,000.00
Batang Rp 10,000.00 Rp 18,000.00
Batang
Btg
Btg
Btg
Batang
M'
- lebar 7 cm/10 cm M'
M'
- lebar 10 cm M'
- lebar 15 cm M'
Batang
M'
M'
M'
Dos Rp 50,000.00
Dos Rp 60,000.00
Dos
Dos Rp 55,000.00
Dos Rp 57,000.00
Dos Rp 45,000.00
Dos Rp 48,000.00
Dos
Dos
Dos
Dos
Top Gres Dos
ng (sandimas) Dos
Dos
Dos
Dos Rp 58,000.00
Dos Rp 65,000.00
M2 Rp 60,000.00
M2 Rp 57,000.00
Dos
Dos
Dos
Dos
Dos
Dos
M2
M2
Dos
Dos
Dos
Dos
Dos
Dos
Dos
Dos
Dos
M2
M2
M2
Bj
M2
Dos
Dos
Dos
Dos
Dos
Dos
Dos
Dos
Dos
M2
Dos
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
Bh Rp 85,000.00 Rp 85,000.00
Bh Rp 500,000.00 Rp 520,000.00
Bh Rp 20,000.00 Rp 15,000.00
Bh Rp 50,000.00 Rp 45,000.00
Bh Rp 15,000.00 Rp 25,000.00
Bh Rp 10,000.00 Rp 15,000.00
Bh
Bh
Bh
Bh
M3
Bh Rp 50,000.00
Unit Rp 65,000.00
Unit Rp 150,000.00
Bh Rp 85,000.00
Bh Rp 60,000.00
Batang Rp 18,000.00
Batang Rp 23,000.00
Batang Rp 30,000.00
Batang Rp 40,000.00
Batang Rp 48,000.00
Batang Rp 62,000.00
Batang Rp 78,000.00
Batang Rp 102,000.00
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
S - 10 MOF Batang
S - 12,5 MOF Batang
Batang
S - 10 MOF Batang
S - 12,5 MOF Batang
Batang
S - 10 MOF Batang
Batang
Batang
S - 10 MOF Batang
Batang
Batang
S - 10 MOF Batang
S - 12,5 MOF Batang
Batang
Batang
S - 10 MOF Batang
S - 10 RR Batang
S - 12,5 MOF Batang
S - 12,5 RR Batang
Batang
Batang
Batang
S - 10 MOF Batang
S - 10 RR Batang
S - 12,5 MOF Batang
S - 12,5 RR Batang
Batang
Batang
Batang
Batang
S - 10 MOF Batang
S - 10 RR Batang
S - 12,5 MOF Batang
S - 12,5 RR Batang
Batang
Batang
Batang
Batang
S - 10 MOF Batang
S - 10 RR Batang
S - 12,5 MOF Batang
S - 12,5 RR Batang
Batang
Batang
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
S - 10 Mof M'
M'
M'
M'
S - 10 Mof M'
M'
M'
M'
M'
S - 10 Mof M'
M'
S - 12,5 Mof M'
M'
M'
M'
M'
S - 10 Mof M'
M'
S - 10 RR M'
M'
S - 12,5 Mof M'
M'
M'
M'
S - 10 Mof M'
M'
S - 10 RR M'
M'
S - 12,5 Mof M'
M'
S - 12,5 RR M'
M'
M'
M'
M'
M'
S - 10 Mof M'
M'
S - 10 RR M'
M'
M'
S - 12,5 RR M'
M'
M'
M'
M'
M'
S - 10 Mof M'
M'
S - 10 RR M'
M'
S - 12,5 Mof M'
M'
S - 12,5 RR M'
M'
M'
S - 10 Mof M'
S - 10 RR M'
S - 10 Mof M'
S - 10 RR M'
S - 12,5 RR M'
S - 10 Mof M'
S - 10 RR M'
S - 12,5 Mof M'
S - 12,5 RR M'
S - 10 Mof M'
S - 10 RR M'
S - 12,5 Mof M'
S - 12,5 RR M'
S - 10 Mof M'
S - 10 RR M'
S - 12,5 Mof M'
S - 10 RR M'
S - 12,5 RR M'
S - 10 RR M'
S - 12,5 RR M'
S - 10 RR M'
S - 12,5 RR 6M'
S - 10 RR M'
S - 12,5 RR M'
S - 10 RR M'
S - 12,5 RR M'
S - 12,5 RR M'
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
SDR 17 PN 14 Batang
SDR 17 PN 15 Batang
SDR 17 PN 16 Batang
SDR 17 PN 17 Batang
Batang
Batang
Batang
Bh Rp 7,000.00
Bh Rp 8,000.00
Bh Rp 15,000.00
Bh Rp 8,000.00
Bh Rp 12,000.00
Bh Rp 18,000.00
Bh Rp 6,000.00
Bh Rp 8,000.00
Bh Rp 12,000.00
Pcs
Pcs
Pcs
Pcs
Pcs
Pcs
Pcs
Pcs
Batang
Batang Rp 10,000.00
Bh Rp 2,000.00 Rp 2,000.00
Bh Rp 2,000.00 Rp 2,000.00
Bh Rp 15,000.00 Rp 15,000.00
Bh Rp 2,000.00
Bh Rp 3,000.00
Bh Rp 8,000.00 Rp 6,000.00
M' Rp 18,000.00
Bh
han Plastik (Floor Dra Bh
han Besi/Kuningan (Fl Bh
Kg Rp 10,000.00
Tube Rp 10,000.00 Rp 10,000.00
Kg Rp 50,000.00 Rp 45,000.00
Tube Rp 15,000.00 Rp 20,000.00
Tube
Meter
Buah Rp 10,000.00 Rp 8,000.00
Buah Rp 15,000.00 Rp 12,000.00
Buah
Buah
Buah Rp 3,000.00 Rp 3,000.00
Buah Rp 4,000.00 Rp 5,000.00
Buah Rp 6,000.00
Buah Rp 12,000.00
Buah Rp 10,000.00
Buah Rp 35,000.00
Buah Rp 12,000.00
Buah Rp 15,000.00
Buah Rp 18,000.00
Batang Rp 100,000.00
Batang Rp 135,000.00
Batang Rp 150,000.00
Batang Rp 240,000.00
Batang Rp 700,000.00
Batang
Batang
Batang
Batang
Batang
Buah Rp 10,000.00
Buah Rp 15,000.00
Buah Rp 23,000.00
Buah Rp 15,000.00
Buah Rp 25,000.00
Buah Rp 35,000.00
Buah Rp 2,000.00
Buah Rp 3,000.00
Buah Rp 2,000.00
Buah Rp 3,000.00
Buah Rp 5,000.00
Buah Rp 8,000.00
Buah Rp 10,000.00
Buah Rp 13,000.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Set
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Roll
Roll Rp 10,000.00
Meter Rp 2,000.00
Meter Rp 3,000.00
Meter
Meter
Meter
Meter Rp 11,000.00
Meter
Meter Rp 7,500.00
Meter
Meter Rp 9,500.00
Meter
Meter
Meter
Meter
Meter
Meter
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Kg
Bh Rp 50,000.00
Bh Rp 55,000.00
Bh Rp 125,000.00
Bh Rp 115,000.00
Bh Rp 105,000.00
Bh Rp 100,000.00
Bh Rp 90,000.00
Bh Rp 35,000.00
Bh Rp 40,000.00
Bh Rp 45,000.00
Meter
Bh
Bh Rp 55,000.00
Bh Rp 65,000.00
Bh
Bh Rp 55,000.00
Bh Rp 55,000.00
Bh Rp 55,000.00
Bh Rp 100,000.00
Bh
Bh
Bh
Bh
Batang
Bh
Bh
Bh Rp 25,000.00
Bh Rp 15,000.00
Bh Rp 35,000.00
Bh Rp 20,000.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Papan
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Pcs
Pcs
Ton
Kg
Kg
Buah
Buah
Buah
M
M
M
M
Buah
Buah
Buah
Buah
Buah
Buah Rp 40,000.00
Psng Rp 5,000.00
Psng
Buah Rp 45,000.00
Buah
Buah
Buah
Buah Rp 1,100,000.00
Buah
Psng
Buah Rp 30,000.00
Buah Rp 15,000.00
Buah
Psng
Psng
Buah Rp 55,000.00
Buah Rp 10,000.00
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Set
Buah
O/H
O/H
O/H
O/H
O/H
O/H
O/H
O/H
O/H
O/H
O/H
O/H
O/H
O/H
/M'
/M2
UPAH KERJA
2019
6 7 8
Mutmainnah
Rp 150,000.00 Rp 132,142.86 Rp 145,357.14
Putih Graha
Rp 550.00 Rp 493.33 Rp 542.67
Mutmainnah
Rp 120,000.00 Rp 129,285.71 Rp 142,214.29
Rp 47,000.00 Rp 51,700.00
Rp 45,000.00 Rp 49,500.00
Rp 140,000.00 Rp 154,000.00
Rp 279,644.00 Rp 307,608.40
Rp 49,715.00 Rp 54,686.50
Rp 77,676.00 Rp 85,443.60
Rp 111,857.00 Rp 123,042.70
Rp 198,858.00 Rp 218,743.80
Rp 198,858.00 Rp 218,743.80
Rp 198,858.00 Rp 218,743.80
Rp 251,679.00 Rp 276,846.90
Rp 2,000.00 Rp 2,200.00
Rp 147,500.00 Rp 162,250.00
Rp 31,000.00 Rp 34,100.00
Rp 155,000.00 Rp 170,500.00
Rp 13,000.00 Rp 12,666.67 Rp 13,933.33
Rp 25,000.00 Rp 27,500.00
Rp 25,000.00 Rp 27,500.00
Rp 300.00 Rp 330.00
Rp 85,000.00 Rp 85,000.00 Rp 93,500.00
Rp 36,000.00 Rp 37,500.00 Rp 41,250.00
Rp 46,000.00 Rp 47,500.00 Rp 52,250.00
Rp 51,000.00 Rp 51,500.00 Rp 56,650.00
Rp 57,000.00 Rp 58,000.00 Rp 63,800.00
Rp 22,000.00 Rp 24,200.00
Rp 27,000.00 Rp 29,700.00
Rp 40,000.00 Rp 44,000.00
Rp 100,000.00 Rp 116,666.67 Rp 128,333.33
Rp 190,000.00 Rp 209,000.00
Rp 180,000.00 Rp 198,000.00
Rp 60,000.00 Rp 66,000.00
Rp 195,000.00 Rp 214,500.00
Rp 260,000.00 Rp 286,000.00
Rp 150,000.00 Rp 165,000.00
Rp 170,000.00 Rp 187,000.00
Rp 265,000.00 Rp 291,500.00
Rp 42,500.00 Rp 55,833.33 Rp 61,416.67
Rp 62,000.00 Rp 68,200.00
Rp 95,000.00 Rp 104,500.00
Rp 295,000.00 Rp 324,500.00
Rp 40,000.00 Rp 44,000.00
Rp 40,000.00 Rp 44,000.00
Rp 750,000.00 Rp 825,000.00
Rp 800,000.00 Rp 880,000.00
Rp 30,000.00 Rp 33,000.00
Rp 50,000.00 Rp 55,000.00
Rp 20,000.00 Rp 22,000.00
Rp 33,000.00 Rp 34,333.33 Rp 37,766.67
Rp 38,500.00 Rp 42,350.00
Rp 31,500.00 Rp 34,650.00
Rp 29,000.00 Rp 31,900.00
Rp 15,000.00 Rp 16,500.00
Rp 3,500.00 Rp 4,166.67 Rp 4,583.33
Rp 65,000.00 Rp 71,500.00
Rp 77,500.00 Rp 85,250.00
Rp 51,000.00 Rp 56,100.00
Rp 63,500.00 Rp 69,850.00
Rp 65,000.00 Rp 71,500.00
Rp 63,500.00 Rp 69,850.00
Rp 75,000.00 Rp 82,500.00
Rp 65,000.00 Rp 71,500.00
Rp 50,000.00 Rp 55,000.00
Rp 50,000.00 Rp 55,000.00
Rp 60,000.00 Rp 66,000.00
Rp 7,000.00 Rp 7,666.67 Rp 8,433.33
Rp 10,000.00 Rp 12,000.00 Rp 13,200.00
Rp 16,000.00 Rp 17,333.33 Rp 19,066.67
AKIS PUTRA
Rp 11,000,000.00
Rp 18,500,000.00
Rp 2,400,000.00 Rp 2,640,000.00
Rp 2,150,000.00 Rp 2,365,000.00
Rp 1,500,000.00 Rp 1,650,000.00
Rp 1,500,000.00 Rp 1,433,333.33 Rp 1,576,600.00
Rp 25,000.00 Rp 27,500.00
Rp 25,000.00 Rp 27,500.00
Rp 12,500.00 Rp 13,750.00
Rp 7,500.00 Rp 8,250.00
Rp 8,000.00 Rp 8,800.00
Rp 6,500.00 Rp 7,150.00
Rp 5,000.00 Rp 5,500.00
Rp 5,000.00 Rp 5,500.00
Rp 14,000.00 Rp 15,400.00
Rp 32,500.00 Rp 35,750.00
Rp 24,000.00 Rp 26,400.00
Rp 30,000.00 Rp 33,000.00
Rp 6,000.00 Rp 6,600.00
Rp 9,750.00 Rp 10,725.00
Rp 10,000.00 Rp 11,000.00
Rp 25,000.00 Rp 27,500.00
Rp 32,500.00 Rp 35,750.00
Rp 85,000.00 Rp 93,500.00
Rp 75,000.00 Rp 82,500.00
Rp 150,000.00 Rp 165,000.00
Rp 125,000.00 Rp 137,500.00
Rp 75,000.00 Rp 82,500.00
Rp 500,000.00 Rp 550,000.00
Rp 10,000.00 Rp 11,000.00
Rp 16,250.00 Rp 17,875.00
Rp 7,500.00 Rp 8,250.00
Rp 30,000.00 Rp 33,000.00
Rp 15,000.00 Rp 16,500.00
Rp -
Rp 115,000.00 Rp 126,500.00
Rp 170,000.00 Rp 187,000.00
Rp 185,000.00 Rp 203,500.00
Rp 150,000.00 Rp 165,000.00
Rp 250,000.00 Rp 275,000.00
Rp 150,000.00 Rp 165,000.00
Rp 180,000.00 Rp 198,000.00
Rp 1,500,000.00 Rp 1,650,000.00
Rp 2,300,000.00 Rp 2,530,000.00
Rp 2,700,000.00 Rp 2,970,000.00
Rp 250,000.00 Rp 275,000.00
Rp 412,500.00 Rp 453,750.00
Rp 735,000.00 Rp 808,500.00
Rp 850,000.00 Rp 935,000.00
Rp 27,500.00 Rp 30,250.00
Rp 850,000.00 Rp 935,000.00
Rp 1,700,000.00 Rp 1,870,000.00
Rp 600,000.00 Rp 660,000.00
Rp 10,000,000.00 Rp 11,000,000.00
Rp 450,000.00 Rp 495,000.00
Rp 750,000.00 Rp 825,000.00
Rp 1,200,000.00 Rp 1,320,000.00
Rp 3,500,000.00 Rp 3,850,000.00
Rp 45,000.00 Rp 49,500.00
Rp 20,000.00 Rp 22,000.00
Rp 45,000.00 Rp 49,500.00
Rp 45,000.00 Rp 49,500.00
Rp 220,000.00 Rp 242,000.00
Rp 72,500.00 Rp 79,750.00
Rp 5,000.00 Rp 5,500.00
Rp 2,310,000.00 Rp 2,541,000.00
Rp 115,000.00 Rp 126,500.00
Rp 600,000.00 Rp 660,000.00
Rp 450,000.00 Rp 495,000.00
Rp 125,000.00 Rp 137,500.00
Rp 46,000.00 Rp 49,000.00 Rp 53,900.00
Rp 61,000.00 Rp 63,666.67 Rp 70,033.33
Rp 125,000.00 Rp 137,500.00
Rp 58,000.00 Rp 63,800.00
Rp 65,000.00 Rp 71,500.00
Rp 60,000.00 Rp 66,000.00
Rp 57,000.00 Rp 62,700.00
Paria Beton
Rp 57,000.00
Rp 66,000.00
Rp 68,000.00 Rp 74,200.00 Rp 81,620.00
Rp 18,000.00 Rp 19,800.00
Rp 23,000.00 Rp 25,300.00
Rp 30,000.00 Rp 33,000.00
Rp 40,000.00 Rp 44,000.00
Rp 48,000.00 Rp 52,800.00
Rp 62,000.00 Rp 68,200.00
Rp 78,000.00 Rp 85,800.00
Rp 102,000.00 Rp 112,200.00
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 24,000.00 Rp 26,400.00
Rp 34,000.00 Rp 37,400.00
Rp 42,000.00 Rp 46,200.00
Rp 64,000.00 Rp 70,400.00
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 24,000.00 Rp 26,400.00
Rp 32,500.00 Rp 35,750.00
Rp 40,000.00 Rp 44,000.00
Rp 47,500.00 Rp 52,250.00
Rp 65,000.00 Rp 71,500.00
Rp 72,500.00 Rp 79,750.00
Rp 122,500.00 Rp 134,750.00
Rp 170,000.00 Rp 187,000.00
Rp 270,000.00 Rp 297,000.00
Rp 390,000.00 Rp 429,000.00
Rp 500,000.00 Rp 550,000.00
Rp 10,000.00 Rp 11,000.00
Rp 15,000.00 Rp 16,500.00
Rp 35,000.00 Rp 38,500.00
Rp 42,500.00 Rp 46,750.00
Rp 55,000.00 Rp 60,500.00
Rp 135,000.00 Rp 148,500.00
Rp 200,000.00 Rp 220,000.00
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 7,000.00 Rp 7,700.00
Rp 8,000.00 Rp 8,800.00
Rp 15,000.00 Rp 16,500.00
Rp 8,000.00 Rp 8,800.00
Rp 12,000.00 Rp 13,200.00
Rp 18,000.00 Rp 19,800.00
Rp 6,000.00 Rp 6,600.00
Rp 8,000.00 Rp 8,800.00
Rp 12,000.00 Rp 13,200.00
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 10,000.00 Rp 11,000.00
Rp 2,000.00 Rp 2,200.00
Rp 2,000.00 Rp 2,200.00
Rp 15,000.00 Rp 16,500.00
Rp 2,000.00 Rp 2,200.00
Rp 3,000.00 Rp 3,300.00
Rp 7,000.00 Rp 7,700.00
Rp 18,000.00 Rp 19,800.00
Rp -
Rp -
Rp -
Rp 10,000.00 Rp 11,000.00
Rp 10,000.00 Rp 11,000.00
Rp 47,500.00 Rp 52,250.00
Rp 17,500.00 Rp 19,250.00
Rp -
Rp -
Rp 7,500.00 Rp 8,500.00 Rp 9,350.00
Rp 10,000.00 Rp 12,333.33 Rp 13,566.67
Rp -
Rp -
Rp 1,500.00 Rp 2,500.00 Rp 2,750.00
Rp 2,500.00 Rp 3,833.33 Rp 4,216.67
Rp 4,000.00 Rp 5,000.00 Rp 5,500.00
Rp 8,500.00 Rp 10,250.00 Rp 11,275.00
Rp 11,000.00 Rp 10,500.00 Rp 11,550.00
Rp 35,000.00 Rp 38,500.00
Rp 100,000.00 Rp 110,000.00
Rp 135,000.00 Rp 148,500.00
Rp 150,000.00 Rp 165,000.00
Rp 240,000.00 Rp 264,000.00
Rp 700,000.00 Rp 770,000.00
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 10,000.00 Rp 11,000.00
Rp 15,000.00 Rp 16,500.00
Rp 23,000.00 Rp 25,300.00
Rp 15,000.00 Rp 16,500.00
Rp 25,000.00 Rp 27,500.00
Rp 35,000.00 Rp 38,500.00
Rp 5,000.00 Rp 5,500.00
Rp 8,000.00 Rp 8,800.00
Rp 10,000.00 Rp 11,000.00
Rp 13,000.00 Rp 14,300.00
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 10,000.00 Rp 11,000.00
Rp 2,500.00 Rp 2,250.00 Rp 2,475.00
Rp 3,500.00 Rp 3,250.00 Rp 3,575.00
Rp -
Rp -
Rp -
Rp 11,000.00 Rp 12,100.00
Rp -
Rp 8,000.00 Rp 7,750.00 Rp 8,525.00
Rp -
Rp 11,000.00 Rp 13,166.67 Rp 14,483.33
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 50,000.00 Rp 55,000.00
Rp 55,000.00 Rp 60,500.00
Rp 125,000.00 Rp 137,500.00
Rp 115,000.00 Rp 126,500.00
Rp 105,000.00 Rp 115,500.00
Rp 100,000.00 Rp 110,000.00
Rp 90,000.00 Rp 99,000.00
Rp 35,000.00 Rp 38,500.00
Rp 40,000.00 Rp 44,000.00
Rp 45,000.00 Rp 49,500.00
Rp -
Rp -
Rp 55,000.00 Rp 60,500.00
Rp 65,000.00 Rp 71,500.00
Rp -
Rp 55,000.00 Rp 60,500.00
Rp 55,000.00 Rp 60,500.00
Rp 55,000.00 Rp 60,500.00
Rp 100,000.00 Rp 110,000.00
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 25,000.00 Rp 27,500.00
Rp 15,000.00 Rp 16,500.00
Rp 35,000.00 Rp 38,500.00
Rp 20,000.00 Rp 22,000.00
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 40,000.00 Rp 44,000.00
Rp 5,000.00 Rp 5,500.00
Rp -
Rp 45,000.00 Rp 49,500.00
Rp -
Rp -
Rp -
Rp 1,100,000.00 Rp 1,210,000.00
Rp -
Rp -
Rp 30,000.00 Rp 33,000.00
Rp 15,000.00 Rp 16,500.00
Rp -
Rp -
Rp -
Rp 55,000.00 Rp 60,500.00
Rp 10,000.00 Rp 11,000.00
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
HARGA SATUAN (PAGU) HPS YANG DIGUNAKAN
9 10
Rp 47,500.00
Rp 27,500.00
Rp 108,000.00
Rp 76,000.00
Rp 30,000.00
Rp 7,200.00
Rp 80,000.00
Rp 80,000.00
Rp 70,000.00
Rp 45,600.00
Rp 49,000.00
Rp 72,000.00
Rp 85,000.00
Rp 75,000.00
Rp 53,000.00
Rp 320,000.00 Rp 145,357.14
Rp 200,000.00
Rp 300,000.00
Rp 200,000.00
Rp 350,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 300,000.00
Rp 1,000.00 Rp 540.00
Rp 900,000.00
Rp 8,000.00
Rp 45,000.00
Rp 45,000.00
Rp 30,000.00
Rp 150,000.00
Rp 225,000.00 Rp 142,200.00
Rp 260,000.00
Rp 260,000.00
Rp 260,000.00
Rp 160,000.00
Rp 200,000.00
Rp 325,000.00
Rp 65,000.00
Rp 48,000.00
Rp 47,000.00
Rp 47,000.00
Rp 45,000.00
Rp 70,000.00
Rp 250,000.00
Rp 20,000.00
Rp 49,500.00
Rp 30,000.00
Rp 80,000.00
Rp 350,000.00
Rp 100,000.00
Rp 40,000.00
Rp 30,000.00
Rp 25,000.00
Rp 35,000.00
Rp 150,000.00
Rp 200,000.00
Rp 300,000.00
Rp 350,000.00
Rp 8,700.00
Rp 7,190.00
Rp 12,941.00
Rp 20,996.00
Rp 13,365.00
Rp 14,074.00
Rp 17,418.00
Rp 19,951.00
Rp 5,500.00
Rp 25,000.00
Rp 190,000.00
Rp 183,000.00
Rp 185,000.00
Rp 190,000.00
Rp 160,000.00 Rp 154,000.00
Rp 135,000.00
Rp 115,000.00 Rp 115,000.00
Rp 95,000.00 Rp 95,000.00
Rp 85,000.00
Rp 790,000.00
Rp 70,000.00
Rp 102,500.00 Rp 96,250.00
Rp 170,000.00 Rp 148,500.00
Rp 250,000.00 Rp 209,000.00
Rp 450,000.00
Rp 615,000.00
Rp 522,000.00
Rp 1,070,000.00
Rp 30,000.00 Rp 30,000.00
Rp 50,500.00 Rp 49,885.00
Rp 78,400.00 Rp 75,130.00
Rp 113,000.00 Rp 112,016.67
Rp 145,000.00 Rp 145,000.00
Rp 186,000.00 Rp 178,227.50
Rp 245,000.00 Rp 233,035.00
Rp 370,000.00 Rp 257,070.00
Rp 78,400.00 Rp 40,755.00
Rp 192,400.00
Rp 455,000.00
Rp 647,000.00
Rp 730,000.00
Rp 910,000.00
Rp 1,300,000.00
Rp 1,400,000.00
Rp 1,620,000.00
Rp 1,730,000.00
Rp 1,950,000.00
Rp 2,050,000.00
Rp 2,610,000.00
Rp 3,350,000.00
Rp 3,763,200.00
Rp 4,984,000.00
Rp 5,712,000.00
Rp 33,500.00 Rp 33,500.00
Rp 44,000.00 Rp 44,000.00
Rp 66,000.00 Rp 66,000.00
Rp 100,000.00 Rp 100,000.00
Rp 180,000.00 Rp 180,000.00
Rp 157,000.00 Rp 157,000.00
Rp 165,000.00 Rp 165,000.00
Rp 270,000.00 Rp 270,000.00
Rp 10,584,000.00
Rp 3,718,400.00
Rp 7,369,600.00
Rp 4,216,800.00
Rp 492,800.00
Rp 13,800.00
Rp 20,750.00 Rp 19,800.00
Rp 175,000.00 Rp 21,083.33
Rp 35,000.00 Rp 22,000.00
Rp 15,000.00 Rp 15,000.00
Rp 25,000.00 Rp 24,750.00
Rp 35,000.00 Rp 27,500.00
Rp 150,000.00 Rp 106,333.33
Rp 25,000.00 Rp 23,833.33
Rp 25,000.00
Rp 65,000.00 Rp 2,200.00
Rp 185,000.00 Rp 162,250.00
Rp 575,000.00
Rp 250,000.00
Rp 12,000.00 Rp 12,000.00
Rp 185,000.00 Rp 170,500.00
Rp 15,000.00 Rp 13,933.33
Rp 1,475,000.00
Rp 3,000,000.00
Rp 20,000.00 Rp 19,800.00
Rp 55,000.00 Rp 55,000.00
Rp 264,000.00
Rp 25,000.00 Rp 25,000.00
Rp 27,700.00 Rp 22,000.00
Rp 25,000.00 Rp 25,000.00
Rp 25,000.00 Rp 25,000.00
Rp 55,000.00 Rp 49,500.00
Rp 250,000.00 Rp 421.67
Rp 145,000.00
Rp 35,000.00 Rp 35,000.00
Rp 14,000.00
Rp 18,000.00 Rp 16,500.00
Rp 18,000.00 Rp 17,600.00
Rp 50,000.00 Rp 20,166.67
Rp 55,000.00 Rp 46,750.00
Rp 47,500.00
Rp 50,000.00
Rp 25,000.00 Rp 25,000.00
Rp 25,000.00 Rp 25,000.00
Rp 1,000.00 Rp 330.00
Rp 25,000.00
Rp 400,000.00
Rp 450,000.00
Rp 500,000.00
Rp 574,000.00
Rp 240,000.00
Rp 288,000.00
Rp 336,000.00
Rp 85,000.00 Rp 85,000.00
Rp 38,000.00 Rp 38,000.00
Rp 44,000.00 Rp 44,000.00
Rp 51,000.00 Rp 51,000.00
Rp 56,000.00 Rp 56,000.00
Rp 45,000.00
Rp 23,500.00 Rp 23,500.00
Rp 30,000.00
Rp 24,000.00 Rp 24,000.00
Rp 29,000.00 Rp 29,000.00
Rp 65,000.00
Rp 30,000.00
Rp 210,000.00
Rp 125,000.00
Rp 159,500.00
Rp 90,800.00
Rp 120,000.00
Rp 1,275,600.00
Rp 275,000.00
Rp 250,000.00
Rp 230,000.00
Rp 220,000.00
Rp 210,000.00
Rp 8,500.00 Rp 8,500.00
Rp 62,000.00 Rp 62,000.00
Rp 65,000.00 Rp 65,000.00
Rp 42,000.00 Rp 42,000.00
Rp 18,000.00 Rp 18,000.00
Rp 38,000.00 Rp 22,000.00
Rp 70,000.00 Rp 70,000.00
Rp 95,000.00 Rp 68,750.00
Rp 137,000.00 Rp 68,750.00
Rp 96,000.00 Rp 96,000.00
Rp 28,100.00
Rp 47,000.00 Rp 44,000.00
Rp 100,000.00 Rp 100,000.00
Rp 185,000.00 Rp 185,000.00
Rp 200,000.00 Rp 198,000.00
Rp 300,000.00 Rp 66,000.00
Rp 70,000.00 Rp 70,000.00
Rp 160,000.00 Rp 160,000.00
Rp 18,000.00 Rp 18,000.00
Rp 145,000.00
Rp 165,000.00 Rp 165,000.00
Rp 260,000.00 Rp 260,000.00
Rp 65,000.00 Rp 61,416.67
Rp 165,000.00 Rp 68,200.00
Rp 121,000.00 Rp 104,500.00
Rp 130,000.00 Rp 130,000.00
Rp 80,000.00 Rp 44,000.00
Rp 57,000.00 Rp 44,000.00
Rp 132,000.00
Rp 725,000.00 Rp 725,000.00
Rp 720,000.00 Rp 720,000.00
Rp 30,000.00 Rp 30,000.00
Rp 45,000.00 Rp 45,000.00
Rp 8,000.00 Rp 8,000.00
Rp 40,000.00 Rp 37,766.67
Rp 40,000.00 Rp 40,000.00
Rp 55,000.00 Rp 34,650.00
Rp 32,000.00 Rp 31,900.00
Rp 8,500.00 Rp 8,500.00
Rp 5,000.00 Rp 4,583.33
Rp 95,000.00
Rp 70,000.00 Rp 70,000.00
Rp 65,000.00 Rp 65,000.00
Rp 65,000.00 Rp 56,100.00
Rp 72,240.00 Rp 69,850.00
Rp 60,000.00 Rp 60,000.00
Rp 60,000.00 Rp 60,000.00
Rp 60,000.00 Rp 60,000.00
Rp 85,000.00 Rp 71,500.00
Rp 135,000.00 Rp 55,000.00
Rp 195,000.00 Rp 55,000.00
Rp 101,500.00 Rp 66,000.00
Rp 8,000.00 Rp 8,000.00
Rp 12,000.00 Rp 12,000.00
Rp 18,000.00 Rp 18,000.00
Rp 50,000.00
Rp 75,000.00 Rp 50,966.67
Rp 57,000.00 Rp 43,450.00
Rp 145,000.00 Rp 49,500.00
Rp 185,000.00 Rp 134,750.00
Rp 12,000.00 Rp 12,000.00
Rp 27,000.00 Rp 27,000.00
Rp 160,000.00 Rp 60,500.00
Rp 132,000.00 Rp 55,000.00
Rp 67,500.00 Rp 66,000.00
Rp 592,000.00
Rp 846,000.00
Rp 1,594,000.00
Rp 13,000,000.00
Rp 15,000,000.00
Rp 24,200,000.00
Rp 25,000,000.00
Rp 20,000,000.00
Rp 20,000,000.00
Rp 3,750,000.00
Rp 3,500,000.00
Rp 2,000,000.00
Rp 2,000,000.00 Rp 1,576,666.67
Rp 2,500,000.00
Rp 8,500,000.00
Rp 9,500,000.00
Rp 60,000.00
Rp 50,000.00
Rp 80,000.00
Rp 280,000.00
Rp 180,000.00
Rp 120,000.00
Rp 50,000.00
Rp 200,000.00
Rp 25,000.00
Rp 165,000.00
Rp 25,000.00 Rp 25,000.00
Rp 77,000.00
Rp 45,000.00 Rp 27,500.00
Rp 15,000.00 Rp 13,750.00
Rp 10,000.00 Rp 8,250.00
Rp 15,000.00 Rp 8,800.00
Rp 15,000.00 Rp 7,150.00
Rp 77,000.00
Rp 11,000.00 Rp 5,500.00
Rp 60,000.00
Rp 12,500.00 Rp 5,500.00
Rp 52,000.00
Rp 20,000.00 Rp 15,400.00
Rp 58,000.00
Rp 35,000.00 Rp 35,000.00
Rp 52,800.00
Rp 25,000.00 Rp 25,000.00
Rp 52,000.00
Rp 77,000.00 Rp 33,000.00
Rp 77,000.00
Rp 25,000.00 Rp 6,600.00
Rp 34,000.00
Rp 48,000.00 Rp 10,725.00
Rp 48,000.00
Rp 35,000.00 Rp 11,000.00
Rp 45,100.00
Rp 20,000.00 Rp 20,000.00
Rp 66,000.00 Rp 35,750.00
Rp 150,000.00 Rp 93,500.00
Rp 663,300.00 Rp 82,500.00
Rp 250,000.00 Rp 165,000.00
Rp 150,000.00 Rp 137,500.00
Rp 100,000.00 Rp 82,500.00
Rp 292,600.00 Rp 292,600.00
Rp 50,000.00 Rp 11,000.00
Rp 40,000.00 Rp 17,875.00
Rp 68,000.00
Rp 25,000.00 Rp 8,250.00
Rp 111,100.00
Rp 15,700.00 Rp 15,700.00
Rp 171,600.00
Rp 7,500.00 Rp 7,500.00
Rp 92,500.00
Rp 110,000.00 Rp 110,000.00
Rp 135,000.00 Rp 135,000.00
Rp 250,000.00
Rp 330,000.00
Rp 440,000.00
Rp 140,000.00 Rp 140,000.00
Rp 420,000.00
Rp 110,000.00 Rp 110,000.00
Rp 575,000.00
Rp 600,000.00
Rp 54,000.00
Rp 240,000.00 Rp 240,000.00
Rp 65,000.00
Rp 155,000.00 Rp 155,000.00
Rp 170,000.00 Rp 170,000.00
Rp 185,000.00
Rp 185,000.00
Rp 215,000.00
Rp 270,000.00
Rp 215,000.00
Rp 485,000.00
Rp 2,265,000.00
Rp 475,000.00
Rp 1,500,000.00
Rp 2,300,000.00 Rp 1,650,000.00
Rp 2,986,000.00 Rp 2,530,000.00
Rp 2,700,000.00 Rp 2,700,000.00
Rp 350,000.00 Rp 275,000.00
Rp 285,000.00 Rp 285,000.00
Rp 650,000.00 Rp 650,000.00
Rp 660,000.00 Rp 660,000.00
Rp 350,000.00 Rp 30,250.00
Rp 500,000.00 Rp 500,000.00
Rp 1,400,000.00 Rp 1,400,000.00
Rp 225,000.00 Rp 225,000.00
Rp 3,000,000.00 Rp 3,000,000.00
Rp 500,000.00 Rp 495,000.00
Rp 750,000.00 Rp 750,000.00
Rp 1,200,000.00 Rp 1,200,000.00
Rp 3,350,000.00 Rp 3,350,000.00
Rp 54,000.00 Rp 49,500.00
Rp 40,000.00 Rp 22,000.00
Rp 40,000.00 Rp 40,000.00
Rp 230,000.00 Rp 49,500.00
Rp 225,000.00 Rp 225,000.00
Rp 110,000.00 Rp 79,750.00
Rp 5,000.00 Rp 5,000.00
Rp 300,000.00 Rp 300,000.00
Rp 110,000.00 Rp 110,000.00
Rp 300,000.00
Rp 160,000.00
Rp 450,000.00 Rp 450,000.00
Rp 345,000.00 Rp 345,000.00
Rp 21,000,000.00
Rp 26,600,000.00
Rp 200,000.00 Rp 137,500.00
Rp 50,000.00 Rp 50,000.00
Rp 60,000.00 Rp 60,000.00
Rp 85,000.00
Rp 90,000.00 Rp 81,400.00
Rp 135,000.00 Rp 93,500.00
Rp 190,000.00
Rp 220,000.00 Rp 220,000.00
Rp 265,000.00
Rp 125,000.00
Rp 110,000.00 Rp 110,000.00
Rp 150,000.00
Rp 70,000.00
Rp 100,000.00
Rp 165,000.00
Rp 265,000.00
Rp 75,000.00 Rp 73,150.00
Rp 77,000.00 Rp 71,500.00
Rp 45,000.00 Rp 27,500.00
Rp 220,000.00
Rp 20,000.00 Rp 18,700.00
Rp 36,600.00 Rp 13,933.33
Rp 20,000.00
Rp 57,500.00
Rp 31,800.00
Rp 71,100.00
Rp 20,000.00
Rp 10,000.00
Rp 12,500.00
Rp 17,500.00
Rp 20,000.00
Rp 25,000.00
Rp 25,200.00
Rp 10,000.00
Rp 15,000.00
Rp 25,000.00
Rp 85,000.00 Rp 55,000.00
Rp 92,000.00 Rp 66,000.00
Rp 57,200.00
Rp 58,000.00 Rp 58,000.00
Rp 59,600.00 Rp 59,600.00
Rp 49,700.00 Rp 49,500.00
Rp 107,000.00 Rp 52,800.00
Rp 107,000.00
Rp 238,000.00
Rp 160,000.00
Rp 263,900.00
Rp 355,000.00
Rp 175,000.00
Rp 295,000.00
Rp 107,900.00
Rp 88,000.00 Rp 63,800.00
Rp 60,000.00 Rp 60,000.00
Rp 58,000.00 Rp 58,000.00
Rp 65,000.00 Rp 62,700.00
Rp 114,000.00
Rp 138,000.00
Rp 200,000.00
Rp 420,000.00
Rp 319,000.00
Rp 345,000.00
Rp 1,212,200.00
Rp 800,000.00
Rp 50,100.00
Rp 68,000.00
Rp 180,000.00
Rp 62,000.00
Rp 60,000.00
Rp 58,000.00
Rp 501,000.00
Rp 60,000.00
Rp 77,000.00
Rp 160,000.00
Rp 193,400.00
Rp 240,600.00
Rp 105,000.00
Rp 175,000.00
Rp 801,500.00
Rp 629,800.00
Rp 629,000.00
Rp 600,000.00
Rp 450,000.00
Rp 343,500.00
Rp 286,300.00
Rp 240,500.00
Rp 171,800.00
Rp 68,000.00
Rp 73,200.00
Rp 68,000.00
Rp 73,200.00
Rp 68,000.00
Rp 45,000.00
Rp 45,000.00
Rp 47,100.00
Rp 52,300.00
Rp 50,200.00
Rp 47,100.00
Rp 43,900.00
Rp 50,200.00
Rp 65,800.00
Rp 68,700.00
Rp 140,000.00
Rp 70,700.00 Rp 70,700.00
Rp 150,000.00
Rp 83,900.00
Rp 129,000.00
Rp 87,900.00
Rp 169,100.00
Rp 90,200.00 Rp 81,620.00
Rp 180,500.00
Rp 97,800.00
Rp 173,000.00
Rp 128,700.00
Rp 179,500.00
Rp 135,800.00
Rp 197,000.00
Rp 6,200.00
Rp 6,800.00
Rp 87,700.00
Rp 132,800.00
Rp 94,000.00
Rp 158,000.00
Rp 101,600.00
Rp 175,000.00
Rp 95,500.00
Rp 107,000.00
Rp 26,200.00
Rp 16,400.00
Rp 20,800.00
Rp 23,000.00
Rp 16,400.00
Rp 20,800.00
Rp 23,000.00
Rp 16,400.00
Rp 20,800.00
Rp 23,000.00
Rp 30,700.00 Rp 30,085.00
Rp 87,400.00
Rp 76,500.00
Rp 93,600.00
Rp 56,600.00
Rp 28,700.00
Rp 22,000.00
Rp 36,400.00
Rp 36,400.00
Rp 31,000.00
Rp 40,100.00
Rp 45,000.00
Rp 57,300.00
Rp 97,000.00
Rp 192,000.00
Rp 330,000.00
Rp 445,000.00
Rp 575,000.00
Rp 945,000.00
Rp 1,737,000.00
Rp 2,471,000.00
Rp 114,500.00
Rp 13,500.00 Rp 3,428.33
Rp 15,000.00
Rp 5,000.00 Rp 5,000.00
Rp 14,900.00
Rp 14,900.00
Rp 14,900.00
Rp 1,250,000.00
Rp 14,900.00
Rp 610,000.00
Rp 5,150.00
Rp 8,500.00
Rp 40,000.00
Rp 6,450.00
Rp 24,000.00
Rp 720,000.00
Rp 235,000.00
Rp 13,000.00
Rp 65,000.00 Rp 65,000.00
Rp 520,000.00 Rp 520,000.00
Rp 30,000.00 Rp 22,000.00
Rp 70,000.00 Rp 51,333.33
Rp 25,000.00 Rp 22,000.00
Rp 15,000.00 Rp 11,733.33
Rp 125,000.00
Rp 15,000.00
Rp 5,000.00
Rp 175,000.00
Rp 54,500.00
Rp 60,000.00 Rp 55,000.00
Rp 85,000.00 Rp 71,500.00
Rp 7,500.00 Rp 7,500.00
Rp 83,000.00 Rp 83,000.00
Rp 55,000.00 Rp 55,000.00
Rp 25,000.00 Rp 19,800.00
Rp 32,500.00 Rp 25,300.00
Rp 42,500.00 Rp 33,000.00
Rp 57,500.00 Rp 44,000.00
Rp 48,000.00 Rp 48,000.00
Rp 74,000.00 Rp 68,200.00
Rp 90,000.00 Rp 85,800.00
Rp 110,000.00 Rp 110,000.00
Rp 25,000.00
Rp 45,000.00
Rp 67,500.00
Rp 101,000.00
Rp 250,000.00
Rp 245,000.00
Rp 502,500.00
Rp 410,000.00
Rp 605,000.00
Rp 350,000.00
Rp 372,000.00
Rp 285,000.00
Rp 307,500.00
Rp 525,000.00
Rp 520,000.00
Rp 455,500.00
Rp 425,000.00
Rp 310,000.00
Rp 756,200.00
Rp 685,000.00
Rp 612,500.00
Rp 20,000.00
Rp 25,000.00
Rp 20,500.00
Rp 30,000.00
Rp 37,000.00
Rp 35,000.00
Rp 55,000.00
Rp 65,000.00
Rp 35,500.00
Rp 87,000.00
Rp 70,000.00
Rp 63,500.00
Rp 135,000.00
Rp 155,000.00
Rp 127,500.00
Rp 110,000.00
Rp 220,000.00
Rp 227,000.00
Rp 245,000.00
Rp 185,000.00
Rp 205,000.00
Rp 165,000.00
Rp 307,500.00
Rp 345,000.00
Rp 325,000.00
Rp 345,000.00
Rp 263,500.00
Rp 290,000.00
Rp 225,000.00
Rp 245,500.00
Rp 435,000.00
Rp 463,000.00
Rp 300,000.00
Rp 330,000.00
Rp 240,000.00
Rp 260,000.00
Rp 318,500.00
Rp 350,500.00
Rp 658,000.00
Rp 688,000.00
Rp 475,000.00
Rp 510,000.00
Rp 360,000.00
Rp 385,000.00
Rp 480,000.00
Rp 510,000.00
Rp 10,000.00
Rp 8,000.00
Rp 7,500.00
Rp 5,000.00
Rp 15,000.00
Rp 8,500.00
Rp 7,500.00
Rp 6,000.00
Rp 15,000.00
Rp 10,000.00
Rp 7,500.00
Rp 12,500.00
Rp 20,500.00
Rp 18,000.00
Rp 15,000.00
Rp 9,500.00
Rp 10,000.00
Rp 40,500.00
Rp 30,000.00
Rp 15,500.00
Rp 13,500.00
Rp 20,000.00
Rp 52,500.00
Rp 37,500.00
Rp 20,000.00
Rp 18,500.00
Rp 30,000.00
Rp 22,500.00
Rp 25,000.00
Rp 65,000.00
Rp 60,000.00
Rp 22,500.00
Rp 40,500.00
Rp 227,500.00
Rp 35,000.00
Rp 23,500.00
Rp 42,500.00
Rp 85,000.00
Rp 87,500.00
Rp 65,000.00
Rp 50,500.00
Rp 80,000.00
Rp 47,500.00
Rp 50,000.00
Rp 35,500.00
Rp 60,000.00
Rp 40,000.00
Rp 55,500.00
Rp 42,500.00
Rp 110,500.00
Rp 120,000.00
Rp 955,000.00
Rp 42,500.00
Rp 115,000.00
Rp 235,000.00
Rp 67,500.00
Rp 82,500.00
Rp 55,000.00
Rp 67,500.00
Rp 80,000.00
Rp 182,000.00
Rp 170,000.00
Rp 87,500.00
Rp 58,000.00
Rp 150,500.00
Rp 65,000.00
Rp 115,500.00
Rp 50,000.00
Rp 117,500.00
Rp 340,000.00
Rp 98,000.00
Rp 110,500.00
Rp 150,000.00
Rp 148,500.00
Rp 150,000.00
Rp 200,500.00
Rp 147,500.00
Rp 300,000.00
Rp 305,500.00
Rp 245,000.00
Rp 217,500.00
Rp 468,500.00
Rp 488,500.00
Rp 388,000.00
Rp 320,000.00
Rp 750,000.00
Rp 770,000.00
Rp 612,500.00
Rp 998,400.00
Rp 598,400.00
Rp 1,269,500.00
Rp 789,500.00
Rp 1,590,000.00
Rp 990,000.00
Rp 2,100,500.00
Rp 1,300,500.00
Rp 1,975,000.00
Rp 1,970,500.00
Rp 2,880,500.00
Rp 24,500.00 Rp 24,500.00
Rp 34,500.00 Rp 34,500.00
Rp 45,000.00 Rp 45,000.00
Rp 65,200.00 Rp 65,200.00
Rp 112,000.00
Rp 178,000.00
Rp 358,000.00
Rp 560,000.00
Rp 1,150,000.00
Rp 143,500.00
Rp 298,500.00
Rp 440,000.00
Rp 940,000.00
Rp 98,000.00
Rp 176,500.00
Rp 376,500.00
Rp 566,500.00
Rp 1,176,500.00
Rp 1,816,500.00
Rp 2,818,000.00
Rp 4,488,000.00
Rp 7,388,000.00
Rp 11,518,000.00
Rp 19,050,000.00
Rp 148,000.00
Rp 318,000.00
Rp 448,000.00
Rp 968,000.00
Rp 1,478,000.00
Rp 2,318,000.00
Rp 3,688,000.00
Rp 5,911,000.00
Rp 9,258,000.00
Rp 15,462,000.00
Rp 175,000.00 Rp 107,250.00
Rp 220,000.00 Rp 132,000.00
Rp 340,000.00 Rp 159,500.00
Rp 430,000.00 Rp 192,500.00
Rp 500,000.00 Rp 225,500.00
Rp 675,000.00 Rp 302,500.00
Rp 875,000.00 Rp 649,000.00
Rp 1,150,000.00 Rp 825,000.00
Rp 1,800,000.00 Rp 1,045,000.00
Rp 1,655,000.00
Rp 1,852,000.00
Rp 2,855,000.00
Rp 5,555,000.00
Rp 7,115,000.00
Rp 11,125,000.00
Rp 130,000.00
Rp 170,000.00
Rp 220,000.00
Rp 280,000.00
Rp 325,000.00
Rp 400,000.00
Rp 510,000.00
Rp 650,000.00
Rp 850,000.00
Rp 85,000.00
Rp 110,000.00
Rp 175,000.00
Rp 200,000.00
Rp 220,000.00
Rp 250,000.00
Rp 325,000.00
Rp 425,000.00
Rp 550,000.00
Rp 28,000.00
Rp 45,000.00
Rp 63,000.00
Rp 92,500.00
Rp 25,000.00 Rp 25,000.00
Rp 32,500.00 Rp 32,500.00
Rp 35,000.00 Rp 35,000.00
Rp 40,000.00 Rp 40,000.00
Rp 53,000.00 Rp 53,000.00
Rp 70,000.00 Rp 70,000.00
Rp 110,000.00 Rp 110,000.00
Rp 180,000.00 Rp 180,000.00
Rp 230,000.00 Rp 230,000.00
Rp 425,000.00 Rp 425,000.00
Rp 700,000.00 Rp 550,000.00
Rp 15,000.00 Rp 11,000.00
Rp 17,500.00 Rp 16,500.00
Rp 30,500.00 Rp 30,500.00
Rp 37,000.00 Rp 37,000.00
Rp 45,000.00 Rp 45,000.00
Rp 62,500.00 Rp 62,500.00
Rp 80,000.00 Rp 80,000.00
Rp 125,000.00
Rp 135,000.00
Rp 125,000.00
Rp 230,000.00
Rp 340,000.00
Rp 167,000.00
Rp 415,000.00
Rp 205,500.00
Rp 320,000.00
Rp 135,000.00
Rp 170,000.00
Rp 37,500.00
Rp 42,500.00
Rp 195,000.00
Rp 275,000.00
Rp 348,500.00
Rp 37,500.00 Rp 7,700.00
Rp 4,800.00 Rp 4,800.00
Rp 75,000.00 Rp 16,500.00
Rp 48,500.00 Rp 8,800.00
Rp 52,500.00 Rp 13,200.00
Rp 110,000.00 Rp 19,800.00
Rp 28,500.00 Rp 6,600.00
Rp 47,500.00 Rp 8,800.00
Rp 48,500.00 Rp 13,200.00
Rp 230,000.00
Rp 295,000.00
Rp 372,000.00
Rp 493,000.00
Rp 532,000.00
Rp 737,000.00
Rp 810,000.00
Rp 1,210,000.00
Rp 13,500.00
Rp 10,000.00 Rp 10,000.00
Rp 12,000.00 Rp 2,200.00
Rp 3,000.00 Rp 2,200.00
Rp 25,000.00 Rp 16,500.00
Rp 15,500.00 Rp 2,200.00
Rp 17,500.00 Rp 3,300.00
Rp 15,000.00 Rp 7,700.00
Rp 27,500.00 Rp 19,800.00
Rp 25,000.00
Rp 15,000.00
Rp 27,500.00
Rp 45,000.00 Rp 11,000.00
Rp 17,500.00 Rp 17,500.00
Rp 72,500.00 Rp 52,250.00
Rp 35,000.00 Rp 35,000.00
Rp 25,000.00
Rp 115,000.00
Rp 7,500.00 Rp 7,500.00
Rp 15,000.00 Rp 13,566.67
Rp 135,000.00
Rp 40,500.00
Rp 3,500.00 Rp 2,750.00
Rp 7,500.00 Rp 4,216.67
Rp 15,000.00 Rp 5,500.00
Rp 27,500.00 Rp 11,275.00
Rp 20,000.00 Rp 11,550.00
Rp 75,500.00 Rp 38,500.00
Rp 10,500.00 Rp 10,500.00
Rp 10,000.00 Rp 10,000.00
Rp 15,500.00 Rp 15,500.00
Rp 176,500.00 Rp 110,000.00
Rp 196,500.00 Rp 148,500.00
Rp 326,500.00 Rp 165,000.00
Rp 56,500.00 Rp 56,500.00
Rp 1,216,500.00 Rp 770,000.00
Rp 1,586,500.00
Rp 145,000.00
Rp 185,000.00
Rp 300,000.00
Rp 625,500.00
Rp 47,500.00 Rp 11,000.00
Rp 65,000.00 Rp 16,500.00
Rp 97,500.00 Rp 25,300.00
Rp 210,000.00 Rp 16,500.00
Rp 68,000.00 Rp 27,500.00
Rp 115,000.00 Rp 38,500.00
Rp 9,500.00 Rp 6,600.00
Rp 17,000.00 Rp 8,800.00
Rp 15,000.00 Rp 2,200.00
Rp 15,500.00 Rp 3,300.00
Rp 10,000.00 Rp 5,500.00
Rp 25,000.00 Rp 8,800.00
Rp 27,500.00 Rp 11,000.00
Rp 47,000.00 Rp 14,300.00
Rp 525,000.00 Rp 525,000.00
Rp 900,000.00 Rp 900,000.00
Rp 560,000.00 Rp 560,000.00
Rp 615,000.00
Rp 565,000.00
Rp 1,215,000.00
Rp 2,615,000.00
Rp 520,000.00
Rp 2,675,000.00
Rp 5,175,000.00
Rp 10,200,000.00
Rp 640,000.00
Rp 960,000.00
Rp 3,500,000.00
Rp 26,059,200.00
Rp 19,332,500.00
Rp 18,705,500.00
Rp 75,000.00
Rp 145,000.00
Rp 225,000.00
Rp 250,000.00
Rp 60,000.00
Rp 50,000.00
Rp 15,000.00
Rp 150,000.00
Rp 155,000.00
Rp 175,000.00
Rp 850,000.00
Rp 195,000.00
Rp 185,000.00
Rp 90,000.00
Rp 700,000.00
Rp 475,000.00
Rp 75,000.00
Rp 75,000.00
Rp 22,000.00
Rp 745,000.00
Rp 975,000.00
Rp 1,300,000.00
Rp 10,000.00
Rp 5,000.00
Rp 7,000.00
Rp 30,000.00
Rp 100,000.00
Rp 55,000.00
Rp 85,000.00
Rp 65,000.00
Rp 75,000.00
Rp 8,500.00 Rp 8,500.00
Rp 2,500.00 Rp 2,500.00
Rp 5,000.00 Rp 3,575.00
Rp 4,000.00
Rp 65,000.00
Rp 40,000.00
Rp 12,500.00 Rp 12,100.00
Rp 11,000.00
Rp 6,500.00 Rp 6,500.00
Rp 6,500.00
Rp 9,000.00 Rp 9,000.00
Rp 9,400.00
Rp 75,000.00
Rp 93,750.00
Rp 125,000.00
Rp 4,700.00
Rp 7,000.00
Rp 28,200.00
Rp 55,000.00
Rp 55,000.00
Rp 57,500.00
Rp 57,500.00
Rp 70,000.00
Rp 30,000.00
Rp 60,000.00
Rp 67,900.00
Rp 26,500.00
Rp 11,000.00
Rp 700,000.00
Rp 5,000.00
Rp 26,100.00
Rp 35,000.00 Rp 35,000.00
Rp 45,000.00 Rp 45,000.00
Rp 185,000.00 Rp 137,500.00
Rp 135,000.00 Rp 126,500.00
Rp 180,000.00 Rp 115,500.00
Rp 300,000.00 Rp 110,000.00
Rp 158,000.00 Rp 99,000.00
Rp 47,000.00 Rp 38,500.00
Rp 57,000.00 Rp 44,000.00
Rp 68,000.00 Rp 49,500.00
Rp 18,000.00
Rp 70,000.00
Rp 55,000.00 Rp 55,000.00
Rp 60,000.00 Rp 60,000.00
Rp 45,000.00
Rp 60,000.00 Rp 60,000.00
Rp 60,000.00 Rp 60,000.00
Rp 60,000.00 Rp 60,000.00
Rp 170,000.00 Rp 110,000.00
Rp 500.00
Rp 800,000.00
Rp 800,000.00
Rp 800,000.00
Rp 360,400.00
Rp 209,000.00
Rp 26,100.00
Rp 16,700.00 Rp 16,700.00
Rp 12,500.00 Rp 12,500.00
Rp 26,500.00 Rp 26,500.00
Rp 15,700.00 Rp 15,700.00
Rp 2,000.00
Rp 2,500.00
Rp 3,500.00
Rp 6,000.00
Rp 3,000.00
Rp 5,000.00
Rp 13,500.00
Rp 33,400.00
Rp 150,000.00
Rp 3,750,000.00
Rp 4,900,000.00
Rp 2,000,000.00
Rp 2,200,000.00
Rp 85,000.00
Rp 425,000.00
Rp 260,000.00
Rp 300,000.00
Rp 455,000.00
Rp 265,000.00
Rp 250,000.00
Rp 41,800.00
Rp 12,000.00
Rp 41,000.00
Rp 16,400.00
Rp 31,400.00
Rp 16,700.00
Rp 26,100.00
Rp 118,400.00
Rp 118,400.00
Rp 9,000.00
Rp 5,000.00
Rp 20,000.00
Rp 15,000.00
Rp 7,500.00
Rp 15,000.00
Rp 15,000.00
Rp 223,600.00
Rp 9,248,300.00
Rp 70,000.00 Rp 44,000.00
Rp 30,000.00 Rp 5,500.00
Rp 400,000.00
Rp 115,000.00 Rp 49,500.00
Rp 55,000.00
Rp 261,300.00
Rp 4,290,000.00
Rp 950,000.00 Rp 950,000.00
Rp 460,000.00
Rp 543,400.00
Rp 65,000.00 Rp 33,000.00
Rp 15,000.00 Rp 15,000.00
Rp 95,000.00
Rp 480,000.00
Rp 500,000.00
Rp 85,000.00 Rp 60,500.00
Rp 15,000.00 Rp 11,000.00
Rp 1,150,000.00
Rp 1,100,000.00
Rp 700,000.00
Rp 1,550,000.00
Rp 78,400.00
Rp 135,900.00
Rp 6,275,000.00
Rp 5,530,000.00
Rp 30,000.00
Rp 176,000.00
Rp 153,000.00
Rp 153,000.00
Rp 141,000.00
Rp 141,000.00
Rp 141,000.00
Rp 117,000.00
Rp 150,000.00
Rp 117,000.00
Rp 164,000.00
Rp 141,000.00
Rp 178,000.00
Rp 113,000.00
Rp 153,000.00
Rp 117,000.00
Rp 153,000.00
Lembar 133
L 2 3
A. BAHAN ATAP
1 Seng Gelombang bjls 0,35 (6 Kaki) Lembar 80,000.00
2 Seng Gelombang bjls 0,30 (6 Kaki) Lembar 70,000.00
3 Seng Gelombang bjls 0,20 (7 Kaki) Lembar 49,000.00
4 Seng Gelombang bjls 0,20 (10 Kaki) Lembar 72,000.00
5 Seng Plat bjls 0,35 (6 KK) Lembar 85,000.00
6 Seng Plat bjls 0,30 (6 KK) Lembar 75,000.00
7 Seng Fiber KK 18,000.00
8 Eternit Jibesmen 1 m x 1 m Lembar 15,000.00
9 Eternit Harflex 1 m x 1 m Lembar 18,000.00
10 Karet Lapis Paku Asbes Biji 72,000.00
11 Karet Talang (50 cm) M 7,500.00
12 Onduline panjang 2m + baut , L,95cm xP, 2m 1.615 m² 102,167.18 Lembar 165,000.00
13 Ondulclear panjang 2m + baut , L,95cm xP, 2m 1.615 m² 198,142.41 Lembar 320,000.00
14 Nok Onduline , 1 m Lembar 79,000.00
B. BAHAN DASAR -
Lembar 134
L 2 3
1 Batu Kali M3 320,000.00
2 Batu kali Belah M3 200,000.00
3 Sirtu Royalty A B & C M3 260,000.00
4 Batu Gunung M3 300,000.00
5 Batu Pecah 2 - 3 cm M3 300,000.00
6 Batu Pecah 1- 2 cm M3 300,000.00
7 Batu Merah Standar Biji 540.00
8 Bata Ringan M3 900,000.00
9 Gorong - Gorong Beton Dia 60 cm M -
10 Gorong - Gorong Beton Dia 30 cm M 189,727.27
11 Tanah Timbunan M3 200,000.00
12 Pasir Kasar/Pasir Beton/Pasir Pasangan M3 142,200.00
13 Pasir Timbunan M3 160,000.00
14 Kerikil Sungai M3 325,000.00
15 Semen 50 kg (Tonasa) P,C Kg 1,300 Sak 65,000.00
16 Semen 40 kg (Tonasa) P,C Kg 1,200 Sak 48,000.00
17 Semen 50 kg (Bosowa) P,C Kg 1,280 Sak 64,000.00
18 Semen 40 kg (Bosowa) P,C Kg 1,175 Sak 47,000.00
19 Semen Putih 40 kg per sak Kg 1,750 Sak 70,000.00
20 Semen Nat Tegel Kg 20,000.00
Lembar 135
L 2 3
21 Plastik untuk beton m² 1.00 4,000.00 M2 80,000.00 Roll
22 Air bersih (air kerja) Ltr 15.00
-
C. BAHAN BAMBU -
1 Bambu - Besar Batang 34,000.00
2 Bambu - Sedang Batang 30,000.00
3 Dolken Ø 8-10cm -4m /(Bambu sedang ) Batang 40,000.00
4 Rotan Pengikat Ikat 50,000.00
5 Gorong-gorong ᶲ 30/ m Buah 150,000.00
6 Gorong-gorong ᶲ 60/ m Buah 275,000.00
7 Gorong-gorong ᶲ 80/ m Buah 350,000.00
-
D BAHAN BESI -
1 Angker Baut Tinggi 70 cm Bh 7,190.00
2 Baut Diameter 12 mm x 10 cm (stainless) Batang/Biji 12,941.00
3 Baut Diameter 12 mm x 18 cm (stainless) Batang 13,365.00
4 Baut Diameter 12 mm x 20 cm Batang 14,000.00
5 Baut Diameter 12 mm x 25 cm Batang 17,400.00
6 Baut Skrup Bh 5,500.00
7 Besi Streep 30 x 3 mm 47,500 m¹ M'/Btg 190,000.00
Lembar 136
L 2 3
8 Besi Hollow 40.60.1,0 mm P = 6 m m¹ 30,500 Btg 183,000.00
9 Besi Hollow 40.60.1,2 mm P = 6 m m¹ 30,833 Btg 185,000.00
10 Besi Hollow 40.40.2 mm P =6 m m¹ 31,667 Btg 190,000.00
11 Besi Hollow 40.40.1,5 mm P =6 m m¹ 26,667 Btg 160,000.00
12 Besi Hollow 40.20.2 mm P = 6 m m¹ 22,500 Btg 135,000.00
13 Besi Hollow 20.20.1,5 mm P = 6 m m¹ 19,167 Btg 115,000.00
14 Plat Besi Kembang 2,3 mm M2 790,000.00
15 Besi Beton Polos (Campuran) Rata-rata harga besi 9,900.00 Kg 9,900.00
16 Besi Beton Ulir (Campuran) 14,143 Kg 14,143.45
17 Besi Beton 6 mm ( 0, 22 kg / M' ) Besi Polos U24Ø6 Kg 11,364 Btg 30,000.00
18 Besi Beton 8 mm ( 0,39 kg / M' ) Besi Polos U24Ø8 Kg 10,791 Btg 50,500.00
19 Besi Beton 10 mm ( 0, 62 kg / M' ) Besi Polos U24Ø10 Kg 10,538 Btg 78,400.00
20 Besi Beton 12 mm ( 0, 89 kg / M' ) Besi Polos U24Ø12 Kg 10,581 Btg 113,000.00
21 Besi Beton 14 mm ( 1, 21 kg / M' ) Besi Polos U24Ø14 Kg 10,069 Btg 145,000.00
22 Besi Beton 16 mm ( 1, 39 kg / M' ) Besi Polos U24Ø16 Kg 11,151 Btg 186,000.00
23 Besi Beton Ulir Dia 8 mm ( 0, 39 kg / M' ) Besi Ulir Kg 16,752 Btg 78,400.00
24 Besi Beton Ulir Dia. 16 mm (1,39 kg/m¹) Besi Ulir Kg 11,535 Btg 192,400.00
25 Beugel Kap V Plat Besi Kg 13,800.00
26 Kawat Ikat Beton 1 Roll 20 kg 20,750 kg Roll 415,000 Kg 20,750.00
27 Kawat Las 2,6 nikko 1,500 Dos 150,000.00
Lembar 137
L 2 3
28 Kawat Saringan Pasir / Ayakan M 25,000.00
29 Lem Kayu dan Karet (Fox) Besar Tube 12,000.00
30 Lem Karet (Fox) Besar Kg 185,000.00
31 Lem Seng M 15,000.00
32 Paku Campuran (5-10 cm) Kg 19,800.00
39 Paku 2-3 cm Kg 25,000.00
40 Paku Seng ( 1 Kg/Dos) Kg 55,000.00
41 Paku Skrup Biji 636.36
42 Paku Skrup Besi Hollow - 1000 biji per dos Biji 1,450.00 Dos/Bgks 145,000.00
43 Paku Skrup Gypsum - 500 biji per bungkus Biji 150.00 Dos/Bgks 35,000.00
44 Paku Beton 5 cm Dos 18,000.00
45 Paku Beton 6 cm Dos 18,000.00
46 Paku Beton 7 - 10 cm Dos 50,000.00
47 Paku Payung Berulir ( 1 Kg/Dos) Kg 55,000.00
48 Paku Triplex (Setara Paku 2-3 cm) Kg 25,000.00
49 Paku Ripet Biji 10,000.00
50 Skamp (Paku Tembak Hollow alumunium) 100 250.00 Bh 25,000.00
-
E BAHAN BAJA RINGAN /SPANDEK -
1 Rangka Baja Ringan 0,75 - M2/6 85,000.00
Lembar 138
L 2 3
2 Spandek 0,25 M' 38,000.00
3 Spandek 0,35 M' 44,000.00
4 Hollow aluminium untuk rangka plafond 0,25 (2x4) btg 17,727.27
5 Nok Spandek M' 45,000.00
6 Baut Dinabolt Bh 10,000.00
7 Main Taso (C.75.40.0,75) 14,655 M¹ Btg 85,000.00
8 Reng Taso( U Type 32.0,45) 7,758.6 M¹ Btg 45,000.00
9 Screw 12-14x20 Bh 1,000.00
10 Screw 12-16x16 Bh 750.00
11 Hollow aluminium rangka plafond 40 x 40 x 2 mm m¹ 7,033 btg 29,000.00
12 Hollow aluminium rangka plafond 40 x 20 x 2 mm m¹ 4,167 btg 24,000.00
13 Kawat Penggantung Hollow aluminium Kg 30,000.00
14 Pintu KM/WC Alumunium (Lengkap Accessories) lebar 6cm Unit 250,000.00
15 Pintu KM/WC PVC kw.1 (Lengkap Accessories) lebar 10cm Unit 300,000.00
16 Pintu KM/ WC,bahan PVC lengkap Accessories ex Maspion star Unit 210,000.00
17 Alminium 4" Brown - 6 Meter Btg 210,000.00
18 Alminium 3" Brown - 6 Meter Btg 125,000.00
19 Alminium Slimar 4" Brown Untuk Daun Jendela Btg 159,500.00
20 Alminium Slimar 3" Brown Untuk Daun Jendela Btg 90,000.00
Lembar 139
L 2 3
21 Pasang Kusen Alminium 4" M¹ 120,000.00
22 Pasang Daun Jendela Alminium + kaca tebal 5mm + karet dan Sealent M² 1,275,600.00
23 Pasang Daun Pintu Alminium Panil Kaca Tebal 5mm (Lengkap Assessories) Unit 275,000.00
F BAHAN FINISHING : -
1 Cat Minyak Afduner Liter/botol 8,500.00
2 Cat Kayu Ex Avian ( 0,9 Kg ) Klg 62,000.00
3 Cat Minyak Super A Liter 38,000.00
4 Cat Dasar Kayu 3.5 Kg kg 7,143 Kaleng 95,000.00
5 Cat Dasar Meni 3.5 Kg kg 23,886 Kaleng 137,000.00
6 Cat Genteng Biasa AGA ( 4 Kg ) 4 Kg kg 57,875 Kaleng 185,000.00
7 Cat Genteng Minyak Nippon 2.5 Kg Kg 80,000 Kaleng 200,000.00
8 Cat Residu / Cloter (10 kg) 10 Kg kg 30,000 Klg 300,000.00
9 Cat Seng Nippon (2,5 kg) 2.5 Kg kg 28,000 Klg 70,000.00
10 Cat Dasar Tembok 5 kg Kg 24,200 Kg 121,000.00
11 Cat Tembok Metrolite /ICI 5 Kg kg 29,000 Kaleng 145,000.00
L 2 3
15 Cat Anti Lumut (No drop) (20 Kg) 20 Kg kg 36,000 Pail 720,000.00
16 Cat Dasar kayu Glatik Kg 30,000.00
17 Plamur Tembok Boyo dan Setara (5kg) 5 Kg kg 9,000 kaleng 45,000.00
18 Dempul Kayu Cap Kucing / merah ( 1 Kg ) Kg 40,000.00
19 Dempul ex Isamu ( 1 Kg ) Kg 55,000.00
20 Tenner A (ex Avian) Liter 32,000.00
21 Minyak Tenner Super Liter 32,000.00
22 Kertas Gosok Lembar 5,000.00
23 Cat Minyak untuk Genteng, Bataco, Paving Block ( AGA ) Kg 195,000.00
24 Kuas 2" (Eterna) Buah 8,000.00
25 Kuas 3" (Eterna) Buah 12,000.00
26 Kuas 4" (Eterna) Buah 18,000.00
27 Lem Fox Kaleng Kg 145,000.00
28 Perban Conpon Roll/Bh 12,000.00
29 Bubuk + air Pelarut Ex Aqugart untuk Waterproofing Kg 27,000.00
30 Cat waterproof eks aquaproof - kw.1 Kg 160,000.00
31 Alminium Composite Panel (Alucopan/ACP)1220x2440x4 mm Skin 0,21mm Lembar 592,000.00
32 Alminium Composite Panel (Alucopan/ACP)1220x2440x4 mm Skin 0,30mm Lembar 846,000.00
33 Alminium Composite Panel (Alucopan/ACP)1220x4880x4 mm Skin 0,30mm Lembar 1,594,000.00
Lembar 141
L 2 3
F BAHAN KAYU -
1 Kayu Kls. I Bayam (balok) Shain saw M3 13,000,000.00
2 Kayu Kls. I Bayam (balok) Sawmill M3 15,000,000.00
3 Kayu Kls. I Bayam (papan) Shain Saw M3 20,000,000.00
4 Kayu Kls. I Bayam (papan) Sawmill - M3 20,000,000.00
5 Kayu Klas. II Samarinda (balok)/ Lokal - M3 2,365,000.00
6 Kayu Klas. II Samarinda (papan)/ Lokal - M3 2,640,000.00
7 Kayu Kls. III Kapur (balok)/ Kemiri - M3 1,650,000.00
8 Kayu Kls. III (papan) - M3 1,576,600.00
9 Kayu Kumea Balok M3 8,500,000.00
10 Kayu Kumea Papan - M3 9,500,000.00
11 Kayu Mangga/Kemiri (papan) - M3 2,500,000.00
G BAHAN PENGGANTUNG -
1 Engsel Kuningan 4 Lubang 2Bh 2 12,500.00 Psg 25,000.00
2 Engsel Stainless Steel 2Bh 2 22,500.00 Psg 45,000.00
3 Engsel Kupu - kupu 2Bh 2 5,000.00 Psg 10,000.00
4 Engsel pintu biasa (Merk 777) 2Bh 2 7,500.00 Psg 15,000.00
5 Engsel Jendela Kuningan (merk Kuningan) 2Bh 2 10,000.00 Psg 20,000.00
6 Engsel Pintu 4" (SES) Bh 35,000.00
Lembar 142
L 2 3
7 Engsel Jendela 3"(SES) Bh 25,000.00
8 Engsel Pintu Kuningan SES 2Bh 2 38,500.00 Psg 77,000.00
H BAHAN KACA
1 Kaca Bening 3 mm M2 110,000.00
2 Kaca Bening 5 mm M2 135,000.00
3 Kaca Bening 8 mm M2 330,000.00
4 Kaca Ryben Tebal 5 mm M2 140,000.00
5 Kaca Ryben Tebal 8 mm M2 522,727.27
Lembar 143
L 2 3
6 Jendela Nako (Rangka+ Kaca Tebal 5mm) 0,6 m x 1 m M2 110,000.00
-
I BAHAN SANITER / SALURAN AIR -
1 Kloset Jongkok ex KIA Buah 350,000.00
2 Kloset Jongkok Biasa (Standar) Buah 285,000.00
L 2 3
2 Pintu KM/WC bahan PVC Lengkap Accessories ex MASPION Unit 855,000.00
3 Multiplex 120 x 240 cm tebal. 18 mm 1 M² 89,021.77 Lembar 265,000.00
4 Triplex 4 mm 120 x 240 cm 1 M² 20,155.87 Lembar 60,000.00
5 Triplex Melamin 120 x 240 cm 3mm 1 M² 36,952.43 Lembar 110,000.00
6 Teakwood 120 x 240 cm t.4mm 1 M² 50,389.68 Lembar 150,000.00
7 Triplex 120 x 240 cm t. 6 mm 1 M² 30,233.81 Lembar 90,000.00
8 Multiplex 120 x 240 cm t. 9 mm 1 M² 33,593.12 Lembar 100,000.00
9 Kalsiboard tebal 4 mm 1 M² 25,866.70 Lembar 77,000.00
K BAHAN LANTAI
1 Tegel Keramik Putih 20 x 25 cm 20.00 Bh 2,980.00 Dos 59,600.00
2 Tegel Keramik Putih 30 x 30 cm 11.11 Bh 4,473.00 Dos 49,700.00
3 Tegel Keramik Putih 40 x 40 cm 6.25 Bh 9,600.00 Dos 60,000.00
4 Tegel Keramik Putih 40 x 40 cm Pemukaan kasar 6.25 Bh 10,400.00 Dos 65,000.00
5 Tegel Keramik warna 20 x 20 cm 25.00 Bh 3,520.00 Dos 88,000.00
6 Tegel Keramik warna 30 x 30 cm 11.11 Bh 5,400.00 Dos 60,000.00
7 Tegel Keramik warna 20 x 25 cm 20.00 Bh 2,900.00 M2 58,000.00
Lembar 145
L 2 3
8 Tegel Keramik warna 40 x 40 cm 6.25 Bh 10,400.0 M2 65,000.00
9 Keramik WC 20 x 20 cm 25.00 Bh 2,480.00 Dos 62,000.00
10 Keramik WC 20 x 25 cm 20.00 Bh 3,000.00 Dos 60,000.00
11 Keramik WC 30 x 30 cm 11.11 Bh 5,400.00 Dos 60,000.00
L BAHAN LAIN-LAIN -
1 Paving Blok Segi Empat 6 cm ( K 225 ) M2 65,800.00
2 Paving Blok Segi Empat 6 cm ( K 250 ) Standar M2 68,700.00
3 Paving Blok Segi Empat 8 cm ( K 225 ) Standar M2 83,900.00
4 Paving Blok Segi Empat 8 cm ( K 225 ) Warna M2 129,000.00
6 Kanstin Type Segi 10-15 x 3 0 x 40 cm - 2,5 Bh/M' M' 87,400.00
7 Batu alam 20 x 20 cm polos M2 193,400.00
8 Kanstin Type Kotak 10 x 2 0 x 40 cm - 2,5 Bh/M' M' 76,500.00
9 Tali Nilon Kg 5,000.00
10 Solar Non Industri Ltr 5,150.00
11 Solar Industri Ltr 8,500.00
12 Minyak Pelumas Ltr 40,000.00
13 Bensin Ltr 6,450.00
14 Minyak bakesting Ltr 24,000.00
15 Filler/abu batu M³ 235,000.00
Lembar 146
L 2 3
15 Kerosen/Minyak Tanah Ltr 13,000.00
16 Mortar M3 720,000.00
17 Plastik Untuk Beton M² 4,545.45
24 Pemasangan M² 11,454.55
-
M ALAT BANTU PEMELIHARAAN -
1 Sekop Bh 65,000.00
2 Gerobak Dorong Arco Bh 520,000.00
3 Betel Bh 30,000.00
4 Palu Bh 70,000.00
5 Sendok Semen Bh 25,000.00
6 Sikat Baja Bh 15,000.00
7 Sapu Lidi Bh 5,000.00
8 Cangkul Bh 60,000.00
L 2 3
1 3/4 Inci -4M 4,757.6 Batang 28,545.45
2 1 Inci -4M 5,636.4 Batang 33,818.18
3 1 1/2 Inci -4M 6,333.3 Batang 38,000.00
4 2 Inci -4M 7,697.0 Batang 46,181.82
5 2 1/2 Inci -4M 9,939.4 Batang 59,636.36
6 3 Inci -4M 13,212.1 Batang 79,272.73
7 4 Inci -4M 20,803.0 Batang 124,818.18
8 5 Inci -4M 33,530.3 Batang 201,181.82
L 2 3
20 Saringan Kotoran Kamar Mandi - Bahan Besi/Kuningan (Floor Drain) Bh 22,727.27
21 Lem FOX Kg 37,363.64
22 Lem Pipa PVC Tube 9,454.55
23 Lem Pipa PVC Kg 436,909.09
24 Talang PVC Meter 98,363.64
P MATERIAL POMPA -
1 Pompa Air Shimiznu 130 (125 Watt) Buah 269,818.18
2 Pompa Air Shimiznu 230 (200 Watt) Buah 470,681.82
Q BAHAN INSTALASI LISTRIK -
1 Box Panel Meter Bh 745,000.00
2 Fitting Lampu Eletra segi Empat Bh 15,000.00
3 Fitting Lampu E 40 Bh 30,000.00
4 Isolasi Kabel Tanah (Bahan Karet) Roll 71,272.73
5 Isolasi Unibell Roll 8,500.00
6 Kabel NYA - 1 x 1,5 mm Meter 2,500.00
7 Kabel NYA - 1 x 2,5 mm Meter 5,000.00
8 Kabel NYY 2 x 2,5 mm Meter 9,000.00
9 Kabel NYM 2 x 1,5 mm Meter 6,500.00
10 Lampu Hemat Energi LED 10 W Bh 57,000.00
Lembar 149
L 2 3
R UPAH KERJA
1 Mandor Lapangan O/H 176,000.00
2 Kepala tukang O/H 153,000.00
3 Kepala Tukang Listrik O/H 150,000.00
4 Tukang Batu /Cat O/H 141,000.00
5 Tukang Kayu / besi O/H 141,000.00
6 Pekerja O/H 113,000.00
Lembar 150
L 2 3
7 Tukang pasang paving O/H 140,000.00
8 Biaya Pasang Canstein /M' 115,000.00
9 Biaya Pasang Paving /M2 130,000.00
L 2 3
Lembar 152
L 2 3
H.ANDI AKBAR KAMAL,S.STP,M.Si
Pangkat : Pembina
Nip.19771218 199612 1 001
Lembar 153
L 2 3
Lembar 154
Lembar 1.
4 5 6 7
A. BAHAN ATAP Dasar Pengenaan Pajak
1 Seng Gelombang bjls 0,35 (6 Kaki) 89,400 89,400.0 0.9090909091 81,272.73
2 Seng Gelombang bjls 0,30 (6 Kaki) 80,600 - - 80,600.0 0.9090909091 73,272.73
3 Seng Gelombang bjls 0,20 (7 Kaki) 50,100 - - 50,100.0 0.9090909091 45,545.45
4 Seng Gelombang bjls 0,20 (10 Kaki) 68,000 - - 68,000.0 0.9090909091 61,818.18
5 Seng Plat bjls 0,35 (6 KK) 83,600 - - 83,600.0 0.9090909091 76,000.00
6 Seng Plat bjls 0,30 (6 KK) 85,000 - 85,000.0 0.9090909091 77,272.73
7 Seng Fiber 18,000 8,000.0 - 13,000.0 0.9090909091 11,818.18
8 Eternit Jibesmen 1 m x 1 m 15,000 - 15,000.0 0.9090909091 13,636.36
9 Eternit Harflex 1 m x 1 m 18,000 - - 18,000.0 0.9090909091 16,363.64
10 Karet Lapis Paku Asbes 5,400 - 5,400.0 0.9090909091 4,909.09
11 Karet Talang (50 cm) 10,000 7,000.0 8,500.0 0.9090909091 7,727.2727
4 5 6 7
1 Batu Kali 220,000.00 - - 220,000.0 0.9090909091 200,000.00
2 Batu kali Belah 250,000.00 - - 250,000.0 0.9090909091 227,272.73
3 Sirtu Royalty 285,100.00 - - 285,100.0 0.9090909091 259,181.82
4 Batu Gunung 300,000.00 - 183,333.3 241,666.7 0.9090909091 219,696.97
5 Batu Pecah 2 - 3 cm 450,000.00 - 257,142.9 353,571.4 0.9090909091 321,428.57
6 Batu Pecah 1- 2 cm 450,000.00 - - 450,000.0 0.9090909091 409,090.91
7 Batu Merah Standar 600.00 600.0 600.0 0.9090909091 545.45
8 Bata Ringan 1,350,000.0 850,000.0 - 1,100,000.0 0.9090909091 1,000,000.00
9 Gorong - Gorong Beton Dia 60 cm - - - - 0.9090909091 -
10 Gorong - Gorong Beton Dia 30 cm 208,700.00 - - 208,700.0 0.9090909091 189,727.27
11 Tanah Timbunan 175,000.00 - 110,000.0 142,500.0 0.9090909091 129,545.45
12 Pasir Kasar/Pasir Beton/Pasir Pasangan 200,000.00 - 233,000.0 216,500.0 0.9090909091 142,200.00
13 Pasir Timbunan 151,600.00 - - 151,600.0 0.9090909091 137,818.18
14 Kerikil Sungai 300,000.00 - - 300,000.0 0.9090909091 272,727.27
15 Semen 50 kg (Tonasa) P,C 60,000.00 55,000.0 - 57,500.0 0.9090909091 52,272.73
16 Semen 40 kg (Tonasa) P,C 50,000.00 45,000.0 43,000.0 46,000.0 0.9090909091 41,818.18
Semen 50 kg (Bosowa) P,C 50,000.00
Semen 40 kg (Tonasa) P,C 45,000.00
17 Semen Putih 40 kg per sak 135,000.00 - - 135,000.0 0.9090909091 122,727.27
18 Semen Nat Tegel 20,000.00 15,000.0 - 17,500.0 0.9090909091 15,909.09
Lembar 156
4 5 6 7
19 Plastik untuk beton 130,700.00 90,000.0 - 130,700.0 0.9090909091 118,818.18
20 Air bersih (air kerja) 15.00 - - 15.0 0.9090909091 13.64
0.9090909091 -
C. BAHAN BAMBU 0.9090909091 -
1 Bambu 37,400.00 - - 37,400.0 0.9090909091 34,000.00
2 Bambu 27,500.00 - 25,000.0 26,250.0 0.9090909091 23,863.64
3 Dolken Ø 8-10cm -4m /(Bambu sedang ) 30,000.00 - - 30,000.0 0.9090909091 27,272.73
4 Rotan Pengikat 35,000.00 - - 35,000.0 0.9090909091 31,818.18
5 Gorong-gorong ᶲ 30/ m 110,000.00 - - 110,000.0 0.9090909091 100,000.00
6 Gorong-gorong ᶲ 60/ m 140,000.00 - - 140,000.0 0.9090909091 127,272.73
7 Gorong-gorong ᶲ 80/ m 150,000.00 - - 150,000.0 0.9090909091 136,363.64
0.9090909091 -
D BAHAN BESI - - 0.9090909091 -
1 Angker Baut Tinggi 70 cm 37,400.00 - - 37,400.0 0.9090909091 34,000.00
2 Baut Diameter 12 mm x 10 cm (stainless) 78,200.00 - - 78,200.0 0.9090909091 71,090.91
3 Baut Diameter 12 mm x 18 cm (stainless) 99,800.00 - - 99,800.0 0.9090909091 90,727.27
4 Baut Diameter 12 mm x 20 cm 7,300.00 - - 7,300.0 0.9090909091 6,636.36
5 Baut Diameter 12 mm x 25 cm 10,600.00 - - 10,600.0 0.9090909091 9,636.36
6 Baut Skrup 1,000.00 - - 1,000.0 0.9090909091 909.09
7 Besi Streep 30 x 3 mm 75,000.00 - - 75,000.0 0.9090909091 68,181.82
Lembar 157
4 5 6 7
8 Besi Hollow 250,000.00 - 250,000.0 0.9090909091 227,272.73
9 Besi Hollow 135,000.00 125,000.0 135,000.0 0.9090909091 122,727.27
10 Besi Hollow 225,000.00 85,000.0 225,000.0 0.9090909091 204,545.45
11 Besi Hollow 110,000.00 - - 110,000.0 0.9090909091 100,000.00
12 Besi Hollow 88,000.00 65,000.0 - 76,500.0 0.9090909091 69,545.45
13 Besi Hollow 75,000.00 60,000.0 - 67,500.0 0.9090909091 61,363.64
14 Plat Besi Kembang 685,000.00 - - 685,000.0 0.9090909091 622,727.27
15 Besi Beton 14,800.00 - 14,800.0 0.9090909091 13,454.55
16 Besi Beton 17,500.00 - 17,500.0 0.9090909091 15,909.09
17 Besi Beton 6 mm ( 0, 22 kg / M' ) 30,000.00 19,000.0 22,000.0 17,454.5 0.9090909091 15,867.77
18 Besi Beton 8 mm ( 0,39 kg / M' ) 48,000.00 30,000.0 39,000.0 0.9090909091 35,454.55
19 Besi Beton 10 mm ( 0, 62 kg / M' ) 65,000.00 55,000.0 48,000.0 37,845.9 0.9090909091 34,405.34
20 Besi Beton 12 mm ( 0, 89 kg / M' ) 98,000.00 75,000.0 42,790.3 0.9090909091 38,900.24
21 Besi Beton 14 mm ( 1, 21 kg / M' ) 140,000.00 95,000.0 - 52,534.7 0.9090909091 47,758.84
22 Besi Beton 16 mm ( 1, 39 kg / M' ) 175,000.00 130,000.0 - 70,575.5 0.9090909091 64,159.58
23 Besi Beton Ulir Dia 8 mm ( 0, 39 kg / M' ) 113,000.00 - - 16,752.1 0.9090909091 15,229.22
24 Besi Beton Ulir Dia. 13 mm 150,000.00 - - 11,534.8 0.9090909091 10,486.16
25 Beugel Kap V Plat Besi 144,300.00 - - 144,300.0 0.9090909091 131,181.82
26 Kawat Ikat Beton 25,000.00 - 22,000.0 19,800.0 0.9090909091 18,000.00
27 Kawat Las 2,6 135,000.00 135,000.0 135,000.0 0.9090909091 122,727.27
Lembar 158
4 5 6 7
28 Kawat Saringan Pasir / Ayakan 25,000.00 - 25,000.0 0.9090909091 22,727.27
29 Lem Kayu dan Karet (Fox) Besar 15,700.00 - 15,700.0 0.9090909091 14,272.73
30 Lem Karet (Fox) Besar 50,300.00 - 50,300.0 0.9090909091 45,727.27
31 Lem Seng 15,700.00 10,000.0 12,850.0 0.9090909091 11,681.82
32 Paku Campuran (5-10 cm) 20,000.00 15,000.0 15,000.0 16,666.7 0.9090909091 15,151.52
39 Paku 2-3 cm 30,000.00 20,000.0 25,000.0 0.9090909091 22,727.27
40 Paku Seng 50,000.00 20,000.0 35,000.0 0.9090909091 31,818.18
41 Paku Skrup 700.00 - 700.0 0.9090909091 636.36
42 Paku Skrup Besi Hollow - 1000 biji per dos 85,000.00 65,000.0 75,000.0 0.9090909091 68,181.82
43 Paku Skrup Gypsum - 500 biji per bungkus 75,000.00 45,000.0 60,000.0 0.9090909091 54,545.45
44 Paku Beton 5 cm 18,000.00 15,000.0 16,500.0 0.9090909091 15,000.00
45 Paku Beton 7 cm 15,700.00 15,000.0 15,350.0 0.9090909091 13,954.55
46 Paku Beton 8 - 10 cm 31,400.00 15,000.0 23,200.0 0.9090909091 21,090.91
47 Paku Payung Berulir 31,400.00 35,000.0 33,200.0 0.9090909091 30,181.82
48 Paku Triplex 25,000.00 20,000.0 - 22,500.0 0.9090909091 20,454.55
49 Paku Ripet 400.00 - - 400.0 0.9090909091 363.64
50 Skamp 525,400.00 - - 525,400.0 0.9090909091 477,636.36
0.9090909091 -
E BAHAN BAJA RINGAN /SPANDEK 0.9090909091 -
1 Rangka Baja Ringan 0,75 80,000.00 - - 80,000.0 0.9090909091 72,727.27
Lembar 159
4 5 6 7
2 Spandek 0,25 37,000.00 37,000.0 37,000.0 0.9090909091 33,636.36
3 Spandek 0,35 45,000.00 39,000.0 39,000.0 41,000.0 0.9090909091 37,272.73
4 Hollow aluminium untuk rangka plafond 24,000.00 15,000.0 19,500.0 0.9090909091 17,727.27
5 Nok Spandek 30,000.00 21,000.0 25,000.0 25,333.3 0.9090909091 23,030.30
6 Baut Dinabolt 5,000.00 4,000.0 4,500.0 0.9090909091 4,090.91
7 Main Taso (C.75.40.0,75) 90,000.00 80,000.0 85,000.0 0.9090909091 77,272.73
8 Reng Taso( U Type 32.0,45) 38,000.00 - 38,000.0 0.9090909091 34,545.45
9 Screw 12-14x20 800.00 - - 800.0 0.9090909091 727.27
10 Screw 12-16x16 400.00 400.0 0.9090909091 363.64
11 Hollow aluminium rangka plafond 40 x 40 x 2 mm 42,200.00 42,200.0 0.9090909091 38,363.64
12 Hollow aluminium rangka plafond 40 x 20 x 2 mm 25,000.00 25,000.0 0.9090909091 22,727.27
13 Kawat Penggantung Hollow aluminium 30,000.00 30,000.0 0.9090909091 27,272.73
14 Pintu KM/WC Alumunium (Lengkap Accessories) 250,800.00 250,800.0 0.9090909091 228,000.00
15 Pintu KM/WC PVC kw.1 (Lengkap Accessories) 600,700.00 600,700.0 0.9090909091 546,090.91
16 Pintu KM/ WC Aluminium + Kaca Buram 5 mm 992,800.00 992,800.0 0.9090909091 902,545.45
Lembar 160
4 5 6 7
4 5 6 7
15 Cat Anti Lumut (No drop) (20 Kg) 783,750.0 783,750.0 0.9090909091 712,500.00
16 Cat Dasar kayu Glatik 49,300.0 49,300.0 0.9090909091 44,818.18
17 Plamur Tembok Boyo dan Setara (5kg) 41,300.0 41,300.0 0.9090909091 37,545.45
18 Dempul Kayu Cap Kucing / merah ( 1 Kg ) 36,600.00 30,000 40,000 35,533.3 0.9090909091 32,303.03
19 Dempul ex Isamu ( 1 Kg ) 52,250.00 52,250.0 0.9090909091 47,500.00
20 Tenner A (ex Avian) 35,000.00 30,000 32,500.0 0.9090909091 29,545.45
21 Minyak Tenner Super 29,300.00 29,300.0 0.9090909091 26,636.36
22 Kertas Gosok 5,000.00 3,000 4,000.0 0.9090909091 3,636.36
23 Cat Minyak 90,200.00 90,200.0 0.9090909091 82,000.00
24 Kuas 2" (Eterna) 10,450.00 5,000 10,000 8,483.3 0.9090909091 7,712.12
25 Kuas 3" (Eterna) 13,100.00 10,000 11,550.0 0.9090909091 10,500.00
26 Kuas 4" (Eterna) 18,300.00 17,000 18,000 17,766.7 0.9090909091 16,151.52
27 Lem Fox Kaleng 62,700.00 62,700.0 0.9090909091 57,000.00
28 Perban Conpon 15,700.00 15,700.0 0.9090909091 14,272.73
29 Bubuk + air Pelarut Ex Aqugart untuk Waterproofin 10,000.00 - - 10,000.0 0.9090909091 9,090.91
30 Cat waterproof eks aquaproof - kw.1 193,400.00 - - 193,400.0 0.9090909091 175,818.18
Lembar 162
4 5 6 7
F BAHAN KAYU 0.9090909091 -
1 Kayu Kls. I Bayam (balok) Senso 12,000,000.00 - - 12,000,000.0 0.9090909091 10,909,090.91
2 Kayu Kls. I Bayam (balok) Sawmill 12,000,000.00 - - 12,000,000.0 0.9090909091 10,909,090.91
3 Kayu Kls. I Bayam (papan) Senso 20,000,000.00 - - 20,000,000.0 0.9090909091 18,181,818.18
4 Kayu Kls. I Bayam (papan) Sawmill 20,000,000.00 - - 20,000,000.0 0.9090909091 18,181,818.18
5 Kayu Klas. II Samarinda (balok)/ Lokal 3,250,000.00 - 3,250,000.0 3,250,000.0 0.9090909091 2,954,545.45
6 Kayu Klas. II Samarinda (papan)/ Lokal 3,750,000.00 - - 3,750,000.0 0.9090909091 3,409,090.91
7 Kayu Kls. III Kapur (balok)/ Kemiri 1,800,000.00 - - 1,800,000.0 0.9090909091 1,636,363.64
8 Kayu Kls. III (papan) 2,000,000.00 - - 2,000,000.0 0.9090909091 1,818,181.82
G BAHAN PENGGANTUNG
1 Engsel Kuningan 4 Lubang 78,400.00 - - 78,400.0 0.9090909091 71,272.73
2 Engsel Stainless Steel 138,000.00 - - 138,000.0 0.9090909091 125,454.55
3 Engsel Kupu - kupu 26,200.00 - - 26,200.0 0.9090909091 23,818.18
4 Engsel pintu biasa (Merk 777) 7,500.00 5,000.0 - 6,250.0 0.9090909091 5,681.82
5 Engsel Jendela Kuningan (merk Kuningan) 20,000.00 - - 20,000.0 0.9090909091 18,181.82
6 Engsel Pintu 4" (SES) 47,100.00 25,000.0 25,000.0 32,366.7 0.9090909091 29,424.24
Lembar 163
4 5 6 7
7 Engsel Jendela 3"(SES) 25,000.00 15,000.0 12,000.0 17,333.3 0.9090909091 15,757.58
8 Engsel Pintu Kuningan SES 28,500.00 25,000.0 - 26,750.0 0.9090909091 24,318.18
4 5 6 7
6 Jendela Nako (Rangka+ Kaca Tebal 5mm) 0,6 m x 104,000.00 - - 104,000.0 0.9090909091 94,545.45
0.9090909091 -
I BAHAN SANITER / SALURAN AIR 0.9090909091 -
1 Kloset Jongkok ex KIA 285,000.0 275,000.0 280,000.0 0.9090909091 254,545.45
2 Kloset Jongkok Biasa (Toto) 295,000.0 95,000.0 195,000.0 0.9090909091 177,272.73
4 5 6 7
2 Pintu KM/WC bahan PVC Lengkap Accessories e 940,500.00 - - 940,500.0 0.9090909091 855,000.00
3 Multiplex 120 x 240 cm tebal. 18 mm 265,000.00 260,000 265,000.0 0.9090909091 240,909.09
4 Triplex 4 mm 120 x 240 cm 55,000.00 55,000 68,000 59,333.3 0.9090909091 53,939.39
5 Triplex Melamin 120 x 240 cm 114,800.00 - 57,400.0 0.9090909091 52,181.82
6 Teakwood 120 x 240 cm t.4mm 204,900.00 - 102,450.0 0.9090909091 93,136.36
7 Multiplex 120 x 240 cm t. 6 mm 80,000.00 75,000 77,500.0 0.9090909091 70,454.55
8 Multiplex 120 x 240 cm t. 9 mm 132,000.00 95,000 113,500.0 0.9090909091 103,181.82
9 Kalsiboard tebal 4 mm 77,700.00 55,000 66,350.0 0.9090909091 60,318.18
10 Les Kayu Profil Lebar 5 cm ( 4 M' ) 36,600.00 15,000 25,800.0 0.9090909091 23,454.55
11 Les Kayu Profil Lebar 3 cm ( 4 M' ) 17,800.00 17,800.0 0.9090909091 16,181.82
K BAHAN LANTAI -
1 Tegel Keramik Putih 20 x 25 cm 59,600.00 59,600.0 0.9090909091 54,181.82
2 Tegel Keramik Putih 30 x 30 cm 49,700.00 46,000.0 47,850.0 0.9090909091 43,500.00
3 Tegel Keramik Putih 40 x 40 cm 58,000.00 50,000.0 - 54,000.0 0.9090909091 49,090.91
4 Tegel Keramik Putih 40 x 40 cm Pemukaan kasar 58,000.00 50,000.0 - 54,000.0 0.9090909091 49,090.91
5 Tegel Keramik warna 20 x 20 cm 88,000.00 58,000.0 73,000.0 0.9090909091 66,363.64
6 Tegel Keramik warna 30 x 30 cm 53,000.00 53,000.0 53,000.0 0.9090909091 48,181.82
7 Tegel Keramik warna 20 x 25 cm 44,000.00 58,000.0 51,000.0 0.9090909091 46,363.64
Lembar 166
4 5 6 7
8 Tegel Keramik warna 40 x 40 cm 58,000.00 56,000.0 57,000.0 0.9090909091 51,818.18
9 Keramik WC 20 x 20 cm 50,000.00 58,000.0 - 54,000.0 0.9090909091 49,090.91
10 Keramik WC 20 x 25 cm 55,000.00 58,000.0 - 56,500.0 0.9090909091 51,363.64
11 Keramik WC 30 x 30 cm 45,000.00 62,500.0 - 53,750.0 0.9090909091 48,863.64
4 5 6 7
15 Kerosen/Minyak Tanah 15,000.00 15,000.0 0.9090909091 13,636.36
16 Mortar 824,400.00 824,400.0 0.9090909091 749,454.55
23 Plastik Untuk Beton 5,000.00 5,000.0 0.9090909091 4,545.45
24 Pemasangan 12,600.00 12,600.0 0.9090909091 11,454.55
0.9090909091 -
M ALAT BANTU PEMELIHARAAN - - 0.9090909091 -
1 Sekop 70,000.00 75,000.0 72,500.0 0.9090909091 65,909.09
2 Gerobak Dorong Arco 550,000.00 500,000.0 525,000.0 0.9090909091 477,272.73
3 Betel 30,000.00 25,000.0 27,500.0 0.9090909091 25,000.00
4 Palu 60,000.00 65,000.0 62,500.0 0.9090909091 56,818.18
5 Sendok Semen 25,000.00 25,000.0 25,000.0 0.9090909091 22,727.27
6 Sikat Baja 15,000.00 15,000.0 15,000.0 0.9090909091 13,636.36
7 Sapu Lidi 12,500.00 12,500.0 0.9090909091 11,363.64
8 Cangkul 91,600.00 91,600.0 0.9090909091 83,272.73
4 5 6 7
3/4 Inci 31,400.00 - - 31,400.0 0.9090909091 28,545.45
1 Inci 37,200.00 - - 37,200.0 0.9090909091 33,818.18
1 1/2 Inci 41,800.00 - - 41,800.0 0.9090909091 38,000.00
2 Inci 50,800.00 - - 50,800.0 0.9090909091 46,181.82
2 1/2 Inci 65,600.00 - - 65,600.0 0.9090909091 59,636.36
3 Inci 87,200.00 - - 87,200.0 0.9090909091 79,272.73
4 Inci 137,300.00 - - 137,300.0 0.9090909091 124,818.18
5 Inci 221,300.00 - - 221,300.0 0.9090909091 201,181.82
4 5 6 7
20 Saringan 25,000.00 - - 25,000.0 0.9090909091 22,727.27
21 Lem FOX 41,100.00 - - 41,100.0 0.9090909091 37,363.64
22 Lem Pipa PVC 10,400.00 - - 10,400.0 0.9090909091 9,454.55
23 Lem Pipa PVC 480,600.00 - - 480,600.0 0.9090909091 436,909.09
24 Talang PVC 108,200.00 - - 108,200.0 0.9090909091 98,363.64
P MATERIAL POMPA
1 Pompa Air Shimiznu 130 (125 Watt) 548,600.00 - 45,000.0 296,800.0 0.9090909091 269,818.18
2 Pompa Air Shimiznu 230 (200 Watt) 940,500.00 - 95,000.0 517,750.0 0.9090909091 470,681.82
Q BAHAN INSTALASI LISTRIK - - 0.9090909091 -
#REF! Box Panel Meter 877,100.00 - - 877,100.0 0.9090909091 797,363.64
4 Fitting Lampu Eletra segi Empat 15,000.00 - - 15,000.0 0.9090909091 13,636.36
5 Fitting Lampu E 40 34,400.00 - - 34,400.0 0.9090909091 31,272.73
6 Isolasi Kabel Tanah (Bahan Karet) 78,400.00 - - 78,400.0 0.9090909091 71,272.73
7 Isolasi Unibell 7,800.00 - - 7,800.0 0.9090909091 7,090.91
8 Kabel NYA - 1 x 1,5 mm 2,500.00 3,000.0 - 2,750.0 0.9090909091 2,500.00
9 Kabel NYA - 1 x 2,5 mm 3,400.00 3,500.0 - 3,450.0 0.9090909091 3,136.36
10 Kabel NYY 2 x 2,5 mm 8,900.00 - - 8,900.0 0.9090909091 8,090.91
#REF! Kabel NYM 2 x 1,5 mm 6,400.00 - - 6,400.0 0.9090909091 5,818.18
13 Lampu Hemat Energi 18 W 45,000.00 - - 45,000.0 0.9090909091 40,909.09
Lembar 170
4 5 6 7
R UPAH KERJA
1 Mandor Lapangan 165,000.00 - - 165,000.0 0.9090909091 150,000.00
2 Kepala tukang 143,000.00 - - 143,000.0 0.9090909091 130,000.00
3 Kepala Tukang Listrik 143,000.00 130,000.0 0.9090909091 118,181.82
4 Tukang Batu /Cat 132,000.00 - - 132,000.0 0.9090909091 120,000.00
5 Tukang Kayu / besi 132,000.00 - - 132,000.0 0.9090909091 120,000.00
6 Pekerja 105,600.00 - - 105,600.0 0.9090909091 96,000.00
Lembar 171
4 5 6 7
7 Tukang pasang paving 132,000.00 - - 132,000.0 0.9090909091 120,000.00
8 Biaya Pasang Canstein 105,000.00 - - 105,000.0 0.9090909091 95,454.55
9 Biaya Pasang Paving 143,000.00 - - 143,000.0 0.9090909091 130,000.00
4 5 6 7
Selaku PPTK
45,000
Lembar 175
- 25
- 25
- 25
- 25
- 25
- 25
Lembar 176
- 25
- 25
- 25
- 25
- 25
- 25
Lembar 177
A.2.2.1.2 Pembuatan 1m² Pagar sementara dari seng gelombang tinggi 2 meter
A TENAGA
Pekerja L.01 OH 0.200 113,000 22,600.00
Tukang Kayu L.02 OH 0.400 141,000 56,400
Kepala Tukang L.03 OH 0.020 153,000 3,060
Mandor L.04 OH 0.020 176,000 3,520
JUMLAH TENAGA KERJA 85,580.00
B BAHAN
Dolken kayu Ø 8-10/400cm btg 1.250 0.00 -
Semen Portland kg 2.500 1,175.00 2,937.500
Seng gelombang bjls 0,2 (7 kaki) lbr 1.200 49,000.00 58,800.000
Pasir Beton m³ 0.005 142,200.00 711.000
Koral Beton m³ 0.009 300,000.00 2,700.000
Kayu 5/7cm m³ 0.072 2,365,000.00 170,280.000
Paku 2" - 5" kg 0.060 19,800.00 1,188.000
Cat Meni dasar kg 0.450 23,885.71 10,748.571
JUMLAH HARGA BAHAN 247,365.071
C PERALATAN
Peralatan Ls 1 - - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 85,580.00 247,365.071 - 332,945.07
E Overhead & Profit 15% XD 12,837.00 37,104.761 49,941.76
F Harga Satuan Pekerjaan (D+E) 98,417.00 284,469.83 382,886.83
L.5.An BOW Membongkar 10 M² Lantai yang lama berikut pekerjaan membersihkan bat-bata atau lainnya yang dibongkar
A TENAGA
Pekerja L.01 OH 1.00 113,000 113,000.00
Mandor L.04 OH 0.05 176,000 8,800
JUMLAH TENAGA KERJA 121,800.00
B BAHAN
B BAHAN
B BAHAN
Lembar 179
-
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 20,100.00
E Overhead & Profit 15% XD 3,015.00
F Harga Satuan Pekerjaan (D+E) 23,115.00
B BAHAN
Bambu Sedang Batang 1.250 30,000.00 37,500.00
tali /rotan Kg 0.186 50,000.00 9,300.00
JUMLAH HARGA BAHAN 46,800.00
C PERALATAN
Peralatan Ls 1.00 - - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 434,400.00 46,800.00 - 481,200.00
E Overhead & Profit 15% XD 65,160.00 7,020.00 72,180.00
F Harga Satuan Pekerjaan (D+E) 499,560.00 53,820.00 553,380.00
B BAHAN
Kayu papam klas III m³ 0.036 1,576,600.00 56,757.60
Kayu balok 5/7 klas III m³ -
Paku biasa Kg 0.08 19,800.00 1,584.00
JUMLAH HARGA BAHAN 58,341.60
C PERALATAN
Peralatan Ls 1.00 - - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 46,890.00 58,341.60 - 105,231.60
E Overhead & Profit 15% XD 7,033.50 8,751.24 15,784.74
F Harga Satuan Pekerjaan (D+E) 53,923.50 67,092.84 121,016.34
B BAHAN
C PERALATAN
Lembar 180
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 89,150.00 - - 89,150.00
E Overhead & Profit 15% XD 13,372.50 13,372.50
F Harga Satuan Pekerjaan (D+E) 102,522.50 102,522.50
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 118,632.00 - - 118,632.00
E Overhead & Profit 15% XD 17,794.80 17,794.80
F Harga Satuan Pekerjaan (D+E) 136,426.80 136,426.80
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 143,520.00 143,520.00
E Overhead & Profit 15% XD 21,528.00 21,528.00
F Harga Satuan Pekerjaan (D+E) 165,048.00 165,048.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan Ls 1.00 - -
Harga Satuan Pekerjaan (D+E) JUMLAH HARGA ALAT
D Jumlah (A+B+C) 39,050.00 - - 39,050.00
E Overhead & Profit 15% XD 5,857.50 5,857.50
JUMLAH HARGA ALAT 44,907.50 44,907.50
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 65,300.00 - - 65,300.00
E Overhead & Profit 15% XD 9,795.000 9,795.00
F Harga Satuan Pekerjaan (D+E) 75,095.00 75,095.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan Ls 1.00 15,000 - 15,000.00
JUMLAH HARGA ALAT 15,000.00
D Jumlah (A+B+C) 65,300.00 - 15,000.00 80,300.00
E Overhead & Profit 15% XD 9,795.00 2,250.00 9,795.00
F Harga Satuan Pekerjaan (D+E) 75,095.00 17,250.00 90,095.00
C PERALATAN
Peralatan Ls 1.00 - - -
Lembar 182
B BAHAN
sirtu/Timbunan Pilihan m³ 1 200,000.00 240,000.00
JUMLAH HARGA BAHAN 240,000.00
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 32,650.00 240,000.00 - 272,650.00
E Overhead & Profit 15% XD 4,897.50 36,000.00 40,897.50
F Harga Satuan Pekerjaan (D+E) 37,547.50 276,000.00 313,547.50
B BAHAN
Batu belah m³ 1.20 200,000.00 240,000.00
semen portlan Kg 202.00 1,200.00 242,400.00
pasir pasang m³ 0.49 142,200.00 68,967.00
JUMLAH HARGA BAHAN 551,367.00
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 299,925.00 551,367.00 - 851,292.00
E Overhead & Profit 15% XD 44,988.75 82,705.05 127,693.80
F Harga Satuan Pekerjaan (D+E) 344,913.75 634,072.05 978,985.80
B BAHAN
Batu belah m³ 1.200 200,000.00 240,000.00
Pasir urug m³ 0.432 1,200.00 518.40
JUMLAH HARGA BAHAN - 240,518.40
Lembar 183
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 155,961.00 240,518.40 - 396,479.40
E Overhead & Profit 15% XD 23,394.15 36,077.76 59,471.91
F Harga Satuan Pekerjaan (D+E) 179,355.15 276,596.16 455,951.31
B BAHAN
Semen portlan Kg 247.000 1,200.00 296,400.00
Pasir beton m³ 0.621 142,200.00 88,265.57
Kerikil ( Maks 30 mm ) m³ 0.555 300,000.00 166,500.00
Air Liter 215.000 15.00 3,225.00
JUMLAH HARGA BAHAN 554,390.57
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT - - -
D Jumlah (A+B+C) 244,117.00 554,390.57 - 798,507.57
E Overhead & Profit 15% XD 36,617.55 83158.58571429 119,776.14
F Harga Satuan Pekerjaan (D+E) 280,734.55 637,549.16 918,283.71
A.4.1.1.2. Membuat 1 m³ beton mutu f'c = 9,8 Mpa ( K 125 ), slump ( 12 ± 2 ) cm, w/c = 0,78
A TENAGA
Pekerja L.01 OH 1.650 113,000 186,450.00
Tukang batu L.02 OH 0.275 141,000 38,775.00
Kepala tukang L.03 OH 0.028 153,000 4,284.00
Mandor L.04 OH 0.083 176,000 14,608.00
JUMLAH TENAGA KERJA 244,117.00
B BAHAN
Semen portlan Kg 276.000 1,200.00 331,200.00
Pasir beton m³ 0.591 142,200.00 84,101.14
Kerikil ( Maks 30 mm ) m³ 0.562 300,000.00 168,666.67
Air Liter 215.000 15.00 3,225.00
JUMLAH HARGA BAHAN 587,192.81
C PERALATAN
Peralatan Ls 1.00 - - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 244,117.00 587,192.8 - 831,309.81
E Overhead & Profit 15% XD 36,617.55 88,078.9 124,696.47
F Harga Satuan Pekerjaan (D+E) 280,734.55 675,271.7 956,006.28
A.4.1.1.3. Membuat 1 m³ beton mutu f'c = 12,2 Mpa ( K 150 ), slump ( 12 ± 2 ) cm, w/c = 0,72
A TENAGA
Pekerja L.01 OH 1.650 113,000 186,450.00
Tukang batu L.02 OH 0.275 141,000 38,775.00
Kepala tukang L.03 OH 0.028 153,000 4,284.00
Mandor L.04 OH 0.083 176,000 14,608
JUMLAH TENAGA KERJA 244,117.00
B BAHAN
Semen portlan Kg 299.000 1,200.00 358,800.00
Pasir beton m³ 0.571 142,200.00 81,155.57
Kerikil ( Maks 30 mm ) m³ 0.565 300,000.00 169,500.00
Air Liter 215.000 15.00 3,225.00
JUMLAH HARGA BAHAN 612,680.57
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 244,117.00 612,680.57 - 856,797.57
E Overhead & Profit 15% XD 36,617.55 91,902.09 128,519.64
F Harga Satuan Pekerjaan (D+E) 280,734.55 704,582.66 985,317.21
CATATAN
Bobot isi pasir = 1.400 kg/m³, Bobot isi kerikil = 1.350 kg/m³, Buckling factor pasir = 20 %
A.4.1.1.4. Membuat 1 m³ lantai kerja beton mutu f'c = 7,4 Mpa ( K 100 ), slump ( 3-6 ) cm, w/c = 0,87
A TENAGA
Pekerja L.01 OH 1.200 113,000 135,600.00
Lembar 184
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT - - -
D Jumlah (A+B+C) 177,420.00 540,869.95 - 718,289.95
E Overhead & Profit 15% XD 26,613.00 81,130.49 107,743.49
F Harga Satuan Pekerjaan (D+E) 204,033.00 622,000.445 826,033.45
A.4.1.1.5. Membuat 1 m³ beton mutu f'c = 14,5 Mpa ( K 175 ), slump ( 12 ± 2 ) cm, w/c = 0,66
A TENAGA
Pekerja L.01 OH 1.650 113,000 186,450.00
Tukang batu L.02 OH 0.275 141,000 38,775.00
Kepala tukang L.03 OH 0.028 153,000 4,284.00
Mandor L.04 OH 0.083 176,000 14,608
JUMLAH TENAGA KERJA 244,117.00
B BAHAN
Semen portlan Kg 326.000 1,200.00 391,200.00
Pasir beton m³ 0.543 142,200.00 77,194.29
Kerikil ( Maks 30 mm ) m³ 0.572 300,000.00 171,500.00
Air Liter 215.000 15.00 3,225.00
JUMLAH HARGA BAHAN 643,119.29
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 244,117.00 643,119.29 - 887,236.29
E Overhead & Profit 15% XD 36,617.55 96,467.89 133,085.44
F Harga Satuan Pekerjaan (D+E) 280,734.55 739,587.18 1,020,321.73
A.4.1.1.6. Membuat 1 m³ beton mutu f'c = 16,9 Mpa ( K 200 ), slump ( 12 ± 2 ) cm, w/c = 0,61
A TENAGA
Pekerja L.01 OH 1.650 113,000 186,450.00
Tukang batu L.02 OH 0.275 141,000 38,775.00
Kepala tukang L.03 OH 0.028 153,000 4,284.00
Mandor L.04 OH 0.083 176,000 14,608
JUMLAH TENAGA KERJA 244,117.00
B BAHAN
Semen portlan Kg 352.000 1,200.00 422,400.00
Pasir beton m³ 0.522 142,200.00 74,248.71
Kerikil ( Maks 30 mm ) m³ 0.573 300,000.00 171,833.33
Air Liter 215.000 15.00 3,225.00
JUMLAH HARGA BAHAN 671,707.05
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 244,117.00 671,707.05 - 915,824.05
E Overhead & Profit 15% XD 36,617.55 100,756.06 137,373.61
F Harga Satuan Pekerjaan (D+E) 280,734.55 772,463.10 1,053,197.65
A.4.1.1.7. Membuat 1 m³ beton mutu f'c = 19,3 Mpa ( K 225 ), slump ( 12 ± 2 ) cm, w/c = 0,58
A TENAGA
Pekerja L.01 OH 1.650 113,000 186,450.00
Tukang batu L.02 OH 0.275 141,000 38,775.00
Kepala tukang L.03 OH 0.028 153,000 4,284.00
Mandor L.04 OH 0.083 176,000 14,608
JUMLAH TENAGA KERJA 244,117.00
B BAHAN
Semen portlan Kg 371.000 1,200.00 445,200.00
Pasir beton m³ 0.499 142,200.00 70,896.86
A.4.1.1.8. Membuat 1 m³ beton mutu f'c = 21,7 Mpa ( K 250 ), slump ( 12 ± 2 ) cm, w/c = 0,56
A TENAGA
Pekerja L.01 OH 1.650 113,000 186,450.00
Tukang batu L.02 OH 0.275 141,000 38,775.00
Kepala tukang L.03 OH 0.028 153,000 4,284.00
Mandor L.04 OH 0.083 176,000 14,608
JUMLAH TENAGA KERJA 244,117.00
B BAHAN
Semen portlan Kg 384.000 1,200.00 460,800.00
Pasir beton m³ 0.494 142,200.00 70,287.43
Kerikil ( Maks 30 mm ) m³ 0.577 300,000.00 173,166.67
Air Liter 215.000 15.00 3,225.00
JUMLAH HARGA BAHAN 707,479.10
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 244,117.00 707,479.10 - 951,596.10
E Overhead & Profit 15% XD 36,617.55 106,121.86 142,739.41
F Harga Satuan Pekerjaan (D+E) 280,734.55 813,600.96 1,094,335.51
B BAHAN
Kayu kelas III m³ 0.045 1,576,600.00 70,947.00
Paku 5 - 10 cm Kg 0.300 19,800.00 5,940.00
Minyak bekisting Liter 0.100 24,000.00 2,400.00
JUMLAH HARGA BAHAN 79,287.00
Lembar 186
C PERALATAN
Peralatan Ls - - -
JUMLAH HARGA ALAT - - -
D Jumlah (A+B+C) 103,974.00 79,287.00 - 183,261.00
E Overhead & Profit 15% XD 15,596.10 11,893.05 27,489.15
F Harga Satuan Pekerjaan (D+E) 119,570.10 91,180.05 210,750.15
B BAHAN
Kayu kelas III m³ 0.040 1,576,600.00 63,064.00
Paku 5 - 12 cm Kg 0.400 19,800.00 7,920.00
Minyak bekisting Liter 0.200 24,000.00 4,800.00
Balok kayu kelas III (Kapur/Kamiri) m³ 0.015 1,650,000.00 24,750.00
Plywood tebal 9 mm Lbr 0.350 100,000.00 35,000.00
Dolken kayu ø 8 - 10 cm - panjang 4 m Batang 2.000 30,000.00 60,000.00
JUMLAH HARGA BAHAN 195,534.00
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT - - -
D Jumlah (A+B+C) 131,967.00 195,534.00 - 327,501.00
E Overhead & Profit 15% XD 19,795.05 29,330.10 49,125.15
F Harga Satuan Pekerjaan (D+E) 151,762.05 224,864.10 376,626.15
B BAHAN
Kayu kelas III m³ 0.040 1,576,600.00 63,064.00
Paku 5 - 12 cm Kg 0.400 19,800.00 7,920.00
Minyak bekisting Liter 0.200 24,000.00 4,800.00
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT - - -
D Jumlah (A+B+C) 131,967.00 315,534.00 447,501.00
Lembar 187
A.4.1.1.28.Membuat
Membuat1 1m³ mpondasi beton bertulang ( 150 kg besi + bekisting )
A TENAGA
Pekerja L.01 OH 5.300 113,000 598,900.00
Tukang batu L.02 OH 0.275 141,000 38,775.00
Tukang kayu L.02 OH 1.300 141,000 183,300.00
Tukang besi L.02 OH 1.050 141,000 148,050.00
Kepala tukang L.03 OH 0.262 153,000 40,086.00
Mandor L.04 OH 0.265 176,000 46,640
JUMLAH TENAGA KERJA 1,055,751.00
B BAHAN
Kayu kelas III m³ 0.200 1,576,600.00 315,320.00
Paku 5 - 12 cm Kg 1.500 19,800.00 29,700.00
Minyak bekisting Liter 0.400 24,000.00 9,600.00
Besi beton polos Kg 157.500 9,900.00 1,559,250.00
Kawat beton kg 2.250 20,750.00 46,687.50
Semen portland Kg 336.000 1,200.00 403,200.00
Pasir beton m³ 0.540 142,200.00 76,788.00
A TENAGA
Pekerja L.01 OH 5.650 113,000 638,450.00
Tukang batu L.02 OH 0.275 141,000 38,775.00
Tukang kayu L.02 OH 1.560 141,000 219,960.00
Tukang besi L.02 OH 1.400 141,000 197,400.00
Kepala tukang L.03 OH 0.323 153,000 49,419.00
Mandor L.04 OH 0.283 176,000 49,808
JUMLAH TENAGA KERJA 1,193,812.00
B BAHAN
Kayu kelas III m³ 0.270 1,576,600.00 425,682.00
Paku 5 - 12 cm Kg 2.000 19,800.00 39,600.00
Minyak bekisting Liter 0.600 24,000.00 14,400.00
Besi beton polos Kg 210.000 9,900.00 2,079,000.00
Kawat beton kg 3.000 20,750.00 62,250.00
Semen portland Kg 336.000 1,200.00 403,200.00
Pasir beton m³ 0.540 142,200.00 76,788.00
Kerikil m³ 0.810 300,000.00 243,000.00
JUMLAH HARGA BAHAN 3,343,920.00
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT - - -
D Jumlah (A+B+C) 1,193,812.00 3,343,920.00 - 4,537,732.00
E Overhead & Profit 15% XD 179,071.80 501,588.00 680,659.80
F Harga Satuan Pekerjaan (D+E) 1,372,883.80 3,845,508.00 5,218,391.80
B BAHAN
Papan Kayu kelas III m³ 0.320 1,576,600.00 504,512.00
Paku 5 - 12 cm Kg 3.200 19,800.00 63,360.00
Minyak bekisting Liter 1.600 24,000.00 38,400.00
Besi beton polos Kg 210.000 9,900.00 2,079,000.00
Kawat beton kg 3.000 20,750.00 62,250.00
Semen portland Kg 336.000 1,200.00 403,200.00
Pasir beton m³ 0.540 142,200.00 76,788.00
Kerikil m³ 0.810 300,000.00 243,000.00
Balok Kayu kelas III m³ 0.140 1,650,000.00 231,000.00
Lembar 189
B BAHAN
Kayu kelas III m³ 0.240 1,576,600.00 378,384.00
Paku 5 - 12 cm Kg 3.200 19,800.00 63,360.00
Minyak bekisting Liter 1.600 24,000.00 38,400.00
Besi beton polos Kg 157.500 9,900.00 1,559,250.00
Kawat beton kg 2.250 20,750.00 46,687.50
Semen portland Kg 336.000 1,200.00 403,200.00
Pasir beton m³ 0.540 142,200.00 76,788.00
Kerikil m³ 0.810 300,000.00 243,000.00
Balok Kayu kelas III m³ 0.160 1,650,000.00 264,000.00
Plywood 9 mm Lbr 2.800 100,000.00 280,000.00
Dolken kayu ø ( 8-10 ) cm, panjang 4 m Batang 24.000 30,000.00 720,000.00
JUMLAH HARGA BAHAN 4,073,069.50
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT - - -
D Jumlah (A+B+C) 1,055,751.00 4,073,069.50 - 5,128,820.50
E Overhead & Profit 15% XD 158,362.65 610,960.43 769,323.08
F Harga Satuan Pekerjaan (D+E) 1,214,113.65 4,684,029.93 5,898,143.58
A.4.1.1.34. Membuat 1 m³ kolom beton bertulang ( 200 kg besi + bekisting )
A TENAGA
Pekerja L.01 OH 5.650 113,000 638,450.00
Tukang batu L.02 OH 0.275 141,000 38,775.00
Tukang kayu L.02 OH 1.560 141,000 219,960.00
Tukang besi L.02 OH 1.400 141,000 197,400.00
Lembar 190
C PERALATAN
Peralatan -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 31,302.00 50,741.90 - 82,043.90
E Overhead & Profit 15% XD 4,695.30 7,611.29 12,306.59
F Harga Satuan Pekerjaan (D+E) 35,997.30 58,353.19 94,350.49
B BAHAN
Papan Kayu kelas III m³ 0.003 1,576,600.00 4,729.80
B BAHAN
jendela nako (rangka + kaca 5mm) m² 1.10 110,000.00 121,000.00
paku skrup 1cm - 2,1 cm) buah 10.00 5,500.00 55,000.00
besi strip m 7.00 47,500.00 332,500.00
JUMLAH HARGA BAHAN - 508,500.00
C PERALATAN
Peralatan - -
JUMLAH HARGA ALAT - -
D Jumlah (A+B+C) 54,036.00 508,500.00 - 562,536.00
E Overhead & Profit 15% XD 8,105.40 76,275.00 84,380.40
F Harga Satuan Pekerjaan (D+E) 62,141.40 584,775.00 646,916.40
B BAHAN
seng plat m 1.050 75,000.00 - 78,750.000
paku 1cm - 2,5 cm kg 0.015 25,000.00 - 375.000
papan kayu kelas II m³ 0.019 2,640,000.00 - 50,160.000
JUMLAH HARGA BAHAN - 129,285.000
C PERALATAN
Peralatan Ls - -
JUMLAH HARGA ALAT - -
D Jumlah (A+B+C) 54,036.00 129,285.000 - 183,321.000
E Overhead & Profit 15% XD 8,105.40 19,392.75 27,498.15
F Harga Satuan Pekerjaan (D+E) 62,141.40 148,677.75 210,819.150
B BAHAN
seng plat m 1.050 75,000.00 78,750.000
paku 1cm - 2,5 cm kg 0.010 25,000.00 250.000
besi strip kg 0.500 47,500.00 23,750.000
JUMLAH HARGA BAHAN 102,750.000
C PERALATAN
Peralatan -
JUMLAH HARGA ALAT
A.4.2.1.20. Pemasangan 1 m² rangka besi holloh 1x40.40.2mm, modul 60x60 cm, dinding
A TENAGA
Pekerja L.01 OH 0.250 113,000 28,250.00
Lembar 192
A.4.4.1.2. Pemasangan 1 m² dinding batu merah (5x11x22)cm tebal 1 batu campuran 1SP:3PP
A TENAGA
Pekerja L.01 OH 0.600 113,000 67,800.00
Tukang batu L.02 OH 0.200 141,000 28,200.00
Kepala tukang L.03 OH 0.020 153,000 3,060.00
Mandor L.04 OH 0.030 176,000 5,280
JUMLAH TENAGA KERJA 104,340.00
B BAHAN
bata merah m³ 140.000 540.00 75,600.00
semen portlan kg 32.950 1,200.00 39,540.00
pasir pasang m³ 0.091 142,200.00 12,940.20
JUMLAH HARGA BAHAN 128,080.20
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 104,340.00 128,080.20 - 232,420.20
E Overhead & Profit 15% XD 15,651.00 19,212.03 34,863.03
F Harga Satuan Pekerjaan (D+E) 119,991.00 147,292.23 267,283.23
Lembar 193
A.4.4.1.4. Pemasangan 1 m² dinding batu merah (5x11x22)cm tebal 1 batu campuran 1SP:5PP
A TENAGA
Pekerja L.01 OH 0.600 113,000 67,800.00
Tukang batu L.02 OH 0.200 141,000 28,200.00
Kepala tukang L.03 OH 0.020 153,000 3,060.00
Mandor L.04 OH 0.030 176,000 5,280
JUMLAH HARGA TENAGA 104,340.00
B BAHAN
bata merah m³ 140.000 540.00 75,600.00
semen portlan kg 22.200 1,200.00 26,640.00
pasir pasang m³ 0.102 142,200.00 14,504.40
JUMLAH HARGA BAHAN 116,744.40
C PERALATAN
Peralatan Ls 1.00 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 104,340.00 116,744.40 - 221,084.40
E Overhead & Profit 15% XD 15,651.00 17,511.66 33,162.66
F Harga Satuan Pekerjaan (D+E) 119,991.00 134,256.06 254,247.06
A.4.4.1.7. Pemasangan 1 m² dinding batu merah (5x11x22)cm tebal ½ batu campuran 1SP:2PP
A TENAGA
Pekerja L.01 OH 0.300 113,000 33,900.00
Tukang batu L.02 OH 0.100 141,000 14,100.00
Kepala tukang L.03 OH 0.010 153,000 1,530.00
Mandor L.04 OH 0.015 176,000 2,640.00
JUMLAH TENAGA KERJA 52,170.00
B BAHAN
bata merah m³ 70.000 540.00 37,800.00
semen portlan kg 18.950 1,200.00 22,740.00
pasir pasang m³ 0.038 142,200.00 5,403.60
JUMLAH HARGA BAHAN 65,943.60
C PERALATAN
Peralatan Ls 1.00 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 52,170.00 65,943.60 - 118,113.60
E Overhead & Profit 15% XD 7,825.50 9,891.54 17,717.04
F Harga Satuan Pekerjaan (D+E) 59,995.50 75,835.14 135,830.64
A.4.4.1.8. Pemasangan 1 m² dinding batu merah (5x11x22)cm tebal ½ batu campuran 1SP:3PP
A TENAGA
Pekerja L.01 OH 0.300 113,000 33,900.00
Tukang batu L.02 OH 0.100 141,000 14,100.00
Kepala tukang L.03 OH 0.010 153,000 1,530.00
Mandor L.04 OH 0.015 176,000 2,640.00
JUMLAH TENAGA KERJA 52,170.00
B BAHAN
bata merah m³ 70.000 540.00 - 37,800.00
semen portlan kg 14.370 1,200.00 - 17,244.00
pasir pasang m³ 0.040 142,200.00 - 5,688.00
JUMLAH HARGA BAHAN - 60,732.00
C PERALATAN
Peralatan Ls 1.00 -
JUMLAH HARGA ALAT - -
D Jumlah (A+B+C) 52,170.00 60,732.00 - 112,902.00
E Overhead & Profit 15% XD 7,825.50 9,109.80 16,935.30
F Harga Satuan Pekerjaan (D+E) 59,995.50 69,841.80 129,837.30
A.4.4.1.10. Pemasangan 1 m² dinding batu merah (5x11x22)cm tebal ½ batu campuran 1SP:5PP
A TENAGA
Pekerja L.01 OH 0.300 113,000 33,900.00
Tukang batu L.02 OH 0.100 141,000 14,100.00
Kepala tukang L.03 OH 0.010 153,000 1,530.00
Mandor L.04 OH 0.015 176,000 2,640.00
JUMLAH TENAGA KERJA 52,170.00
B BAHAN
bata merah m³ 70.000 540.00 37,800.00
semen portlan kg 9.680 1,200.00 11,616.00
pasir pasang m³ 0.045 142,200.00 6,399.00
JUMLAH HARGA BAHAN 55,815.00
C PERALATAN
Peralatan Ls 1.00 -
JUMLAH HARGA ALAT -
Lembar 194
B BAHAN
1. PC kg 10.224 1,200.00 12,268.80
2. Pasir Pasang m³ 0.020 142,200.00 2,844.00
JUMLAH HARGA BAHAN 15,112.80
C PERALATAN
Peralatan Ls 1.00 -
JUMLAH HARGA ALAT - -
D Jumlah (A+B+C) 59,985.00 15,112.80 - 75,097.80
E Overhead & Profit 15% XD 8,997.75 2,266.92 11,264.67
F Harga Satuan Pekerjaan (D+E) 68,982.75 17,379.72 86,362.47
B BAHAN
1. PC kg 7.776 1,200.00 9,331.20
2. PP m³ 0.023 142,200.00 3,270.60
JUMLAH HARGA BAHAN 12,601.80
C PERALATAN
Peralatan Ls 1.00 -
JUMLAH HARGA ALAT - -
D Jumlah (A+B+C) 59,985.00 12,601.80 - 72,586.80
E Overhead & Profit 15% XD 8,997.75 1,890.27 10,888.02
F Harga Satuan Pekerjaan (D+E) 68,982.75 14,492.07 83,474.82
B BAHAN
1. PC kg 5.184 1,200.00 6,220.80
2. PP m³ 0.026 142,200.00 3,697.20
JUMLAH HARGA BAHAN 9,918.00
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 59,985.00 9,918.00 - 69,903.00
E Overhead & Profit 15% XD 8,997.75 1,487.70 10,485.45
F Harga Satuan Pekerjaan (D+E) 68,982.75 11,405.70 80,388.45
B BAHAN
1. PC Kg 6.912 1,200.00 8,294.40
2. PP m³ 0.035 142,200.00 4,977.00
JUMLAH HARGA BAHAN 13,271.40
C PERALATAN
Peralatan Ls 1.00 -
JUMLAH HARGA ALAT - - -
D Jumlah (A+B+C) 80,332.00 13,271.40 - 93,603.40
E Overhead & Profit 15% XD 12,049.80 1,990.71 14,040.51
F Harga Satuan Pekerjaan (D+E) 92,381.80 15,262.11 107,643.91
Peralatan Ls 1.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 30,157.00 3729.6 - 33,886.60
E Overhead & Profit 15% XD 4,523.55 559.44 5,082.99
F Harga Satuan Pekerjaan (D+E) 34,680.55 4,289.04 38,969.59
A.4.4.2.26. Pemasangan 1 m² finishing siar pasangan batu kali, campuran 1 SP : 2 PP
A TENAGA
Pekerja L.01 OH 0.300 113,000 33,900.00
Tukang batu L.03 OH 0.150 141,000 21,150.00
Kepala tukang L.03 OH 0.015 153,000 2,295.00
Mandor L.04 OH 0.015 176,000 2,640.00
JUMLAH TENAGA KERJA 59,985.00
B BAHAN
Semen PC Kg 6.340 1,200.00 7,608.00
Pasir pasang m³ 0.012 142,200.00 1,706.40
JUMLAH HARGA BAHAN 9,314.40
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 59,985.00 9,314.40 - 69,299.40
E Overhead & Profit 15% XD 8,997.75 1,397.16 10,394.91
F Harga Satuan Pekerjaan (D+E) 68,982.75 10,711.56 79,694.31
B BAHAN
Ubin keramik Bh 26.50 3,520.00 93,280.00
Semen portlan Kg 10.40 1,200.00 12,480.00
Pasir pasang m³ 0.045 142,200.00 6,399.00
Semen warna Kg 0.53 20,000.00 10,500.00
JUMLAH HARGA BAHAN 122,659.00
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 139,965.00 122,659.00 - 262,624.00
E Overhead & Profit 15% XD 20,994.75 18,398.85 39,393.60
F Harga Satuan Pekerjaan (D+E) 160,959.75 141,057.85 302,017.60
B BAHAN
Ubin keramik Bh 33.00 1,506.06 49,700.00
Semen portlan Kg 9.80 1,200.00 11,760.00
Pasir pasang m³ 0.045 142,200.00 6,399.00
Semen warna Kg 0.53 20,000.00 10,500.00
JUMLAH HARGA BAHAN 78,359.00
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 210,112.00 78,359.00 288,471.00
E Overhead & Profit 15% XD 31,516.80 11,753.85 43,270.65
F Harga Satuan Pekerjaan (D+E) 241,628.80 90,112.85 331,741.65
B BAHAN
Keramik artistik Bh 26.50 3,520.00 93,280.00
Semen portlan Kg 9.30 1,200.00 11,160.00
Pasir Pasang m³ 0.018 142,200.00 2,559.60
Semen warna Kg 0.58 20,000.00 11,640.00
JUMLAH HARGA BAHAN 118,639.60
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 179,955.00 118,639.60 - 298,594.60
E Overhead & Profit 15% XD 26,993.25 17,795.94 44,789.19
F Harga Satuan Pekerjaan (D+E) 206,948.25 136,435.54 343,383.79
A.4.4.3.58Pemasangan 1 m2 dinding batu tempel hitam
A TENAGA
Pekerja L.01 OH 0.70 113,000 79,100.00
Tukang batu L.02 OH 0.35 141,000 49,350.00
Kepala tukang L.03 OH 0.035 153,000 5,355.00
Mandor L.04 OH 0.035 176,000 6,160
JUMLAH TENAGA KERJA 139,965.00
B BAHAN
dinding batu tempel hitam Bh 1.10 193,400.00 212,740.00
Semen portland Kg 11.75 1,300.00 15,275.00
Pasir Pasang m³ 0.035 142,200.00 4,977.00
A.4.5.1.2. Pemasangan 1 m² langit - langit triplex ukuran ( 120 x 240 ) cm, tebal 4 mm,
A TENAGA
Pekerja L.01 OH 0.100 113,000 11,300.00
Tukang kayu L.02 OH 0.100 141,000 14,100.00
Kepala tukang L.03 OH 0.010 153,000 1,530.00
Mandor L.04 OH 0.005 176,000 880.00
JUMLAH TENAGA KERJA 27,810.00
B BAHAN
Triplex 4 mm Lembar 0.375 60,000.00 22,500.00
Paku triplex Kg 0.030 25,000.00 750.00
-
JUMLAH HARGA BAHAN 23,250.00
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 27,810.00 23,250.00 - 51,060.00
E Overhead & Profit 15% XD 4,171.50 3,487.50 7,659.00
F Harga Satuan Pekerjaan (D+E) 31,981.50 26,737.50 58,719.00
Lembar 199
A.4.5.1.3. Pemasangan 1 m² langit - langit triplex ukuran ( 120 x 240 ) cm, tebal 6 mm,
A TENAGA
Pekerja L.01 OH 0.100 113,000 11,300.00
Tukang kayu L.02 OH 0.100 141,000 14,100.00
Kepala tukang L.03 OH 0.010 153,000 1,530.00
Mandor L.04 OH 0.005 176,000 880.00
JUMLAH TENAGA KERJA 27,810.00
B BAHAN
Triplex tebal 6 mm Lbr 0.375 90,000.00 33,750.00
Paku triplex Kg 0.030 38,000.00 1,140.00
-
JUMLAH HARGA BAHAN 34,890.00
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 27,810.00 34,890.00 - 62,700.00
E Overhead & Profit 15% XD 4,171.50 5,233.50 9,405.00
F Harga Satuan Pekerjaan (D+E) 31,981.50 40,123.50 72,105.00
B BAHAN
Seng plat 3"x6" bjls 28 Lembar 0.300 75,000.00 22,500.00
Lembar 200
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
B BAHAN
Seng spandek t,0,35mm Lembar 1.43 44,000.00 62,857.14
Paku ulir lapis karet Kg 0.02 55,000.00 1,100.00
-
JUMLAH HARGA BAHAN 63,957.14
C PERALATAN
Peralatan Ls 1.00 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 40,821.00 63,957.14 - 104,778.14
E Overhead & Profit 15% XD 6,123.15 9,593.57 15,716.72
F Harga Satuan Pekerjaan (D+E) 46,944.15 73,550.71 120,494.86
A.4.5.2.41. Pemasangan 1 m¹ nok alminium
A TENAGA
Pekerja L.01 OH 0.100 113,000 11,300.00
Tukang kayu L.03 OH 0.100 141,000 14,100.00
Kepala tukang L.11 OH 0.010 153,000 1,530.00
Mandor L.15 OH 0.050 176,000 8,800.000
JUMLAH TENAGA KERJA 35,730.00
B BAHAN
Nok alminium standar lebar 40cm Lembar 1.200 45,000.00 54,000.00
Paku seng lapis karet Kg 0.040 55,000.00 2,200.00
-
JUMLAH HARGA BAHAN 56,200.00
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 35,730.00 56,200.00 - 91,930.00
E Overhead & Profit 15% XD 5,359.50 8,430.00 13,789.50
F Harga Satuan Pekerjaan (D+E) 41,089.50 64,630.00 105,719.50
A.4.6.1.2. Pembuatan dan pemasangan 1 m³ kusen pintu dan kusen jendela, kayu kelas II
A TENAGA
Pekerja L.01 OH 6.000 113,000 678,000.00
Tukang kayu L.03 OH 18.000 141,000 2,538,000.00
Kepala tukang L.03 OH 1.800 153,000 275,400.00
Lembar 201
B BAHAN
Balok kayu II lokal m³ 1.200 2,365,000.00 2,838,000.00
Paku 10 cm Kg 1.250 19,800.00 24,750.00
Lem kayu Kg 1.000 185,000.00 185,000.00
JUMLAH HARGA BAHAN 3,047,750.00
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 3,544,200.00 3,047,750.00 - 6,591,950.00
E Overhead & Profit 15% XD 531,630.00 457,162.50 988,792.50
F Harga Satuan Pekerjaan (D+E) 4,075,830.00 3,504,912.50 7,580,742.50
A.4.6.1.6. Pembuatan dan pemasangan 1 m² pintu dan jendela kaca , kayu kelas I
A TENAGA
Pekerja L.01 OH 0.800 113,000 90,400.00
Tukang kayu L.03 OH 2.400 141,000 338,400.00
Kepala tukang L.03 OH 0.240 153,000 36,720.00
Mandor L.04 OH 0.040 176,000 7,040.00
JUMLAH TENAGA KERJA 472,560.00
B BAHAN
Papan kayu kls,1 bayam m³ 0.024 20,000,000.00 480,000.00
Lem kayu Kg 0.300 185,000.00 55,500.00
JUMLAH HARGA BAHAN 535,500.00
C Peralatan
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 472,560.00 535,500.00 - 1,008,060.00
E Overhead & Profit 15% XD 70,884.00 80,325.00 151,209.00
F Harga Satuan Pekerjaan (D+E) 543,444.00 615,825.00 1,159,269.00
A.4.6.1.7. Pembuatan dan pemasangan 1 m² pintu dan jendela jalusi , kayu kelas I
A TENAGA
Pekerja L.01 OH 1.000 113,000 113,000.00
Tukang kayu L.03 OH 3.000 141,000 423,000.00
Kepala tukang L.03 OH 0.300 153,000 45,900.00
Mandor L.04 OH 0.050 176,000 8,800.00
JUMLAH TENAGA KERJA 590,700.00
B BAHAN
Papan kayu 1 bayam m³ 0.064 20,000,000.00 1,280,000.00
Lem kayu Kg 0.500 185,000.00 92,500.00
JUMLAH HARGA BAHAN 1,372,500.00
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 590,700.00 1,372,500.00 - 1,963,200.00
E Overhead & Profit 15% XD 88,605.00 205,875.00 294,480.00
F Harga Satuan Pekerjaan (D+E) 679,305.00 1,578,375.00 2,257,680.00
A.4.6.1.8. Pembuatan 1 m² daun pintu plywood rangkap , rangka kayu kelas II tertutp ( lebar sampai 90 m )
A TENAGA
Pekerja L.01 OH 0.700 113,000 79,100.00
Tukang kayu L.03 OH 2.100 141,000 296,100.00
Kepala tukang L.03 OH 0.210 153,000 32,130.00
Mandor L.04 OH 0.035 176,000 6,160.00
Lembar 202
B BAHAN
Papan kayu kelas II lokal m³ 0.025 2,365,000.00 59,125.00
Paku 1 cm - 2,5 cm Kg 0.030 25,000.00 750.00
Lem kayu Kg 0.500 185,000.00 92,500.00
Plywood tebal 4 mm Ukuran - Lembar 1.409 150,000.00 211,406.25
doble Teakwod (90X220cm) JUMLAH HARGA BAHAN 363,781.25
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 413,490.00 363,781.25 - 777,271.25
E Overhead & Profit 15% XD 62,023.50 54,567.19 116,590.69
F Harga Satuan Pekerjaan (D+E) 475,513.50 418,348.44 893,861.94
A.4.6.1.9. Pembuatan 1 m² daun pintu plywood rangkap , rangka expose kayu kelas I
A TENAGA
Pekerja L.01 OH 0.800 113,000 90,400.00
Tukang kayu L.03 OH 2.400 141,000 338,400.00
Kepala tukang L.03 OH 0.240 153,000 36,720.00
Mandor L.04 OH 0.040 176,000 7,040
JUMLAH TENAGA KERJA 472,560.00
B BAHAN
Papan kayu 1 bayam m³ 0.0256 20,000,000.00 512,000.00
Paku 1 cm - 2,5 cm Kg 0.030 25,000.00 750.00
Lem kayu Kg 0.500 185,000.00 92,500.00
Plywood tebal 4 mm Ukuran (90x220) cm Lembar 1.409 150,000.00 211,406.25
JUMLAH HARGA BAHAN 816,656.25
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 472,560.00 816,656.25 - 1,289,216.25
E Overhead & Profit 15% XD 70,884.00 122,498.44 193,382.44
F Harga Satuan Pekerjaan (D+E) 543,444.00 939,154.69 1,482,598.69
B BAHAN
Papan kayu 2 Kw.1 m³ 0.060 20,000,000.00 1,200,000.00
Paku 1 cm - 2,5 cm Kg 0.150 25,000.00 3,750.00
JUMLAH HARGA BAHAN 1,203,750.00
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 447,270.00 1,203,750.00 - 1,651,020.00
E Overhead & Profit 15% XD 67,090.50 180,562.50 247,653.00
F Harga Satuan Pekerjaan (D+E) 514,360.50 1,384,312.50 1,898,673.00
B BAHAN
Papan kayu 1 bayam m³ 0.025 20,000,000.00 500,000.00
Paku 1 cm - 2,5 cm Kg 0.030 25,000.00 750.00
Lem kayu Kg 0.300 185,000.00 55,500.00
Taekwood 4 mm 90x220 cm Lembar 1.409 150,000.00 211,406.25
JUMLAH HARGA BAHAN 767,656.25
Lembar 203
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 472,560.00 767,656.25 - 1,240,216.25
E Overhead & Profit 15% XD 70,884.00 115,148.44 186,032.44
F Harga Satuan Pekerjaan (D+E) 543,444.00 882,804.69 1,426,248.69
B BAHAN
Balok kayu kelas 2 Lokal m³ 1.100 2,365,000.00 2,601,500.00
Besi strip tebal 5 mm Kg 15.000 47,500.00 712,500.00
Paku 12 cm Kg 5.600 19,800.00 110,880.00
-
JUMLAH HARGA BAHAN 3,424,880.00
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 2,362,800.00 3,424,880.00 - 5,787,680.00
E Overhead & Profit 15% XD 354,420.00 513,732.00 868,152.00
F Harga Satuan Pekerjaan (D+E) 2,717,220.00 3,938,612.00 6,655,832.00
B BAHAN
Balok kayu kelas 1 bayam m³ 1.200 15,000,000.00 18,000,000.00
besi strip tebal 5 mm Kg 15.000 47,500.00 712,500.00
Paku 12 cm Kg 5.600 19,800.00 110,880.00
JUMLAH HARGA BAHAN 18,823,380.00
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 3,957,690.00 18,823,380.00 - 22,781,070.00
E Overhead & Profit 15% XD 593,653.50 2,823,507.00 3,417,160.50
F Harga Satuan Pekerjaan (D+E) 4,551,343.50 21,646,887.00 26,198,230.50
B BAHAN
Main Taso (C.75.40.0,75) M¹ 3.00 14,655.17 43,965.52
Reng Taso ( U Type 38.30.0,40) M¹ 5.00 7,758.62 38,793.10
Screw 12-14x20 Bh 9.00 750.00 6,750.00
Screw 12-16x16 Bh 11.00 400.00 4,400.00
Baut Dinabolt Bh 0.60 10,000.00 6,000.00
JUMLAH HARGA BAHAN 99,908.62
C PERALATAN
Peralatan Ls 1.00 10,000.00 10,000.00
JUMLAH HARGA ALAT 10,000.00
D Jumlah (A+B+C) 39,197.00 99,908.62 10,000.00 149,105.62
E Overhead & Profit 15% XD 5,879.55 14,986.29 20,865.84
F Harga Satuan Pekerjaan (D+E) 45,076.55 114,894.91 169,971.46
B BAHAN
Kaso - kaso 5 x 7 cm m³ 0.0163 2,365,000.00 38,549.50
Paku 5 cm - 10 cm Kg 0.250 19,800.00 4,950.00
-
JUMLAH HARGA BAHAN 43,499.50
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 71,250.00 43,499.50 - 114,749.50
E Overhead & Profit 15% XD 10,687.50 6,524.93 17,212.43
F Harga Satuan Pekerjaan (D+E) 81,937.50 50,024.43 131,961.93
B BAHAN
Papan kayu kelas 2 lokal m³ 0.0108 2,640,000.00 28,512.00
Paku 5 dan 10 cm Kg 0.100 19,800.00 1,980.00
-
JUMLAH HARGA BAHAN 30,492.00
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 43,440.00 30,492.00 - 73,932.00
E Overhead & Profit 15% XD 6,516.00 4,573.80 11,089.80
F Harga Satuan Pekerjaan (D+E) 49,956.00 35,065.80 85,021.80
Lembar 205
B BAHAN
Papan wood plank /kalsi lebar 30cm m¹ 1.050 23,750.00 24,937.50
Paku /sekrew Bh 8.000 1,000.00 8,000.00
-
JUMLAH HARGA BAHAN 32,937.50
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 27,194.00 32,937.50 - 60,131.50
E Overhead & Profit 15% XD 4,079.10 4,940.63 9,019.73
F Harga Satuan Pekerjaan (D+E) 31,273.10 37,878.13 69,151.23
B BAHAN
Papan kayu kelas 2 lokal m³ 0.028 2,640,000.00 73,920.00
Paku 5 dan 10 cm Kg 0.150 19,800.00 2,970.00
-
JUMLAH HARGA BAHAN 76,890.00
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 88,693.00 76,890.00 - 165,583.00
E Overhead & Profit 15% XD 13,303.95 11,533.50 24,837.45
F Harga Satuan Pekerjaan (D+E) 101,996.95 88,423.50 190,420.45
C PERALATAN
Lembar 206
Peralatan Ls 1.00
B BAHAN
Menie besi Kg 0.10 23,885.71 2,388.57
Pengencer L 0.01 32,000.00 320.00
Kwas Bh 0.01 12,000.00 120.00
Perancah kayu m³ 0.002 1,650,000.00 3,300.00
JUMLAH HARGA BAHAN 6,128.57
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 64,737.50 6,128.57 - 70,866.07
E Overhead & Profit 15% XD 9,710.63 919.29 10,629.91
F Harga Satuan Pekerjaan (D+E) 74,448.13 7,047.86 81,495.98
B BAHAN
Menie A Kg 0.10 32,000.00 3,200.00
Menie B Kg 0.10 32,000.00 3,200.00
Cat Avian Kg 0.08 62,000.00 4,960.00
Kwas Bh 0.01 12,000.00 120.00
Pengencer L 0.01 32,000.00 320.00
JUMLAH HARGA BAHAN 11,800.00
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 35,828.80 11,800.00 - 47,628.80
E Overhead & Profit 15% XD 5,374.32 1,770.00 7,144.32
F Harga Satuan Pekerjaan (D+E) 41,203.12 13,570.00 54,773.12
B BAHAN
Closet jongkok Unit 1.00 285,000.00 285,000.00
Semen portlan Kg 6.00 1,200.00 7,200.00
Pasir pasang m³ 0.01 142,200.00 1,422.00 1,422.00
JUMLAH HARGA BAHAN 1,422.00 293,622.00
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 375,610.00 293,622.00 - 669,232.00
E Overhead & Profit 15% XD 56,341.50 44,043.30 100,384.80
F Harga Satuan Pekerjaan (D+E) 431,951.50 337,665.30 769,616.80
B BAHAN
Westafel Unit 1.20 650,000.00 780,000.00
Semen portlan Kg 6.00 1,200.00 7,200.00
Pasir pasang m³ 0.01 142,200.00 1,422.00
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 373,560.00 882,222.00 - 1,255,782.00
E Overhead & Profit 15% XD 56,034.00 132,333.30 188,367.30
F Harga Satuan Pekerjaan (D+E) 429,594.00 1,014,555.30 1,444,149.30
B BAHAN
Bak fibreglass Unit 1.00 1,200,000.00 1,200,000.00
Perlengkapan Ls 12% x bak 144,000.00 144,000.00
JUMLAH HARGA BAHAN 1,344,000.00
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,139,550.00 1,344,000.00 - 2,483,550.00
E Overhead & Profit 15% XD 170,932.50 201,600.00 372,532.50
F Harga Satuan Pekerjaan (D+E) 1,310,482.50 1,545,600.00 2,856,082.50
B BAHAN
Floor drain Unit 1.00 15,000.00 15,000.00
-
JUMLAH HARGA BAHAN 15,000.00
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 17,640.00 15,000.00 - 32,640.00
E Overhead & Profit 15% XD 2,646.00 2,250.00 4,896.00
F Harga Satuan Pekerjaan (D+E) 20,286.00 17,250.00 37,536.00
A.5.1.1.16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm
A TENAGA
Pekerja L.01 OH 3,2 113,000 #VALUE!
Tukang batu L.02 OH 1,15 141,000 #VALUE!
Kepala tukang L.03 OH 0,011 153,000 1,683,000.00
Mandor L.04 OH 0,016 176,000 2,816,000.00
JUMLAH TENAGA KERJA #VALUE!
B BAHAN
Bata merah Bh 70,00 540.00 #VALUE!
Semen portlan Kg 77,00 1,200.00 #VALUE!
Pasir pasang m³ 0,13 142,200.00 #VALUE!
B BAHAN
kran air 1/2" M 1,00 40,000.00 #VALUE!
sealtape Buah 0.25 3,772.73 943.18
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #VALUE! #VALUE! - #VALUE!
E Overhead & Profit 15% XD #VALUE! #VALUE! #VALUE!
F Harga Satuan Pekerjaan (D+E) #VALUE! #VALUE! #VALUE!
B BAHAN
Pipa PVC 1/2" M 1,20 5,233.33 #VALUE!
Perlengkapan % 35,00 #VALUE! #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #VALUE! #VALUE! - #VALUE!
E Overhead & Profit 15% XD #VALUE! #VALUE! #VALUE!
F Harga Satuan Pekerjaan (D+E) #VALUE! #VALUE! #VALUE!
A.5.1.1.26. Pemasangan 1 m' pipa PVC tipe D Saluran Air diameter 3/4"
A TENAGA
Pekerja L.01 OH 0,036 113,000 4,068,000.00
Tukang batu L.02 OH 0,06 141,000 #VALUE!
Kepala tukang L.03 OH 0,006 153,000 918,000.00
Mandor L.04 OH 0,002 176,000 352,000.00
JUMLAH TENAGA KERJA #VALUE!
B BAHAN
Pipa PVC 3/4" M 1,20 4,757.58 #VALUE!
Perlengkapan % 35,00 #VALUE! #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #VALUE! #VALUE! - #VALUE!
E Overhead & Profit 15% XD #VALUE! #VALUE! #VALUE!
F Harga Satuan Pekerjaan (D+E) #VALUE! #VALUE! #VALUE!
A.5.1.1.27. Pemasangan 1 m' pipa PVC tipe D Saluran Air diameter 1"
A TENAGA
Pekerja L.01 OH 0,036 113,000 4,068,000.00
Tukang batu L.02 OH 0,06 141,000 #VALUE!
Kepala tukang L.03 OH 0,006 153,000 918,000.00
Mandor L.04 OH 0,002 176,000 352,000.00
JUMLAH TENAGA KERJA #VALUE!
B BAHAN
Pipa PVC 1" M 1,20 5,636.36 #VALUE!
Perlengkapan % 35,00 #VALUE! #VALUE!
JUMLAH HARGA BAHAN #VALUE!
Lembar 209
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C) #VALUE! #VALUE! - #VALUE!
E Overhead & Profit 15% XD #VALUE! #VALUE! #VALUE!
F Harga Satuan Pekerjaan (D+E) #VALUE! #VALUE! #VALUE!
A.5.1.1.28. Pemasangan 1 m' pipa PVC tipe D Asluran Air diameter 1 1/2"
A TENAGA
Pekerja L.01 OH 0.050 113,000 5,650.00
Tukang batu L.02 OH 0.090 141,000 12,690.00
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 20,245.00 10,260.00 - 30,505.00
E Overhead & Profit 15% XD 3,036.75 1,539.00 4,575.75
F Harga Satuan Pekerjaan (D+E) 23,281.75 11,799.00 35,080.75
A.5.1.1.29. Pemasangan 1 m' pipa PVC tipe D Saluran Air diameter 2"
A TENAGA
Pekerja L.01 OH 0,054 113,000 6,102,000.00
Tukang batu L.02 OH 0,09 141,000 #VALUE!
Kepala tukang L.03 OH 0,009 153,000 1,377,000.00
Mandor L.04 OH 0,003 176,000 528,000.00
JUMLAH TENAGA KERJA #VALUE!
B BAHAN
Pipa PVC 2" M 1,20 7,696.97 #VALUE!
Perlengkapan % 35,00 0.00 #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #VALUE! #VALUE! - #VALUE!
E Overhead & Profit 15% XD #VALUE! #VALUE! #VALUE!
F Harga Satuan Pekerjaan (D+E) #VALUE! #VALUE! #VALUE!
A.5.1.1.31. Pemasangan 1 m' pipa PVC tipe D Saluran Air diameter 3"
A TENAGA
Pekerja L.01 OH 0,081 113,000 9,153,000.00
Tukang batu L.02 OH 0,135 141,000 19,035,000.00
Kepala tukang L.03 OH 0,0135 153,000 #VALUE!
Mandor L.04 OH 0,004 176,000 704,000.00
JUMLAH TENAGA KERJA #VALUE!
B BAHAN
Pipa PVC 3" M 1,20 13,212.12 #VALUE!
Perlengkapan % 35,00 0.00 #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #VALUE! #VALUE! - #VALUE!
E Overhead & Profit 15% XD #VALUE! #VALUE! #VALUE!
F Harga Satuan Pekerjaan (D+E) #VALUE! #VALUE! #VALUE!
A.5.1.1.32. Pemasangan 1 m' pipa PVC tipe D Saluran Air diameter 4"
A TENAGA
Pekerja L.01 OH 0,081 113,000 9,153,000.00
Tukang batu L.02 OH 0,135 141,000 19,035,000.00
Kepala tukang L.03 OH 0,0135 153,000 #VALUE!
Mandor L.04 OH 0,004 176,000 704,000.00
JUMLAH TENAGA KERJA #VALUE!
B BAHAN
Pipa PVC 4" M 1,20 20,803.03 #VALUE!
Perlengkapan % 35,00 0.00 #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
Lembar 210
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #VALUE! #VALUE! - #VALUE!
E Overhead & Profit 15% XD #VALUE! #VALUE! #VALUE!
F Harga Satuan Pekerjaan (D+E) #VALUE! #VALUE! #VALUE!
A.5.1.1.36. Pemasangan 1 m' pipa beton diameter 30-100 cm
A TENAGA
Pekerja L.01 OH 0.38 113,000 42,940.00
Tukang batu L.02 OH 0.19 141,000 26,790.00
Kepala tukang L.03 OH 0.019 153,000 2,907.00
Mandor L.04 OH 0.019 176,000 3,344.00
JUMLAH TENAGA KERJA 75,981.00
B BAHAN
pipa tanah diameter 30cm Bh 1.10 150,000.00 165,000.00
bata merah M² 0.55 124,182.75 68,300.51
semen portlan Kg 10.30 1,200.00 12,360.00
pasir pasang M3 0.061 142,200.00 8,674.20
pasir urung M3 0.069 200,000.00 13,800.00
JUMLAH HARGA BAHAN 268,134.71
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 75,981.00 268,134.71 - 344,115.71
E Overhead & Profit 15% XD 11,397.15 40,220.21 51,617.36
F Harga Satuan Pekerjaan (D+E) 87,378.15 308,354.92 395,733.07
A.4.7.1.19. 1 M² Pengecatan Bidang Kayu Baru ( 1Lapis Plamir,1 lapis Cat Dasar ,2 Lapis Cat Penutup)
A TENAGA
Pekerja L.01 OH 0.0700 113,000 7,910.00
Tukang cat L.02 OH 0.0090 141,000 1,269.00
Kepala Tukang L.03 OH 0.0060 153,000 918.00
Mandor L.04 OH 0.0025 176,000 440.00
JUMLAH TENAGA KERJA 10,537.00
B BAHAN
Cat Meni Kg 0.2000 23,885.71 4,777.1429
Plamir kayu Kg 0.1500 40,000.00 -
Cat Dasar Kg 0.1700 7,142.86 1,214.2857
Cat Penutup 2 kali Kg 0.2600 62,000.00 16,120.0000
JUMLAH HARGA BAHAN 22,111.4286
C PERALATAN
Peralatan Ls 1.00 -
JUMLAH HARGA ALAT - -
D Jumlah (A+B+C) 10,537.00 22,111.4286 - 32,648.43
E Overhead & Profit 15% XD 1,580.55 3,316.71 4,897.26
F Harga Satuan Pekerjaan (D+E) 12,117.55 25,428.14 37,545.69
A.4.7.1.20. 1 M² Mengecat Tembok Baru (1 Lapis Plamir,1 Lapis Cat dasar, 2 Lapis Cat penutup)
A TENAGA
Pekerja L.01 OH 0.0200 113,000 2,260.00
Tukang cat L.02 OH 0.0630 141,000 8,883.00
Kepala Tukang L.03 OH 0.0063 153,000 963.90
Mandor L.04 OH 0.0025 176,000 440.00
JUMLAH TENAGA KERJA 12,546.90
B BAHAN
Plamir kg 0.1000 9,000.00 900.00
Cat Dasar kg 0.1000 24,200.00 2,420.00
Cat Penutup 2 kali (Metrolite) kg 0.2600 29,000.00 7,540.00
JUMLAH HARGA BAHAN 10,860.00
C PERALATAN
Peralatan Ls 1.00 0.00 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 12,546.90 10,860.00 - 23,406.90
E Overhead & Profit 15% XD 1,882.04 1,629.00 3,511.04
F Harga Satuan Pekerjaan (D+E) 14,428.94 12,489.00 26,917.94
B BAHAN
keramik 40 x 40 cm Bh 6.2500 9,600.00 60,000.00
Semen Portland Kg 9.8000 1,200.00 11,760.00
Pasir Pasang m³ 0.0450 142,200.00 6,399.00
Semen Nat Kg 0.5200 20,000.00 10,400.00
JUMLAH HARGA BAHAN 88,559.00
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 139,965.00 88,559.00 - 228,524.00
E Overhead & Profit 15% XD 20,994.75 13,283.85 34,278.60
F Harga Satuan Pekerjaan (D+E) 160,959.75 101,842.85 262,802.60
A TENAGA
Pekerja L.01 OH 0.700 113,000 79,100.00
Tukang batu L.02 OH 0.350 141,000 49,350.00
Kepala tukang L.03 OH 0.035 153,000 5,355.00
Mandor L.04 OH 0.035 176,000 6,160.00
JUMLAH TENAGA KERJA 139,965.00
B BAHAN
keramik 40 x 40 cm Permu' kasar Bh 6.2500 10,400.00 65,000.00
Semen Portland Kg 9.8000 5,000.00 49,000.00
Pasir Pasang m³ 0.0450 142,200.00 6,399.00
Semen Nat Kg 0.5200 20,000.00 10,400.00
JUMLAH HARGA BAHAN 130,799.00
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 139,965.00 130,799.00 - 270,764.00
E Overhead & Profit 15% XD 20,994.75 19,619.85 40,614.60
F Harga Satuan Pekerjaan (D+E) 160,959.75 150,418.85 311,378.60
B BAHAN
Keramik artistik Bh 20.000 2,900.00 58,000.00
Semen portlan Kg 9.300 1,200.00 11,160.00
Pasir Pasang m³ 0.018 142,200.00 2,559.60
Semen warna Kg 0.640 20,000.00 12,800.00
JUMLAH HARGA BAHAN 84,519.60
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 179,955.00 84,519.60 264,474.60
E Overhead & Profit 15% XD 26,993.25 12,677.94 39,671.19
F Harga Satuan Pekerjaan (D+E) 206,948.25 97,197.54 304,145.79
B BAHAN
Keramik putih polos Bh 6.250 9,600.00 60,000.00
Semen portlan Kg 9.300 1,200.00 11,160.00
Pasir Pasang m³ 0.018 142,200.00 2,559.60
Semen warna Kg 0.600 20,000.00 12,000.00
JUMLAH HARGA BAHAN 85,719.60
C PERALATAN
Peralatan Ls 1.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 179,955.00 85,719.60 265,674.60
E Overhead & Profit 15% XD 26,993.25 12,857.94 39,851.19
F Harga Satuan Pekerjaan (D+E) 206,948.25 98,577.54 305,525.79
B BAHAN
Kunci tanam 1xSlag Bh 1.00 250,000.00 250,000.00
JUMLAH HARGA BAHAN 250,000.00
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT - -
D Jumlah (A+B+C) 101,088.00 250,000.00 - 351,088.00
E Overhead & Profit 15% XD 15,163.20 37,500.00 52,663.20
F Harga Satuan Pekerjaan (D+E) 116,251.20 287,500.00 403,751.20
B BAHAN
Engsel pintu kuningan SES Bh 1.00 77,000.00 77,000.00
JUMLAH HARGA BAHAN 77,000.00
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT - -
D Jumlah (A+B+C) 25,280.80 77,000.00 - 102,280.80
E Overhead & Profit 15% XD 3,792.12 11,550.00 15,342.12
F Harga Satuan Pekerjaan (D+E) 29,072.92 88,550.00 117,622.92
B BAHAN
Engsel Jendela kuningan SES Bh 1.00 25,000.00 25,000.00
Lembar 214
B BAHAN
Kait anging Bh 1.00 40,000.00 40,000.00
JUMLAH HARGA BAHAN 40,000.00
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT - -
D Jumlah (A+B+C) 26,548.00 40,000.00 - 66,548.00
E Overhead & Profit 15% XD 3,982.20 6,000.00 9,982.20
F Harga Satuan Pekerjaan (D+E) 30,530.20 46,000.00 76,530.20
B BAHAN
Kaca bening tebal 3mm M² 1.00 110,000.00 110,000.00
Sealant Kg 0.05 50,000.00 2,500.00
JUMLAH HARGA BAHAN 112,500.00
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT - -
D Jumlah (A+B+C) 25,280.80 112,500.00 - 137,780.80
E Overhead & Profit 15% XD 3,792.12 16,875.00 20,667.12
F Harga Satuan Pekerjaan (D+E) 29,072.92 129,375.00 158,447.92
B BAHAN
Kaca bening tebal 5mm M² 1.10 135,000.00 148,500.00
Sealant Kg 0.05 50,000.00 2,500.00
JUMLAH HARGA BAHAN 151,000.00
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT - -
D Jumlah (A+B+C) 27,500.80 151,000.00 - 178,500.80
E Overhead & Profit 15% XD 4,125.12 22,650.00 26,775.12
F Harga Satuan Pekerjaan (D+E) 31,625.92 173,650.00 205,275.92
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT - -
D Jumlah (A+B+C) 61,500.00 90,030.30 - 151,530.30
E Overhead & Profit 15% XD 9,225.00 13,504.55 22,729.55
F Harga Satuan Pekerjaan (D+E) 70,725.00 103,534.85 174,259.85
C PERALATAN
Peralatan Ls 1.00 0.00 -
JUMLAH HARGA ALAT - -
D Jumlah (A+B+C) 61,500.00 105,730.30 - 167,230.30
E Overhead & Profit 15% XD 9,225.00 15,859.55 25,084.55
F Harga Satuan Pekerjaan (D+E) 70,725.00 121,589.85 192,314.85
B BAHAN
Kabel Listrik NYY 2 x 2,5 mm M' 5.00 9,000.00 45,000.00
Pipa Listrik 3/8" M' 5.00 4,006.06 20,030.30
Stop Saklar tunggal Broko Bh 1.00 12,500.00 12,500.00
Bahan lainnya Ls 1.00 25,000.00 25,000.00
JUMLAH HARGA BAHAN 102,530.30
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT - -
D Jumlah (A+B+C) 61,500.00 102,530.30 - 164,030.30
E Overhead & Profit 15% XD 9,225.00 15,379.55 24,604.55
F Harga Satuan Pekerjaan (D+E) 70,725.00 117,909.85 188,634.85
B BAHAN
Kayu kelas 2 balok 3/5 cm M3 0.0240 2,365,000.00 56,760.00
Lembar 216
B BAHAN
Main Taso (C.75.40.0,75) M¹ 4.500 14,655.17 65,948.276
Tripleks t,6mm M² 0.764 90,000.00 68,750.000
Screw 12-14x20 Bh 14.000 1,000.00 14,000.000
Screw 12-16x16 Bh 16.000 750.00 12,000.000
Baut Dinabolt Bh 0.780 10,000.00 7,800.000
Engsel Bh 2.000 5,000.00 10,000.000
JUMLAH HARGA BAHAN 178,498.276
C PERALATAN
Peralatan Ls 1.00 0.00 -
JUMLAH HARGA ALAT - -
D Jumlah (A+B+C) 39,197.00 178,498.276 - 217,695.28
E Overhead & Profit 15% XD 5,879.55 26,774.74 32,654.29
F Harga Satuan Pekerjaan (D+E) 45,076.55 205,273.02 250,349.57
C PERALATAN
Peralatan Ls
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 39,197.00 97,925.450 - 137,122.450
E Overhead & Profit 15% XD 5,879.55 14,688.818 - 20,568.368
F Harga Satuan Pekerjaan (D+E) 45,076.55 112,614.268 157,690.818
B BAHAN
Kawat las listrik Kg 0.040 1,500.00 60.00
Solar Ltr 0.030 5,150.00 154.50
Minyak pelumas Ltr 0.004 40,000.00 160.00
JUMLAH HARGA BAHAN 374.50
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT - -
D Jumlah (A+B+C) 3,276.80 374.50 - 3,651.30
E Overhead & Profit 15% XD 491.52 56.18 547.70
F Harga Satuan Pekerjaan (D+E) 3,768.32 430.68 4,199.00
B BAHAN
Kayu kelas III m³ 0.200 1,576,600.00 315,320.00
Paku 5 - 12 cm Kg 1.500 19,800.00 29,700.00
Minyak bekisting Liter 0.400 24,000.00 9,600.00
Lembar 218
B BAHAN
Kayu kelas III m³ 0.200 1,576,600.00 315,320.00
Paku 5 - 12 cm Kg 1.500 19,800.00 29,700.00
Minyak bekisting Liter 0.400 24,000.00 9,600.00
Besi beton polos Kg 150.000 9,900.00 1,485,000.00
Kawat beton kg 2.250 20,750.00 46,687.50
Semen portland Kg 336.000 1,200.00 403,200.00
Pasir beton m³ 0.540 142,200.00 76,788.00
Kerikil 2-3cm m³ 0.810 300,000.00 243,000.00
JUMLAH HARGA BAHAN 2,609,295.50
C PERALATAN
Peralatan Ls 1.00 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,055,751.00 2,609,295.50 - 3,665,046.50
E Overhead & Profit 15% XD 158,362.65 391,394.33 549,756.98
F Harga Satuan Pekerjaan (D+E) 1,214,113.65 3,000,689.83 4,214,803.48
B BAHAN
Papan Kayu kelas III m³ 0.320 1,576,600.00 504,512.00
Paku 5 - 12 cm Kg 3.200 19,800.00 63,360.00
Minyak bekisting Liter 1.600 24,000.00 38,400.00
Besi beton polos Kg 160.000 9,900.00 1,584,000.00
Kawat beton kg 2.250 20,750.00 46,687.50
Semen portland Kg 336.000 1,200.00 403,200.00
Pasir beton m³ 0.540 142,200.00 76,788.00
Kerikil m³ 0.810 300,000.00 243,000.00
A.4.7,7.1.9 Membuat 1 m³ Ring balok 12cmx20cm beton bertulang ( 235 kg besi + bekisting )
A TENAGA
Pekerja L.01 OH 5.650 113,000 638,450.00
Tukang batu L.02 OH 0.275 141,000 38,775.00
Lembar 219
B BAHAN
Kayu kelas III m³ 0.270 1,576,600.00 425,682.00
Paku 5 - 12 cm Kg 2.000 19,800.00 39,600.00
Minyak bekisting Liter 0.600 24,000.00 14,400.00
Besi beton polos Kg 235.000 9,900.00 2,326,500.00
Kawat beton kg 3.000 20,750.00 62,250.00
Semen portland Kg 336.000 1,200.00 403,200.00
Pasir beton m³ 0.540 142,200.00 76,788.00
Kerikil m³ 0.810 300,000.00 243,000.00
JUMLAH HARGA BAHAN 3,591,420.00
C PERALATAN
Peralatan Ls 1.00 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,193,812.00 3,591,420.00 - 4,785,232.00
E Overhead & Profit 15% XD 179,071.80 538,713.00 717,784.80
F Harga Satuan Pekerjaan (D+E) 1,372,883.80 4,130,133.00 5,503,016.80
B BAHAN
Kayu kelas III m³ 0.320 1,576,600.00 504,512.00
Paku 5 - 12 cm Kg 3.200 19,800.00 63,360.00
Minyak bekisting Liter 1.600 24,000.00 38,400.00
Besi beton polos Kg 200.000 9,900.00 1,980,000.00
Kawat beton kg 2.250 20,750.00 46,687.50
Semen portland Kg 336.000 1,200.00 403,200.00
Pasir beton m³ 0.540 142,200.00 76,788.00
Kerikil m³ 0.810 300,000.00 243,000.00
Kayu kelas III balok m³ 0.120 1,576,600.00 189,192.00
Multipleks 9 mm Lbr 2.800 100,000.00 280,000.00
Dolken kayu ø ( 8-10 ) cm, panjang 4 m Batang 20.000 30,000.00 600,000.00
JUMLAH HARGA BAHAN 4,425,139.50
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT - -
A.4.7,7.2.1 Membuat 1 m³ Ring balok 15cmx20cm beton bertulang ( 190 kg besi + bekisting )
A TENAGA
Pekerja L.01 OH 5.650 113,000 638,450.00
Tukang batu L.02 OH 0.275 141,000 38,775.00
Peralatan Ls 1.00 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,210,612.00 3,145,920.00 - 4,356,532.00
E Overhead & Profit 15% XD 181,591.80 471,888.00 653,479.80
F Harga Satuan Pekerjaan (D+E) 1,392,203.80 3,617,808.00 5,010,011.80
C PERALATAN
Peralatan Ls 1.00 - -
JUMLAH HARGA ALAT - -
D Jumlah (A+B+C) 16,848.00 19,000.00 - 35,848.00
E Overhead & Profit 15% XD 2,527.20 2,850.00 5,377.20
F Harga Satuan Pekerjaan (D+E) 19,375.20 21,850.00 41,225.20
B.35. Bongkar 1M² bekisting secara biasa ( dan membereskan puing - puing ) dimbil 10% - 15% dari upah kerja pemasangan
A TENAGA
Pekerja L.01 OH 0.099 113,000 11,187.00
Tukang kayu L.02 OH 0.050 141,000 6,979.50
Ka.Tukang L.03 OH 0.005 153,000 757.35
Mandor L.04 OH 0.005 176,000 871.20
JUMLAH TENAGA KERJA 19,795.05
B BAHAN
DR.Abd.Rahman Bando,SP.M.Si
Pangkat : Pembina Utama Muda
Nip.19700210 199803 1 014
Lembar 224
Galian tanah
Pr1. 4 1.1 1.3 1.50 8.58 M³
Pr2. 9 1 1.0 1.50 13.50 M³
Sloop 0.3 0.5 38.0 5.70 M³
27.78 M³
Urugan pasir ex,galian poer dan sloop
Pr1. 2 1.1 1.3 0.10 0.29 M³
Pr2. 3 1 1.0 0.10 0.30 M³
Sloop 0.3 38.0 0.10 1.14 M³
Sloop 0.3 38.0 0.10 1.14 M³
0.666
2.2104
(9,128,648.003) #REF!
Plat beton 1 14.2 0.12 10.100 17.210 M³ 58
Kolom 15/30 Lt,2 Ljt,K1 4 0.15 0.25 3.550 0.533 M³ 84.3592
Ring balok ruang kelas12/15 - 0.12 0.15 47.800 0.860 M³
Cat beton
Fisnishing Lt 1
Buka plesteran dinding bts Ruang 4 sisi 4 8.3 3.2 106.24 M²
Buka plesteran dinding depan & Blkng 3 sisi 3 14 3.2 134.4 M²
Jml Buka plestern Netto 240.64 M²
Luas Pj Lt 1
Y 7.1 2 14.160 M¹
Teras+overstek X 7.3 2 14.560 M¹
Y 3.0 2 5.900 M¹
Overstek belakang X 7.3 2 14.560 M¹
Y 1.2 2 2.400 M¹
Overstek miring X 6.8 2 13.520 M¹
Y 1.2 2 2.400 M¹
160.710 M¹
Kuda-Kuda Batu
Pasangan 1/2 bt, 8.85 2.6 50% 11.505 M²
Kolom 12/15 0.12 0.15 2.60 0.0468 M³
R,Blk Sopi-sopi 2 0.12 0.15 5.28 0.19008 M³
Kusen 2 3.10 0.15 0.05 0.0465 M³
Jalusi 2 0.8 0.7 1.1200 M²
Finishing/Cat Lt,1
Arah X 2 7.4 3.7 54.76 M²
Arah y 2 7.2 3.7 53.28 M²
108.04 M²
Luas Pjv
Pintu 1 0.800 2.580 2.064 M² 75%
Ventilasi terali pengaman 1 2.410 0.820 1.976 M²
Ventilasi terali pengaman 1 3.250 0.820 2.665 M²
Ventilasi kayu silang +kaca JV1 2 3.250 1.520 9.880 M²
Jumlah luas PJ 16.585 M²
Jumlah (a)
Lembar 229
12.439
Lembar 230
Lembar 231
#VALUE! (a)
#VALUE! (b)
#VALUE!
#REF!
#REF! (e)
PEMERINTAH KOTA MAKASSAR
DINAS PENDIDIKAN
Jl.Letjen Hertasning No.8 Tlp.(0411)868073 Fax.869256 Makassar 90222
Website:http/www.dikbud_makassar.info;e-mail:dikbud.makassar@yahoo.com
R E KAPI T U LAS I
Mengetahui
Kepala Bidang Sarana Dan Prasarana
Selaku PPK
8,620,000
SAROKHADI M. S.Sos,MM
Nip.19621231 199003 1 126
Mengetahui
Kepala Dinas Pendidikan
Kota Makassar
DR.Abd.Rahman Bando,SP.M.Si
Pangkat : Pembina Utama Muda
Nip.19700210 199803 1 014
REKAP KEBUTUHAN BAHAN MATERIAL PAGAR SDI KERA KERA