Design of Compressor Suction

Scrubbers
Or
Dont wreck the expensive compressor with cheap
scrubbers or with inadequate engineering
TEKNA-Conference
Norway, 26-27 September 2012

Hans Nooijen, GSNL-PTD/TRD


Principal Technologist Distillation

Copyright of Shell Global Solutions International B.V.

Paul Clinton, GSNL-PTU/EKUW


Principal Concept Engineer

DEFINITIONS AND CAUTIONARY NOTE


Resources: Our use of the term resources in this announcement includes quantities of oil and gas not yet classified as Securities and Exchange Commission of the United
States ("SEC") proved oil and gas reserves or SEC proven mining reserves. Resources are consistent with the Society of Petroleum Engineers 2P and 2C definitions.

The companies in which Royal Dutch Shell plc directly and indirectly owns investments are separate entities. In this announcement "Shell", "Shell Group" and "Royal Dutch
Shell" are sometimes used for convenience where references are made to Royal Dutch Shell plc and its subsidiaries in general. Likewise, the words "we", "us" and "our"
are also used to refer to subsidiaries in general or to those who work for them. These expressions are also used where no useful purpose is served by identifying the
particular company or companies. "Subsidiaries", "Shell subsidiaries" and "Shell companies" as used in this announcement refer to companies in which Shell either directly
or indirectly has control, by having either a majority of the voting rights or the right to exercise a controlling influence. The companies in which Shell has significant influence
but not control are referred to as "associated companies" or "associates" and companies in which Shell has joint control are referred to as "jointly controlled entities". In this
announcement, associates and jointly controlled entities are also referred to as "equity-accounted investments". The term "Shell interest" is used for convenience to indicate
the direct and/or indirect (for example, through our 23 per cent. shareholding in Woodside Petroleum Ltd.) ownership interest held by Shell in a venture, partnership or
company, after exclusion of all third-party interest.

This announcement contains forward looking statements concerning the financial condition, results of operations and businesses of Shell and the Shell Group. All
statements other than statements of historical fact are, or may be deemed to be, forward-looking statements. Forward-looking statements are statements of future
expectations that are based on management's current expectations and assumptions and involve known and unknown risks and uncertainties that could cause actual
results, performance or events to differ materially from those expressed or implied in these statements. Forward-looking statements include, among other things, statements
concerning the potential exposure of Shell and the Shell Group to market risks and statements expressing managements expectations, beliefs, estimates, forecasts,
projections and assumptions. These forward looking statements are identified by their use of terms and phrases such as "anticipate", "believe", "could", "estimate",
"expect", "goals", "intend", "may", "objectives", "outlook", "plan", "probably", "project", "risks", "seek", "should", "target", "will" and similar terms and phrases. There are a
number of factors that could affect the future operations of Shell and the Shell Group and could cause those results to differ materially from those expressed in the forward
looking statements included in this announcement, including (without limitation): (a) price fluctuations in crude oil and natural gas; (b) changes in demand for Shell's
products; (c) currency fluctuations; (d) drilling and production results; (e) reserves estimates; (f) loss of market share and industry competition; (g) environmental and
physical risks; (h) risks associated with the identification of suitable potential acquisition properties and targets, and successful negotiation and completion of such
transactions; (i) the risk of doing business in developing countries and countries subject to international sanctions; (j) legislative, fiscal and regulatory developments
including regulatory measures addressing climate change; (k) economic and financial market conditions in various countries and regions; (l) political risks, including the risks
of expropriation and renegotiation of the terms of contracts with governmental entities, delays or advancements in the approval of projects and delays in the reimbursement
for shared costs; and (m) changes in trading conditions. All forward looking statements contained in this announcement are expressly qualified in their entirety by the
cautionary statements contained or referred to in this section. Readers should not place undue reliance on forward looking statements. Additional factors that may affect
future results are contained in Shell's 20-F for the year ended 31 December 2011 (available at www.shell.com/investor and www.sec.gov ). These factors also should be
considered by the reader. Each forward looking statement speaks only as of the date of this announcement, 22 February 2012. Neither Shell nor any of its subsidiaries nor
the Shell Group undertake any obligation to publicly update or revise any forward looking statement as a result of new information, future events or other information. In
light of these risks, results could differ materially from those stated, implied or inferred from the forward looking statements contained in this announcement.

Shell may have used certain terms, such as resources, in this announcement that the SEC strictly prohibits Shell from including in its filings with the SEC. U.S. investors
are urged to consider closely the disclosure in Shell's Form 20-F, File No 1-32575, available on the SEC website www.sec.gov. You can also obtain these forms from the
SEC by calling 1-800-SEC-0330.

Copyright of Shell Global Solutions International B.V.

CONTENTS

1. What is the problem?


2. Its an old problem and its an ongoing problem
3. Why do we get it wrong?

4. Examples of getting it wrong.


5. How should we get it right?

Copyright of Shell Global Solutions International B.V.

10/2/2012

WHATS THE PROBLEM?

Copyright of Shell Global Solutions International B.V.

10/2/2012

WHAT IS THE PROBLEM?


Inadequate separation upstream of compressors results in:
Liquids entering the compressor
Dissolved and entrained solids entering the compressor

Effect on the compressor:


Erosion
Deposition of solids

Eventual consequences:
Reduction of compression efficiency = loss of performance
Rotor imbalance - more unscheduled maintenance
Possible catastrophic failure
Copyright of Shell Global Solutions International B.V.

10/2/2012

ITS:
An old problem

A current problem
An ongoing problem

Copyright of Shell Global Solutions International B.V.

10/2/2012

COMPRESSOR FOULING - ITS AN OLD PROBLEM

27 May 1984
Case 1 Lift Gas Compressors Performance Check K-614

The second stage discharge pressure is higher than


expected. The high pressure trip has been reached
and the machine keeps tripping.
The problem has been getting worse and it is
suspected that carry-over is fouling the machine up.
This would have its greatest effect in the third stage
where the clearances are smaller.

Copyright of Shell Global Solutions International B.V.

10/2/2012

CASE 1 IN 2006

The liquid being drained from the casing drain resembled heavy crude
rather than condensate.

GS.06.50099 Case 1 Visit Report : COMPRI & Smart Fields Scouting Study
Copyright of Shell Global Solutions International B.V.

10/2/2012

CASE 2

Copyright of Shell Global Solutions International B.V.

10/2/2012

CASE 3

Salt
deposits

Copyright of Shell Global Solutions International B.V.

10/2/2012

10

CASE 4 - FOULED DIFFUSER

Copyright of Shell Global Solutions International B.V.

10/2/2012

11

CASE 5 - 1ST STAGE COMPRESSOR INLET EYE

Copyright of Shell Global Solutions International B.V.

10/2/2012

12

CASE 6 COMPRESSOR - EROSION

Copyright of Shell Global Solutions International B.V.

10/2/2012

13

CASE 7 CATASTROPHIC FAILURE

When machine
was opened,
these pools of
liquid were found
in it.

Copyright of Shell Global Solutions International B.V.

10/2/2012

14

CASE 7 - PIECE BROKEN OFF IMPELLER

Copyright of Shell Global Solutions International B.V.

10/2/2012

15

CASE 7 - BROKEN SEAL

Copyright of Shell Global Solutions International B.V.

10/2/2012

16

WHY DO WE GET IT WRONG?

Copyright of Shell Global Solutions International B.V.

10/2/2012

17

WHY DO WE GET IT WRONG?


Ignorance - not thinking about our design and not understanding

what is happening in our own process


Not following established good practice
Delegating design responsibility
Lack of attention to detail
No close supervision of contractors
Package unit & vendor guarantee mentality
Concept of Industry standard
Attempt to save money

Copyright of Shell Global Solutions International B.V.

10/2/2012

18

HOW DOES A COMPRESSOR SUCTION SCRUBBER


WORK?
Vessel
Provides larger flow area to

reduce flow velocity


For gas dominated two phase
flow, vertical vessel makes best
use of available area
If high proportion of liquid, need
pre-separation
Control volume for separated
liquid

Outlet nozzle & pipe


Avoids channeling of flow in the

demister

Demisting internals
Remove liquids by various means
Merge small droplets into bigger

droplets
Catch the droplets (cyclones, flow
direction change, etc
Return removed liquid to bottom
of vessel

Inlet device
Inlet nozzle & pipe
Avoids severe maldistribution of

two phase flow across pipe area


Provides non slugging flow
regime
If mist flow be careful - if very
small
droplet
size,International
difficultB.V.to
Copyright
of Shell
Global Solutions
separate

Makes coarse gas/liquid

separation
Distributes gas flow across vessel
area
Avoids re-entrainment of droplets

10/2/2012

19

UNDERSTANDING BEGINS AT THE PFS


What is wrong
with thisare
PFS?
Production
separators
only
(whatseparators,
is missing?)
bulk
just like slug
catchers.

Suction
scrubber was
missing

wells Flowlines
manifold
(5 - 10 km long)
Copyright of Shell Global Solutions International B.V.

Production separator

A clue:
Now the second
stage is shown

compressor

10/2/2012

20

UNDERSTANDING CONTINUES TO PEFS


WhatInstructions
instruction to
is avoid
missing
slug
from
formation!
these
PEFSs?

Slope, do
not pocket
Slope, do
not pocket
To compressor

Slope, do
not pocket
From separator

To second
compression train,
see PEFS xyz

PEFS
Production
separator
Copyright of Shell Global Solutions International
B.V.

PEFS
Compression
10/2/2012

21

RUNNING PIPING TO COMPRESSORS - PLAN VIEW

Distance can be > 100 m

Compression train

Well flowlines
Piping dept dont know about slugs and the
capabilities of your separators.
If you dont instruct otherwise they will run the
pipes in the most convenient way:
At grade
Underground
Copyright of Shell Global Solutions International B.V.

Compression train
10/2/2012

22

Suction scrubbers are not


slugcatchers.
When a slug hits the suction scrubber,
a significant proportion will leave in the
gas and enter the compressor.

Production
separator

This gas pipe is now similar to a two phase


cross country pipeline. And it also has
slugs:
Terrain induced
Flow rate induced
A half full 100m long 30 inch pipe holds 7
m3 ofCopyright
liquid!
of Shell Global Solutions International B.V.

Suction
scrubber

RUNNING PIPING TO COMPRESSORS - ELEVATION


VIEW

Worst case is starting another


compressor. The equilibrium hold up
changes and a huge slug can be
generated.
High carryover to compressor
LZHH may be reached on running
machines - which will trip.10/2/2012

23

I CAN SOLVE THAT WITH A DRAIN POT!

LZHH

By the time you have


engineered the drain pot,
how high must the pipe be
elevated?
Definitely higher than it
used to be!

Range for
control
LZLL
Clearance for
access

Copyright of Shell Global Solutions International B.V.

10/2/2012

24

IF YOU CANNOT ELIMINATE SLUGS, ONLY PROPER


SOLUTION IS A SLUGCATCHER
To suction scrubber

Long pipe

slugcatcher

The slugcatcher will eliminate slugs.


Liquid removal by dip tube or
occasional blowdown are
desperate measures for
constructed plant. They should not
be engineered into a new design.
Copyright of Shell Global Solutions International B.V.

Underground slugcatchers are nice for the


hydraulics, but very difficult for
maintenance and safety. (dont do it)
Dont forget that the compressor will still
require a suction scrubber.
10/2/2012

25

SUCTION SCRUBBER INLET & OUTLET PIPING

Inlet nozzle
straight length
requirement.
Slope, do
not pocket

Outlet nozzle v2
requirement usually
needs larger pipe
size.
Note 2
Outlet nozzle
straight length
requirement.

Note 1

Inlet nozzle v2
requirement usually
needs larger pipe size.
Note 1. No bends in horizontal plane, valves or swages allowed within 10 pipe diameters of inlet nozzle
Note 2. No bends in horizontal plane, valves or swages allowed within 2 pipe diameters of outlet nozzle
Copyright of Shell Global Solutions International B.V.

10/2/2012

26

DEVIATION FROM SEPARATOR DEP


Vendor Special

DEP Separator

Exciting new technology

Established technology

Smaller vessel

Based on many actual

Cheaper!
CFD based design

field tests across Shell


Group

Great list of installed units

(but have you spoken to


them?)

Deviation Control
Not applying the DEP requires approval to deviate from Shell practice.
You are not authorized to make this decision.

Why Gamble?
Taking a gamble on a cheaper scrubber is just not worth the risk of compressor damage.
Copyright of Shell Global Solutions International B.V.

10/2/2012

27

EXAMPLES OF GETTING IT WRONG


Please remember that all these examples were engineered by engineers - it wasnt an accident.

Copyright of Shell Global Solutions International B.V.

10/2/2012

28

CASE 1 IN 2006

The root cause failure report for K 0611 highlighted (utilizing thermo-graphic photos)
that the liquid suction header for the inlet scrubber was half filled with liquids (low
section of the header). This is the suction header to inlet scrubber V-0610.
Copyright of Shell Global Solutions International B.V.

10/2/2012

29

CASE 8

Long underground lines from flow


station
Copyright of Shell Global Solutions International B.V.

10/2/2012

30

CASE 1 K-614 SCRUBBER - VESSEL DATA SHEET

What basis is there for believing that


this proprietary separator will work?

Copyright of Shell Global Solutions International B.V.

10/2/2012

31

CASE 1 K-614 SCRUBBER - IT GETS EVEN WORSE

Dresser stated that they were


unable to comply with 24
manway requirements.
Customer (x) agreed for
vessels with no internals.

Copyright of Shell Global Solutions International B.V.

10/2/2012

32

PROPRIETARY SEPARATOR CASE 9


Outlet 12
Flow evenly
distributed
across vane
pack?

Channelling
through vane
pack?

Vessel ID
= 750 mm

Re-entrainment
of droplets?

Inlet 12
Copyright of Shell Global Solutions International B.V.

10/2/2012

33

CASE 9 PROPRIETARY SEPARATOR - EVALUATION


In September 2003 severe rotor damage of the Export compressor K-83502
occurred.
Liquid carryover from the suction scrubber vessel V-83502 was identified as a
possible cause of failure.
To quantify the level of liquid carryover and to determine the separation efficiency of
the scrubber V-83502, a dedicated isokinetic sampling campaign was carried out by
Shell Global Solution (SGSi-OGRD) over the period 10 to 12 October 2004.
The vendor guarantee specification for liquid in the off gas from this scrubber is
< 13 litres/MMsm3 (0.1 US gal/MMsft3). This translates to an actual liquid
concentration
of < 10 ppmw in the scrubber off gas.
Conclusions
The measurements from the isokinetic sampling showed an average liquidingas
concentration of 0.19wt% with a separator liquid removal efficiency of 68%.
The vendor guarantee separator performance of 0.1 Usgal/MMsft3 (or 13
liters/MMsm3) carryover in the gas, which equates to a separation efficiency of
99.8%, is by far not being achieved.
Copyright
of Shell Global Solutions International B.V.
Ref
OG.04.50720

10/2/2012

34

CASE 10 - INCORRECT INLET PIPING TO SUCTION


SCRUBBER
Case 10 Pre-start-up audit, July 2005

Bend in horizontal plane


violating 10D straight length
requirement.

Copyright of Shell Global Solutions International B.V.

V-1410
Propane
compressor
suction
scrubber

10/2/2012

35

HOW SHOULD WE GET IT RIGHT?

Copyright of Shell Global Solutions International B.V.

10/2/2012

36

HOW SHOULD WE GET IT RIGHT?


Understand the problem and how to avoid it.
Follow established good practice:
Use

the Separator DEP

Eliminate

slugs and keep them from re-forming

Pipework

configuration correct

Dont delegate design responsibility:


Put

high level philosophical requirements in BOD & BDP

Ensure that our requirements are fulfilled:


Project

spec contractor to correctly express our philosophical


requirements in the EPC bid document

EPC

contractor to purchase accordingly

EPC

contractor to construct accordingly

Copyright of Shell Global Solutions International B.V.

10/2/2012

37

RELATIONSHIPS & EXPERTISE


There is no reason for the expertise not to be at the Principals

end.
That expertise should be you!

relationship

Vendor

Fabricator

relationship

relationship
relationship
Principal
Design
(asset owner)
contractor

Technical
advisor

Who is making the decisions?


Who is truly providing the guarantee?
Where is the expertise?
Who really knows how the equipment will
perform?

Is the process engineering expertise in the project at the Principals end or the other end?

Copyright of Shell Global Solutions International B.V.

10/2/2012

38

THANK YOU FOR YOUR ATTENTION

Copyright of Shell Global Solutions International B.V.

10/2/2012

39

SURGE FACTORS For the production separator upstream of the compressor suction
scrubber
DEP 31.22.05.11-Gen. September 2002
In E&P Offshore service
Separator handling natural-flowing production from:
a) its own platform
b) another platform or well jacket in shallow water
c) another platform or well in deep water
Separator handling gas lifted production from:
a) its own platform
b) another platform or well jacket
In E&P Onshore service
Separator handling natural flowing production, or gas plant inlet separator in:
a) flat or low rolling country
b) hilly country
Separator handling gas lifted production in:
a) flat or low rolling country
b) hilly country
In Refineries and Chemical plants:
The design margin ranges typically from
Copyright of Shell Global Solutions International B.V.

1.2
1.3
1.4
1.4
1.5

1.2
1.3
1.4
1.5
1.15 to 1.25
10/2/2012

40

CORROSION EROSION

Copyright of Shell Global Solutions International B.V.

10/2/2012

41

THRUST BEARING (BOTTOM) & SEAL

Copyright of Shell Global Solutions International B.V.

10/2/2012

42

RECIPROCATING COMPRESSOR OUTBOARD


DISCHARGE VALVE

Copyright of Shell Global Solutions International B.V.

10/2/2012

43