Alloc Centre

03A- Duvha
Doc ID:
ESF0170

Duvha Unit 3 Recovery


Removal Of Equipment

Rev

Page

0
1 of 1

When equipment is needed from Unit 3 in order to keep a running unit on load verbal approval is
needed from the POWER STATION MANAGER, or the RECOVERY MANAGER.
This form is then to be filled in at the latest the next day, and to be signed by the POWER STATION
MANAGER AND RECOVERY MANAGER and forwarded to the Recovery Project Secretary.
FULL DETAILS OF PLANT / EQUIPMENT REMOVED including AKZ
MOTIVATION FOR REMOVAL

EQUIPMENT RETURN DATE

CONTACT PERSON

LOCATION OF PLANT / EQUIPMENT NOW FITTED


REMOVED BY

SIGN

DEPARTMENT

PERMISSION
REQUESTED BY

NAME

DATE

SIGN

PERMISSION
GRANTED BY (PSM)

NAME

DATE

SIGN

PERMISSION GRANTED
BY (RECOVERY ENGG.
MNGR.)

NAME

DATE

SIGN

PERMISSION GRANTED
BY (RECOVERY MGR)

NAME

DATE

SIGN

CONDITIONS FOR LOAN


COST OF ITEM

WBS BUDGET

DETAILS OF PLANT / EQUIPMENT REPLACED

DATE REPLACED

NAME

REMARKS ON ITEMS REPLACED


RECOVERY MANAGER

SIGNATURE

NB : Requestor is responsible for ensuring that the SHE and the PSR requirements are met when pirating the spares.