You are on page 1of 1

LOCATION EQUIPMENT DETAILS PRE-COMMISSIONING

S. No. COMMENTS / REMARKS


BUILDING DESCRIP REFERENCE NO SYSTEM SERVING TO DONE SUBMIT DATE
1 BSW TION
FCU FCU-BSW-01 BREAK ROOM TED
03/12/2016 Need power / FAHU-1 to be on for FA
2 BSW FCU FCU-BSW-02 OFFICE 03/12/2016 Need power / FAHU-1 to be on for FA
3 BSW FCU FCU-BSW-03 CONFERENCE ROOM 03/12/2016 Need power / FAHU-1 to be on for FA
4 BSW FCU FCU-BSW-04 MANAGER OFFICE 03/12/2016 Need power / FAHU-1 to be on for FA
5 BSW FCU FCU-BSW-05 OPEN OFFICE 03/12/2016 Need power / FAHU-1 to be on for FA
6 BSW FCU FCU-BSW-06 OPEN OFFICE 03/12/2016 Need power / FAHU-1 to be on for FA
7 BSW FCU FCU-BSW-07 OPEN OFFICE 03/12/2016 Need power / FAHU-1 to be on for FA
8 BSW FCU FCU-BSW-08 OPEN OFFICE 03/12/2016 Need power / FAHU-1 to be on for FA
9 BSW FCU FCU-BSW-09 STORAGE
10 BSW FCU FCU-BSW-10 IDF ROOM
11 BSW FCU FCU-BSW-10 IDF ROOM
12 BSW FCU FCU-BSW-11 ELECTRICAL ROOM
13 BSW FCU FCU-BSW-12 MALE PRAYER ROOM 03/12/2016 Need power / FAHU-1 to be on for FA
14 BSW FCU FCU-BSW-13 FEMALE PRAYER ROOM 03/12/2016 Need power / FAHU-1 to be on for FA
15 BSW FCU FCU-BSW-14 MECHANICAL ROOM
16 BSW FCU FCU-BSW-15 MECHANICAL ROOM

By: Mohan Chandra


Sutton International llc 03/12/2016, 9:55 AM Page 1 of 1