PT.

MITRA INDAH LESTARI


JOB SITE SINGLURUS PRATAMA

DAILY ANALYSIS & CONTROL EQUIPMENT


PERFORMANCE REPORT
###
PREPARED BY : Rahaldi Noer Arshy (Data Center)
Sabtu WORK HOUR
HAULING. OB
NO CODE UNIT
PRO GEN NS
A. EXCAVATOR
22 EH330 12 EH3
23 EH330 15 EH3
24 EH330 20 EH3 0.3
25 ED225 27 ED2 2.0
26 ED225 29 ED2 52.1
27 ED225 31 ED2
28 EH210 33 EH2 24.9
29 EH200 36 EH2 2.3 61.2
30 WL 01 WL 0.2
31 WL 02 WL

TOTAL / AVERAGE 3,358 657.2 -

B. BULLDOZER
1 DK85 12 DK8 168.5
2 DK85 23 DK8 213.1
3 DK85 28 DK8 179.3
4 DK85 32 DK8 40.9
5 DK85 37 DK8 334.8
6 DK85 39 DK8 10.3
7 DK85 58 DK8 358.1
8 DK85 68 DK8 430.7
9 DK85 17 DK8 77.9
10 DK85 27 DK8 5.8
11 DK85 55 DK8 113.4

TOTAL / AVERAGE - 1,932.9 -

C. MOTOR GRADER
1 KG511 02 173.6
2 KG511 08 23.4
3 KG511 10 68.9
4 KG705 12 2.8
5 KG705 29 181.1
6 KG705 21 105.0
-

TOTAL / AVERAGE - 554.8 -

I. WATER TRUCK
1 WT 18 7.0
2 WT 50 81.3
-
TOTAL / AVERAGE - 88.3 -

J. WATER PUMP
1 WP 07 44.4
2 WP 11 11.8
3 WP 12 29.0
-

TOTAL / AVERAGE - 85.2 -


WORK HOUR
HAULING. COAL
PRO GEN NS

36.5
8.5
419.3
340.5
2.3 30.3

18.4
2.3 75.0
517.7
457.4

480.6 1,960.3 -
- - ###

- - ###
- - ###

- - ###