Business continuity planning (or business co ry and resiliency
planning) is the process of creating systems of prevention and recovery to
deal with potential threats to a company.!!
Any event that could negatively impact operations is included in the plan,
such as supply chain interruption, loss of or damage to critical
infrastructure (major machinery or computing network resource). As such,
BCP is a subset of risk management.2IMn the US, government entities refer
to the process as continuity of operations planning (COOP).E)
Contents
= 1 Current Standards
= 1.1 Civil Contingencies Act
= 2 Analy:
= 2.1 Business impact analysis (BIA)
= 2.2 Threat and risk analysis (TRA)
Impact scenarios
= 2.4 Recovery requirement
Solution design
Implementation
Testing and organizational acceptance
= 5.1 Tabletop exercises
= 5.2 Medium exercises
= 5,3 Complex exercises
= 6 Maintenance
= 6.1 Information/targets
= 62 Technical
= 63 Testing and verification of recovery procedures
7 See also
= 8 References
= 8.1 Notes
* 82 Bibliography
= 9 Further reading
9.1 Intemational Organization for Standardization
* 9.2 British Standards Institution
= 9.3 Others
10 External links
wae
Current Standards
planning lifecycle
Testing & Solution
acceptance design
meek?
Business continuity planning lif
cycle
In December 2006, the British Standards Institution (BSI) released an independent standard for BCP — BS 25999-
1. Prior to the introduction of BS 25999, BCP professionals relied on information security standard BS 7799,
which only peripherally addressed BCP to improve an organization's information security procedures. BS 25999's
htteev/enwikipedia.craNwiki/Business continulty clannina
10amen Business continuity planning Wikipedia
applicability extends to all orgenizations, In 2007, the BSI published BS 2599-2 "Specification for Business
Continuity Management”, which specifies requirements for implementing, operating and improving a documented
business continuity management system (BCMS),
Business continuity management is standardized across the UK by British Standards (BS) through BS 25999-
1007 and BS 25999-1:2006, BS 25999-2:2007 business continuity management is the British Standard for
business continuity management across all 01 . The standard
provides a best practice framework to minimize disruption during unexpected events that could bring business to a
standstill. The document gives a practical plan to deal with most eventualities — from extreme weather conditions
to terrorism, IT system failure, and staff sickness.(4]
This document was superseded in November 2012 by the British standard BS 1S022301:2012, the current standard
for business continuity planning.!5)
Civil Contingencies Act
In 2004, following crises in the preceding years, the UK. government passed the Civil Contingencies Act 2004 (The
Act). This provides the legislation for civil protection in the UK: Businesses need to have continuity planning
measures in place in order to survive and continue to thrive whilst working towards keeping the incident as
minimal as possible.)
‘The Act was separated into two parts: Part | focuses on local arrangements for civil protection, establishing a
statutory framework of roles and responsibilities for local responders. Part 2 focused on emergency powers,
establishing a modem framework for the use of special legislative measures that might be necessary to deal with
the effcets of the most serious emergency.
Analysis
‘The analysis phase consists of impact analysis, threat analysis and impact scenarios.
Business impact analysis (BLA)
A Business impact analysis (BIA) differentiates critical (urgent) and non-critical (non-urgent) organization
functions/activities. Critical functions are those whose disruption is regarded as unacceptable. Perceptions of
acceptability are affected by the cost of recovery solutions, A function may also be considered critical if dictated
by law. For each critical (in scope) function, two values are then assigned:
= Recovery Point Objective (RPO) — the acceptable latency of data that will not be recovered. For example is
it acceptable for the company to lose 2 days of data?l7]
= Recovery Time Objective (RTO) — the acceptable amount of time to restore the function.
‘The recovery point objective must ensure that the maximum tolerable data loss for each activity is not exceeded.
The recovery time objective must ensure that the Maximum Tolerable Period of Disruption (MTPoD) for each
activity is not exceeded
‘Next, the impact analysis results in the recovery requirements for each critical function. Recovery requirements
consist of the following information
= The business requirements for recovery of the eritieal function, and/or
= The technical requirements for recovery of the critical function
oS _s2ri2017 Business continuity planning Wikipedia
Threat and risk analysis (TRA)
Afier defining recovery requirements, each potential threat may require unique recovery steps. Common threats
include:
= Epidemic = Hurricane or other major = Waricivil disorder
= Earthquake storm = Theft (insider or external
= Fire = Power outage threat, vital information or
= Flood = Water outage (supply material)
= Cyber attack interruption, contamination) = Random failure of mission-
= Sabotage (insider or external = Telecomms outage critical systems
threat) = IT outage
= Terrorism/Piracy
The impact of an epidemic can be regarded as purely human, and may be alleviated with technical and business
solutions. However, if people behind these plans are affected by the disease, then the process can stumble
During the 2002-2003 SARS outbreak, some organizations grouped staff into separate teams, and rotated the
teams between primary and secondary work sites, with a rotation frequeney equal to the incubation period of the
disease. The organizations also banned face-to-face intergroup contact during business and non-business hours.
The split increased resiliency against the threat of quarantine measures if one person in a team was exposed to the
disease
Impact scenarios
After identifying the applicable threats, impact scenarios are considered to support the development of a busin
recovery plan, Business continuity testing plans may document scenarios for each identified threats and impact
scenarios. More localized impact scenarios — for example loss of a specific floor in a building — may also be
documented. The BC plans should reflect the requirements to recover the business in the widest possible damage.
The risk assessment should cater to developing impact scenarios that are applicable to the business or the premises
it operates. For example, it might not be logical to consider tsunami in the region of Mideast since the likelihood of
such a threat is negligible
Recovery requirement
After the analysis phase, business and technical recovery requirements precede the solutions phase. Asset
inventories allow for quick identification of deployable resources. For an office-based, IT-intensive business, the
plan requirements may cover desks, human resources, applications, data, manual workarounds, computers and
peripherals. Other business environments, such as production, distribution, warehousing ete. will need to cover
these elements, but likely have additional issues.
The robustness of an emergency management plan is dependent on how much money an organization or business
can place into the plan. The organization must balance realistic feasibility with the need to properly prepare. In
general, every $1 put into an cmergency management plan will prevent $7 of loss.!*)
Solution design
The solution design phase identifies the most cost-effective disaster recovery solution that meets two main
requirements from the impact analysis stage.
oS -amen Business continuity planning Wikipedia
For IT purposes, this is commonly expressed as the minimum application and data requirements and the time in
which the minimum application and application data must be available.
Outside the IT domain, preservation of hard copy information, such as contracts, skilled staff or restoration of
embedded technology in a process plant must be considered. This phase overlaps with disaster recovery planning
methodology. The solution phase determines:
crisis management command structure
secondary work sites
telecommunication architecture between primary and secondary work sites,
data replication methodology between primary and secondary work sites
applications and data required at the secondary work site
physical data requirements at the secondary work site.
Implementation
The implementation phase invelves policy changes, material acquisitions. staffing and testing.
Testing and organizational acceptance
The purpose of testing is to achieve organizational acceptance that the solution satisfies the recovery req
Plans may fail fo meet expectations due to insufficient or inaccurate recovery requirements, solution desi
or solution implementation errors. Testing may include:
Crisis command team call-out testing
Technical swing test from primary to secondary work locations
Technical swing test from secondary to primary work locations
Application test
Business process test
At minimum, testing is conducted on a biannual schedule,
The 2008 book Exercising for Excellence, published by The British Standards Institution identified three types of
exercises that can be employed when testing business continuity plans.
Tabletop exercises
Tabletop exercises typically involve a small number of people and concentrates on a specific aspect of a BCP. They
can easily accommodate complete teams from a specific area of a business.
Another form involves a single representative from each of several teams. Typically, participants work through
simple scenario and then discuss specific aspects of the plan, For example, a fire is discovered out of working
hours.
The exercise consumes only a few hours and is often split into two or three s
different theme.
jons, each concentrating on a
Medium exercises
oS _amen Business continuity planning Wikipedia
A medium exercise is conducted within a "Virtual World" and brings together several departments, teams or
disciplines. It typically concentrates on multiple BCP aspects, prompting interaction between teams. The scope of
a medium exercise can range from a few teams from one organisation co-located in one building to multiple teams
operating across dispersed locations. The environment needs to be as realistic as practicable and team sizes should
reflect a realistic situation. Realism may extend to simulated news broadcasts and websites
A medium exercise typically lasts a few hours, though they can extend over several days. They ty
‘Scenario Cell” that adds pre-seripted "surprises" throughout the exereise.
ally involve a
Complex exercises
A complex exercise aims to have as few boundaries as possible. It incorporates alll the aspects of a medium
exercise. The exercise remains within a virtual world, but maximum realism is essential. This might include no-
notice activation, actual evacuation and actual invocation of a disaster recovery site.
While start and stop times a
course.
re pre-agreed, the actual duration might be unknown if events are allowed to run their
Maintenance
Biannual or annual maintenance cycle maintenance of a BCP manual is broken down into three periodic activities,
= Confirmation of information in the manual, roll out to staff for awareness and specific training for critical
individuals.
= Testing and verification of technical solutions established for recovery operations.
= Testing and verification of organization recovery procedures.
Issues found during the testing phase often must be reintroduced to the analysis phase.
Information/targets
The BCP manual must evolve with the orgenization. Activating the call tree verifies the notification plan's
efficiency as well as contact data accuracy, Like most business procedures, business continuity planning has its
‘own jargon. Organisation-wide understanding of business continuity jargon is vital and glossaries are available.)
‘Types of organisational changes that should be identified and updated in the manual include:
Staffing
Important clients
Vendors/suppliers
Organization structure changes
Company investment portfolio and mission statement
Communication and transportation infrastructure such as roads and bridges
Technical
Specialized technical resources must be maintained. Checks include:
Virus definition distribution
Application security and service patch distribution
Hardware operability
Application operability
Data verification
oS os2ri2017
Business continuity planning Wikipedia
Data application
Testing and verification of recovery procedures
As work processes change, previous recovery procedures may no longer be suitable. Checks include:
Are all work processes for critical functions documented?
Have the systems used for critical functions changed?
Are the documented work checklists meaningful and accurate?
Do the documented work process recovery tasks and supporting disaster recovery infrastructure allow staff
to recover within the predetermined recovery time objective?
See also
= Catastrophe modeling = Man-made hazards = System lifecycle
= Disaster recovery = Risk management = Systems thinking
= Disaster ® Disaster recovery and ® Seven tiers of disaster
= Emergency management business continuity auditing recovery
= Natural hazar = Systems engineering
References
Notes
Elliot, D.; Swartz, E.; Herbane, B. (1999) Just waiting for the next big bang: business continuity planning in the UK
finance sector. Journal of Applied Management Studies, Vol. 8, No, pp. 43-60. Here: p. 48
Intrieri, Charles (10 September 2013). "Business Continuity Planning”. Flevy. Retrieved 29 September 2013.
hipy//www.fema. gov’ guidance-directives
British Standards Institution (2006). Business continuity management-Part 1: Code of practice :London
. British Standards Institution (2012). Societal security ~ Business continuity management Systems — Requirements:
London
Cabinet Office. (2004). overview of the Act. In: Civil Contingencies Secretariat Civil Contingencies Act 2004: a short.
London: Civil Contingencies Secretariat
May, Richard, "Finding RPO and RTO"
"Can Your Organization Survive @ Natural Disaster?", Boston University, Retrieved 22 December 2014
Glossary of Business Continuity Terms (lattp:/en.bempedia. org’)
Bibliography
oS
Business Continuity Planning, FEMA (http://www.ready. gov/business/implementation/continuity),
Retrieved: June 16, 2012
Continuity of Operations Planning (http:/Avww.ready. gov/business/plan/planning.html) (no date). U.S.
Department of Homeland Security. Rettieved July 26, 2006.
Purpose of Standard Checklist Criteria For Business Recovery (https://web.archive.org/web/200608 1007464
O/http://www.fema.gov:80/business/be.shtm) (no date). Federal Emergency Management Agency. Retrieved
July 26, 2006.
NFPA 1600 Standard on Disaster/Emergency Management and Business Continuity Programs — PDF (htt
pulwww.nfpa.org/assets/files//PDF/Research/RFLithiumlonBatteriesHazard.paf/PDF/NFPA 16002010,pdt)
(2010). National Fire Protection Association.
United States General Accounting Office V2k BCP Guide (http://www.gao.gov/special.pubs/bepguide.pdt)
(August 1998). United States Government Accountability Office.2ri2017 Business continuity planning Wikipedia
Further reading
International Organization for Standardization
= ISO/IEC 27001:2005 (formerly BS 7799-2:2002) Information Security Management System
= ISO/IEC 27002:2005 (renumerated IS017999:2005) Information Security Management — Code of Practice
= ISO/IEC 27031:2011 Information technology - Security techniques - Guidelines for information and
communication technology readiness for business continuity
ISO/PAS 22399:2007 Guideline for incident preparedness and operational continuity management
ISO/IEC 24762:2008 Guidelines for information and communications technology disaster recovery services
IWA 5:2006 Emergency Preparede:
TSO 22301:2012 Societal security - Business continuity management systems - Requirements
ISO 22313:2012 Societal security - Business continuity management systems - Guidance
ISO/TS 22315:2015 Societal security - Business continuity management systems - Guidelines for business
impact analysis (BA)
Bri
ish Standards Institution
= BS 25999-1:2006 Business Continuity Management Part 1: Code of practice
= BS 25999-2:2007 Business Continuity Management Part 2: Specification
Others
James C. Barnes. A Guide to Business Continuity Planning. ISBN 978-0471530152.
Kenneth L Fulmer. Business Continuity Planning, A Step-by-Step Guide. ISBN 978-193 1332217.
Richard Kepenach. Business Continuity Plan Design, 8 Steps for Getting Started Designing a Plan.
Judy Bell. Disaster Survival Planning: A Practical Guide far Businesses. ISBN 978-0963058003.
Dimattia, S. (November 15, 2001). "Planning for Continuity". Library Journal: 32-34.
External links
= Department of Homeland Security Emergency Plan Guidelines (http:/www.ready.gov/business/index.html)
= CIDRAP/SHRM Pandemic HR Guide Toolkit (http://www. cidrap.umn.edw/cidrap/files/33/cidrap-shtm-hr-pa
ndemic-toolkit.pdf)
Retrieved from "http:
/len.wikipedia.org/wiindex. php ?title—Business_continuity_planning&oldid~762408242"
Categories: Systems thinking | Business continuity | Collaboration
= This page was last modified on 28 January 2017, at 16:59,
= Text is available under the Creative Commons Attribution-ShareA like License; additional terms may apply.
By using this site, you agree to the Terms of Use and Privacy Policy. Wikipedia® is a registered trademark
of the Wikimedia Foundation, Inc., a non-profit organization,
htteev/enwikipedia.craNwiki/Business continulty clannina a.