Professional Documents
Culture Documents
The English language version prevails. u tin phn Anh ng khi c tranh chp.
Constraints S bt buc
The following site and other constraints Cc ni dung sau y v cc im bt
apply to the electrical systems on this buc khc c p dng cho cc h
project: thng in ca d n ny:
System requirements Yu cu ca h thng
Nominal supply voltage 380V in p ngun danh nh 380 V
Number of phases 3 S pha 3 pha
Frequency 50Hz Tn s 50 Hz
Number of wires - system 5 S dy h thng 5
Neutral connection yes Ni trung tnh c
Earthing system MEN H thng tip t MEN
Harmonics IEEE 519 Sng hi IEEE 519
The English language version prevails. u tin phn Anh ng khi c tranh chp.
3 ACCESSORIES 3 PH KIN
The English language version prevails. u tin phn Anh ng khi c tranh chp.
cannot be displaced during normal i trng thi trong khi ang hot ng
operation, by means of retaining screws. bnh thng, bng cc vis kp cht.
4 PLANT
4.1 AND EQUIPMENT 4.1 TIP CN MY MC V TRANG
ACCESS THIT B
General
4 Tng qut
Locate and arrange all electrical services B tr v lp t cc h thng in v
and
4 equipment so that: my mc sao cho:
It is readily accessible for inspection N sn sng cho tip cn kim tra
and maintenance and arranged so that v bo tr v b tr mt cch thch
4 inspection and maintenance can be hp cng tc kim tra v bo tr c
carried out in a safe and efficient th c thc hin an ton v hiu
4 manner. qu.
Inspection and maintenance operations Hot ng kim tra v bo tr c th
can be arranged to minimise c b tr thc hin sao cho gim
4
inconvenience and disruption to thiu nh hng v gin on cho
building occupants. nhn vin to nh.
4 Mt cch ring bit:
In particular: Lp t cc thit b yu cu phi thc
4
Locate items requiring inspection and hin kim tra v bo tr pha trn
maintenance over tiled sections of phn trn ni khi c th.
4 ceilings wherever possible. Nu lp t pha trn cc khu vc
If located over set plaster or other trn chm hoc trn khng tip cn
inaccessible ceilings, arrange for the c, phi lp t cc np thm trn
4 provision of access panels. trn.
4
4.2 PREINSTALLATION PROTECTION 4.2 BO V TRC KHI LP T
General Tng qut
All fixtures, equipment and apparatus to Tt c cc thit b, my mc v c
be covered as required to protect against c bao che theo yu cu bo v
direct water or mechanical damage both chng nc trc tip hoc cc h hng
before and after installation. c hc trc v sau khi lp t.
Fixtures, equipment or apparatus Thit b, my mc v c b h hng
damaged prior to final acceptance of the trc ngy chp thun cui cng ca
The English language version prevails. u tin phn Anh ng khi c tranh chp.
The English language version prevails. u tin phn Anh ng khi c tranh chp.