LECTURE 06 Equipment Sizing and Capital Cost Estimation PDF
LECTURE 06 Equipment Sizing and Capital Cost Estimation PDF
Warren D. Seider
University of Pennsylvania
Philadelphia, Pennsylvania
cw
Reflux Accumulator
(horiz. process vessel)
4'
Distillate
Reflux
Pump
Column
Feed (vertical process
2' vessel)
Condensate
Bottoms Product
Reboiler Pump
TH,in TC,in
Q = UATLM
Q
A=
UTLM
Equipment Sizing and Capital Cost Estimation 5
Floating Head
{
CB = exp 11.667 0.8709 [ ln( A) ] + 0.09005 [ ln( A)]
2
}
Fixed Head
{
CB = exp 11.0545 0.9228 [ ln( A) ] + 0.09861[ ln( A) ]
2
}
U-tube
{
CB = exp 11.147 0.9186 [ ln( A) ] + 0.09790 [ ln( A) ]
2
}
Kettle Vaporizer
{
CB = exp 11.967 0.8709 [ ln( A) ] + 0.09005 [ ln( A) ]
2
}
Equipment Sizing and Capital Cost Estimation 7
Purchase Cost
CP = FP FM FLCB
Pressure Tube-length
factor Materials correction
factor
2
P P
FP = 0.9803 + 0.018 + 0.0017
100 100
Cost Indexes
Cost Equations
SSL (2004) Purchase Cost Equations for numerous
process units see Table 16.32 for other equipment
items.
Available literature sources back to 1960 consulted.
After determining a suitable equipment size factor,
all of the cost data were plotted.
When a wide spread in the data was evident, which
was not uncommon, an attempt was made to assess
the validity of the data by comparison with costs of
similar equipment.
When the validity could not be determined, the data
were averaged.
In some cases, cost data were obtained from vendors.
Bare module factors are not used. Extensive data are used
to estimate the costs of materials, labor, and construction
equipment