This document provides a schedule for development work on Lot PTD 68905 Phase 1 in Tebrau, Johor Bahru, Johor from January 16, 2016 to March 16, 2016. The schedule details the description of work activities like sheet piling, piling works, structure works, fabrication and installation of an arch culvert, concrete surround and rip rap installation over the time period in weekly intervals.
This document provides a schedule for development work on Lot PTD 68905 Phase 1 in Tebrau, Johor Bahru, Johor from January 16, 2016 to March 16, 2016. The schedule details the description of work activities like sheet piling, piling works, structure works, fabrication and installation of an arch culvert, concrete surround and rip rap installation over the time period in weekly intervals.
This document provides a schedule for development work on Lot PTD 68905 Phase 1 in Tebrau, Johor Bahru, Johor from January 16, 2016 to March 16, 2016. The schedule details the description of work activities like sheet piling, piling works, structure works, fabrication and installation of an arch culvert, concrete surround and rip rap installation over the time period in weekly intervals.