You are on page 1of 4

As of:

Progress of Works SUPERSTRUCTURE WORK:


Monitoring RAILING, SIDEWALK & CARRIAGEWAY
1-Aug-2019

THE PROJECT FOR CONSTRUCTION OF BRIDGE IN KOUMONGOU, REPUBLIC OF TOGO

PROGRESS :

A1 P1 P2 P3 A2
Section
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Rebar & Rebar & Rebar & Rebar & Rebar & Rebar & Rebar & Rebar & Concrete Concrete Concrete Concrete Concrete Concrete Concrete
Rebar
Downstream

Handrail Form Form Form Form Form Form Form Form 16.Jul.2019 23.Jul.2019 16.Jul.2019 23.Jul.2019 9.Jul.2019 16.Jul.2019 9.Jul.2019
Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Formwork Formwork Formwork Formwork Concrete Concrete Concrete
Side Walk 13.Jul.2019 15.Jul.2019 13.Jul.2019 15.Jul.2019 20.Jul.2019 22.Jul.2019 20.Jul.2019 22.Jul.2019 Setting Setting Setting Setting 27.Jul.2019 29.Jul.2019 27.Jul.2019

Carriageway

Carriageway
Upstream

Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Formwork Formwork Formwork Formwork Concrete Concrete Concrete
Side Walk 13.Jul.2019 15.Jul.2019 13.Jul.2019 15.Jul.2019 20.Jul.2019 22.Jul.2019 20.Jul.2019 22.Jul.2019 Setting Setting Setting Setting 27.Jul.2019 29.Jul.2019 27.Jul.2019
Rebar & Rebar & Rebar & Rebar & Rebar & Rebar & Rebar & Rebar & Concrete Concrete Concrete Concrete Concrete Concrete Concrete
Rebar
Handrail Form Form Form Form Form Form Form Form 16.Jul.2019 23.Jul.2019 16.Jul.2019 23.Jul.2019 9.Jul.2019 16.Jul.2019 9.Jul.2019

LEGEND : Rebar Set Rebar and Formwork Set

Formwork Set Concrete Casted

PICTURE :

Handrail P2-P1, DS : Formwork Setting Sidewalk A2-P3-1, 2, US, DS : Curing

Handrail P1-A1, US : Formwork Setting Side Walk P2-P3, US, DS : Formwork Setting
As of:
Progress of Works APPROACH ROAD WORK :
Monitoring Hydraulic Concrete Pavement
1-Aug-2019

THE PROJECT FOR CONSTRUCTION OF BRIDGE IN KOUMONGOU, REPUBLIC OF TOGO


SKETCH/ DRAWING :

PICTURE :

Sta. No. 961+28.5 - 961+38.5, US : Concrete Casting Sta. No. 961+38.5 - 962+8.5, US : Setting Formwork & Rebar

CONCRETE CASTING MONITORING :


Station
Date Length (m) Ave. Width (m) AREA (m2) REMARKS
From To
3-Jul-2019 961+23.5 961+28.5 5.0 4.0 20.0 Downstream
5-Jul-2019 961+23.5 961+28.5 5.0 4.0 20.0 Upstream
11-Jul-2019 961+28.5 961+38.5 10.0 5.4 53.5 Downstream
12-Jul-2019 961+38.5 962+8.5 20.0 5.2 104.0 Downstream
17-Jul-2019 962+8.5 962+28.5 20.0 5.2 104.0 Downstream
18-Jul-2019 962+28.5 962+48.5 20.0 5.2 104.0 Downstream
19-Jul-2019 962+48.5 963+18.5 20.0 5.2 104.0 Downstream
24-Jul-2019 963+18.5 963+38.5 20.0 5.2 104.0 Downstream
25-Jul-2019 963+38.5 964+8.5 20.0 5.2 104.0 Downstream
26-Jul-2019 964+8.5 964+28.5 20.0 5.2 104.0 Downstream
30-Jul-2019 964+28.5 964+44.5 16.0 5.2 83.2 Downstream
31-Jul-2019 964+44.5 965+00 5.5 5.2 28.6 Downstream
1-Aug-2019 961+28.5 961+38.5 10.0 5.4 53.5 Upstream

TOTAL : 986.80
As of:
Progress of Works REVETMENT WORK USING GABION
Monitoring Location: Around A1 ABUTMENT
1-Aug-2019

THE PROJECT FOR CONSTRUCTION OF BRIDGE IN KOUMONGOU, REPUBLIC OF TOGO

SKETCH/ DRAWING : PROGRESS/ ACCOMPLISHMENT :


AREA SET
DATE
(sq.m.)
Feb. - March 2019 218.0
July 20-22, 2019 24.0
23-Jul-2019 18.0
24-Jul-2019 20.0
25-Jul-2019 20.0
26-Jul-2019 22.0
27-Jul-2019 18.0
29-Jul-2019 18.0
30-Jul-2019 24.0
31-Jul-2019 18.0
1-Aug-2019 14.0

PICTURE :

TOTAL : 414.0
Required Quantity : 642.0
Percent of Progress : 64.5%
Date:
QUALITY CONTROL : CONCRETE BENDING STRENGTH TEST
Test Report Method: ASTM C78 1-Aug-2019

PROJET DE CONSTRUCTION DE DEUX PONTS, KARA ET KOUMONGOU

Actual Required
Load at Quality
Structure/ Age Weight Density Strength Average Reference
Date Placed Date of Test Failure at σage
Location (days) (Kg) (g/cc) (N/mm2) Strength Document
(KN)
(N/mm2) (N/mm2)

10.404 2.601 20 6.0


Hydraulic Pavement,
Sta. No. 963+38.5- 25-Jul-19 01-Aug-19 7 10.443 2.611 17 5.1 5.6
964+8.5, DS
10.476 2.619 19 5.7