STRUCTURAL DRAWING

FOR
RESIDENTIAL BUILDING
DAGON TOWNSHIP

LIST OF STRUCTURAL DRAWING

NO. DRAWING TITLE DATE NO. DRAWING TITLE DATE

1 SPECIFICATION-1 7.9.2019 20 COLUMN & BEAM CROSS-SECTION-1 7.9.2019

2 SPECIFICATION-2 7.9.2019 21 COLUMN & BEAM CROSS-SECTION-2 7.9.2019

3 SCHEDULE-1 7.9.2019 22 COLUMN & BEAM CROSS-SECTION-3 7.9.2019

3(a) SCHEDULE-2 7.9.2019 23 COLUMN SECTION DETAIL 7.9.2019

4 FOUNDATION & RETAINING WALL PLAN 7.9.2019 24 FLOOR BEAM & SLAB SECTION DETAIL 7.9.2019

5 COLUMN PLAN-1 7.9.2019 25 BEAM SPECIFICATION 7.9.2019

6 COLUMN PLAN-2 7.9.2019 26 MAIN STAIR DETAIL 7.9.2019

7 COLUMN PLAN-3 7.9.2019 27 EMERGENCY STAIR DETAIL 7.9.2019

8 BEAM PLAN-1 7.9.2019 28

9 BEAM PLAN-2 7.9.2019 29

10 BEAM PLAN-3 7.9.2019 30

11 BEAM PLAN-4 7.9.2019 31

12 BEAM PLAN-5 7.9.2019 32

13 BEAM PLAN-6 7.9.2019 33

14 SLAB PLAN-1 7.9.2019 34

15 SLAB PLAN-2 7.9.2019 35

16 SLAB PLAN-3 7.9.2019 36

17 ROOF PLAN 7.9.2019 37

18 SQUARE & RECTANGULAR FOOTING PLAN & SECTION 7.9.2019 38

19 RETAINING WALL SECTION & COMBINED FOOTING 7.9.2019 39


Material Strength of Reinforced Concrete COMPANY

Specified Compressive Cylinder Strength of Concrete fc' 2.5ksi

Specified Yield Strength of Main Steel fy 40ksi

Specified Yield Strength of Stirrup & Tie fys 40ksi


CLIENT
Loading from Myanmar National Building Code (MNBC2016)
Roof Live Load 20psf

Typical Floor Live Load 100psf


Project

100psf RESIDENTIAL
Stair Live Load BUILDING
Finish Load 20psf Location

9" Brick Wall Load 100psf


DAGON TOWNSHIP
50psf
4.5" Brick Wall Load

Concrete Cover(Clear Cover) Title Specification-1


Exposed directly to Not exposed directly to weather
Description weather or in contact or not in contact with ground Drawn By
with ground
Foundation 3"
KSI ENGINEERING
Beam & Column 2" 1.5"

Slab 2" (or) 1.5" 0.75" Sheet No. 1

Scale NTS
Code MNBC2016

Frame Design Software Date 7.9.2019


ETABS 9.7.1
Revised
Foundation Design Software KSI Software Date
COMPANY

Time For Removal of Formwork Bar Spacing (for aggregate=1")


3Days Item Minimum Clear Spacing Minimum Clear Spacing
Slabs (Props Remain)

7Days -
Beam Soffits & Flat Slabs (Props Remain) Beam 1.3" or bar diameter

7Days CLIENT
Props to Slabs between Beams Column 1.5" or 1.5xbar diameter -

Props to Beams, Flat Slabs & Waffle Slabs 14Days 18"or2h (Main),5h(Temp & Shrinkage)
Slab 3"

Props to Cantilevers 28Days 18"or2h (Main),5h(Temp & Shrinkage)


Wall 3"
Project
RESIDENTIAL
BUILDING

Location

Standard Bar Hook Lap Splices in Tension & Compression DAGON TOWNSHIP

Minimum diameter of bend for standard hooks(main bars) Item Tension Splice Ld

Bar Size Minimum diameter(inside) Class A 1.0 Ld 32xD (for 20mm and smaller)
Title Specification-2

No.3 (10mm) through 6xbar diameter No.8 (25mm) 40xD (for 22mm and larger)
Drawn By
Minimum diameter of bend for standard hooks(stirrups & ties) Class B 1.3 Ld 32xD (for 20mm and smaller)
KSI ENGINEERING
Bar Size Minimum diameter(inside) 40xD (for 22mm and larger)
No.5 (16mm) through
Smaller bars 4xbar diameter Item Compression Splice Ld
Sheet No. 2
Class1 1.0Ld 32xD (for 20mm and smaller)
Note(1) Clear side cover > (or)=2in for both top and bottom hooks in all cases.
Scale NTS
Note (2) In most cases, under gravity loads only for the bottom bars, Note (1)Lap splice,in general must be Class B splices,according to ACI Code and
a standard hook with >6in inside the column or primary beam will be suffient <50% of the total reinforcement is spliced within the required lap length.
Note (2) In any case,the minimum length of the splice is 12in.
Note (3) Suggested locations of tension splice for beams under gravity loads only Date 7.9.2019
(i.e for ordinary moment resisting frames )are within the middle third or
L/2 for top bars and at/near the support for bottom bars.
Revised
Date
COMPANY
SQUARE FOOTING SCHEDULE
FOOTING SIZE REINFORCEMENT CLEAR
TYPE REMARK
Thk; B(ft) L(ft) Longitudinal Steel Transverse Steel COVER

SF1 14" 6'-6" 6'-6" 14-16mmØ 14-16mmØ Square Footing 3"


SF2 14" 7' 7' 15-16mmØ 15-16mmØ Square Footing 3"
SF3 16" 8' 8' 20-16mmØ 20-16mmØ Square Footing 3" CLIENT
SF4 18" 8'-6" 8'-6" 24-16mmØ 24-16mmØ Square Footing 3"

RECTANGULAR FOOTING SCHEDULE


FOOTING SIZE REINFORCEMENT Project
TYPE REMARK CLEAR
Thk; B(ft) L(ft) Longitudinal Steel Transverse Steel COVER
RESIDENTIAL
RF1 16" 7'-0" 8'-6" 17-16mmØ 21-16mmØ Rectangular footing 3" BUILDING

Location

COMBINED FOOTING SCHEDULE DAGON TOWNSHIP


SIZE REINFORCEMENT
TYPE REMARK CLEAR
COVER
Thk; B(ft) L(ft) Longitudinal Steel Transverse Steel
CF1 12" 6'-0" 9'-0" 16mmØ@6"c/c 16mmØ@5"c/c Two Layer 3"
Title Schedule-1
CF2 14" 6'-6" 10'-6" 16mmØ@6"c/c 16mmØ@5"c/c Two Layer 3"
CF3 20" 8'-0" 12'-0" 16mmØ@4"c/c 16mmØ@5"c/c Two Layer 3"
Drawn By
CF4 18" 8'-0" 15'-0" 16mmØ@6"c/c 16mmØ@5"c/c Two Layer 3"
KSI ENGINEERING
COLUMN SCHEDULE
REINFORCEMENT CLEAR
TYPE SIZE LEVEL REMARK
COVER Sheet No. 3
Main Tie
GC 14"x 14" Foundation To P.L 8-16mm 2-8mmØ @5"c/c GROUND COLUMN 2"
C1 14"x14" P.L To 2F 8-16mm 2-8mmØ @5"c/c COLUMN 1.5" Scale NTS
C2 12"x12" 2F To 5F 6-16mm 1.5-8mmØ @5"c/c COLUMN 1.5"
C3 10"x10" 5F to RF 4-16mm 8mmØ @5"c/c COLUMN 1.5" Date 7.9.2019

Revised
Date
COMPANY
GROUND BEAM SCHEDULE
LEFT END SUPPORT MIDDLE RIGHT END SUPPORT STIRRUP CLEAR
TYPE SIZE REMARK COVER
TOP BOTTOM TOP BOTTOM TOP BOTTOM INSIDE 2h OUTSIDE 2h
GB1 10"x14" 4-16mmØ 4-16mmØ 4-16mmØ 4-16mmØ 4-16mmØ 4-16mmØ 8mmØ@3"c/c 8mmØ@5"c/c Two Row No. 2"
GB2 10"x14" 3-16mmØ 3-16mmØ 3-16mmØ 3-16mmØ 3-16mmØ 3-16mmØ 8mmØ@3"c/c 8mmØ@5"c/c Ground Beam 2"
GB3 10"x14" 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 8mmØ@3"c/c 8mmØ@5"c/c Ground Beam 2" CLIENT
GB4 10"x10" 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 8mmØ@3"c/c 8mmØ@5"c/c Ground Beam 2"

FLOOR BEAM SCHEDULE


LEFT END SUPPORT MIDDLE RIGHT END SUPPORT STIRRUP
TYPE SIZE REMARK CLEAR
TOP BOTTOM TOP BOTTOM TOP BOTTOM INSIDE 2h OUTSIDE 2h COVER
Project
FB1 10"x14" 5-16mmØ 3-16mmØ 3-16mmØ 5-16mmØ 5-16mmØ 3-16mmØ 8mmØ@3"c/c 8mmØ@5"c/c FB(Two Row Bar) 1.5"
RESIDENTIAL
FB2 10"x14" 3-16mmØ 2-16mmØ 2-16mmØ 3-16mmØ 3-16mmØ 2-16mmØ 8mmØ@3"c/c 8mmØ@5"c/c Floor Beam 1.5"
BUILDING
SB 10"x10" 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 8mmØ@3"c/c 8mmØ@5"c/c Secondary Beam 1.5"
CB1 10"x14" 3-16mmØ 3-16mmØ 3-16mmØ 3-16mmØ 3-16mmØ 3-16mmØ 8mmØ@3"c/c 8mmØ@5"c/c Cantilever Beam 1.5"
Location
CB2 10"x10" 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 8mmØ@3"c/c 8mmØ@5"c/c Cantilever Beam 1.5"
Landing Beam
DAGON TOWNSHIP
LB1 10"x14" 3-16mmØ 3-16mmØ 3-16mmØ 3-16mmØ 3-16mmØ 3-16mmØ 8mmØ@3"c/c 8mmØ@5"c/c 1.5"
LB2 10"x14" 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 8mmØ@3"c/c 8mmØ@5"c/c Landing Beam 1.5"
LB3 10"x10" 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 8mmØ@3"c/c 8mmØ@5"c/c Landing Beam 1.5"
LB4 10"x10" 3-16mmØ 3-16mmØ 3-16mmØ 3-16mmØ 3-16mmØ 3-16mmØ 8mmØ@3"c/c 8mmØ@5"c/c Landing Beam 1.5" Title Schedule-2
ROOF BEAM SCHEDULE
LEFT END SUPPORT MIDDLE RIGHT END SUPPORT STIRRUP Drawn By
TYPE SIZE REMARK CLEAR
TOP BOTTOM TOP BOTTOM TOP BOTTOM INSIDE 2h OUTSIDE 2h COVER

Roof Beam
KSI ENGINEERING
RB1 10"x10" 3-16mmØ 2-16mmØ 2-16mmØ 3-16mmØ 3-16mmØ 2-16mmØ 8mmØ@3"c/c 8mmØ@5"c/c 1.5"
RB2 10"x10" 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 8mmØ@3"c/c 8mmØ@5"c/c Roof Beam 1.5"

SLAB SCHEDULE Sheet No. 3(a)


ROOFING DETAIL
TYPE Thk; MAIN STEEL CLEAR Rafter = 125mm x 50mm x 5mm GI Hollow (5"x2")
DISTRIBUTION STEEL REMARK COVER
ONE WAY 0.75" Purlin = 50mm x 50mm x 1.5mm GI Hollow (2"x2")
S1 4" 10mmØ@6"c/c 10mmØ@6"c/c Scale NTS
Roofing = 4-angle roofing sheet
LS(stair) 5" 12mmØ@8"c/c 10mmØ@8"c/c ONE WAY 0.75"

Date 7.9.2019
TYPE Thk; LONGITUDINAL STEEL CLEAR
TRANSVERSE STEEL REMARK COVER
S2 4" 10mmØ@6"c/c 10mmØ@6"c/c TWO WAY 0.75" Revised
Date
A B C A B C
8' 14' COMPANY

6 6

CF1 CF3 CF2 6' 6'


5 5

CLIENT

14' 14'

4 4 Project
SF1 SF4 RF1
RESIDENTIAL
BUILDING
14' 14' Location

DAGON TOWNSHIP
3 3
SF1 SF4 RF1

Foundation &
Title RW Plan
14' 14'

Drawn By
2 2
CF4 RF1
KSI ENGINEERING

14' 14' Sheet No. 4

Scale 3/32"=1'-0"
1 1
SF1 SF3 SF2
Date 7.9.2019
FOOTING PLAN RETAINING WALL PLAN
NOTE;
1) Structural Drawings,based on centerline analysis,are not exactly same with architectural drawings. Revised
Therefore,it should be confirmed with architects. Date
2)According to Structural analysis,beam and column are not allowed to move more than 20% of h.
A B C A B C
8' 8'
COMPANY
14' 14'
6 6
GC GC GC C1 C1 C1
6' 6'
5 5
GC GC GC C1 C1 C1

CLIENT
14' 14'

4 4
GC GC GC C1 C1 C1 Project
RESIDENTIAL
BUILDING
14' 14'
Location

3 3 DAGON TOWNSHIP
GC GC GC C1 C1 C1

14' 14' Column Plan-1


Title

Drawn By
2 2
GC GC GC C1 C1 C1
KSI ENGINEERING

14' 14'
Sheet No. 5
14" 14"

1 1 Scale 3/32"=1'-0"
GC GC 14" GC C1 C1 14" C1

COLUMN PLAN (FOUNDATION TO PLINTH LEVEL) COLUMN PLAN (PLINTH LEVEL TO SECOND FLOOR) Date 7.9.2019
NOTE;
1) Structural Drawings,based on centerline analysis,are not exactly same with architectural drawings. Revised
Therefore,it should be confirmed with architects. Date
2)According to Structural analysis,beam and column are not allowed to move more than 20% of h.
A B C A B C
8' 14' 8' 14' COMPANY

6 6
C2 C2 C2 C3 C3 C3
6' 6'
5 5
C2 C2 C2 C3 C3 C3

CLIENT

14' 14'

4 4 Project
C2 C2 C2 C3 C3 C3
RESIDENTIAL
BUILDING
14' 14' Location

DAGON TOWNSHIP
3 3
C2 C2 C2 C3 C3 C3

Column Plan-2
Title
14' 14'

Drawn By
2 2
C2 C2 C2 C3 C3 C3 KSI ENGINEERING

14' 14' Sheet No. 6

Scale 3/32"=1'-0"
1 1
C2 C2 C2 C3 C3 C3

Date 7.9.2019
COLUMN PLAN (SECOND FLOOR TO FIFTH FLOOR) COLUMN PLAN (FIFTH FLOOR TO ROOF FLOOR)
NOTE;
1) Structural Drawings,based on centerline analysis,are not exactly same with architectural drawings.
Revised
Therefore,it should be confirmed with architects. Date
2)According to Structural analysis,beam and column are not allowed to move more than 20% of h.
A B C
COMPANY
8' 14'
6

6'
5

CLIENT

14'

4 Project
C3 C3 C3 C3
RESIDENTIAL
BUILDING
14' Location

DAGON TOWNSHIP
3
C3 C3 C3 C3

Title Column Plan-3


14'

Drawn By
2
C3 C3 C3 C3 KSI ENGINEERING

14' Sheet No. 7

Scale 3/32"=1'-0"
1

Date 7.9.2019
ROOF PROP COLUMN PLAN
NOTE;
1) Structural Drawings,based on centerline analysis,are not exactly same with architectural drawings. Revised
Therefore,it should be confirmed with architects. Date
2)According to Structural analysis,beam and column are not allowed to move more than 20% of h.
A B C A B C
8' 14' 8' 14' COMPANY
GB3 GB3
6 6

GB3

GB3
GB3

GB4

GB4
6' 6'
5 5
GB3 GB3

CLIENT

GB3

GB3
GB3

14' 14'

GB3 GB3
4 4 Project
RESIDENTIAL
BUILDING
GB3

GB3
GB3

14' 14' Location

GB3 GB3 DAGON TOWNSHIP


3 3

Title Beam Plan-1


GB3

GB3
GB3

14' 14'

Drawn By
GB3 GB3 LB2
2 2
KSI ENGINEERING
LB3 LB3 4'

LB4
GB1

GB2

GB3

14' 14' Sheet No. 8


GB4
4' Scale 3/32"=1'-0"
GB3 GB3
1 1

Date 7.9.2019
GROUND BEAM PLAN
LANDING BEAM PLAN(BETWEEN G.F & 1ST FLOOR)
NOTE;
1) Structural Drawings,based on centerline analysis,are not exactly same with architectural drawings. Revised
Therefore,it should be confirmed with architects. Date
2)According to Structural analysis,beam and column are not allowed to move more than 20% of h.
A B C A B C
8' 8'
COMPANY
FB1 LB1
14' LB1
14'
6 6

FB2

FB2
FB2
SB 6' 6'

SB

LB3

LB3
5 5
FB1 FB1

CLIENT

FB2

FB2
FB2

14' 14'

FB2 FB2
4 4
Project
RESIDENTIAL
BUILDING
FB2

FB2
FB2

14' 14'
Location

FB2 FB2
3 3 DAGON TOWNSHIP

14' 14'
FB2

FB2
FB2

Title Beam Plan-2

FB2 FB2 LB2 Drawn By


2 2
LB3 LB3 4' KSI ENGINEERING
LB3
FB1
FB1

FB2

14' 14'
Sheet No. 9
LB3

FB2 FB2
1 1 Scale 3/32"=1'-0"
CB1

CB1

4'
1'
CB2
LANDING BEAM PLAN(BETWEEN 1ST FLOOR & 2ND FLOOR) Date 7.9.2019
FIRST FLOOR BEAM PLAN
NOTE;
1) Structural Drawings,based on centerline analysis,are not exactly same with architectural drawings. Revised
Therefore,it should be confirmed with architects. Date
2)According to Structural analysis,beam and column are not allowed to move more than 20% of h.
A B C A B C
8' 14' 8' 14' COMPANY
FB1 LB1 LB1
6 6

FB2

FB2
FB2
SB 6' 6'

SB

LB3

LB3
5 5
FB1 FB1

CLIENT

FB2

FB2
FB2
14' 14'

FB2 FB2
4 4
Project
RESIDENTIAL
BUILDING
FB2

FB2
FB2

14' 14'
Location

FB2 FB2
3 3 DAGON TOWNSHIP

14' 14'
FB2

FB2
FB2

Title Beam Plan-3

FB2 FB2 LB2 Drawn By


2 2
LB3 LB3 4' KSI ENGINEERING
LB3
FB1

FB2

14' 14'
FB1

Sheet No. 10
LB3

FB2 FB2
1 1 Scale 3/32"=1'-0"
CB1

CB1

4'
1'
CB2
LANDING BEAM PLAN(BETWEEN 2ND FLOOR & 3RD FLOOR) Date 7.9.2019
SECOND FLOOR BEAM PLAN
NOTE;
1) Structural Drawings,based on centerline analysis,are not exactly same with architectural drawings. Revised
Therefore,it should be confirmed with architects. Date
2)According to Structural analysis,beam and column are not allowed to move more than 20% of h.
A B C A B C
8' 14' COMPANY
FB1 LB1 LB1
8' 14'
6 6

FB2

FB2
FB2
SB 6' 6'

SB

LB3

LB3
5 5
FB1 FB1

CLIENT

FB2

FB2
FB2

14' 14'

FB2 FB2
4 4
Project
RESIDENTIAL
BUILDING
FB2

FB2
FB2

14' 14'
Location

FB2 FB2
3 3 DAGON TOWNSHIP

14' 14'
FB2

FB2
FB2

Title Beam Plan-4

FB2 FB2 LB2 Drawn By


2 2
LB3 LB3 4' KSI ENGINEERING
LB3
FB1

FB2

14' 14'
FB1

Sheet No. 11
LB3

FB2 FB2
1 1 Scale 3/32"=1'-0"
CB1

CB1

4'
1'
CB2
LANDING BEAM PLAN(BETWEEN 3RD FLOOR & 4TH FLOOR) Date 7.9.2019
THIRD FLOOR BEAM PLAN
NOTE;
1) Structural Drawings,based on centerline analysis,are not exactly same with architectural drawings. Revised
Therefore,it should be confirmed with architects. Date
2)According to Structural analysis,beam and column are not allowed to move more than 20% of h.
A B C A B C
8' 14' 8' 14' COMPANY
FB1 LB1 LB1
6 6

FB2

FB2
FB2
6' 6'

SB
SB

LB3

LB3
5 5
FB1 FB1

CLIENT

FB2

FB2
FB2

14' 14'

FB2 FB2
4 4
Project
RESIDENTIAL
BUILDING
FB2

FB2
FB2

14' 14'
Location

FB2 FB2
3 3 DAGON TOWNSHIP

14' 14'
FB2

FB2
FB2

Title Beam Plan-5

FB2 FB2 LB2 Drawn By


2 2
LB3 LB3 4' KSI ENGINEERING
LB3
FB1

FB2
FB1

14' 14'
Sheet No. 12
LB3

FB2 FB2
1 1 Scale 3/32"=1'-0"
CB1

CB1

4'
1'
CB2 Date 7.9.2019
LANDING BEAM PLAN(BETWEEN 4TH FLOOR & 5TH FLOOR)
FOURTH FLOOR BEAM PLAN
NOTE;
1) Structural Drawings,based on centerline analysis,are not exactly same with architectural drawings. Revised
Therefore,it should be confirmed with architects. Date
2)According to Structural analysis,beam and column are not allowed to move more than 20% of h.
A B C A B C
8' 14'
COMPANY
8' 14'
FB1 LB1 LB1 RB2 RB2
6 6

FB2

FB2
FB2

RB2

RB2

RB2
6' 6'

SB
SB

LB3

LB3
RB2 RB2
5 5
FB1 FB1

CLIENT

RB2

RB2

RB2
FB2

FB2
FB2
14' 14'

FB2 FB2 RB2 RB2


4 4
Project
RESIDENTIAL
BUILDING

RB2

RB2

RB2
FB2

FB2
FB2

14' 14'
Location

FB2 FB2 RB2 RB2


3 3
DAGON TOWNSHIP

RB2

RB2

RB2
14' 14' Title Beam Plan-6
FB2

FB2
FB2

FB2 FB2 RB2 RB2 Drawn By


2 2
KSI ENGINEERING

RB2

RB2
FB1

FB2
FB1

14' 14'
Sheet No. 13
LB3

FB2 FB2 RB2 RB1


1 1 Scale 3/32"=1'-0"
CB1

CB1

RB1

RB1
4' RB2
1' 1'
CB2 Date 7.9.2019
FIFTH FLOOR BEAM PLAN ROOF FLOOR BEAM PLAN
NOTE;
1) Structural Drawings,based on centerline analysis,are not exactly same with architectural drawings. Revised
Therefore,it should be confirmed with architects. Date
2)According to Structural analysis,beam and column are not allowed to move more than 20% of h.
A B C A B C
COMPANY
8' 14' 8' 14'
6 6
S2 S2 LS LS
Sg Sg Sg Sg 6' 6'
LS
5 5

CLIENT
Sg Sg S2 S2
14' 14'

4 4
Project
RESIDENTIAL
Sg Sg S2 S2
BUILDING
14' 14'
Location

DAGON TOWNSHIP
3 3

Sg Sg S2 S2
14' 14' Title Slab Plan-1

Drawn By
2 2
KSI ENGINEERING

Sg Sg S2
14' 14'
Sheet No. 14

Sg LS

1 1 Scale 3/32"=1'-0"
S1 4'
Date 7.9.2019
SLAB ON GROUND PLAN TYPICAL FLOOR SLAB PLAN
NOTE;
1) Structural Drawings,based on centerline analysis,are not exactly same with architectural drawings. Revised
Therefore,it should be confirmed with architects. Date
2)According to Structural analysis,beam and column are not allowed to move more than 20% of h.
A B C A B C
COMPANY
8' 14' 8' 14'
6 6
S2
S1 6' 6'
5 5

CLIENT
14' 14'

4 4
Project
RESIDENTIAL
BUILDING
14' 14'
Location

3 3 DAGON TOWNSHIP
10mm @ 6"c/c(both way)

14' 14' Title Slab Plan-2

Drawn By
2 2
KSI ENGINEERING

14' 14'
12mm @ 8"c/c(main) Sheet No. 15
10mm @ 8"c/c(dist;)

1 1 Scale 3/32"=1'-0"
S1 4'
1' 1'
Date 7.9.2019
ROOF FLOOR SLAB PLAN TYPICAL FLOOR SLAB BOTTOM REINFORCEMENT PLAN
NOTE;
1) Structural Drawings,based on centerline analysis,are not exactly same with architectural drawings. Revised
Therefore,it should be confirmed with architects. Date
2)According to Structural analysis,beam and column are not allowed to move more than 20% of h.
A B C A B C
COMPANY
8' 14' 8' 14'
6 6
10mm @ 6"c/c(both way)
6' 6'
5 5

CLIENT
14' 14'

4 4
Project
RESIDENTIAL
BUILDING
14' 14'
Location

3 3
DAGON TOWNSHIP
10mm @ 6"c/c(both way)

14' 14' Title Slab Plan-3

Drawn By
2 2
KSI ENGINEERING

14' 14'
12mm @ 8"c/c(main) Sheet No. 16
10mm @ 8"c/c(dist;)

1 1 Scale 3/32"=1'-0"
4' 4'
1'
Date 7.9.2019
TYPICAL FLOOR SLAB TOP REINFORCEMENT PLAN ROOF SLAB PLAN
NOTE;
1) Structural Drawings,based on centerline analysis,are not exactly same with architectural drawings.
Revised
Therefore,it should be confirmed with architects. Date
2)According to Structural analysis,beam and column are not allowed to move more than 20% of h.
A B C A B C
8' 14' 8' 14'
COMPANY
6 6

6' 6'
5 5

CLIENT
14' 14'

4 4
Project
RESIDENTIAL
BUILDING
14' 14'
Location

3 3 DAGON TOWNSHIP

14' 14' Title Roof Plan

Drawn By
2 2
KSI ENGINEERING

14' 14'
Sheet No. 17

2'-6"
1 1 Scale 3/32"=1'-0"
8' 7' 7' 4' 4'
1' 1'
RAFTER LAYOUT PLAN PURLIN LAYOUT PLAN Date 7.9.2019
NOTE;
1) Structural Drawings,based on centerline analysis,are not exactly same with architectural drawings. Revised
Therefore,it should be confirmed with architects. Date
2)According to Structural analysis,beam and column are not allowed to move more than 20% of h.
7' 17-16mmØ(Longitudinal Steel) COMPANY

21-16mmØ(Transverse Steel)

15-16mmØ(Both way)
7'
7' GC
GC
A A B B CLIENT

8'-6"
Square Footing Plan(SF2) Rectangular Footing Plan(RF1)

Project
RESIDENTIAL
BUILDING

(+2'-0")P.L (+2'-0")P.L Location

2' 2' DAGON TOWNSHIP


(±0'-0")N.G.L (±0'-0")N.G.L

GC(14"x14") GC(14"x14")
Footing Plan &
Title Section
6' 6'
15-16mmØ(Both way) 3" Drawn By
3" 21-16mmØ
1'-6" 1'-6" 1'-2" 1'-6" 1'-6" 1'-4" KSI ENGINEERING

3" Thk; 1:3:6 Lean Concrete 17-16mmØ 3" Thk; 1:3:6 Lean Concrete
7' 3" Thk; Sand Filling 8'-6" 3" Thk; Sand Filling Sheet No. 18
9" Thk; Hard Core 9" Thk; Hard Core

Square Footing Section Detail(SF2) Scale NTS


Rectangular Footing Section Detail(RF1)
Section A-A
Section B-B
Date 7.9.2019

Revised
Date
COMPANY
12"1thick 1:2:4 Cement Concrete
4.5" Brick wall 42"1 thick 1:3:6 Cement Concrete
6" thick Sand Filling
(+2'-0") P.L Earth Filling

2'
(±0'-0") N.G.L 8' CLIENT
9" Brick wall GC GC
2 41"
6"
C C
4'
3"
3" thick 1:3:6 Lean Concrete
3" thick Sand Filling Project
2' 6" 9" thick Hard Core 15'
RESIDENTIAL
Retaining Wall Section Combined Footing Plan(CF4) BUILDING

Location

DAGON TOWNSHIP

(+2'-0")P.L
RW Section &
2' Title Combined Footing
(±0'-0")N.G.L

Drawn By
GC(14"x14") GC(14"x14")
KSI ENGINEERING
6'

16mmØ @ 5"C/C
Sheet No. 19
1'-6" 1'-6" 1'-6" 1'-6" 18"
16mmØ @ 6"C/C
Scale NTS
3" Thk; 1:3:6 Lean Concrete
15' 3" Thk; Sand Filling
9" Thk; Hard Core Date 7.9.2019
Combined Footing Section Detail(CF4)
Section C-C Revised
Date
GROUND BEAM SECTION DETAIL COMPANY

GB 1 GB 2 GB 3 GB 4

Size (10"x14") Size (10"x14") Size (10"x14") Size (10"x10")

END
Main Top = 4-16mmØ Main Top = 3-16mmØ Main Top = 2-16mmØ Main Top = 2-16mmØ CLIENT
Main Bottom = 4-16mmØ Main Bottom = 3-16mmØ Main Bottom = 2-16mmØ Main Bottom = 2-16mmØ
Stirrup = 8mmØ @ 3"C/C Stirrup = 8mmØ @ 3"C/C Stirrup = 8mmØ @ 3"C/C Stirrup = 8mmØ @ 3"C/C

Size (10"x14") Size (10"x14") Size (10"x14") Size (10"x10")

Project
CENTER
Main Top = 4-16mmØ Main Top = 3-16mmØ Main Top = 2-16mmØ Main Top = 2-16mmØ RESIDENTIAL
Main Bottom = 4-16mmØ Main Bottom = 3-16mmØ Main Bottom = 2-16mmØ Main Bottom = 2-16mmØ
BUILDING
Stirrup = 8mmØ @ 5" C/C Stirrup = 8mmØ @ 5" C/C Stirrup = 8mmØ @ 5" C/C Stirrup = 8mmØ @ 5" C/C Location

DAGON TOWNSHIP

FLOOR BEAM SECTION DETAIL

FB 1 FB 2 FB 3 SB Column & Beam


Title
Cross-Section-1
Size (10"x14") Size (10"x14") Size (10"x14") Size (10"x10")

Drawn By
END
Main Top = 5-16mmØ Main Top = 3-16mmØ Main Top = 3-16mmØ Main Top = 2-16mmØ KSI ENGINEERING
Main Bottom = 3-16mmØ Main Bottom = 2-16mmØ Main Bottom = 2-16mmØ Main Bottom = 2-16mmØ
Stirrup = 8mmØ @ 3"C/C Stirrup = 8mmØ @ 3"C/C Stirrup = 8mmØ @ 4"C/C Stirrup = 8mmØ @ 3"C/C
Sheet No. 20
Size (10"x14") Size (10"x14") Size (10"x14") Size (10"x10")

CENTER Scale NTS


Main Top = 3-16mmØ Main Top = 2-16mmØ Main Top = 2-16mmØ Main Top = 2-16mmØ
Main Bottom = 5-16mmØ Main Bottom = 3-16mmØ Main Bottom = 3-16mmØ Main Bottom = 2-16mmØ Date 7.9.2019
Stirrup = 8mmØ @ 5" C/C Stirrup = 8mmØ @ 5" C/C Stirrup = 8mmØ @ 6" C/C Stirrup = 8mmØ @ 5" C/C

Revised
Date
COMPANY

FLOOR BEAM SECTION DETAIL

CB 1 CB 2 LB1 LB2 LB3

Size (10"x14") Size (10"x10") Size (10"x14") Size (10"x14") Size (10"x10")

END CLIENT
Main Top = 3-16mmØ Main Top = 2-16mmØ Main Top = 3-16mmØ Main Top = 2-16mmØ Main Top = 2-16mmØ
Main Bottom = 3-16mmØ Main Bottom = 2-16mmØ Main Bottom = 3-16mmØ Main Bottom = 2-16mmØ Main Bottom = 2-16mmØ
Stirrup = 8mmØ @ 3"C/C Stirrup = 8mmØ @ 3"C/C Stirrup = 8mmØ @ 3"C/C Stirrup = 8mmØ @ 3"C/C Stirrup = 8mmØ @ 3"C/C

Size (10"x14") Size (10"x10") Size (10"x14") Size (10"x14") Size (10"x10")
Project
RESIDENTIAL
CENTER
BUILDING
Main Top = 3-16mmØ Main Top = 2-16mmØ Main Top = 3-16mmØ Main Top = 2-16mmØ Main Top = 2-16mmØ
Main Bottom = 3-16mmØ Main Bottom = 2-16mmØ Main Bottom = 3-16mmØ Main Bottom = 2-16mmØ Main Bottom = 2-16mmØ Location
Stirrup = 8mmØ @ 5" C/C Stirrup = 8mmØ @ 5" C/C Stirrup = 8mmØ @ 5" C/C Stirrup = 8mmØ @ 5" C/C Stirrup = 8mmØ @ 5" C/C

LB4 DAGON TOWNSHIP

Size (10"x10")

Column & Beam


END Title
Cross-Section-2
Main Top = 3-16mmØ
Main Bottom = 3-16mmØ
Drawn By
Stirrup = 8mmØ @ 3"C/C

Size (10"x10") KSI ENGINEERING

CENTER
Sheet No. 21
Main Top = 3-16mmØ
Main Bottom = 3-16mmØ
Stirrup = 8mmØ @ 5" C/C Scale NTS

Date 7.9.2019

Revised
Date
COMPANY
ROOF BEAM SECTION DETAIL

RB1 RB2

Size (10"x10") Size (10"x10")

END
CLIENT
Main Top = 3-16mmØ Main Top = 2-16mmØ
Main Bottom = 2-16mmØ Main Bottom = 2-16mmØ
Stirrup = 8mmØ @ 3"C/C Stirrup = 8mmØ @ 3"C/C

Size (10"x10") Size (10"x10")


Project
CENTER RESIDENTIAL
Main Top = 2-16mmØ Main Top = 2-16mmØ BUILDING
Main Bottom = 3-16mmØ Main Bottom = 2-16mmØ
Location
Stirrup = 8mmØ @ 5" C/C Stirrup = 8mmØ @ 5" C/C

DAGON TOWNSHIP

COLUMN SECTION DETAIL

GC C1 C2 C3 Column & Beam


Title
Cross-Section-3
Size (14"x14") Size (14"x14") Size (12"x12") Size (10"x10")

Drawn By
END
KSI ENGINEERING
Main Steel = 8-16mmØ Main Steel = 8-16mmØ Main Steel = 6-16mmØ Main Steel = 4-16mmØ
Stirrup = 2-8mmØ @ 5"C/C Stirrup = 2-8mmØ @ 5"C/C Stirrup = 1.5-8mmØ @ 5"C/C Stirrup = 8mmØ @ 5"C/C
Sheet No. 22
Size (14"x14") Size (14"x14") Size (12"x12") Size (10"x10")

CENTER Scale NTS

Main Steel = 8-16mmØ Main Steel = 8-16mmØ Main Steel = 6-16mmØ Main Steel = 4-16mmØ Date 7.9.2019
Stirrup = 2-8mmØ @ 5"C/C Stirrup = 2-8mmØ @ 5"C/C Stirrup = 1.5-8mmØ @ 5"C/C Stirrup = 8mmØ @ 5" C/C

Revised
Date
COMPANY

CLIENT

C2(12"x12")

Project
RESIDENTIAL
BUILDING

splice length 1:6(Max.) Location

DAGON TOWNSHIP
1:6(Max.)

Column Section
C1(14"x14") C1(14"x14") Title
Detail

Drawn By
5"
KSI ENGINEERING
2.5"

Sheet No. 23

Scale 3/8"=1'-0"

Date 7.9.2019
COLUMN SECTION DETAIL(C1) COLUMN SECTION DETAIL(C1&C2)
Revised
Date
A B C COMPANY

FB2 FB2
2h 2h L/3 L/3
≥2" 5"
3"
CLIENT

L/8 L/8

Project
RESIDENTIAL
BUILDING
8' 14'
Location

FLOOR BEAM SECTION DETIAL


DAGON TOWNSHIP

1 2
Floor Beam&Slab
Title
14' Section Detail
L/3 L/3
Drawn By
4"
10mm @ 6"c/c(both way) 10mm @ 6"c/c(both way) KSI ENGINEERING

S2 SLAB SECTION DETAIL

Sheet No. 24
1 1'
Scale NTS

4'
Date 7.9.2019
4"
10mm @ 6"c/c(both way)
Revised
Date
S1 SLAB SECTION DETAIL
COMPANY

SPLICE LOCATION FOR BEAM

CLIENT
2h 2h 2h
splice length

Splice Zone splice length


Project
Splice Zone
RESIDENTIAL
Splice Location For Top Bars L/3 L/3 L/3 BUILDING
L
Location

Splice Location For Bottom Bars


DAGON TOWNSHIP

Title Beam Specification


SIMPLIFIED CUTOFF POINTS END ANCHORAGE LENGTHS
Drawn By

L/3 L/3 La1≥Ldh≥8db or 6 in


KSI ENGINEERING
clear cover
≥2"
Sheet No. 25
L/8 L/8
La2≥Ldh≥8db or 6 in
Scale NTS
Beam-Column Connections(using standard hooks)

Date 7.9.2019

Revised
Date
COMPANY
2 1

CLIENT

Project
RESIDENTIAL
BUILDING
9
4'
Location
8

7 DAGON TOWNSHIP
14"
6
10mmØ @ 8"c/c
10" 5
Tread = 9"
12mmØ @ 8"c/c 9" 4 Riser = 6.67" Title Main Stair Detail
Waist = 5"
6.67" 3
10mmØ @ 8"c/c Drawn By
2

1 KSI ENGINEERING
4'

(+2'-0")P.L Sheet No. 26

10"
Scale 1/2"=1'-0"
10"

Date 7.9.2019
Main Stair Detail
Revised
Date
C B COMPANY

3'
11

CLIENT
10
14"
10mmØ @ 8"c/c
9
10" 12mmØ @ 8"c/c
Project
8
RESIDENTIAL
10mmØ @ 8"c/c BUILDING
7
Location

6
DAGON TOWNSHIP

Title Emergency Stair


4 Detail
Tread = 9.6" Drawn By
3 Riser = 10.9"
Waist = 5" KSI ENGINEERING
2 3'

Sheet No. 27
1
9.6"

B6.bak
Scale 1/2"=1'-0"
10.9"
(+2'-0")P.L
Date 7.9.2019
10"
Emergency Stair Detail
10" Revised