REINFORCEMENT DETAIL:-
SL. OVERALL 1 2 3 4 5 6 6a 7 7a 8 9 H BASE
PRESSURE
NO. HT. H0 (mm) DIA. SPACING DIA. SPACING DIA. SPACING DIA. SPACING DIA. SPACING DIA. SPACING DIA. SPACING DIA. SPACING DIA. SPACING DIA. SPACING DIA. SPACING T/M.Sq.
SHAPE
DIMENSION DETAIL:-
CLIENT: AUTHORITY ENGINEER: EPC CONTRACTOR: SAFETY CONSULTANT: PROOF CONSULTANT: DESIGN CONSULTANT: PROJECT: TITLE :
M/sATLASCONSTRUCTION
Khanna Designers & REHABILITATION AND UPGRADATION TO 2 - LANE WITH PAVED TYPICAL DIMENSION AND REINFORCEMENT
MINISTRY OF ROAD PVT.LTD. Consultants Pvt. Ltd. SHOULDERS CONFIGURATION OF BEWAR - NEAR KARRI DETAILS OF RETAINING WALL
TRANSPORT AND VILLAGE SECTION ( KM 0.000 TO KM 30.000) ( PACKAGE - 1 )
H.No-102,Secter 15A CASTAENGINEERS 473, Pace City-2 DRAWING NO:
HIGHWAYS Faridabad, Haryana
Civilbaba Infra consultant Private Limited
Sector-37, Gurugram, OF NH - 92 IN THE STATE OF UTTARPRADESH UNDER GREEN
PVT.LTD. Plote No.21,3rd Floor,
Haryana-122004 22103/KDCPL/UP/BEWAR/RETAINING WALL-01
R1 21.11.2022 MINOR CHANGES VK VVV SK L.N. MALVIYA INFRA PROJECT PVT.LTD. Sector-32 Gurugram(Haryana) 122001 NATIONAL HIGHWAYS CORRIDOR PROJECT ( GNHCP ) WITH
A-26, B-1, EXTANTION, MOHAN
L.N. MALVIYA INFRA PROJECT PVT.LTD.
R0 10.11.2022 INITIAL SUBMISSION VK VVV SK COOPERATIVE INDUSTRIAL THE LOAN ASSISTANCE OF WORLD BANK ON EPC MODE DATE: SCALE: REV:
NO. DATE REVISION DRAWN CHECKED APPROVED ESTATE , NEW DELHI - 110044 NOV-2022 AS SHOWN R1