Professional Documents
Culture Documents
FOR
RESIDENTIAL BUILDING
W2 WC Bath
Emergency Stair 6'
UP
W1
4' 4' 5
D1 D1 D4
4.5" Thick
Brick Wall CLIENT
Dinning Room
W1 D2 W1 14'
4
D3 Project
RESIDENTIAL
BUILDING
W1 W1 14' Location
Purposed Building Bed Room
Drawn By
2 KSI ENGINEERING
Living Room
F2
A Revised
BUILDING LAYOUT PLAN GROUND FLOOR PLAN Date
A B C A B C COMPANY
22' 22'
8' 14' 8' 14'
F1 F1
6 6
W1 D2 14'
W1
D3
Project
4 4
RESIDENTIAL
BUILDING
W1 W1 14' Location
Bed Room
2 2 KSI ENGINEERING
F2
Sheet No. 2
W1 14'
F2
UP
D2
Scale 3/32"=1'-0"
D2 W1
1 1
F3 Verandah 4' Roof Slab Date 7.9.2019
1' 1'
CLIENT
10' 10'
Project
10' 10'
RESIDENTIAL
4th Floor 4th Floor BUILDING
Location
ELEVATION
Title
10' 10' VIEW
KSI ENGINEERING
10' 10'
Scale 3/32"=1'-0"
10' 10'
Riser = 10.9"
P.L(+ 2'-0") Tread = 9.6" P.L(+ 2'-0") Date 7.9.2019
N.G.L(± 0'-0") N.G.L(± 0'-0")
Revised
FRONT ELEVATION BACK ELEVATION
Date
6 5 4 3 2 1 1'
COMPANY
Roof Floor
CLIENT
10'
5th Floor
Project
10'
RESIDENTIAL
4th Floor BUILDING
Location
LEFT SIDE
Title ELEVATION
10' VIEW
2nd Floor
Drawn By
KSI ENGINEERING
10'
Scale 3/32"=1'-0"
10'
9"
P.L(+ 2'-0") Date 7.9.2019
6" N.G.L(± 0'-0")
Revised
LEFT SIDE ELEVATION Date
1' 1 2 3 4 5 6
COMPANY
Roof Floor
CLIENT
10'
5th Floor
Project
10'
RESIDENTIAL
4th Floor BUILDING
Location
10'
DAGON TOWNSHIP
3rd Floor
RIGHT SIDE
Title ELEVATION
10'
VIEW
2nd Floor
Drawn By
KSI ENGINEERING
10'
CLIENT
10'
5th Floor
10' Project
4th Floor RESIDENTIAL
BUILDING
10' Location
3rd Floor
DAGON TOWNSHIP
10'
10' Drawn By
1st Floor
KSI ENGINEERING
1-1/2" Thick (1:2:4) Cement Concrete
4-1/2" Thick (1:3:6) Cement Concrete 4'
Riser = 6.67" 10'
6" Thick Sand Filling Tread = 9"
5' Sheet No. 6
Earth Filling
4' P.L(+ 2'-0")
2' N.G.L(± 0'-0")
Scale 2/25"=1'-0"
6'
Date 7.9.2019
W1 W2 F1 F2 F3
6' 3' 1'-6.0" 1'-6.0" 4'
6"x 2" Chowket 1'
1
4"x 1 2" Frame
4' 6mm Thick Glass 4' 4' 4' CLIENT
Project
RESIDENTIAL
BUILDING
Location
D1 D2 D3 D4
6'
2'-6.0" 3' 3' 3' 2'-6.0" DAGON TOWNSHIP
6"x 2" Chowket
6mm Thick Glass 1'-6.0"
5"x 1 12" Frame
DOOR &
1" Thick teak panel Title WINDOW-1
7' 7' 7'
Drawn By
3"x 1 12" Frame 7'
teak
louvre KSI ENGINEERING
Sheet No. 7
Scale 1/4"=1'-0"
Date 7.9.2019
Revised
Date
COMPANY
13' 7'
1'-9.0" 1'-9.0"
CLIENT
10' 10'
Project
RESIDENTIAL
BUILDING
Location
Collapsible Door-1 Collapsible Door-2
DAGON TOWNSHIP
DOOR AND WINDOW SCHEDULE