Bill of Quantity

No Particular Quantity Unit Rate Unit Amount


Amount Remark
Detail of measurement
No Particular Quantity Measurement Deduction
Pre Engineering Work L(ft) B(ft) H(ft)
1 Site Clearing and levelling 1 1 40 60

2 Temporary Site Store and Site Office

3 Setting of Construction Survey


6"x1" Post Frame 1 2 46
1 2 26
3"x2" Post 2 10.2 3.5
2 6.2 3.5

4 Footing
Excavation 1 15 3 3 3.5
Hardcore and Sand Filling 1 15 3 3 0.5
1:3:6 Lean Concrete Work 1 15 3 3 0.25
(1:2:4) Concrete
Formwork 4 15 3 0.75
Rebar Work 4 15 3
concrete 1 15 3 3 0.75
Content Total Unit

2400 2400 Sft

1 1 Item

92
52
71.4
43.4
258.8 258.8 Rft

472.5 472.5 Cft


67.5 67.5 Cft
33.75 33.75 Cft
0
135 135 Sft
630 630 Rft
101.25 101.25 Cft
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Name of Work-Summary
Sr.No Particular Amount Remarks
Name of Work-Abstract of Cost
No Total Quantity Unit Particular Rate
Per Amount Total
Builder Estimate
No Particular Quantity Unit Rate Total of Each
Total of Each Total