You are on page 1of 36

DETAIL OF MEASUREMENT

Measurments
Sr. No Particulars No
Deducti
Content Unit
Total of
L (Ft) B (Ft) H (Ft) on Each
1 Site Cleaning 1 77.00 30.00 2310.00 Ft²
Site Cleaning 2310.00 Ft² 2310.00

2 Levelling or Surveying
1 71.00 24.00 1704.00 Ft²
Levelling or Surveying 1704.00 Ft² 1704.00

3 Earthwork Excavation
3.1 Footing
F1 24 6.00 6.00 6.00 5184.00 Ft³
5184.00 Ft³ 5184.00
3.2 Retaining Wall
X-direction
Line 1,2&3 3 29.00 2.50 3.00 652.50 Ft³
Y-direction
Line A,B,C,D,E,F&G 7 6.00 2.50 3.00 315.00 Ft³
Line H 1 6.00 2.50 3.00 45.00 Ft³
1012.50 Ft³ 1012.50
Earthwork Excavation Ft³ 6196.50

4 Hardcore & Sand Filling Work


4.1 Footing
F1 24 6.00 6.00 0.75 648.00 Ft³
648.00 Ft³ 648.00
4.2 Retaining Wall
X-direction
Line 1,2&3 3 29 2.5 0.5 108.75 Ft³
Y-direction
Line A,B,C,D,E,F&G 7 6 2.5 0.5 52.50 Ft³
Line H 1 6 2.5 0.5 7.50 Ft³
168.75 Ft³ 168.75
Hardcore & Sand Filling Ft³ 816.75

5 1:3:6 Concrete work


5.1 Footing (3''thk;)
F1 24 6.00 6.00 0.25 216.00 Ft³
216.00 Ft³ 216.00
5.2 Retaining Wall (3'' thk;)
X-direction
Line 1,2&3 3 29 2.5 0.25 54.375 Ft³
Y-direction
Line A,B,C,D,E,F&G 7 6 2.5 0.25 26.25 Ft³
Line H 1 6 2.5 0.25 3.75 Ft³
84.375 Ft³ 84.38
1:3:6 Concrete work Ft³ 300.38

6 Brick Work (1:3) (Retaining Wall)


For 9'' Thk;
X-direction
Line 1,2&3 3 64.125 0.75 3.5 504.98438 Ft³

Page1
DETAIL OF MEASUREMENT
Measurments
Sr. No Particulars No
Deducti
Content Unit
Total of
L (Ft) B (Ft) H (Ft) on Each
Y-direction
Line A,B,C,D,E,F&G 7 11 0.75 3.5 202.125 Ft³
Line H 1 11.25 0.75 3.5 29.53125 Ft³
Total of Brick Work (1:3) (RW) 736.64 Ft³ 736.64

7 Ground Floor Slab


7.1 1:2:4 Concrete Work (1-1/2''thk; ) Topping
Ground Floor
Bet; Line B~C 1 65.75 11.25 0.13 92.46 Ft³
Bet; Line C~D 1 65.75 11.25 0.13 92.46 Ft³

7.2 1:2:4 Concrete Work (4.5''thk; )


Ground Floor
Bet; Line B~C 1 65.75 11.25 0.38 277.38 Ft³
Bet; Line C~D 1 65.75 11.25 0.38 277.38 Ft³

1:2:4 Concrete Work (Ground Floor Slab) 739.69 Ft³ 739.69

8 Footing
8.1 1:2:4 Concrete Work
F1 24 6.00 6.00 1.00 864.00 Ft³
1:2:4 Concrete Work (Footing) 864.00 Ft³ 864.00

8.2 Formwork
F1 24 6.00 6.00 1.00 576.00 Ft²
Formwork (Footing) 576.00 Ft² 576.00

8.3 Steel Work


F1 24 6.00 6.00
16mm @ 6''c/c both way
LD 288 6.50 1872.00 Rft
SD 288 6.50 1872.00 Rft
3744.00 Rft 3744.00
Steel Work (Footing) 16mmØ Ton 1.89

9 Column
9.1 1:2:4 Concrete Work
Footing to Plinth Beam Level Column
C1 (9''x9'') 3 0.75 0.75 4.50 7.59 Ft³
C2 (12''x12'') 21 1.00 1.00 4.50 94.50 Ft³
1:2:4 Conc; Work (Footing to Plinth Beam 102.09 Ft³ 102.09

9.2 Formwork
Footing to Plinth Beam Level Column
C1 (9''x9'') 3 0.75 0.75 4.50 40.50 Ft²
C2 (12''x12'') 21 1.00 1.00 4.50 378.00 Ft²
Formwork (Footing to Plinth Beam C1) 418.50 Ft² 418.50

9.3 Steel Work


Footing to Plinth Beam Level Column
C1 21 0.75 0.75 5.50
Page2
DETAIL OF MEASUREMENT
Measurments
Sr. No Particulars No
Deducti
Content Unit
Total of
L (Ft) B (Ft) H (Ft) on Each
(9''x9'')
Main Bar(16mm x4nos) 84 10.19 856.24 Rft
Tie Bar(6mm@6''c/c) 252 2.50 630.00 Rft

C2 3 1.00 1.00 5.50


Main Bar(16mm x4nos) 12 10.19 122.32 Rft
Tie Bar(6mm@6''c/c) 36 3.50 126.00 Rft
Steel work (Footing to Plinth Beam C1) 16mmØ Ton 0.49
6mmØ Ton 0.05

10 Beam
10.1 1:2:4 Concrete Work
Plinth Beam
X-direction
Line 1,2&3 PB1 3 64.125 0.75 1.00 144.28 Ft³
Y-direction
Line A,B,C,D,E,F&G PB1 7 11 0.75 1.00 57.75 Ft³
Line H PB1 1 11.25 0.75 1.00 8.44 Ft³
1:2:4 Concrete Work (Plinth Beam) 210.47 Ft³ 210.47
10.2 Formwork
Plinth Beam
X-direction
Line 1,2&3 PB1 3 64.125 0.75 1.00 384.75 Ft³
Y-direction
Line A,B,C,D,E,F&G PB1 7 11 0.75 1.00 154.00 Ft³
Line H PB1 1 11.25 0.75 1.00 22.50 Ft³
Formwork (Plinth Beam) 561.25 Ft² 561.25
10.3 Steel Work
Plinth Beam
X-direction
Line 1,2&3 PB1 16mm 6mm
PB1 (9''x12'') 3 64.125 0.75 1
Top Bar (3-16mmØ) 9 65.38 588.38 Rft
Bottom Bar (3-16mmØ) 9 64.88 583.88 Rft
Stirrups (6mmØ @ 6''c/c) 388 3.00 Rft 1163.25

Line A,B,C,D,E,F&G PB1


PB3 (9''x12'') 7 11.00 0.75 1.00
Top Bar (3-16mmØ) 21 12.25 257.25 Rft
Bottom Bar (3-16mmØ) 21 11.75 246.75 Rft
Stirrups (6mmØ @ 6''c/c) 161 3.00 Rft 483.00

Line H PB1
PB2 (9''x12'') 1 11.00 0.75 1.00
Top Bar (3-16mmØ) 3 12.25 36.75 Rft
Bottom Bar (3-16mmØ) 3 11.75 35.25 Rft
Stirrups (6mmØ @ 6''c/c) 23 3.00 Rft 69.00

Steel Work (Plinth Beam) 16mmØ Ton 0.88


6mmØ Ton 0.12

Page3
DETAIL OF MEASUREMENT
Measurments
Sr. No Particulars No
Deducti
Content Unit
Total of
L (Ft) B (Ft) H (Ft) on Each

11 Earth Filling Work (50%)


Total Earthwork Excavation 0.5 6196.50 3098.25 Ft³
Total of Earth Filling Work (50%) 3098.25 Ft³ 3098.25

Page4
BUILDER'S ESTIMATE
Sr. No
Particular Quantity Unit Rate Per Amount

1 Site Cleaning 2310.00 Ft²


Labour
Workers 5.775 Nos 7500 43312.50
43312.50
2 Levelling or Surveying 1704.00 Ft²
Material (2 times used)
Timber Scantling 1.37 Ton 760000 1042507.20
Nails 14.20 viss 1250 17750.00
1060257.20
Labour
Carpenter 17.04 Nos 10000 170400.00
170400.00
3 Earthwork Excavation 6196.50 Ft³
Labour
Workers 123.93 Nos 7500 929475.00
929475.00
4 Hardcore & Sand Filling Work 816.75 Ft³
Material
Broken Brick(+15%) 9.39 Suds 35000 328741.88
Sand 4.70 Suds 22000 103318.88
432060.75
Labour
Workers 16.335 Nos 7500 122512.50
122512.50
5 1:3:6 Concrete work 300.38 Ft³
Material
Cement 38.62 Bags 6000 231717.86
Aggregate 2.88 Suds 55000 158598.00
Sand 1.44 Suds 22000 31719.60
422035.46
Labour
Mason 3.00 Nos 10000 30000.00
Workers 24.00 Nos 7500 180000.00
210000.00

6 Brick Work (1:3) (Retaining Wall) 736.64 Ft³


Material
Cement 51.30 Bags 6000 307810.55
Brick 9944.65 Nos 100 994464.84
Sand 1.92 Suds 22000 42135.84
1344411.23
Labour
page -5
BUILDER'S ESTIMATE
Sr. No
Particular Quantity Unit Rate Per Amount

Mason 36.83 Nos 10000 368320.31


Workers 44.20 Nos 7500 331488.28
699808.59

7 1:2:4 Concrete Work (1-1/2'' thk;)and (4.5"Thk)


Ground Floor Slab 739.69 Ft³
Material
Cement 17.11 Bags 6000 102631.64
Sand 0.43 Suds 22000 9357.05
Aggregate 0.85 Suds 55000 46785.23
158773.92
Labour
Mason 5.55 Nos 10000 55476.56
Workers 11.10 Nos 7500 83214.84
138691.41
8 1:2:4 Concrete Work
Footing, Column & Plinth Beam 1176.56 Ft³
Material
Cement 217.45 Bags 6000 1304723.77
Sand 5.41 Suds 22000 119068.13
Aggregate 10.82 Suds 55000 595340.63
Fuel 23.53 Gals 4000 94125.00
2113257.52
Labour
Mason 23.53 Nos 10000 235312.50
Workers 70.59 Nos 7500 529453.13
Machine Driver 5.88 Nos 8500 50003.91
814769.53
9 Formwork (Timber Shuttering)
Footing, Column & Plinth Beam 1555.75 Ft²
Material (2 times used)
Timber Scantling 2.33 Tons 760000 1773555.00
5 ply wood (8'x4')(+10%) 26.74 Shts 25000 668486.33
Nails 12.96 Viss 1250 16205.73
Red Oxide 4.93 Gals 10560 52079.04
Turpentine 1.00 Gals 6750 6738.34
2517064.44
Labour
Carpenter 62.23 Nos 10000 622300.00
Workers 31.12 Nos 7500 233362.50
855662.50
10 Steel Work
page -6
BUILDER'S ESTIMATE
Sr. No
Particular Quantity Unit Rate Per Amount

Footing, Column & Plinth Beam 3.44 Ton


Material
16mmØ 3.26 Ton 670000 2183684.08
6mmØ 0.18 Ton 670000 117786.20
Bending wire 19.08 viss 720 13740.12
2315210.41
Labour 3.44 Ton 95000 326327.88
326327.88

11 Earth Filling Work (50%) 3098.25 Ft³


Labour 3098.25 Ft³ 70 216877.50

Total Materials Charges 10,363,071


Total Labours Charges 4527837
Total Materials + Labours Charges 14,890,908

page -7
216878

page -8
Abstract of cost
Item Particulars Qty Unit Rate Per Total Amount

1 Site Cleaning 2310.00 Sft 18.75 Sft 43,313


2 Levelling or Surveying 1704.00 Sft 722.22 Sft 1,230,657
3 Earthwork Excavation 6196.50 Cft 150.00 Cft 929,475
4 Hardcore & Sand Filling Work 816.75 Cft 679.00 Cft 554,573
5 1:3:6 Concrete work 300.38 Cft 2104.15 Cft 632,035
6 1:2:4 Concrete Work (1-1/2''thk; ) Topping
Ground Floor Slab 739.69 Cft 402.15 Cft 297,465

7 Brick Work (1:3) (Retaining Wal 736.64 Cft 2775.06 Cft 2,044,220

8 1:2:4 Concrete Work


Footing, Column & Plinth Beam 1176.56 Cft 2488.63 Cft 2,928,027

9 Formwork (Timber Shuttering)


Footing, Column & Plinth Beam 1555.75 Sft 2167.91 Sft 3,372,727

10 Steel Work
10.1 Footing, Column & Plinth Beam 3.44 Ton 769000.00 Ton 2,641,538

11 Earth Filling Work (50%) 3098.25 Ft³ 70.00 216,878


14,890,908
BILL OF QUANTITY
Sr.
Particular Quantity Unit Rate Per Amount Remarks
No
A Materials

1 Timber Scantling 3.71 Ton 760000 Ton 2,816,062.20


2 5 ply wood (8'x4')(+10%) 26.74 sht 25000 sht 668,486.33
3 Red Oxide 4.93 Gal 10560 Gal 52,079.04
4 Turpentine 1.00 Gal 6750 Gal 6,738.34
5 Nails 27.16 viss 1250 viss 33,955.73
6 Broken Brick(+15%) 9.39 sud 35000 sud 328,741.88
7 Brick 9944.65 Nos 100 Nos 994,464.84
8 Sand 13.89 sud 22000 sud 305,599.49
9 Cement 324.48 bag 6000 bag 1,946,883.82
10 Aggregate 14.56 sud 55000 sud 800,723.86
11 Fuel 23.53 Gal 4000 Gal 94,125.00
12 16mm 3.26 Ton 670000 Ton 2,183,684.08
13 6 mm 0.18 Ton 670000 Ton 117,786.20
14 Bending wire 19.08 viss 720 viss 13,740.12
Total Materials Charges 10,363,071

B Labours
1 Carpenter 79.27 Nos 10000 Nos 792,700.00
2 Mason 68.91 Nos 10000 Nos 689,109.38
3 Workers 327.04 Nos 7500 Nos 2,452,818.75
4 Machine Driver 5.88 Nos 8500 Nos 50,003.91
5 Steel Work 3.44 Ton 95000 Ton 326,327.88
6 Earth Filling Work (50%) 3098.25 Ft³ 70 Ft³ 216,877.50
Total Labours Charges 4,527,837

Total Materials + Labours Charges 14,890,908

page - 11
10363071

4527837
14890908

page - 12
SUB STRUCTURE WORK ( FOUNDATION)

SUMMUARY

SR.NO PARTICULAR AMOUNT UNIT REMARKS

1 TOTAL MATERIALS COST 10,363,071 Kyats

2 TOTAL LABOUR COST 4,527,837 Kyats

TOTAL (MAT + LAB) COST 14,890,908 Kyats

3 TRANSPORATION FEE (5% OF MAT) 518,154 Kyats

4 SUPERVISION FEE (5% OF MAT + LAB) 744,545 Kyats

GRAND TOTAL ESTIMATED COST 16,153,607 Kyats


(Super Sturcture)
DETAIL OF MEASUREMENT
Measurments
Sr. No
Total of
Particulars No Ded; Content Unit
L (Ft) B (Ft) H (Ft) Each
1 Column
1.1 Ground to 1st Floor
A 1:2:4 Concrete Work
C1(9''x9'') 3 0.75 0.75 10.00 16.88 Ft³
C2(12''x12'') 21 1.00 1.00 10.00 210.00 Ft³
1:2:4 Conc; Work 226.88 Ft³ 226.88

B Formwork
C1(9''x9'') 1 0.75 0.75 10.00 30.00 Ft²
C2(12''x12'') 2 1.00 1.00 10.00 80.00 Ft²
Formwork 110.00 Ft² 110.00

C Steel Work
C1(9''x9'') 3 0.75 0.75 10.00
Main Bar(16mm x 4 nos) 12 12.13 145.60 Rft
Tie Bar(6mm@6''c/c) 63 2.50 157.50 Rft

C2(12''x12'') 21 1.00 1.00 10.00


Main Bar(16mm x 4 nos) 84 12.13 1019.20 Rft
Tie Bar(6mm@6''c/c) 441 3.50 1543.50 Rft

Steel work 16mmØ Ton 0.59


6mmØ Ton 0.12

1.2 1st to 2nd Floor Column


A 1:2:4 Concrete Work
C1(9''x9'') 3 0.75 0.75 9.00 15.19 Ft³
C2(12''x12'') 21 1.00 1.00 9.00 189.00 Ft³
1:2:4 Conc; Work 204.19 Ft³ 204.19

B Formwork
C1(9''x9'') 3 0.75 0.75 9.00 81.00 Ft²
C2(12''x12'') 21 1.00 1.00 9.00 756.00 Ft²
Formwork 837.00 Ft² 837.00

C Steel Work
C1(9''x9'') 3 0.75 0.75 9.00
Main Bar(16mm x 4 nos) 12 9.48 113.76 Rft
Tie Bar(6mm@6''c/c) 57 2.50 142.50 Rft

C2(12''x12'') 21 1.00 1.00 9.00


Main Bar(16mm x 4 nos) 84 9.48 796.32 Rft
Tie Bar(6mm@6''c/c) 399 3.50 1396.50 Rft

Steel work 16mmØ Ton 0.46


6mmØ Ton 0.11
1.3 2nd Floor To Roof Beam Column

14
(Super Sturcture)
DETAIL OF MEASUREMENT
Measurments
Sr. No
Total of
Particulars No Ded; Content Unit
L (Ft) B (Ft) H (Ft) Each
A 1:2:4 Concrete Work
C1(9''x9'') 40 0.75 0.75 9.00 202.50 Ft³
1:2:4 Conc; Work 202.50 Ft³ 202.50

B Formwork
C1(9''x9'') 40 0.75 0.75 9.00 1080.00 Ft²
Formwork 1080.00 Ft² 1080.00

C Steel Work
C1(9''x9'') 40 0.75 0.75 9.00
Main Bar(16mm x 4 nos) 160 9.48 1516.80 Rft
Tie Bar(6mm@6''c/c) 760 2.50 1900.00 Rft
Steel work 16mmØ Ton 0.76
6mmØ Ton 0.14
2 Beam
2.1 Floor Beam
A 1:2:4 Concrete Work
X-direction
Line 1,2&3 PB1
FB2 (9''x12'') 3 64.13 0.75 0.67 96.24 Ft³

Y-direction
Line A,B,C,D,E,F&G PB1
FB3 (9''x12'') 7 11.00 0.75 0.67 38.52 Ft³

Line H PB1
FB2 (9''x12'') 1 11.25 0.75 0.67 5.63 Ft³
1:2:4 Concrete Work (Floor Beam) 140.38 Ft³ 140.38

B Formwork
X-direction
Line 1,2&3 PB1
FB2 (9''x12'') 3 64.13 0.75 0.67 256.63 Ft²

Y-direction
Line A,B,C,D,E,F&G PB1
FB3 (9''x12'') 7 11.00 0.75 0.67 102.72 Ft²

Line H PB1
FB2 (9''x12'') 3 11.25 0.75 0.67 45.02 Ft²
Formwork (Floor Beam) 404.37 Ft² 404.37

C Steel Work
X-direction
Line 1,2&3 PB1 16mm 6mm
FB2 (9''x12'') 3 64.13 0.75 0.67
Top Bar (3-16mmØ) 9 64.71 582.38 Rft
Bottom Bar (3-16mmØ) 9 64.88 583.88 Rft
15
(Super Sturcture)
DETAIL OF MEASUREMENT
Measurments
Sr. No
Total of
Particulars No Ded; Content Unit
L (Ft) B (Ft) H (Ft) Each
Stirrups (6mmØ @ 6''c/c) 388 2.33 Rft 905.01

Y-direction
Line A,B,C,D,E,F&G PB1
FB3 (9''x12'') 7 11.00 0.75 0.92
Top Bar (3-16mmØ) 21 14.22 298.56 Rft
Bottom Bar (3-16mmØ) 21 13.88 291.55 Rft
Stirrups (6mmØ @ 6''c/c) 161 2.83 Rft 456.27

Line H PB1
FB2 (9''x12'') 1 11.25 0.75 0.67
Top Bar (3-16mmØ) 3 11.83 35.50 Rft
Bottom Bar (3-16mmØ) 3 12.00 36.00 Rft
Stirrups (6mmØ @ 6''c/c) 24 2.33 Rft 54.85

Steel Work (Floor Beam) 16mmØ Ton 0.92


6mmØ Ton 0.10

2.2 2nd Floor Beam


A 1:2:4 Concrete Work
X-direction
Line 1,2&3 PB1
FB2 (9''x12'') 3 64.13 0.75 0.67 96.24 Ft³

Y-direction
Line A,B,C,D,E,F&G PB1
FB3 (9''x12'') 7 11.00 0.75 0.67 38.52 Ft³

Line H PB1
FB2 (9''x12'') 1 11.25 0.75 0.67 5.63 Ft³
1:2:4 Concrete Work (Floor Beam) 140.38 Ft³ 140.38

B Formwork
X-direction
Line 1,2&3 PB1
FB2 (9''x12'') 3 64.13 0.75 0.67 256.63 Ft²

Y-direction
Line A,B,C,D,E,F&G PB1
FB3 (9''x12'') 7 11.00 0.75 0.67 102.72 Ft²

Line H PB1
FB2 (9''x12'') 3 11.25 0.75 0.67 45.02 Ft²
Formwork (Floor Beam) 404.37 Ft² 404.37

D Steel Work
X-direction
Line 1,2&3 PB1 16mm 6mm
16
(Super Sturcture)
DETAIL OF MEASUREMENT
Measurments
Sr. No
Total of
Particulars No Ded; Content Unit
L (Ft) B (Ft) H (Ft) Each
FB2 (9''x12'') 3 64.13 0.75 0.67
Top Bar (3-16mmØ) 9 64.71 582.38 Rft
Bottom Bar (3-16mmØ) 9 64.88 583.88 Rft
Stirrups (6mmØ @ 6''c/c) 388 2.33 Rft 905.01

Y-direction
Line A,B,C,D,E,F&G PB1
FB3 (9''x12'') 7 11.00 0.75 0.92
Top Bar (3-16mmØ) 21 14.22 298.56 Rft
Bottom Bar (3-16mmØ) 21 13.88 291.55 Rft
Stirrups (6mmØ @ 6''c/c) 161 2.83 Rft 456.27

Line H PB1
FB2 (9''x12'') 1 11.25 0.75 0.67
Top Bar (3-16mmØ) 3 11.83 35.50 Rft
Bottom Bar (3-16mmØ) 3 12.00 36.00 Rft
Stirrups (6mmØ @ 6''c/c) 24 2.33 Rft 54.85

Steel Work (Floor Beam) 16mmØ Ton 0.92


6mmØ Ton 0.10
2.2 Roof Floor Beam
A 1:2:4 Concrete Work
X-direction
Line 1,2&3 PB1
FB2 (9''x12'') 3 64.13 0.75 0.67 96.24 Ft³

Y-direction
Line A,B,C,D,E,F&G PB1
FB3 (9''x12'') 7 11.00 0.75 0.67 38.52 Ft³

Line H PB1
FB2 (9''x12'') 1 11.25 0.75 0.67 5.63 Ft³
1:2:4 Concrete Work 140.38 Ft³ 140.38

B Formwork
X-direction
Line 1,2&3 PB1
FB2 (9''x12'') 3 64.13 0.75 0.67 256.63 Ft²

Y-direction
Line A,B,C,D,E,F&G PB1
FB3 (9''x12'') 7 11.00 0.75 0.67 102.72 Ft²

Line H PB1
FB2 (9''x12'') 3 11.25 0.75 0.67 45.02 Ft²
Formwork (Floor Beam) 404.37 Ft² 404.37

C Steel Work
17
(Super Sturcture)
DETAIL OF MEASUREMENT
Measurments
Sr. No
Total of
Particulars No Ded; Content Unit
L (Ft) B (Ft) H (Ft) Each
X-direction
Line 1,2&3 PB1 16mm 6mm
FB2 (9''x12'') 3 64.13 0.75 0.67
Top Bar (3-16mmØ) 9 64.71 582.38 Rft
Bottom Bar (3-16mmØ) 9 64.88 583.88 Rft
Stirrups (6mmØ @ 6''c/c) 388 2.33 Rft 905.01

Y-direction
Line A,B,C,D,E,F&G PB1
FB3 (9''x12'') 7 11.00 0.75 0.92
Top Bar (3-16mmØ) 21 14.22 298.56 Rft
Bottom Bar (3-16mmØ) 21 13.88 291.55 Rft
Stirrups (6mmØ @ 6''c/c) 161 2.83 Rft 456.27

Line H PB1
FB2 (9''x12'') 1 11.25 0.75 0.67
Top Bar (3-16mmØ) 3 11.83 35.50 Rft
Bottom Bar (3-16mmØ) 3 12.00 36.00 Rft
Stirrups (6mmØ @ 6''c/c) 24 2.33 Rft 54.85

Steel Work (Floor Beam) 16mmØ Ton 0.92


6mmØ Ton 0.10
3 Slab
3.1 1st Floor Slab
A 1:2:4 Concrete Work
1 71.00 28.00 0.33 662.00 Ft³
Deduction
Stair 1 7.00 12.00 0.33 27.97 Ft³

1:2:4 Concrete Work (1st Floor Slab) 27.97 662.00 Ft³ 634.03

B Formwork
1 71.00 28.00 0.33 1988.00 Ft²
Deduction
Stair 1 7.00 12.00 0.33 84 Ft²
Formwork (1st Floor Slab) 84.00 1988.00 Ft² 1904.00

C Steel Work (10mm @ 6''c/c both way)


Two Way
Bet; Line A~B 1 71.00 28.00
SD 281 28.83 8101.23 Rft
LD 109 71.83 7829.47 Rft
15930.70 Rft
Steel Work (1st Floor Slab) 10mmØ Ton 3.15

4 Stair Case
4.1 Ground To 1st Floor Level Stair

18
(Super Sturcture)
DETAIL OF MEASUREMENT
Measurments
Sr. No
Total of
Particulars No Ded; Content Unit
L (Ft) B (Ft) H (Ft) Each
A 1:2:4 Concrete Work
Landing Slab 3 7.00 5.00 0.33 34.97 Ft³
Landing Beam 3 7.00 0.75 0.75 11.81 Ft³
Waist 6 8.67 3.50 0.50 91.04 Ft³
Step 48 3.50 0.28 46.67 Ft³

1:2:4 Concrete Work (Ground to 1st Fl Level Stair) 184.48 Ft³ 184.48

B Formwork
Landing Slab 3 7.00 5.00 0.33 105.00 Ft²
Landing Beam 3 7.00 0.75 0.75 31.50 Ft²
Waist 6 8.67 3.50 0.50 182.07 Ft²
Step 48 3.50 0.28 46.67 Ft²
Step Cover 12 8.67 1.50 156.06 Ft²
Formwork (Ground to 1st Fl Level Stair) 521.30 Ft² 521.30

C Steel Work
Waist 6 8.67 4.34 0.50 12mm 10mm
Main bar (12mm @ 6''c/c)
Bottom Steel 48 16 776.24 Rft
Top Steel (L/3) 48 6 290.72 Rft
Top Steel (L/3) 48 9 430.80 Rft

Dist; bar (10mm @ 6''c/c )


Bottom Steel 104 4.75 Rft 494.19
Top Steel (L/3) 35 4.75 Rft 164.73
Top Steel (L/3) 35 4.75 Rft 164.73

Landing Slab 3 7.00 5.00


Long direction 20 7.75 Rft 155.00
10mm @ 6''c/c (for Two Layer)

Landing Beam (9''x9'') 3 7.00 0.75 0.75 16mm


Top Bar (2-16mmØ) 6 7.75 46.50 Rft
Bottom Bar (2-16mmØ) 6 8.50 51.00 Rft
6 mm
Stirrups (6mm @ 6''c/c) 43 3.00 129.00 Rft

6 mm 16mm 12mm 10mm


129.00 97.50 1497.76 Rft 978.65
Steel Work ( Ground to 1st Fl Level Stair) 16mmØ Ton 0.05
12mmØ Ton 0.45
10mmØ Ton 0.19
6mmØ Ton 0.009

19
(Super Sturcture)
Builder's Estimate
Sr. No Particular Quantity Unit Rate Per Amount Total Amount

A 1:2:4 Concrete Work


1 Column, Beam, Slab & Stair
755.92 Ft³
Material
Cement 139.71 Bags 6000 Bags 838266.07952
Sand 3.48 Suds 22000 Suds 76499.541479
Aggregate 6.95 Suds 55000 Suds 382497.7074
Fuel 15.12 Gals 4000 Gals 60473.945833
1357737.2742 1357737.27

Labour
Mason 15.12 Nos 10000 Nos 151184.86458
Workers 45.36 Nos 7500 Nos 340165.94531
Machine Driver 3.78 Nos 8500 Nos 32126.783724
523477.59362 523477.59
B Formwork (Timber Shuttering)
1 Column, Beam, Slab & Stair
3776.77 Ft²
Material (2 times used)
Timber Scantling 5.67 Tons 760000 Tons 4305513.42
5 ply wood (8'x4')(+10%) 64.91 Shts 25000 Shts 1622829.21
Nails 31.47 Viss 1250 Viss 39341.31
Red Oxide 11.97 Gals 10560 Gals 126428.00
Turpentine 2.42 Gals 6750 Gals 16358.12
6110470.06 6110470.06
Labour
Carpenter 151.07 Nos 10000 Nos 1510706.46
Workers 75.54 Nos 7500 Nos 566514.92
2077221.39 2077221.39
C Steel Work
1 Column, Beam, Slab & Stair
6.15 Tons
16mmØ 2.01 Tons 670000 Tons 1349999.62
12mmØ 0.45 Tons 670000 Tons 304415.38
10mmØ 3.34 Tons 670000 Tons 2240269.03
6mmØ 0.34 Tons 670000 Tons 228071.82
Bending wire 35.16 Viss 720 Viss 25316.71
4148072.56 4148072.56

Labour 6.15 Ton 95000 584569.86


584569.86 584569.86
14,801,549
20
#REF!

21
(Super Sturcture)

Abstract of cost

Item Particulars Qty Unit Rate Per Total Amount

A 1:2:4 Concrete Work


1 Column, Beam, Slab & Stair
755.92 Ft³ 2488.63 Ft³ 1,881,215

B Formwork (Timber Shuttering)


1 Column, Beam, Slab & Stair 3776.77 Ft² 2167.91 Ft² 8,187,691

C Steel Work
1 Column, Beam, Slab & Stair 6.15 Ton 769114.29 Ton 4,732,642

14,801,549

22
14,801,549

23
(Super Sturcture)

BILL OF QUANTITY
Sr.
Particular Quantity Unit Rate Per Amount
No
A Materials

1 Cement 139.71 bag 6000 bag 838,266.08

2 Sand 3.48 sud 22000 sud 76,499.54

3 Aggregate 6.95 sud 55000 sud 382,497.71

4 Fuel 15.12 Gal 4000 Gal 60,473.95

5 Timber Scantling 5.67 Ton 760000 Ton 4,305,513.42

6 5 ply wood (8'x4')(+10%) 64.91 sht 25000 Sht 1,622,829.21

7 Red Oxide 11.97 Gal 10560 Gal 126,428.00

8 Turpentine 2.42 Gal 6750 Gal 16,358.12

9 Nails 31.47 viss 1250 viss 39,341.31

11 16mm 2.01 Ton 670000 Ton 1,349,999.62

12 12mm 0.45 Ton 670000 Ton 304,415.38

13 10mm 3.34 Ton 670000 Ton 2,240,269.03

14 6mm 0.34 Ton 670000 Ton 228,071.82

15 Bending wire 35.16 viss 720 viss 25,316.71


Total Materials Charges 11,616,280

B Labours

1 Carpenter 151.07 Nos 10000 Nos 1,510,706.46

2 Mason 15.12 Nos 10000 Nos 151,184.86

3 Workers 120.89 Nos 7500 Nos 906,680.87

4 Machine Driver 3.78 Nos 8500 Nos 32,126.78

5 Steel Work 6.15 Nos 95000 Nos 584,569.86


Total Labours Charges 3,185,269

Total Materials + Labours Charges 14,801,549

24
#REF!

Err:509

14,801,548.7

25
SUPER STRUCTURE WORK

SUMMUARY

SR.NO PARTICULAR AMOUNT UNIT REMARKS

1 TOTAL MATERIALS COST 11,616,280 Kyats

2 TOTAL LABOUR COST 3,185,269 Kyats

TOTAL (MAT + LAB) COST 14,801,549 Kyats

3 TRANSPORATION FEE (5% OF MAT) 580,814 Kyats

4 SUPERVISION FEE (5% OF MAT + LAB) 740,077 Kyats

GRAND TOTAL ESTIMATED COST 16,122,440 Kyats


(Finishing work)
DETAIL OF MEASUREMENT
Sr. No
Measurments Total of
Particulars No Deduction Content Unit
L (Ft) B (Ft) H (Ft) Each
1 4-1/2'' Thk; Brick Work
(1:3) Cement Motor (For Walling)
1.1 Ground Floor
X-direction
Line 1 & 2 2 71.00 10.00 1420.00 Ft²

Y-direction
Line A,B,C,E,F& G 7 11.00 10.00 770.00 Ft²
Line H 1 11.25 10.00 112.50 Ft²

1.2 First Floor


X-direction
Line 1,2,3,4&5 5 71.00 9.00 3195.00 Ft²

Y-direction
10 24.00 9.00 2160.00 Ft²
1.3 Second Floor
X-direction
Line 1,2,3,4&5 5 71.00 9.00 3195.00 Ft²

Y-direction
10 24.00 9.00 2160.00 Ft²
Deduction
Door & Window
TD1 Door Size Ft²
TD2 Ft²
TD3 Ft²
TD4 Ft²
TW1 Ft²
TW2 Ft²
TW3 Ft²
TW4 Ft²
TW5 Ft²
0.00 13012.50 Ft² 13012.50
Total of 4-1/2'' Brick Work (Walling) Ft² 13012.50

2 3/4'' Thk; Plastering Work (1:3)

Walling 2 13012.50 26025.00 Ft²


Beam 1 404.47 404.47 Ft²

Total of 3/4'' Thk; Plastering Work 26429.47 Ft² 26429.47

3 Painting Work (3 Coats)

Total Plastering work 1 26429.47 26429.47 Ft²


Slab Painting (Slab F/W) 1 1904.00 1904.00 Ft²
Stair Painting (Stair F/W) 1 521.30 521.30 Ft²
Total of Painting Work (3 Coats) 28854.77 Ft² 28854.77

27
(Finishing work)
DETAIL OF MEASUREMENT
Sr. No
Measurments Total of
Particulars No Deduction Content Unit
L (Ft) B (Ft) H (Ft) Each
4 Scaffolding Work
Front & Back 2 77.00 41.00 6314.00 Ft²
Left & Right 2 34.00 41.00 2788.00 Ft²
Total of Scaffolding Work 9102.00 Ft² 9102.00

28
(Finishing work)
Builder's Estimate

Sr. No Particular Quantity Unit Rate Per Amount Total Amount

1 4-1/2'' Thk; Brick Work 13012.50 Ft²


Material
Cement 345.06 Bags 6000 Bags 2070381.7
Brick 71568.75 No 100 No 7156875
Sand 13.01 Suds 22000 Suds 286275
X-Met 14964.38 Rft 100 Rft 1496437.5 11009969.1964
Labour
Mason 260.25 Nos 10000 Nos 2602500
Worker 390.38 Nos 7500 Nos 2927812.5 5530312.5

2 3/4'' Thk; Plastering Work ( 26429.47 Ft²


Material
Cement 530.95 Bags 6000 3185694.98
Sand 19.82 Suds 22000 436086.247 3621781.2299
Labour
Mason 396.44 Nos 10000 Nos 3964420.42
Worker 792.88 Nos 7500 Nos 5946630.64 9911051.05915

3 Painting Work (3 Coats) 28854.77 Ft²


Material
Ready Mixed Paint 216.41 Gals 12000 2596928.95
Putty 11.54 Gals 8500 98106.2049 2695035.15913
Labour
Painter 288.55 Nos 10000 2885476.62
Worker 288.55 Nos 7500 Nos 2164107.46 5049584.0776

4 Scaffolding Work 9102.00 Ft²


Material
Bamboo 442.46 Nos 3000 1327375
Coinyan 12.64 Viss 1500 18962.5
Wire Nail 13.17 Viss 720 9481.25 1355818.75
Labour
Worker 47.41 Nos 7500 Nos 355546.875 355546.875

39,529,099

29
11009969.2 #REF!
#REF!

5530312.5

3621781.23

9911051.06

2695035.159

5049584.08

1355818.75
18682604.34
355546.875
20846495 39529098.8472114

30
(Finishing work)
Abstract of cost

Item Particulars Qty Unit Rate Per Total Amount

1 4-1/2'' Thk; Brick Work 13012.50 Ft² 1271.11 16,540,282

2 3/4'' Thk; Plastering Work (1:3) 26429.47 Ft² 512.04 13,532,832


3 Painting Work (3 Coats) 28854.77 Ft² 268.40 7,744,619

4 Scaffolding Work 9102.00 Ft² 188.02 1,711,366

39,529,099

31
39,529,099

32
(Finishing work)
BILL OF QUANTITY
Sr.
Particular Quantity Unit Rate Per Amount
No
A Materials

1 Cement 876.01 Bags 6000 Bags 5,256,076.68

2 Brick 71568.75 Nos 100 Nos 7,156,875.00

3 Sand 32.83 Sud 22000 Sud 722,361.25

4 X-Met 14964.38 Rft 100 Rft 1,496,437.50

5 Ready Mixed Paint 216.41 Gal 12000 Gal 2,596,928.95

6 Putty 11.54 Gal 8500 Gal 98,106.20

23 Bamboo 442.46 Nos 3000 Nos 1,327,375.00

24 Coinyan 12.64 Viss 1500 Viss 18,962.50

25 Wire Nail 13.17 Viss 720 Viss 9,481.25


Total Materials Charges 18,682,604

B Labours

2 Mason 656.69 Nos 10000 Nos 6,566,920.42

3 Painter 288.55 Nos 10000 Nos 2,885,476.62

4 Workers 1519.21 Nos 7500 Nos 11,394,097.47


Total Labours Charges 20,846,495

Total Materials + Labours Charges 39,529,099

33
18,682,604

20846494.51

39,529,098.8

34
FINISHING WORK (Finishing)

SUMMUARY

SR.NO PARTICULAR AMOUNT UNIT REMARKS

1 TOTAL MATERIALS COST 18,682,604 Kyats

2 TOTAL LABOUR COST 20,846,495 Kyats

TOTAL (MAT + LAB) COST 39,529,099 Kyats

3 TRANSPORATION FEE (5% OF MAT) 934,130 Kyats

4 SUPERVISION FEE (5% OF MAT + LAB) 1,976,455 Kyats

GRAND TOTAL ESTIMATED COST 42,439,684 Kyats


CIVIL WORK

SUMMUARY

SR.NO PARTICULAR AMOUNT UNIT REMARKS

1 SUB STRUCTURE WORK 16,153,607 Kyats

2 SUPER STRUCTURE WORK 16,122,440 Kyats

3 FINISHING WORK 42,439,684 Kyats

GRAND TOTAL ESTIMATED COST 74,715,731 Kyats

BUILDING FLOOR AREA 4,298 sft

PAE RATE FOR BUILDING 17,384 Kyats