G.1 Ground Floor CHB Laying including 342.26 sq m 500.00 171,130.88 171,130.88
Plastering
#4 CHB 4,278.27 pcs 12.00 51,339.26 51,339.26
Portland Cement 468.21 bags 240.00 112,371.38 112,371.38
Sand 25.84 cu.m 450.00 11,628.34 11,628.34
12mm RSB 649.65 kg 28.00 18,190.12 8.50 5,522.00 23,712.12
10mm RSB 695.75 kg 28.00 19,480.99 8.50 5,913.87 25,394.86
#16 Tie Wire 19.51 kg 40.00 780.36 4.00 78.04 858.39
G.2 Second Floor CHB Laying including 210.64 sq m 500.00 105,318.40 105,318.40
Plastering
#4 CHB 2,632.96 pcs 12.00 31,595.52 31,595.52
Portland Cement 288.15 bags 240.00 69,156.27 69,156.27
Sand 15.90 cu.m 450.00 7,156.39 7,156.39
12mm RSB 399.81 kg 28.00 11,194.67 8.50 3,398.38 14,593.05
10mm RSB 428.18 kg 28.00 11,989.11 8.50 3,639.55 15,628.66
#16 Tie Wire 12.01 kg 40.00 480.25 4.00 48.03 528.28
H Consumables 1.00 lot 59,273.06
subtotal for Structural/Civil Works 1,530,823.79 654,779.87 2,244,876.72
III ARCHITECTURAL WORKS (SHELL ONLY)
A Cement Plaster Finish 433.62 sq m 80.00 34,689.28 34,689.28
Portland Cement 124.88 bags 250.00 31,220.35 31,220.35
Sand 6.94 cu m 500.00 3,468.93 3,468.93
B Painting (Masonry/Concrete) 552.90 sq m 95.00 52,525.36 52,525.36
Concrete Neutralizer 11.06 lit. 115.00 1,271.67 1,271.67
Primer 22.12 gal 585.00 12,937.83 12,937.83
Patching Compound 27.64 kgs 15.00 414.67 414.67
Paint Latex Semi Gloss 88.46 gal 585.00 51,751.31 51,751.31
C Roofing Works 188.28 sq m 90.00 16,944.84 16,944.84
Pre-Painted Metal Roofing Sheet GA. 26 188.28 sq m 395.00 74,369.02 74,369.02
Long Span
teckscrew 1,694.48 pc 2.00 3,388.97 3,388.97
Roof Sealant 3.58 L 329.73 1,179.52 1,179.52
D Gutter 13.40 l.m. 20.00 268.00 268.00
Pre-Painted Gutter, GA 24 (0.701mm x 13.40 l.m. 190.00 2,546.00 2,546.00
2.44m
teckscrew 134.00 pc 2.00 268.00 268.00
Blind Rivets 26.80 pc 0.50 13.40 13.40
E Flashing and Ridge Roll 40.70 l.m. 20.00 814.00 814.00
Pre-Painted Flashing, GA 24 (0.701mm x 40.70 l.m. 190.00 7,733.00 7,733.00
2.44m)
teckscrew 407.00 pc 2.00 814.00 814.00
Blind Rivets 81.40 pc 0.50 40.70 40.70
F Painting (Steel) 40.20 sq m 120.00 4,823.84 4,823.84
Red Oxide Primer 4.02 gal 680.00 2,733.51 2,733.51
Paint Enamel 10.05 gal 640.00 6,431.79 6,431.79
G Consumables 1.00 lot 10,029.13
subtotal for Architectural Works 200,582.67 110,065.33 320,677.12
TOTAL 1,736,906.46 1,066,693.20 2,895,350.61
59.99% 36.84%
X 120.00
=
174.24 76.50
X= 273.32
SAY 274.00 DAYS
5.00 Mob/Demob
46.00 Pre-determined CD
Total CD = 325.00 DAYS
TOTAL DURATION OF PROJECT = 10.83 MONTHS
13.00
Item Cost Sheet ID QTY Unit
Removal of Structures and
E. 1.00 lump sum
Obstructions
Length width
F1 2.00 2.00
Length width
TB 114.96 0.20
Length width
F1 2.00 2.00
0 - -
0 - -
0 - -
0 - -
0 - -
Length width
F1 2.00 2.00
0 - -
0 - -
0 - -
0 - -
0 - -
TB 114.96 0.20
SOG 174.42 1.00
w/ 5% Shrinkage Factor
Item Cost Sheet ID QTY Unit
B.5 Embankment 87.21 cu. m.
Ground Floor
Volume =
Length width
F1 1.20 1.20
0 - -
0 - -
0 - -
0 - -
0 - -
Length width
TB 114.96 0.20
Length width
SOG 174.42 1.00
Length width
C1 0.20 0.40
Length width
C1 0.20 0.40
pc1 0.20 0.40
Length width
B1 162.23 0.20
Length width
B3, CB2
B4,CB3
Length width
RB1 100.89 0.20
Length/Height
Suspended Slab 119.33
Length/Height
Suspended Slab
Length/Height
Suspended Slab
Length/Height
STAIR FOOTING 1 0.40
STAIR WALL 1 0.80
STAIRCASE STEPS 1 19.00
STAIRCASE LANDING 1 1.00
STAIRCASE STRINGER 1 6.70
Diameter
F1 0.016
0 0.016
0 0.016
0 0.016
0 0.016
0 0.016
LEFT SUPPORT
TB 0.016 4
DIAMETER SECTION
TB 0.01 0.20
Ground Floor
Slab No. of Pieces
174.42 1 1
DIAMETER SECTION
C1 0.01 0.20
0 0.01 -
DIAMETER SECTION
C1 0.01 0.20
pc1 0.01 0.20
DIAMETER SECTION
C1 0.01 -
PC2 0.01 -
LEFT SUPPORT
B1 0.016 10
0
0
DIAMETER SECTION
B1 0.01 0.20
0 0.01
0 0.01
LEFT SUPPORT
LEFT SUPPORT
RB1 0.016 4
DIAMETER SECTION
RB1 0.01 0.2
2ND FLOOR
Slab No. of Pieces
119.33 1 1
2ND FLOOR
Slab No. of Pieces
- 1 1
WALL FOOTING
No. of Bars Width Length
3 0.4 1.1
STAIR FOOTING
No. of Bars Width Length
4 0.8 1.10
STAIR WALL
No. of Bars Width Length
3 0.8 1.10
STAIR LANDING
No. of Bars Width Length
10 1.1 4
STAIR STRINGER
No. of Bars Width Length
5 1.1 2.20
STAIR STEPS
No. of STEPS BASE HEIGHT
38 0.176 0.3
DIAMETER SECTION
LANDING beam 0.01 0.2
Section
TB 0.2 0.3
Section
C1 0.2 0.4
C2 0 0
Section
C1 0.2 0.4
PC1
Section
C1 0.25 0.5
PC1 0.25 0.5
Section
B1 0.2 0.3
Section
BE, CB2 0.25 0.5
B4, CB3 0.25 0.5
Section
RB1 0.15 0.2
2ND FLOOR
3rd FLOOR
3rd FLOOR
2"x2"x1/4" Angle
Bar = 6.000 x
1.5"x1.5"x1/4"
Angle Bar = 6.000 x
4"GI Pipe 6.000 x
4" CHB
LENGTH HEIGHT AREA
83.56 5.12 342.26
CEMENT AND SAND FOR CHB MORTAR PER SQUARE
METER
AREA CEMENT (BAGS) SAND (CU.M.)
342.26176 271.07131 14.88838656
CEMENT AND SAND FOR PLASTERIN
AREA TOTAL AREA
342.26176 2 684.52352
REBARS (10 MM)
NO. OF CHB
VERTICAL (600MM) KGS
4278.272 731.58451 649.647046656
Tie wire
Area kgs
Ground 342.26176 19.50892032
Summa
CHB
Cement
Sand
12mmØ RSB
10mmØ RSB
Tie Wire
4" CHB
LENGTH HEIGHT AREA
82.28 3.2 210.6368
CEMENT AND SAND FOR CHB MORTAR PER SQUARE
METER
AREA CEMENT (BAGS) SAND (CU.M.)
210.6368 166.82435 9.1627008
CEMENT AND SAND FOR PLASTERIN
AREA TOTAL AREA
210.6368 2 421.2736
REBARS (10 MM)
NO. OF CHB
VERTICAL (600MM) KGS
2632.96 450.23616 399.80971008
Tie wire
Area kgs
Ground 210.6368 12.0062976
Summa
CHB
Cement
Sand
12mmØ RSB
10mmØ RSB
Tie Wire
4" CHB
LENGTH HEIGHT AREA
45.3 3.2 144.96
CEMENT AND SAND FOR CHB MORTAR PER SQUARE
METER
AREA CEMENT (BAGS) SAND (CU.M.)
144.96 114.80832 6.30576
CEMENT AND SAND FOR PLASTERIN
AREA TOTAL AREA
144.96 2 289.92
REBARS (10 MM)
NO. OF CHB
VERTICAL (600MM) KGS
1812 309.852 275.148576
Tie wire
Area kgs
Ground 144.96 8.26272
Summa
CHB
Cement
Sand
12mmØ RSB
10mmØ RSB
Tie Wire
height Unit
1.20 19.00 =
=
=
=
=
=
height Unit
0.40 1.00 =
height Unit
1.30 19.00 =
1.30 - =
1.30 - =
1.30 - =
1.30 - =
1.30 - =
height Unit
0.30 19.00 =
- =
- =
- =
- =
- =
Total Volume =
height Unit
0.10 19.00 =
0.10 - =
0.10 - =
0.10 - =
0.10 - =
0.10 - =
0.10 1.00 =
0.10 1.00 =
Total Volume =
Length width
1.00 x 1.00
87.21 cu m
height Unit
0.20 19.00 =
- =
- =
- =
- =
- =
Total Volume =
height Unit
0.40 1.00 =
Total Volume =
height Unit
0.10 1.00 =
Total Volume =
height Unit
5.12 19.00 =
=
Total Volume =
height Unit
3.20 12.00 =
3.20 2.00 =
Total Volume =
height Unit
=
=
Total Volume =
height Unit
0.40 1.00 =
1.00 =
1.00 =
Total Volume =
height Unit
1.00 =
1.00 =
Total Volume =
height Unit
0.40 1.00 =
Total Volume =
width
x 1.00 x
width
x 1.00 x
width
x 1.00 x
width
x 0.80 x
x 0.10 x
x 0.03 x
x 1.00 x
x 1.10 x
BOTTOM
Width Length width
1.20 1.20 12.00
- - -
- - -
- - -
- - -
- - -
2 2 4
Stirrups
SECTION PERIMETER LENGTH
0.40 1.2 114.96
- 0 0
- 0 0
5 5 10
Stirrups
SECTION PERIMETER LENGTH
0.40 1.2 162.23
0 -
0 -
4 4 8
4 4 8
Stirrups
SECTION PERIMETER LENGTH
0.5 1.5 -
0.5 1.5 -
2 2 4
Stirrups
SECTION PERIMETER LENGTH
0.4 1.2 100.89
2 2 4
Stirrups
SECTION PERIMETER LENGTH
0.3 1 2.4
Long Side No. of Pieces Area
1.20 19.00 18.24
- - 0
- - 0
- - 0
- - 0
- - 0
18.24
1 4 0.2
0 0 0
1 4 0.2
0
Total Length Vertical(7) Horizontal (31.67)
4 28 126.68
0 0
3 3.5 0.25
6 3.5 0.25
4.7100 x 16.00
3.5796 x 20.00
9.8722 x
1.5783 x 56.00
NO. OF CHB
4278.272
Summary
4278.272 pcs
468.21408768 bags
25.84076288 cu m
649.647046656 kgs
695.749705728 kgs
19.50892032 kgs
NO. OF CHB
2632.96
Summary
2632.96 pcs
288.1511424 bags
15.9030784 cu m
399.80971008 kgs
428.18248704 kgs
12.0062976 kgs
NO. OF CHB
1812
Summary
pcs
bags
cu m
kgs
kgs
kgs
Volume
91.20
-
-
-
-
-
91.20
Volume
9.20
9.20
Volume
98.80
-
-
-
-
-
98.80
Volume
22.80
-
-
-
-
-
22.80
76.00
Volume
7.60
-
-
-
-
-
2.30
17.44
27.34
1.37
28.71
Area Depth Units
x 174.42 x 0.50 x 1.00 =
Volume
5.47
-
-
-
-
-
5.47
5.47
Volume
9.20
9.20
9.20
Volume
17.44
17.44
17.44
Volume
7.78
-
7.78
7.78
Volume
3.07
0.51
3.58
3.58
Volume
-
-
-
-
Volume
12.98
-
-
12.98
12.98
Volume
-
-
-
-
Volume
8.07
8.07
8.07
RIGHT SUPPORT
LEFT
BOTTOM No. of MIDSPAN
TOP BARS Length Main Bar Support(L/3
BARS Pieces (L/2)
)
4 2 114.96 1 4 76.64 114.96
Factor KGS
Bottom Short Span(10mm)
Round-off Total Length Factor KGS
0.616 429.77088 581.4 582 582 0.616 358.512
788.28
(L/0.125)
NO. OF TOTAL
Factor KGS
No. of Rebars No. of Ties Total No. PIECES LENGTH
of Rebars
40.96 1 40.96 19 933.888 0.617 575.778374
0 1 0 0 0 0.617 0
TOTAL LENGTH Factor KGS
339.968 1.578 536.58504
42.496 1.578 67.07313
(L/0.125)
NO. OF TOTAL
Factor KGS
No. of Rebars No. of Ties Total No. PIECES LENGTH
of Rebars
25.6 1 25.6 12 368.64 0.617 227.280937
25.6 1 25.6 2 61.44 0.617 37.8801562
(L/0.125)
NO. OF TOTAL
Factor KGS
No. of Rebars No. of Ties Total No. PIECES LENGTH
of Rebars
0 2 0 0 0 0.617 0
0 2 0 0 0 0.617 0
RIGHT SUPPORT
LEFT
BOTTOM No. of MIDSPAN
TOP BARS Length Main Bar Support(L/3
BARS Pieces (L/2)
)
10 5 162.23 1 4 594.84333333 892.265
- 1 4 0 0
- 1 4 0 0
RIGHT SUPPORT
LEFT
BOTTOM No. of MIDSPAN
TOP BARS Length Main Bar Support(L/3
BARS Pieces (L/2)
)
8 4 - 1 4 0 0
8 4 - 1 4 0 0
(L/0.125) NO. OF PIECES
TOTAL LENGTH Factor KGS
0 1 0 0.617 -
0 1 0 0.617 -
TOTAL = -
RIGHT SUPPORT
LEFT
BOTTOM No. of MIDSPAN
TOP BARS Length Main Bar Support(L/3
BARS Pieces (L/2)
)
4 2 100.89 1 4 67.26 100.89
Factor KGS
0.616 245.168 490.34 10MM
Factor KGS 724.30 12MM
0.888 370.88
Factor KGS
0.888 353.42
Factor KGS
0.616 245.168
Factor KGS
0.616 0 - 10MM
Factor KGS - 12MM
0.888 0
Factor KGS
0.888 0
Factor KGS
0.616 0
Factor KGS
0.616 0 - 10MM
Factor KGS - 12MM
0.888 0
Factor KGS
0.888 0
Factor KGS
0.616 0
Along S (12mmØ)
Total Length Factor Kgs 12mmØ
4.4 0.888 3.9072 6.8376
6.84 kg
Along S (12mmØ)
Total Length Factor Kgs 16mmØ
7.92 0.888 7.03296 10.94016
10.94 kg
Along S (12mmØ)
Total Length Factor Kgs 16mmØ
15.84 0.888 14.06592 19.92672
19.93 kg
Along S (12mmØ)
Total Length Factor Kgs 12mmØ
32 0.888 28.416 99.456
99.46 kg
Along S (12mmØ)
Total Length Factor Kgs 12mmØ
17.6 0.888 15.6288 35.1648
35.16 kg
Factor 12mmØ
0.888 174.2810112 174.28 kg
LEFT
TOP BARS BOTTOM BARS Length No. of Pieces Main Bar MIDSPAN (L/2)
Support(L/3)
4 2 2 1 4 1.33333333 2
Board Foot
Long Side 2(a+b)+0.20 Area A/2.88 No. of Plywoods (30.5) CWN
0.4 1.4 5.6 1.94444444 2 20.3333333 0.305
0 0.2 0 0 0 0 0
5.6 1.94444444 2 20.3333333 0.305
Bracing(17.5) Bd. Ft. CWN
70 224.68 3.3702
0 0 0
74.89333333 3.3702
Board Foot
Long Side 2(a+b)+0.20 Area A/2.88 No. of Plywoods (30.5) CWN
0.5 1.7 17.85 6.19791667 7 71.1666667 1.0675
0.5 1.7 35.7 12.3958333 13 132.166667 1.9825
53.55 18.59375 20 203.333333 3.05
CWN
0.8682916666667
0.87
CWN
0
0.00
CWN
0
0.00
Board Foot
A/2.88 No. of Plywoods (28) CWN
0.0694444444444 1 9.3333333 0.14
0.2638888888889 0.091628086 0.8338156 0.01250723
0.1180555555556 0.040991512 0.3730228 0.00559534
2.0833333333333 0.72337963 6.5827546 0.09874132
5.625 1.953125 17.773438 0.26660156
3.4833333333333 1.209490741 11.006366 0.16509549
5.02 45.90 0.69
= 452.16 kg
= 429.55 kg
= - kg
= 26.52 kg
908.23 kg
w/ 5% Waste = 953.64 kg
Volume
87.21
87.21
RIGHT
SPLICE Total
Support(L Factor KGS
(40D) Length
/3)
76.64 32.70 760.78 1.578 1,200.77
KG
RIGHT
SPLICE Total
Support(L Factor KGS
(40D) Length
/3)
594.843333 46.15 2,777.02 1.578 4,383.08
0 - - 0.000 -
0 - - 0.000 -
TOTAL = 4,383.08
RIGHT
SPLICE Total
Support(L Factor KGS
(40D) Length
/3)
0 - - 1.578 -
0 - - 1.578 -
TOTAL = -
RIGHT
SPLICE Total
Support(L Factor KGS
(40D) Length
/3)
67.26 28.70 667.67 1.578 1,053.81
TOTAL = 1,053.81
RIGHT
Support(L/3)
SPLICE (40D) Total Length Factor KGS
Ground Floor
No of
Section Perimeter Height
Pieces
Ground Floor C1 0.2 0.4 1.2 5.12 19.00
0 0 0 0 0 -
Second Floor C1 0.2 0.4 1.2 3.2 12
pc1 0.2 0.4 1.2 3.2 2
Third Floor C1 0 0 0 0 0
PC2 0 0 0 0 0
No of
Section Perimeter Length
Pieces
2nd floor Beams B1 0.2 0.4 1 162.23 1
0 0 0 0 - 1
0 0 0 0 - 1
3rd floor Beams B3, CB2 0 0 0 - 1
B4,CB3 0 0 0 - 1
Roof Beams RB1 0.2 0.4 1 100.89 1
Roofing = 188.276
2"x2"x1/4"
Angle Bar = 6.000 x 0.2000 x 16.00
1.5"x1.5"x1/4
" Angle Bar = 6.000 x 0.1520 x 20.00
16mmØ
Anchor 0.300 x 0.0503 x 56.00
Bolts =
w/ 5% Waste =
= 18.24 sq m
= - sq m
= 0.84 sq m
38.28 sq m
w/ 5% Waste = 40.20 sq m