Professional Documents
Culture Documents
SUMMARY
A. Materials Cost 59.17% Php 531,707.00
B. Labor Cost 27.03% Php 242,905.65
C. Plans & Specifications 3.45% Php 30,984.51
D. Contractor's Profit 10.34% Php 92,953.52
E. Total Construction Cost 100.00% Php 898,550.67
EIGHT HUNDRED NINETY EIGHT THOUSAND FIVE HUNDRED FIFTY & 67/100.