You are on page 1of 7

Quality Design and Construction Pvt. Ltd.

Kupondole-10, Lalitpur
Rate Sheet
A)Existing Building
It
Description Unit Rate(Nrs.) Amount Remarks
No
1 PLASTER WORKS
a) Wall Sft 70
b) Rain Dip Rft 65
2 Punning Works
a) Wall Sft 30
3 Painting Works
a) Internal Sft 40
b) External Sft 42
Quality Design and Construction Pvt. Ltd.
Kupondole-10, Lalitpur
Running Bill I
A)Existing Building Date:25 th Feb 2021
S.n Description Nos L B H Quanity Unit Rate
1 External Plaster
Back Side 1 54.5 13.08 712.86 Sft 70.00
1 17.33 4.08 70.71 Sft 70.00
1 8.33 5.5 45.82 Sft 70.00
1 9 6 54.00 Sft 70.00
Deduction
Door -1 3 8.25 -24.75 Sft 70.00
Window -1 4 1.5 -6.00 Sft 70.00
-1 4 4 -16.00 Sft 70.00
Terrace 1 32.75 6.25 204.69 Sft 70.00
Top 1 1 14 3.5 49.00 Sft 70.00
1 44.25 3.5 154.88 Sft 70.00
Terrace Top 1 22 2 44.00 Sft 70.00
Top Side 1 108.5 108.50 Rft 70.00
Door/Window Sill 1 19.5 19.50 Rft 70.00
1 27 27.00 Rft 70.00

2 Rain Dip
1 76.25 76.25 Rft 65.00

3 Punning
Back Side 1 54.5 13.08 712.86 Sft 30.00
1 17.33 4.08 70.71 Sft 30.00
Old GF Plastered Wall 1 54.5 10 545.00 Sft 42.00
Terrace 1 32.75 6.25 204.69 Sft 30.00
Top 1 1 14 3.5 49.00 Sft 30.00
1 44.25 3.5 154.88 Sft 30.00
Terrace Top 1 22 2 44.00 Sft 30.00

4 Plumbing Work
Pipe and fittings 1 1 1.00 LS 16030.00
Plumbing Charge 1 3 3.00 Nos 1500.00
Amount For Running Bill I 186553.69
te:25 th Feb 2021
Amount

49900.20
4949.45
3207.05
3780.00

-1732.50
-420.00
-1120.00
14328.13
3430.00
10841.25
3080.00
7595.00
1365.00
1890.00

4956.25

21385.80
2121.19
22890.00
6140.63
1470.00
4646.25
1320.00

16030.00
4500.00
186553.69
Quality Design and Construction Pvt. Ltd.
Kupondole-10, Lalitpur
Running Bill II
A)Existing Building Date:11 th March 2021
S.n Description Nos L B H Quanity Unit Rate
1 External Plaster
Terrace Top Bottom 1 38.5 38.50 Rft 70.00
Old GF Plastered Wall 1 41 10 410.00 Sft 70.00

2 Shed Plaster
1 28 3 84.00 Sft 60.00
1 10.5 3 31.50 Sft 60.00
1 12.67 3 38.01 Sft 60.00
1 4.5 1.75 7.88 Sft 60.00
1 2.16 2.25 4.86 Sft 60.00
1 3 2.25 6.75 Sft 60.00
1 4 2.25 9.00 Sft 60.00
1 2.25 2.25 5.06 Sft 60.00
1 2 2.25 4.50 Sft 60.00
1 11.75 3 35.25 Sft 60.00

3 Shed Punning
1 28 3 84.00 Sft 30.00
1 10.5 3 31.50 Sft 30.00
1 12.67 3 38.01 Sft 30.00
1 11.75 3 35.25 Sft 30.00

3 Outside
1 19.5 2.75 53.63 Sft 60.00

4 Boundary Wall
1 14 5.25 73.50 Sft 60.00
1 6.5 4 26.00 Sft 60.00
1 25.5 2.5 63.75 Sft 60.00
1 63.5 4.415 280.35 Sft 60.00

5 4'' Wall Addition


1 33 1.33 43.89 Sft 185.00
1 32 1.33 42.56 Sft 185.00
1 14 1 14.00 Sft 185.00

7 Painting Works
a Main Building
Back Side 1 54.5 13.08 712.86 Sft 42.00
1 17.33 4.08 70.71 Sft 42.00
1 8.33 5.5 45.82 Sft 42.00
1 9 6 54.00 Sft 42.00
Terrace 1 32.75 6.25 204.69 Sft 42.00
Top 1 1 14 3.5 49.00 Sft 42.00
1 44.25 3.5 154.88 Sft 42.00
Terrace Top 1 22 2 44.00 Sft 42.00
Top Side 1 108.5 108.50 Sft 42.00
Old GF Plastered Wall 1 54.5 10 54.50 Sft 42.00
b Shed
1 28 7.5 28.00 Sft 40.00
1 10.5 7.5 10.50 Sft 40.00
1 12.67 7.5 12.67 Sft 40.00
1 4.5 1.75 4.50 Sft 40.00
1 2.16 2.25 2.16 Sft 40.00
1 3 7.5 3.00 Sft 40.00
1 4 7.5 4.00 Sft 40.00
1 2.25 2.25 2.25 Sft 40.00
1 2 2.25 2.00 Sft 40.00
1 11.75 7.5 11.75 Sft 40.00
c Boundary wall
1 14 5.25 14.00 Sft 42.00
1 6.5 4 6.50 Sft 42.00
1 25.5 2.5 25.50 Sft 42.00
1 63.5 4.415 63.50 Sft 42.00

8 Additional
Soil 2 2.00 Trip 2500.00
Labour 11 11.00 Nos 1000.00

Total Amount 185870.9938


Running I+Running II 372424.6838
Advance Amount 300000
Amount For Running Bill I 72424.68
te:11 th March 2021
Amount

2695.00
28700.00

5040.00
1890.00
2280.60
472.50
291.60
405.00
540.00
303.75
270.00
2115.00

2520.00
945.00
1140.30
1057.50

3217.50

4410.00
1560.00
3825.00
16821.15

8119.65
7873.60
2590.00

29940.12
2969.67
1924.23
2268.00
8596.88
2058.00
6504.75
1848.00
4557.00
2289.00

1120.00
420.00
506.80
180.00
86.40
120.00
160.00
90.00
80.00
470.00

588.00
273.00
1071.00
2667.00

5000.00
11000.00

185870.9938
372424.6838
300000
72424.68