S.

L Name of Item Unit Anower Sazzad Salahuddi Remar


Md. Ali Selim Jahid Siraj
L.M vai n
1 Layout sft 2 2.00 1.5 1.5 1.50 4000 2.00  
2 Leveling &Dressing sft 2 5.00 2.5 1.50 2.00 3.00  
3 Earth Excavation cft 7.5 10.00 6 10.00 8.00 8.00 7.50  
4 Brick flat soling sft 3.5 4.00 3.5 3.00 2.00 4.00  
5 Earth filling cft 4 3.5 6.00 3.00 2.00  
6 Polything laying sft 0.5 1.00 1.00 0.5 1.00 0.30 0.80  
10 15.00
7 C.C casting sft 10.00 7.00 8.00 7.00
6.50  
8 Casting (mixture machine) cft 21 25.00 24.00 25 18.00 23.00  
Casting (Ready mix without
9 cft 14.00 12
pump) 10.58  
10 Casting (Ready mix with pump) cft 7.00 7.00 8 7.00 7.00  
Shutter (cleaning, oil, fitting & 18
11 sft 22.00 23.00 20 18.00 18.50
opening)  
12 Chipping sft 2.5 2.00 1.50 2.00 1.50  
13 Brick wall (5") sft 11.5 14.00 14.00 13.00 12.16 12.00  
14 Brick wall (10") cft 17 18.00 18.00 18.00 17.36 14.00  
Ceramic Brick (10") both side 70
15 sft 58.00 70.00 55.00
flash  
16 Ceramic Brick (5") sft 40 38.00 40.00 45.00  
17 Rule Pointing sft 10 25.00 10.00 50.00  
Plaster inside (including R.C.C 11 11.00
18 sft 12 14.00 12 11.00
surface chipping)
Plaster outside (including 15.00
19 R.C.C surface chipping & sft 18 14.00 18
scaffolding)
20 Scaffolding sft 8 5.00 7.00 10.00 2.00
21 Plaster (Cobla) rft 4 11.00 13.00 9.00 13.50 8.00  
Nosing at the edge of 6
22 rft 11.00 15.00 9.00 8.00
sunshade 3.00  
23 Grove Plaster rft 6 11.00 13.00 8.00 3.00 8.00  
24 Design Plaster rft 10 25.00 15.00 15.00 18.00 10.00  
25 Neat cement finishing sft 3 4.00 3.50 3.00 2.00 4.00  
26 Rod binding (with G.I wire) kg 5.5 6.00 6.0 6.00 4.5 4.50  
Staging or tressing (if slab 10 sft
27 sft 10.00 10 10.0 7 4.00
height above 15'-0")  
28 Door frame fitting nos 300 300.00 350 250.00 250.00 250.00  
29 Grill fitting at window sft 11 10.00 8.0 10.00 11.00 8.50  
30 Water barrier for slab curing rft 2 3.00 3.0 3.00 1.00 3.00  
31 Brick Soaking nos .6 1.50 0.5 0.6 0.50  
32 Sand Washing & netting cft 5 4.00 4.00 2.50  
33 Safety fencing sft 2.00 3.00  
34 Block making 3/4" nos 1 0.50 1.00 0.5 1.00  
35 Block making (pipe block 4-6") nos 2.5 3.00 2.00 3.00 1.50 3.00  
36 RCC Dismental cft 90 100.00 110.00 60.00 170.00 96.00  
37 Brick work Dismental cft 2 45.00 11.00 20.00  
38 Daily Mason nos 550 700.00 650 650.00  
39 Helper/Labour nos 450 500.00 450 450.00  

Terms and Conditions:

1. NTCL will provide Roof hoist, Mixture Machine, Vibrator machine, Welding machine, Plate Compactor, Mud pump, Rod,
Cement, Sand, Stone Chips, Brick, Brick chips, Water, Chemical, Electrode rod,Bucket, Drum, Ropes, Polythine,Cup brush,
old Mobil, Foam, Labor shade, Electricity and all Shuttering materials.
2. The Sub-Contractor will provide Rod cutting machine, granding machine and other equipment if needed.
3. All machine operator (Roof hoist, Mixture machine, Welding machine, Rod cutting machine) supply by sub-contractor.
4. NTCL will provide Curing man.
5. Spade, Shovel, Rupban Sheet, All Nails, 24 no Gi wire& others materials supply by sub-contractor.
6. 4% will increase for every floor from 1st Floor.
7. Tk.300 (Three Hundred) will be given per day per worker for day.
8. 10% Security money deduction from each running bill which will be paid after 3 months of completion of the project.
9. No intermediate enhancement in rate will be allowed till completion of the project.
10. All incidental expenses are to be borne by the sub-contractor. NTCL will not pay any compensation, donation to the
workers for any fatal incidents or any incidental expenses.
11. The sub-contractor is fully responsible for the safety and security of his employed workers and shell bear all legal
consequences, if any.
12. Work should be as per Drawing for any faulty and defective works done by the sub-contractor shall be rectified by the
sub-contractor at his own cost.
13. Before brick work, bricks must be wet 24 hours in the water house.
14. Rate of any non-schedule items of works (if any) shell be settled by mutual consent of both the parties as per market
rate.
15. Final bill will be made only after satisfactory completion of work.
16. Management reserves the right to cancel the contract at any time or stages of the work/item are satisfactory.
17. If the sub-contractor failure to complete the work, security money will be not paid & that balance work will be done by
the other contractor.
18. Sub-contractor must clean site area every day after finish the work by his own expenses and responsibility as per
instruction of Engineer-in-charge, rubbish/dust will be removed to the specific space area if sub-contractor failure to
clean the site area. NTCL will take responsibility to clean &that expenses will deduct from the sub-contractor’s bill.