EASTERN RAILWAY, HOWRAH

1200 SEATING ARRANGEMENT AUDITORIUM AT BURN STANDARD BLDG


out Side Work
A Land Development Work

SL
DESCRIPTION OF ITEM NO. L (m) B (m) H (m) Area(m2) Unit
NO.

1 Gradening Area 1 125.50 16.81 2110.07


1 60.40 31.25 1887.50
1 30.00 20.00 600.00
4597.57 Sq.M.
2 Proposed Lawn Area 1 14.50 26.50 384.25
1 18.80 25.50 479.40
863.65 Sq.M.
3 Car Parking Area 1 93.50 30.83 2882.14
1 20.28 17.20 348.73
1 20.28 21.65 438.95
1 18.78 15.78 296.18
1 34.78 13.50 469.46
1 63.63 22.00 1399.75
1 62.00 5.50 341.00
1 72.50 57.10 4139.75
10315.96 Sq.M.
B Brick Drain with Cover

SL
DESCRIPTION OF ITEM NO. L (m) B (m) H (m) Area(m2) Unit
NO.

length as per Boundary Wall(753M)


1 Earth Work
1.0 753.0 0.9 0.675 457.45 Cum

2 S.B.F.S. 1.0 753.0 0.9 677.70 Sq.M.


3
Ordinary Cement Concrete , M-20
Base 1.0 753.0 0.9 0.1 67.77 Cum
4 250mm Brick Work
1.0 753.0 0.25 0.5 94.13 Cum
5 125mm Brick Work
1.0 753.0 0.5 376.50 Sq.M.
6 Plastering
Inside 2.0 753.0 0.5 753.00
Base 1.0 753.0 0.5 376.50
1129.50 Sq.M.

7 Neat Cement
Same As Plaster 1129.50 Sq.M.

8 Shuttering
1.0 753.0 0.525 395.33
2.0 753.0 0.2 301.20
696.53 Sq.M.
9 Concrete : M20
1.0 753.0 0.9 0.110 74.55 Cum
10 Reinforcement 5851.94 Kg
C Fire Tank, 2No-4.0mX7.0mX2.0m(clr)

SL
DESCRIPTION OF ITEM NO. L (m) B (m) H (m) Area(m2) Unit
NO.

1 Earth Work
Footing Size:- 2.0 4.5 7.5 2.6 175.50 Cum

2 Sand Filling 2.0 4.5 7.5 0.075 5.06 Cum


3 S.B.F.S. 2.0 4.5 7.5 67.50 Sq.M.

4 Hire & Labour Charges


Footing 4.0 24 0.125 12.00
Slab 2.0 24 0.175 8.40
2.0 4.5 7.5 67.50
87.90 Sq.M.

5 Ordinary Cement Concrete , M-20


Footing slab 2.0 4.50 7.5 0.125 8.44
Top Slab 2.0 4.50 7.5 0.1754 11.84
20.28 Cum

6 Reinforcement
1.15% Of Concrete Volume 1830.5 Kg
1.83 M.T.

7 250mm Brick Work


2.0 30.25 0.25 2.15 32.52 Cum

8 Plastering
Outer Face 2.0 28.00 2.15 120.40
Base 2.0 4.0 7.0 56.00
176.40 Sq.M.

9 Neat Cement 176.40 Sq.M.

10 7 M.T. manhole 6 Nos

D Brick Drain With Cover


SL
DESCRIPTION OF ITEM NO. L (m) B (m) H (m) Area(m2) Unit
NO.

140m Brick Drain


1 Earth Work
1.0 140.0 0.9 0.675 85.05 Cum

2 S.B.F.S. 1.0 140.0 0.9 126.00 Sq.M.


3 Ordinary Cement Concrete , M-20
Base 1.0 140.0 0.9 0.1 12.60
4 250mm Brick Work
2.0 140.0 0.25 0.5 35.00 Cum

5 Plastering
Inside 2.0 140.0 0.5 140.00
Base 1.0 140.0 0.5 70.00
210.00 Sq.M.
6 Neat Cement
Same As Plaster 210.00 Sq.M.
7 Shuttering
1.0 140.0 0.525 73.50
2.0 140.0 0.2 56.00
129.50 Sq.M.
8 Concrete : M20
1.0 140.0 0.9 0.110 13.86 Cum
9 Reinforcement 1088.01 Kg

753m Length Boundary Wall

SL
DESCRIPTION OF ITEM NO. L (m) B (m) H (m) Area(m2) Unit
NO.

1 Earth Work
Footing Size:-1.05x1.05x1.05 215.0 1.05 1.05 1.05 248.89
Tie Beam 1.0 527.25 0.25 0.3 39.54
288.43 Cum
2 Earth Work in Filling 190.3659 Cum
3 S.B.F.S. 215.0 1.05 1.05 237.04
1.0 527.25 0.25 131.81
368.85 Sq.M.
4 Hire & Labour Charges
Footing 215.0 4.2 0.15 135.45
Pedestal 215.0 1.6 0.525 180.60
Column 215.0 1.0 1.5 322.50
Tie Beam 1.0 753.0 0.3 225.90
864.45 Sq.M.
5 Ordinary Cement Concrete , M-20
Footing 215.0 1.05 1.05 0.175 41.48
Pedestal 215.0 0.40 0.4 0.525 18.06
Column 215.0 0.25 0.25 1.5 20.16
Tie Beam 1.0 753.00 0.25 0.3 56.48
136.17 Cum

6 Reinforcement
1.15% Of Concrete Volume 12293.0 Kg
12.293 M.T.

7 250mm Brick Work


1.0 699.25 0.25 0.3 52.44 Cum
8 125mm Brick Work
1.0 699.25 1.2 839.10 Sq.M.

9 Plastering
Outer Face 1.0 753.00 1.5 1129.50
Inside 1 806.75 1.5 1210.13
Top 1 806.75 0.25 201.69
2541.31 Sq.M.
10 Neat Cement
both side 2.0 753.00 0.6 903.60
11 Primer
Same As Plaster 1637.71 Sq.M.

12 Paint 1637.71 Sq.M.

ROAD WORK

SL
DESCRIPTION OF ITEM NO. L (m) B (m) H (m) Area(m2) Unit
NO.

1 Road Surface Area


1 104.50 8.50 888.25
1 90.40 8.50 768.40
1 62.51 8.50 531.37
1 6.00 8.50 51.00
1 76.43 8.50 649.61
1 16.10 8.50 136.85
1 54.51 8.50 463.37
1 36.51 9.45 345.06
1 15.80 8.50 134.30
1 23.60 9.00 212.40
1 8.00 10.50 84.00
1 12.00 9.50 114.00
4378.61 Sq.M.
SULLAGE, SEWERAGE, RAIN WATER PIPE
SL Total
DESCRIPTION OF ITEM NO. L (m) Unit
NO. Length(m)
SULLAGE PIPE LINE
1 150/230/250 mm Dia Pipe 1 21.85 21.85
1 121.73 121.73
1 67.45 67.45
1 41.50 41.50
1 8.00 8.00
1 25.50 25.50
1 7.00 7.00
2 3.00 6.00
1 12.50 12.50
1 9.00 9.00
4 4.50 18.00
338.53 Mtr.

SEWERAGE PIPE LINE


1 150/230/250 mm Dia Pipe 1 44.70 44.70
1 67.82 67.82
1 87.74 87.74
1 9.00 9.00
1 25.50 25.50
2 4.00 8.00
1 8.00 8.00
2 63.20 126.40
1 7.50 7.50
4 8.00 32.00
1 12.00 12.00
6 7.50 45.00
473.65 Mtr.

RAIN WATER PIPE LINE


1 75/110/150 Mm Dia Pipe 1 24.50 24.50
1 15.03 15.03
1 4.95 4.95
1 6.73 6.73
1 29.98 29.98
1 8.18 8.18
1 4.10 4.10
1 10.30 10.30
1 8.60 8.60
1 34.25 34.25
1 33.50 33.50
1 5.70 5.70
2 4.80 9.60
1 3.00 3.00
1 5.60 5.60
1 17.50 17.50
1 3.10 3.10
1 5.20 5.20
1 3.20 3.20
3 7.50 22.50
5 4.20 21.00
276.50 Mtr.

Total No Of Pit
1 IP(W) 45
2 IP(S) 40
3 RAIN WATER PIPE 40
Total 125 NoS

Inspection pit

SL
DESCRIPTION OF ITEM NO. L (m) B (m) H (m) Area(m2) Unit
NO.

1 Gully Pipt /3M.T./12M.T./25M.T. 178.0 Nos

Septic Tank, 2No-5.0mX15.0mX2.0m(clr)


SL
DESCRIPTION OF ITEM NO. L (m) B (m) H (m) Area(m2) Unit
NO.

1 Earth Work
Footing Size:-1.05x1.05x1.05 2.0 15.5 5.5 2.6 443.30 Cum

2 Sand Filling 2.0 15.5 5.5 0.075 12.79 Cum

3 S.B.F.S. 2.0 15.5 5.5 170.50 Sq.M.

4 Hire & Labour Charges


Footing 4.0 42 0.125 21.00
Slab 2.0 42 0.175 14.70
2.0 15.5 5.5 170.50
206.20 Sq.M.

5 Ordinary Cement Concrete , M-20


Footing slab 2.0 15.50 5.5 0.125 21.31
Top Slab 2.0 15.50 5.5 0.1754 29.91
51.22 Cum

6 Reinforcement
1.15% Of Concrete Volume 4623.7 Kg
4.62 M.T.
7 250mm Brick Work
2.0 46.25 0.25 2.15 49.72 Cum
8 Plastering
Outer Face 2.0 50.00 2.15 215.00
Base 2.0 15.0 5.0 150.00
365.00 Sq.M.

9 Neat Cement 365.00 Sq.M.


ok
10 7 M.T. manhole 6 Nos

U.G.- Small, 2No-3.125mX4.0mX2.0m(clr)

SL
DESCRIPTION OF ITEM NO. L (m) B (m) H (m) Area(m2) Unit
NO.

1 Earth Work
Footing Size: 2.0 3.625 4.5 2.6 84.83 Cum

2 Sand Filling 2.0 3.625 4.5 0.075 2.45 Cum

3 S.B.F.S. 2.0 3.625 4.5 32.63 Sq.M.

4 Hire & Labour Charges


Footing 4.0 16.25 0.125 8.13
Slab 2.0 16.25 0.175 5.69
2.0 3.625 4.5 32.63
46.44 Sq.M.

5 Ordinary Cement Concrete , M-20


Footing slab 2.0 3.625 4.5 0.125 4.08
Top Slab 2.0 3.625 4.5 0.175 5.71
9.79 Cum

6 Reinforcement
1.15% Of Concrete Volume 883.6 Kg
0.88 M.T.

7 250mm Brick Work


2.0 19.50 0.25 2.15 20.96 Cum

8 Plastering
Outer Face 2.0 22.25 2.15 95.68
Base 2.0 3.1 4.0 25.00
120.68 Sq.M.

9 Neat Cement 120.68 Sq.M.

10 7 M.T. manhole 4 Nos

U.G.- Big, 1No-5mX10.0mX2.0m(clr)

SL
DESCRIPTION OF ITEM NO. L (m) B (m) H (m) Area(m2) Unit
NO.

1 Earth Work
Footing Size: 1.0 10.5 5.5 2.6 150.15 Cum
2 Sand Filling 1.0 10.5 5.5 0.075 4.33 Cum
3 S.B.F.S. 1.0 10.5 5.5 57.75 Sq.M.
4 Hire & Labour Charges
Footing 2.0 32.0 0.125 8.00
Slab 1.0 32.0 0.175 5.60
1.0 10.5 5.5 57.75
71.35 Sq.M.
5 Ordinary Cement Concrete , M-20
Footing slab 1.0 10.500 5.5 0.125 7.22
Top Slab 1.0 10.500 5.5 0.175 10.11
17.33 Cum
6 Reinforcement
1.15% Of Concrete Volume 1564.0 Kg
1.56 M.T.
7 250mm Brick Work
1.0 36.25 0.25 2.15 19.48 Cum
8 Plastering
Outer Face 1.0 43.00 2.15 92.45
Base 1.0 10.5 5.5 57.75
150.20 Sq.M.
9 Neat Cement 150.20 Sq.M.
10 7 M.T. manhole 3 Nos

Fire Line Inlet & Outlet Pipe Line

SL LENGTH Total
NO. DESCRPTION OF ITEM NO. (m) Length(m) Unit
1 U.G.R. TO Pump
1 22.00 22.0
1 7.00 7.0
1 14.00 14.0
2 3.00 6.0
1 5.00 5.0
54.00 Mtr.

2 Pump To Distribution Line


2 136.5 273.0
2 90.0 180.0
1 18.0 18.0
1 11.0 11.0
1 7.0 7.0
489.0 Mtr.
110mm Pipe Connection For W.C.

SL LENGTH BREADTH Total


NO. DESCRPTION OF ITEM NO. (m) (m) Length(m) Unit
Ground Floor
1 W.C. Connection(all Floor) 160 1.50 240.00
4 4.50 18.00
4 7.50 30.00
6 3.50 21.00
3 4.00 12.00
321.0 Mtr.

1st Floor Floor


4 6.0 24.0
4 3.5 14.0
2 7.0 14.0
6 3.5 21.0
3 4.0 12.0
85.0 Mtr.
2nd Floor Floor
4 6.0 24.0
4 3.5 14.0
2 7.0 14.0
6 3.5 21.0
3 4.0 12.0
85.0 Mtr.
3rd Floor Floor
4 6.0 24.0
4 3.5 14.0
2 7.0 14.0
6 3.5 21.0
3 4.0 12.0
85.0 Mtr.
4th Floor Floor
4 6.00 24.00
4 3.50 14.00
2 7.00 14.00
6 3.50 21.00
3 4.00 12.00
85.0 Mtr.

EASTERN RAILWAY, HOWRAH


1200 SEATING ARRANGEMENT AUDITORIUM AT BURN STANDARD BLDG
160mm Pipe Connection For W.C.

SL LENGTH BREADTH Total


NO. DESCRPTION OF ITEM NO. (m) (m) Length(m) Unit
For Exposed Connection
4 18.00 72.00
6 13.50 81.00
8 11.00 88.00
16 7.00 112.00

Rain Water pipe connctin roof to ground 15 24.50 367.50


Side connection of shed 2 115.00 230.00
2 45.00 90.00
1040.5 Mtr.