You are on page 1of 159

DESIGN CALCULATION FOR MCR

BUILDING FOR 4.1 MW AT


MEDINIPUR,W.B.

DESIGN CALCULATION

FOR

MCR BUILDING DESIGN WITH STAAD

PROJECT

DEVELOPMENT OF 4.1 MW SOLAR POWER PLANT


M/S DALMIA CEMENT (BHARAT) LTD MEDINIPUR,W.B.

DOC NO. – RPEPL-BCW-ME-4.1MW-ED-CRA-F11-01

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 1 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

CLIENT

DPM (DALMIA CEMENT)BHARAT

EPC
RAYS POWER EXPERT PVT.LTD, JAIPUR

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 2 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

0 30/09/20 FOR
M.A M.A M.A
APPROVAL
REV INTLS SGN INTLS SGN INTLS SGN
DATE STATUS
NO PRPD. BY CHKD. BY APPR. BY

CONTENTS

1. GENERAL............................................................................................................................... 5
1.1. SCOPE........................................................................................................................................ 5
RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 3 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

1.2. UNITS OF MEASUREMENTS..................................................................................................... 5

1.3. CODES AND REFERENCES...................................................................................................... 5

1.4. MATERIAL PROPERTIES........................................................................................................... 6

1.5. PLANT SITE INFORMATION....................................................................................................... 6

1.6. SOFTWARE REFERENCE.......................................................................................................... 6

2. DESCRIPTION OF STRUCTURE & GEOMETRY..................................................................6


3. DESIGN PHILOSOPHY.......................................................................................................... 6
3.1 BASIC LOADS.............................................................................................................................. 7

3.2 LOAD CASES............................................................................................................................... 8

4. DESIGN OF RC ELEMENTS................................................................................................11
4.1 3D VIEW..................................................................................................................................... 11

4.2 STAAD MODEL........................................................................................................................... 11

4.3 STAAD LOADING....................................................................................................................... 12

4.4 DESIGN OF COLUMNS............................................................................................................. 15

4.5 DESIGN OF PLINTH AND ROOF BEAMS.................................................................................15

4.6 INPUT STAAD FILE.................................................................................................................... 17

CONCRETE DESIGN
ANNEXURE -A (Foundation Design)

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 4 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

1. GENERAL

1.1. SCOPE
This document covers the Analysis and Design of MCR building for Development of4.1 MW
proposed Solar Power project at Medinipur,W.B.The objective of this document is to design
the Foundations, Columns, Beams and Slab of MCR building.

1.2. UNITS OF MEASUREMENTS


SI unit system is used for measurements in the analysis.

1.3. CODES AND REFERENCES


The following codes and references have been referred for the design of MCR

Project Reference Drawings / Documents


1 Geo-technical Investigation
Indian Standard Codes
2 IS 456 – 2000 Plain and Reinforced Concrete –Code of Practice
3 IS 1893-2016 Code for Criteria for Earthquake Resistant
4 IS 875: Part 1 & 2 Code of practice for the design loads for buildings
and structures-
5 IS 875: Part 3-2015 Code of practice for the design loads for buildings
and structures- Wind Loads
6 IS 1893: 2002 Code of practice for reinforced concrete structures
subjected to seismic forces.

1.4. MATERIAL PROPERTIES

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 5 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Material Property Value Units

Density 25 kN/cum
N/sq
Concrete, Characteristic Strength 25
mm
M25
N/sq
Modulus of Elasticity 25000
mm
Specification IS 13920
High Strength Density 78.5 kN/cum
Reinforcing
N/sq.m
Steel Characteristic Strength 415
m
(TMT)
N/sq.m
Modulus of Elasticity 200000
m
Specification IS 1786

1.5. PLANT SITE INFORMATION

Location of site : MEDINIPUR,W.B.

Basic wind speed : 50 m/s (180 km/h). (As per IS 875-Part 3 - 2015)
1.6. SOFTWARE REFERENCE
STAAD - Pro, Research Engineers Inc., Berkely, USA
In-house developed Ms-Excel Sheets.
The above software packages are used for the structural analysis and the same are carried
out in this document.

2. DESCRIPTION OF STRUCTURE & GEOMETRY

The MCR building is a Single Story RCC framed structure of length 5.0 m, breadth 5.0 m (both
from center to center of columns) and height 3.5 m (from Finished Floor Level to the top of
roof slab).

3. DESIGN PHILOSOPHY

The MCR building is designed using the structural analysis software package STAAD.Pro V8i
and in-house MS-Excel Sheets. The analysis is performed for self-weight of structural
members, other Dead Load on the members, Live Load & Seismic Loads. Various possible
load combinations of the above loads are listed in section 4.3 in accordance with IS-456:2000.

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 6 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

3.1 BASIC LOADS


DEAD LOAD
Self-Weight:
Self-weight of Beams, Columns be calculated by STAAD.Pro inbuilt command.
Wall Loads:
On plinth beams for 230mm thick Brick wall = 3.2 * 0.23 * 19.2 = 14.13 kN/m (External wall)
On plinth beams for 115mm thick Brick wall = 3.2 * 0.115 * 19.2 = 7.065 Kn/m (Internal Wall)
Roof Loads:
Load has been considered as per the specification
1) Floor load (Slab Load) = 0.15*25 = 3.75 KN/sqm
2) Self-weight of the 50mm thk. Screed concrete + 50mm THK. Plaster (Finishing)
(For PCC) = 2.15 KN/sqm (Defined as Floor Load in STAAD)
3) Load due to Parapet Wall =1.2*0.115*19 = 2.622 KN/m.
4) Water Tank = (1.0*9.8) /(2.762*2.863) (Area load) = 1.2 KN/sqm

LIVE LOAD
Live Load = 1.5 kN/m2

WIND LOAD
Wind Load on structure is calculated as per IS: 875 (Part-III)-2015. The Wind load have been
defined in STAAD for intensity of 1.075 KN/sqm.

3.2 LOAD CASES


Load Case -1: Dead Load (DL)
Load Case -2: Live Load (LL)
Load Case -3: Wind Load in +X-dir
Load Case -4: Wind Load in -X-dir

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 7 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Load Case -5: Wind Load in +Z-dir


Load Case -6: Wind Load in -Z-dir
LOAD COMBINATIONS

Limit State of serviceability


LOAD COMB 101 1*DL+1*LL
LOAD COMB 102 1*DL+0.8*LL
LOAD COMB 103 1*DL+0.8*LL
LOAD COMB 104 1*DL+0.8*LL
LOAD COMB 105 1*DL+0.8*LL
LOAD COMB 106 1*DL+1*WX
LOAD COMB 107 1*DL+1*-WX
LOAD COMB 108 1*WZ+1*DL
LOAD COMB 109 1*-WZ+1*DL
LOAD COMB 110 0.8*WX+1*DL+0.8*LL
LOAD COMB 111 0.8*-WX+1*DL+0.8*LL
LOAD COMB 112 0.8*WZ+1*DL+0.8*LL
LOAD COMB 113 0.8*-WZ+1*DL+0.8*LL

Limit State of collapse/Strength


LOAD COMB 201 1.5*DL+1.5*LL
LOAD COMB 202 1.2*DL+1.2*LL
LOAD COMB 203 1.2*DL+1.2*LL
LOAD COMB 204 1.2*DL+1.2*LL
LOAD COMB 205 1.2*DL+1.2*LL
LOAD COMB 206 1.5*WX+1.5*DL
LOAD COMB 207 1.5*-WX+1.5*DL
LOAD COMB 208 1.5*WZ+1.5*DL
LOAD COMB 209 1.5*-WZ+1.5*DL
LOAD COMB 210 1.5*WX+0.9*DL
LOAD COMB 211 1.5*-WX+0.9*DL
RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 8 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

LOAD COMB 212 1.5*WZ+0.9*DL


LOAD COMB 213 1.5*-WZ+0.9*DL
LOAD COMB 214 1.2*WX+1.2*DL+1.2*LL
LOAD COMB 215 1.2*-WX+1.2*DL+1.2*LL
LOAD COMB 216 1.2*WZ+1.2*DL+1.2*LL
LOAD COMB 217 1.2*-WZ+1.2*DL+1.2*LL

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 9 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

4. DESIGN OF RC ELEMENTS

4.1 3D VIEW

4.2 STAAD MODEL

FIGURE – 2: CENTRE LINE MODEL

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 10 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

4.3 STAAD LOADING

DEAD LOAD

LIVE LOAD

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 11 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

WIND LOAD ON BUILDING IN +X DIRECTION

WIND LOAD ON BUILDING IN -X DIRECTION

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 12 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

WIND LOAD ON BUILDING IN +Z DIRECTION

WIND LOAD ON BUILDING IN -Z DIRECTION

4.4 DESIGN OF COLUMNS


RCC Columns for building frames are being automatically designed by using suitable design
column command in STAAD.Pro following the relevant standard IS: 456 – 2000.

4.5 DESIGN OF PLINTH AND ROOF BEAMS


Plinth and roof beams for building frames are being designed by STAAD.Pro automatically

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 13 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

using the suitable command following the relevant clauses of IS: 456 – 2000.

4.6 STAAD INPUT


1. STAAD SPACE DXF IMPORT OF FIRST 123.DXF INPUT FILE 7-10-2021\mcr first.STD
2. START JOB INFORMATION
3. ENGINEER DATE 11-OCT-21
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. UNIT MMS KN
7. JOINT COORDINATES
8. 1 3027.5 0 -6.67; 2 3027.5 0 2520.83; 3 3192.5 0 6663.33; 4 3192.5 0 4135.83
9. 7 6270 0 -6.67; 9 6270 0 4135.83; 10 6270 0 6663.33; 11 8.991E-013 0 6663.33
10. 12 8.991E-013 0 4135.83; 16 1.991E-013 0 -6.67; 17 3027.5 1500 -6.67
11. 18 3027.5 1500 2520.83; 19 3192.5 1500 6663.33; 20 3192.5 1500 4135.83
12. 21 1578 1500 -6.67; 22 1578 1500 2520.83; 23 6270 1500 -6.67
13. 24 6270 1500 2520.83; 25 6270 1500 4135.83; 26 6270 1500 6663.33
14. 27 8.991E-013 1500 6663.33; 29 4.991E-013 1500 4135.83
15. 31 1.991E-013 1500 2520.83; 32 1.991E-013 1500 -6.67; 33 3027.5 4700.01 -6.67
16. 34 3027.5 4700.01 2520.83; 35 3192.5 4700.01 6663.33
17. 36 3192.5 4700.01 4135.83; 37 1578 4700.01 -6.67; 38 1578 4700.01 2520.83
18. 39 6270 4700.01 -6.67; 40 6270 4700.01 2520.83; 41 6270 4700.01 4135.83
19. 42 6270 4700.01 6663.33; 43 8.991E-013 4700.01 6663.33
20. 45 4.991E-013 4700.01 4135.83; 47 1.991E-013 4700.01 2520.83
21. 48 1.991E-013 4700.01 -6.67
22. MEMBER INCIDENCES
23. 20 1 17; 21 2 18; 22 3 19; 23 4 20; 26 7 23; 28 9 25; 29 10 26; 30 11 27
24. 31 12 29; 33 16 32; 34 17 18; 35 19 20; 36 21 22; 37 23 24; 38 24 25; 39 25 26
25. 40 27 29; 41 29 31; 42 31 32; 43 22 18; 44 17 23; 45 31 22; 46 18 24; 47 20 29
26. 48 26 19; 49 17 21; 50 21 32; 51 20 25; 52 19 27; 53 17 33; 54 18 34; 55 19 35
27. 56 20 36; 59 23 39; 61 25 41; 62 26 42; 63 27 43; 64 29 45; 66 32 48; 67 33 34
28. 68 35 36; 69 37 38; 70 39 40; 71 40 41; 72 41 42; 73 43 45; 74 45 47; 75 47 48
29. 76 38 34; 77 33 39; 78 47 38; 79 34 40; 80 36 45; 81 42 35; 82 33 37; 83 37 48
30. 84 36 41; 85 35 43
31. ELEMENT INCIDENCES SHELL
32. 86 17 18 22 21; 87 17 18 24 23; 88 19 20 25 26; 89 24 25 29 31; 90 33 34 38 37
33. 91 33 34 40 39; 92 35 36 41 42; 93 40 41 45 47; 94 48 47 38 37; 95 32 21 22 31
34. 96 27 19 20 29; 97 45 43 35 36
35. ELEMENT PROPERTY
36. 86 TO 97 THICKNESS 150
37. DEFINE MATERIAL START
38. ISOTROPIC CONCRETE
39. E 21.7184
40. POISSON 0.17
41. DENSITY 2.36158E-008
42. ALPHA 5E-006
43. DAMP 0.05
44. TYPE CONCRETE
45. STRENGTH FCU 0.0275789
46. END DEFINE MATERIAL
47. MEMBER PROPERTY AMERICAN
48. 34 TO 52 67 TO 85 PRIS YD 300 ZD 300
49. 20 TO 23 26 28 TO 31 33 53 TO 56 59 61 TO 64 66 PRIS YD 300 ZD 300
50. CONSTANTS
51. MATERIAL CONCRETE ALL
52. SUPPORTS
53. 1 TO 4 7 9 TO 12 16 FIXED
54. UNIT METER KN
55. DEFINE WIND LOAD.

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 14 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

56. TYPE 1 WX
57. INT 1 1.5 HEIG 10 20
58. UNIT MMS KN
59. LOAD 1 LOADTYPE DEAD TITLE DL
60. MEMBER LOAD
61. 37 TO 42 44 48 TO 50 52 UNI GY -0.01413
62. 34 TO 36 43 45 TO 47 51 UNI GY -0.007005
63. SELFWEIGHT Y -2.15
64. MEMBER LOAD
65. 70 TO 75 77 81 TO 83 85 UNI GY -0.002622
66. FLOOR LOAD
67. YRANGE 0 10000 FLOAD -3.75E-006 GY
68. UNIT METER KN
69. YRANGE 0 10 FLOAD -3.75 GY
70. UNIT MMS KN
71. LOAD 2 LOADTYPE LIVE REDUCIBLE TITLE LL
72. MEMBER LOAD
73. 20 TO 23 26 28 TO 31 33 TO 56 59 61 TO 64 66 TO 85 UNI GY -0.0015
74. UNIT METER KN
75. LOAD 3 LOADTYPE WIND TITLE WX
76. WIND LOAD X 1 TYPE 1 YR 0 10
77. WIND LOAD X -1 TYPE 1 YR 0 10
DXF IMPORT OF FIRST 123.DXF -- PAGE NO. 3
78. LOAD 4 LOADTYPE WIND TITLE WZ
79. WIND LOAD Z 1 TYPE 1 YR 0 10
80. WIND LOAD Z -1 TYPE 1 YR 0 10
81. LOAD COMB 5 GENERATED INDIAN CODE GENRAL_STRUCTURES 1 82. 1 1.5 2 1.5
83. LOAD COMB 6 GENERATED INDIAN CODE GENRAL_STRUCTURES 2 84. 1 1.2 2 1.2 3 1.2
85. LOAD COMB 7 GENERATED INDIAN CODE GENRAL_STRUCTURES 3 86. 1 1.2 2 1.2 4 1.2
87. LOAD COMB 8 GENERATED INDIAN CODE GENRAL_STRUCTURES 4 88. 1 1.2 2 1.2 3 -1.2
89. LOAD COMB 9 GENERATED INDIAN CODE GENRAL_STRUCTURES 5 90. 1 1.2 2 1.2 4 -1.2
91. LOAD COMB 10 GENERATED INDIAN CODE GENRAL_STRUCTURES 6 92. 1 1.2 2 1.2
93. LOAD COMB 11 GENERATED INDIAN CODE GENRAL_STRUCTURES 7 94. 1 1.5 3 1.5
95. LOAD COMB 12 GENERATED INDIAN CODE GENRAL_STRUCTURES 8 96. 1 1.5 4 1.5
97. LOAD COMB 13 GENERATED INDIAN CODE GENRAL_STRUCTURES 9 98. 1 1.5 3 -1.5
99. LOAD COMB 14 GENERATED INDIAN CODE GENRAL_STRUCTURES 10 100. 1 1.5 4 -1.5
101. LOAD COMB 15 GENERATED INDIAN CODE GENRAL_STRUCTURES 11 102. 1 1.5
103. LOAD COMB 16 GENERATED INDIAN CODE GENRAL_STRUCTURES 12 104. 1 0.9
!> END GENERATED DATA BLOCK
FLOOR LOAD
YRANGE 3.5 4 FLOAD -2.15 GY
LOAD 4 LOADTYPE Live REDUCIBLE TITLE IMPOSED LOAD
FLOOR LOAD
YRANGE 3.5 4 FLOAD -1.5 GY
LOAD 6 LOADTYPE Wind TITLE WX- DIR
WIND LOAD X -1 TYPE 1 YR -1.2 4.75
LOAD 7 LOADTYPE Wind TITLE WZ+ DIR
WIND LOAD Z 1 TYPE 1 YR -1.2 6.75
LOAD 8 LOADTYPE Wind TITLE WZ- DIR
WIND LOAD Z -1 TYPE 1 YR -1.2 4.75
LOAD 5 LOADTYPE Wind TITLE WX
WIND LOAD X 1 TYPE 1 YR -1.2 4.75
******************************************
* * * Limit State of serviceability
******************************************
LOAD COMB 101 1*DL+1*LL
3 1.0 4 1.0
RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 15 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

LOAD COMB 106 1*DL+0.8*LL


3 1.0 4 0.8
LOAD COMB 107 1*DL+0.8*LL
3 1.0 4 0.8
LOAD COMB 108 1*DL+0.8*LL
3 1.0 4 0.8
LOAD COMB 109 1*DL+0.8*LL
3 1.0 4 0.8
LOAD COMB 110 1*DL+1*WX
5 1.0 3 1.0
LOAD COMB 111 1*DL+1*-WX
6 1.0 3 1.0
LOAD COMB 112 1*WZ+1*DL
7 1.0 3 1.0
LOAD COMB 113 1*-WZ+1*DL
8 1.0 3 1.0
LOAD COMB 114 0.8*WX+1*DL+0.8*LL
5 0.8 3 1.0 4 0.8
LOAD COMB 115 0.8*-WX+1*DL+0.8*LL
6 0.8 3 1.0 4 0.8
LOAD COMB 116 0.8*WZ+1*DL+0.8*LL
7 0.8 3 1.0 4 0.8
LOAD COMB 117 0.8*-WZ+1*DL+0.8*LL
8 0.8 3 1.0 4 0.8
******************************************
* * * Limit State of collapse
******************************************
LOAD COMB 201 1.5*DL+1.5*LL
3 1.5 4 1.5
LOAD COMB 210 .2*DL+1.2*LL
3 1.2 4 1.2
LOAD COMB 211 1.2*DL+1.2*LL
3 1.2 4 1.2
LOAD COMB 212 1.2*DL+1.2*LL
3 1.2 4 1.2
LOAD COMB 213 1.2*DL+1.2*LL
3 1.2 4 1.2
LOAD COMB 214 1.5*WX+1.5*DL
5 1.5 3 1.5
LOAD COMB 215 1.5*-WX+1.5*DL
6 1.5 3 1.5
LOAD COMB 216 1.5*WZ+1.5*DL
7 1.5 3 1.5
LOAD COMB 217 1.5*-WZ+1.5*DL
8 1.5 3 1.5
LOAD COMB 218 1.5*WX+0.9*DL
5 1.5 3 0.9
LOAD COMB 219 1.5*-WX+0.9*DL
6 1.5 3 0.9

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 16 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

LOAD COMB 220 1.5*WZ+0.9*DL


7 1.5 3 0.9
LOAD COMB 221 1.5*-WZ+0.9*DL
8 1.5 3 0.9
LOAD COMB 222 1.2*WX+1.2*DL+1.2*LL
5 1.2 3 1.2 4 1.2
LOAD COMB 223 1.2*-WX+1.2*DL+1.2*LL
6 1.2 3 1.2 4 1.2
LOAD COMB 224 1.2*WZ+1.2*DL+1.2*LL
7 1.2 3 1.2 4 1.2
LOAD COMB 225 1.2*-WZ+1.2*DL+1.2*LL
8 1.2 3 1.2 4 1.2
PERFORM ANALYSIS PRINT ALL
*START CONCRETE DESIGN
*CODE IS13920
*FC 25000 ALL
*FYMAIN 415000 ALL
*FYSEC 415000 ALL
*MAXMAIN 16 ALL
*MAXSEC 16 ALL
*MINMAIN 12 ALL
*MINSEC 8 ALL
*RATIO 4 ALL
*TRACK 2 ALL
*DESIGN BEAM 24 ,25,27,30,32,34 TO 52,56 TO 58 ,60,63,65,67 TO 85
*DESIGN COLUMN20 TO 23,28 TO31,33,59,61,62,64,66,53,55,54,26
*CONCRETE TAKE
*END CONCRETE DESIGN
PERFORM ANALYSIS PRINT ALL
START CONCRETE DESIGN
CODE INDIAN
FYMAIN 415000 ALL
FYSEC 415000 ALL
MAXMAIN 12 ALL
MAXSEC 10 ALL
MINMAIN 10 ALL
MINSEC 10 ALL
RATIO 4 ALL
FC 25000 ALL
DESIGN BEAM 24 ,25,27,30,32,34 TO 52,56 TO 58 ,60,63,65,67 TO 85
DESIGN COLUMN 20 TO 23,28 TO31,33,59,61,62,64,66,53,55,54,26
CONCRETE TAKE
END CONCRETE DESIGN
PERFORM ANALYSIS PRINT ALL
FINISH

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 17 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Footing No. Group ID Foundation Geometry

- - Length Width Thickness


1 1 8.300 m 8.300 m 1.115 m
2 2 9.150 m 9.150 m 1.215 m
3 3 7.850 m 7.850 m 1.061 m
4 4 8.200 m 8.200 m 1.113 m
7 5 7.450 m 7.450 m 0.961 m
9 6 9.800 m 9.800 m 1.265 m
10 7 5.750 m 5.750 m 0.761 m
11 8 5.900 m 5.900 m 0.811 m
12 9 9.750 m 9.750 m 1.265 m
16 10 7.800 m 7.800 m 1.011 m
Footing No. Footing Reinforcement Pedestal Reinforcement

- Bottom Reinforcement(Mz) Bottom Reinforcement(Mx) Top Reinforcement(Mz) Top Reinforcement(Mx) Main Steel Trans Steel
1 Ø16 @ 85 mm c/c Ø16 @ 85 mm c/c Ø10 @ 55 mm c/c Ø10 @ 55 mm c/c N/A N/A
2 Ø16 @ 80 mm c/c Ø16 @ 80 mm c/c Ø10 @ 50 mm c/c Ø10 @ 50 mm c/c N/A N/A
3 Ø12 @ 50 mm c/c Ø12 @ 50 mm c/c Ø10 @ 60 mm c/c Ø10 @ 60 mm c/c N/A N/A
4 Ø16 @ 85 mm c/c Ø16 @ 85 mm c/c Ø10 @ 55 mm c/c Ø10 @ 55 mm c/c N/A N/A
7 Ø12 @ 50 mm c/c Ø12 @ 50 mm c/c Ø10 @ 60 mm c/c Ø10 @ 65 mm c/c N/A N/A
9 Ø16 @ 75 mm c/c Ø16 @ 75 mm c/c Ø10 @ 50 mm c/c Ø10 @ 50 mm c/c N/A N/A
10 Ø12 @ 60 mm c/c Ø12 @ 65 mm c/c Ø10 @ 75 mm c/c Ø8 @ 50 mm c/c N/A N/A
11 Ø12 @ 65 mm c/c Ø12 @ 65 mm c/c Ø8 @ 50 mm c/c Ø8 @ 50 mm c/c N/A N/A
12 Ø16 @ 75 mm c/c Ø16 @ 75 mm c/c Ø10 @ 50 mm c/c Ø10 @ 50 mm c/c N/A N/A
16 Ø12 @ 50 mm c/c Ø12 @ 50 mm c/c Ø10 @ 60 mm c/c Ø10 @ 60 mm c/c N/A N/A
Design For Isolated Footing 16
Isolated Footing 1

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 18 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Input Values
Footing Geomtery
Design Type : Calculate Dimension
Footing Thickness (Ft) : 305.000 mm
Footing Length - X (Fl) : 1000.000 mm
Footing Width - Z (Fw) : 1000.000 mm
Eccentricity along X (Oxd) : 0.000 mm
Eccentricity along Z (Ozd) : 0.000 mm

Column Dimensions
Column Shape : Rectangular
Column Length - X (Pl) : 0.300 m
Column Width - Z (Pw) : 0.300 m

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 19 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Pedestal
Include Pedestal? No
Pedestal Shape : N/A
Pedestal Height (Ph) : N/A
Pedestal Length - X (Pl) : N/A
Pedestal Width - Z (Pw) : N/A

Design Parameters
Concrete and Rebar Properties
Unit Weight of Concrete : 25.000 kN/m3
Strength of Concrete : 25.000 N/mm2
Yield Strength of Steel : 415.000 N/mm2
Minimum Bar Size : Ø6
Maximum Bar Size : Ø32
Minimum Bar Spacing : 50.000 mm
Maximum Bar Spacing : 500.000 mm
Pedestal Clear Cover (P, CL) : 50.000 mm
Footing Clear Cover (F, CL) : 50.000 mm
Soil Properties
Soil Type : Drained
Unit Weight : 22.000 kN/m3
Soil Bearing Capacity : 100.000 kN/m2
Soil Surcharge : 0.000 kN/m2
Depth of Soil above Footing : 0.000 mm
Cohesion : 0.000 kN/m2
Min Percentage of Slab : 0.000
Sliding and Overturning

Coefficient of Friction : 0.500


Factor of Safety Against Sliding : 1.500
Factor of Safety Against Overturning : 1.500

------------------------------------------------------

Load Combination/s- Service Stress Level

Load Combination
Load Combination Title
Number
1 DL
2 LL
3 WX
4 WZ
5 Generated Indian Code Genral_Structures 1

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 20 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

6 Generated Indian Code Genral_Structures 2


7 Generated Indian Code Genral_Structures 3
8 Generated Indian Code Genral_Structures 4
9 Generated Indian Code Genral_Structures 5
10 Generated Indian Code Genral_Structures 6
11 Generated Indian Code Genral_Structures 7
12 Generated Indian Code Genral_Structures 8
13 Generated Indian Code Genral_Structures 9
14 Generated Indian Code Genral_Structures 10
15 Generated Indian Code Genral_Structures 11
16 Generated Indian Code Genral_Structures 12
1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000
101
x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL
0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800
102
x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL
Load Combination/s- Strength Level
Load Combination
Load Combination Title
Number
1 DL
2 LL
3 WX
4 WZ
5 Generated Indian Code Genral_Structures 1
6 Generated Indian Code Genral_Structures 2
7 Generated Indian Code Genral_Structures 3
8 Generated Indian Code Genral_Structures 4
9 Generated Indian Code Genral_Structures 5
10 Generated Indian Code Genral_Structures 6
11 Generated Indian Code Genral_Structures 7
12 Generated Indian Code Genral_Structures 8
13 Generated Indian Code Genral_Structures 9
14 Generated Indian Code Genral_Structures 10
15 Generated Indian Code Genral_Structures 11
16 Generated Indian Code Genral_Structures 12
1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500
201
x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL
0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960
202
x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL
1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200
203
x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL
0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900
204
x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL
Applied Loads - Service Stress Level
LC Axial Shear X Shear Z Moment X Moment Z
(kN) (kN) (kN) (kNm) (kNm)
1 269.244 0.874 -10.318 -4.167 -0.360

2 23.375 0.076 -0.595 -0.246 -0.026

3 0.013 -0.001 0.017 0.014 0.000

4 -0.095 -0.013 2.695 0.283 0.011

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 21 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

5 438.929 1.424 -16.370 -6.619 -0.578

6 351.159 1.138 -13.075 -5.279 -0.462

7 351.029 1.123 -9.862 -4.956 -0.449

8 351.127 1.140 -13.117 -5.312 -0.463

9 351.257 1.155 -16.330 -5.635 -0.476

10 351.143 1.139 -13.096 -5.295 -0.462

11 403.886 1.309 -15.451 -6.229 -0.539

12 403.723 1.290 -11.434 -5.825 -0.522

13 403.847 1.311 -15.503 -6.271 -0.540

14 404.009 1.330 -19.520 -6.675 -0.557

15 403.866 1.310 -15.477 -6.250 -0.539


16 242.320 0.786 -9.286 -3.750 -0.324
101 4748.831 15.392 -176.722 -72.212 -6.284
102 3799.065 12.313 -141.378 -57.770 -5.027
Applied Loads - Strength Level
LC Axial Shear X Shear Z Moment X Moment Z
(kN) (kN) (kN) (kNm) (kNm)
1 269.244 0.874 -10.318 -4.167 -0.360
2 23.375 0.076 -0.595 -0.246 -0.026
3 0.013 -0.001 0.017 0.014 0.000
4 -0.095 -0.013 2.695 0.283 0.011
5 438.929 1.424 -16.370 -6.619 -0.578
6 351.159 1.138 -13.075 -5.279 -0.462
7 351.029 1.123 -9.862 -4.956 -0.449
8 351.127 1.140 -13.117 -5.312 -0.463
9 351.257 1.155 -16.330 -5.635 -0.476
10 351.143 1.139 -13.096 -5.295 -0.462
11 403.886 1.309 -15.451 -6.229 -0.539
12 403.723 1.290 -11.434 -5.825 -0.522
13 403.847 1.311 -15.503 -6.271 -0.540
14 404.009 1.330 -19.520 -6.675 -0.557
15 403.866 1.310 -15.477 -6.250 -0.539
16 242.320 0.786 -9.286 -3.750 -0.324
201 7123.247 23.088 -265.083 -108.318 -9.426
202 4558.878 14.776 -169.653 -69.324 -6.033
203 5698.597 18.470 -212.067 -86.654 -7.541
204 4273.948 13.853 -159.050 -64.991 -5.656
------------------------------------------------------

Design Calculations
Footing Size

Initial Length (Lo) = 1.000 m

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 22 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Initial Width (Wo) = 1.000 m

Uplift force due to buoyancy = 0.000 kN


Effect due to adhesion = 0.000 kN

Area from initial length and width, A o = Lo X Wo = 1.000 m2 Min. area required from

bearing pressure, Amin = P / qmax = 62.276 m2

Note: Amin is an initial estimation.


P = Critical Factored Axial Load(without self weight/buoyancy/soil). q max = Respective
Factored Bearing Capacity.

Final Footing Size

Length (L2) = 8.300 m Governing Load Case : #


101
8.300 m Governing Load Case : #
101
Width (W2) =

Depth (D2) = 1.115 m Governing Load Case : # 101

Area (A2) = 68.890 m2

------------------------------------------------------

Pressures at Four Corner

Area of
Pressure at Pressure at Pressure at Pressure at footing in
Load Case corner 1 (q1) corner 2 (q2) corner 3 (q3) corner 4 (q4) uplift (Au)
(kN/m2) (kN/m2) (kN/m2) (kN/m2)
(m2)

101 99.2545 99.7449 94.1126 93.6221 0.000

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 23 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

101 99.2545 99.7449 94.1126 93.6221 0.000


101 98.5138 98.8524 94.9622 94.6236 0.000
101 98.5138 98.8524 94.9622 94.6236 0.000
If Au is zero, there is no uplift and no pressure adjustment is necessary. Otherwise, to account for uplift, areas of negative pressure
will be set to zero and the pressure will be redistributed to remaining corners.

Summary of adjusted Pressures at Four Corner


Pressure at Pressure at Pressure at Pressure at
corner 1 (q1) corner 2 (q2) corner 3 (q3) corner 4 (q4)
Load Case

(kN/m2) (kN/m2) (kN/m2) (kN/m2)

101 99.2545 99.7449 94.1126 93.6221


101 99.2545 99.7449 94.1126 93.6221
101 98.5138 98.8524 94.9622 94.6236
101 98.5138 98.8524 94.9622 94.6236
Details of Out-of-Contact Area
(If Any)
Governing load case = N/A
Plan area of footing = 68.890 sq.m
Area not in contact with soil = 0.000 sq.m
% of total area not in contact = 0.000%

------------------------------------------------------
Check For Stability Against Overturning And Sliding
- Factor of safety against sliding Factor of safety against overturning

Load Case Along X- Along Z- About X- About Z-


No. Direction Direction Direction Direction

1 1248.339 105.685 579.452 6808.841


2 12787.229 1625.665 8854.844 73268.756
3 1451924.061 55597.613 239742.520 6955297.492
4 71338.838 354.643 2422.584 301688.130
5 825.476 71.797 393.509 4519.734
6 994.006 86.532 474.470 5443.025
7 1007.481 114.722 590.496 5539.639
8 992.615 86.258 472.567 5434.331
9 979.533 69.288 395.228 5341.335
10 993.312 86.395 473.516 5438.682
11 884.272 74.931 411.021 4823.604
12 897.306 101.247 518.910 4916.382
13 882.922 74.681 409.276 4815.240

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 24 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

14 870.304 59.317 339.083 4726.228


15 883.598 74.806 410.146 4819.424
16 1369.921 115.978 635.887 7471.985
101 216.365 18.845 102.995 1182.808
102 231.891 20.197 110.385 1267.680
Critical Load Case And The Governing Factor Of Safety For Overturning and Sliding X Direction
Critical Load Case for Sliding along X-Direction : 101
Governing Disturbing Force : 15.392 kN
Governing Restoring Force : 3330.265 kN
Minimum Sliding Ratio for the Critical Load Case : 216.365
Critical Load Case for Overturning about X-Direction : 101
Governing Overturning Moment : -268.370 kNm
Governing Resisting Moment : 27640.690 kNm
Minimum Overturning Ratio for the Critical Load Case : 102.995
Critical Load Case And The Governing Factor Of Safety For Overturning and Sliding Z Direction
Critical Load Case for Sliding along Z-Direction : 101
Governing Disturbing Force : -176.722 kN
Governing Restoring Force : 3330.265 kN
Minimum Sliding Ratio for the Critical Load Case : 18.845
Critical Load Case for Overturning about Z-Direction : 101
Governing Overturning Moment : -23.369 kNm Governing Resisting
Moment : 27640.690 kNm Minimum Overturning Ratio for the Critical
Load Case : 1182.808

------------------------------------------------------

Moment Calculation
Check Trial Depth against moment (w.r.t. X Axis)

Critical Load Case = #201

Effective Depth = = 1.057 m

Governing moment (Mu) = 7055.954 kNm As Per IS 456 2000

ANNEX G G-1.1C

= 0.479107 Limiting Factor1 (K


umax) =

Limiting Factor2 (Rumax) = = 3444.291146 kN/m2

)=
Limit Moment Of Resistance (Mumax

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 25 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

= 31938.902382 kNm

Mu <= Mumax hence, safe

Check Trial Depth against moment (w.r.t. Z Axis)

Critical Load Case = #201

Effective Depth = = 1.057 m

Governing moment (Mu) = 6882.241 kNm As Per IS 456 2000

ANNEX G G-1.1C

= 0.479107 Limiting Factor1 (K


umax) =

Limiting Factor2 (Rumax) = = 3444.291146 kN/m2

)=
Limit Moment Of Resistance (Mumax
= 31938.902382 kNm

Mu <= Mumax hence, safe

------------------------------------------------------

Shear Calculation
Check Trial Depth for one way shear (Along X Axis)
(Shear Plane Parallel to X Axis)

Critical Load Case = #201

DX = 1.057 m

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 26 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Shear Force(S) = 2592.348 kN

Shear Stress(Tv) = 295.488199 kN/m2

Percentage Of Steel(Pt) = 0.2131

As Per IS 456 2000 Clause 40 Table 19

Shear Strength Of Concrete(Tc) = 340.140 kN/m2

Tv< Tc hence, safe

Check Trial Depth for one way shear (Along Z Axis) (Shear Plane Parallel to Z
Axis)

Critical Load Case = #201

DZ = 1.057 m
Shear Force(S) = 2531.548 kN

Shear Stress(Tv) = 288.558029 kN/m2

Percentage Of Steel(Pt) = 0.2187

As Per IS 456 2000 Clause 40 Table 19

Shear Strength Of Concrete(Tc) = 344.032 kN/m2

Tv< Tc hence, safe

Check Trial Depth for two way shear

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 27 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Critical Load Case = #201


Shear Force(S) = 6932.841 kN

Shear Stress(Tv) = 1208.361 kN/m2


As Per IS 456 2000 Clause 31.6.3.1

Ks = = 1.000

Shear Strength(Tc)= = 1250.0000 kN/m2

Ks x Tc = 1250.0000 kN/m2

Tv<= Ks x Tc hence, safe

------------------------------------------------------

Reinforcement Calculation
Calculation of Maximum Bar Size

Along X Axis

Bar diameter corresponding to max bar size (db) = 32 mm

As Per IS 456 2000 Clause 26.2.1

Development Length(ld) =
= 1.289 m

Allowable Length(ldb) =
= 3.950 m

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 28 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

ldb >=ld hence, safe

Along Z Axis

Bar diameter corresponding to max bar size(d b) = 32 mm

As Per IS 456 2000 Clause 26.2.1

Development Length(ld) = = 1.289 m

Allowable Length(ldb) = = 3.950 m

ldb >=ld hence, safe

Bottom Reinforcement Design

Along Z Axis

For moment w.r.t. X Axis (Mx)

As Per IS 456 2000 Clause 26.5.2.1


Critical Load Case = #201

Minimum Area of Steel (Astmin) = 11105.400 mm2

Calculated Area of Steel (Ast) = 19185.829 mm2

Provided Area of Steel (Ast,Provided) = 19185.829 mm2

Astmin<= Ast,Provided Steel area is accepted

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 29 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Selected bar Size (db) = Ø16

Minimum spacing allowed (Smin) = 56.000 mm

Selected spacing (S) = 86.147 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size...

The reinforcement is accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø16 @ 85.000 mm o.c.

Along X Axis

For moment w.r.t. Z Axis (Mz)

As Per IS 456 2000 Clause 26.5.2.1


Critical Load Case = #201

Minimum Area of Steel (Astmin) = 11105.400 mm2

Calculated Area of Steel (Ast) = 18695.487 mm2

Provided Area of Steel (Ast,Provided) = 18695.487 mm2

Astmin<= Ast,Provided Steel area is accepted

Selected bar Size (db) = Ø16

Minimum spacing allowed (Smin) = = 50.000 mm

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 30 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Selected spacing (S) = 88.957 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size...

The reinforcement is accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø16 @ 85.000 mm o.c.

Top Reinforcement Design

Along Z Axis

Minimum Area of Steel (Astmin) = 11105.400 mm2

Calculated Area of Steel (Ast) = 11075.520 mm2

Provided Area of Steel (Ast,Provided) = 11105.400 mm2

Astmin<= Ast,Provided Steel area is accepted Governing Moment =

2047.296 kNm

Selected bar Size (db) = Ø10

Minimum spacing allowed (Smin) = 50.000 mm

Selected spacing (S) = 58.085 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size... The reinforcement is

accepted.

Based on spacing reinforcement increment; provided reinforcement is

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 31 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Ø10 @ 55 mm o.c.

Along X Axis

Minimum Area of Steel (Astmin) = 11105.400 mm2

Calculated Area of Steel (Ast) = 11075.520 mm2

Provided Area of Steel (Ast,Provided) = 11105.400 mm2

Astmin<= Ast,Provided Steel area is accepted Governing Moment =

2047.296 kNm

Selected bar Size (db) = Ø10

Minimum spacing allowed (Smin) = = 50.000 mm

Selected spacing (S) = 58.085 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size... The reinforcement is

accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø10 @ 55 mm o.c.

------------------------------------------------------

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 32 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Isolated Footing 2

Input Values
Footing Geomtery
Design Type : Calculate Dimension
Footing Thickness (Ft) : 305.000 mm
Footing Length - X (Fl) : 1000.000 mm
Footing Width - Z (Fw) : 1000.000 mm Eccentricity along X (Oxd) : 0.000
mm
Eccentricity along Z (Ozd) : 0.000 mm

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 33 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Column Dimensions
Column Shape : Rectangular
Column Length - X (Pl) : 0.300 m
Column Width - Z (Pw) : 0.300 m

Pedestal
Include Pedestal? No
Pedestal Shape : N/A
Pedestal Height (Ph) : N/A
Pedestal Length - X (Pl) : N/A
Pedestal Width - Z (Pw) : N/A

Design Parameters
Concrete and Rebar Properties
Unit Weight of Concrete : 25.000 kN/m3
Strength of Concrete : 25.000 N/mm2
Yield Strength of Steel : 415.000 N/mm2
Minimum Bar Size : Ø6
Maximum Bar Size : Ø32
Minimum Bar Spacing : 50.000 mm
Maximum Bar Spacing : 500.000 mm
Pedestal Clear Cover (P, CL) : 50.000 mm
Footing Clear Cover (F, CL) : 50.000 mm
Soil Properties
Soil Type : Drained
Unit Weight : 22.000 kN/m3
Soil Bearing Capacity : 100.000 kN/m2
Soil Surcharge : 0.000 kN/m2
Depth of Soil above Footing : 0.000 mm
Cohesion : 0.000 kN/m2
Min Percentage of Slab : 0.000
Sliding and Overturning

Coefficient of Friction : 0.500


Factor of Safety Against Sliding : 1.500
Factor of Safety Against Overturning : 1.500

------------------------------------------------------

Load Combination/s- Service Stress Level

Load Combination Load Combination Title

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 34 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Number
1 DL
2 LL
3 WX
4 WZ

5 Generated Indian Code Genral_Structures 1


6 Generated Indian Code Genral_Structures 2
7 Generated Indian Code Genral_Structures 3
8 Generated Indian Code Genral_Structures 4
9 Generated Indian Code Genral_Structures 5
10 Generated Indian Code Genral_Structures 6
11 Generated Indian Code Genral_Structures 7
12 Generated Indian Code Genral_Structures 8
13 Generated Indian Code Genral_Structures 9
14 Generated Indian Code Genral_Structures 10
15 Generated Indian Code Genral_Structures 11
16 Generated Indian Code Genral_Structures 12
1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000
101
x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL
0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800
102
x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL
Load Combination/s- Strength Level
Load Combination
Load Combination Title
Number
1 DL
2 LL
3 WX
4 WZ
5 Generated Indian Code Genral_Structures 1
6 Generated Indian Code Genral_Structures 2
7 Generated Indian Code Genral_Structures 3
8 Generated Indian Code Genral_Structures 4
9 Generated Indian Code Genral_Structures 5
10 Generated Indian Code Genral_Structures 6
11 Generated Indian Code Genral_Structures 7
12 Generated Indian Code Genral_Structures 8
13 Generated Indian Code Genral_Structures 9
14 Generated Indian Code Genral_Structures 10
15 Generated Indian Code Genral_Structures 11
16 Generated Indian Code Genral_Structures 12
1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500
201
x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL
0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960
202
x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL
1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200
203
x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL
0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900
204
x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL
Applied Loads - Service Stress Level

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 35 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Axial Shear X Shear Z Moment X Moment Z


LC
(kN) (kN) (kN) (kNm) (kNm)
1 314.908 5.091 8.836 4.868 -2.353

2 25.922 0.292 0.503 0.272 -0.130

3 0.019 -0.004 0.034 0.027 0.003

4 0.121 -0.011 0.320 0.259 0.009

5 511.246 8.074 14.009 7.711 -3.725

6 409.019 6.455 11.249 6.202 -2.977

7 409.142 6.446 11.591 6.479 -2.970

8 408.974 6.464 11.166 6.136 -2.983

9 408.851 6.473 10.824 5.859 -2.990

10 408.997 6.460 11.208 6.169 -2.980

11 472.391 7.631 13.306 7.344 -3.525

12 472.544 7.620 13.734 7.690 -3.516


13 472.334 7.643 13.203 7.261 -3.534
14 472.181 7.654 12.775 6.915 -3.542
15 472.363 7.637 13.255 7.303 -3.529
16 283.418 4.582 7.953 4.382 -2.118
101 5542.430 88.508 153.967 84.877 -40.861
102 4433.943 70.806 123.174 67.901 -32.689
Applied Loads - Strength Level
LC Axial Shear X Shear Z Moment X Moment Z
(kN) (kN) (kN) (kNm) (kNm)
1 314.908 5.091 8.836 4.868 -2.353
2 25.922 0.292 0.503 0.272 -0.130
3 0.019 -0.004 0.034 0.027 0.003
4 0.121 -0.011 0.320 0.259 0.009
5 511.246 8.074 14.009 7.711 -3.725
6 409.019 6.455 11.249 6.202 -2.977
7 409.142 6.446 11.591 6.479 -2.970
8 408.974 6.464 11.166 6.136 -2.983
9 408.851 6.473 10.824 5.859 -2.990
10 408.997 6.460 11.208 6.169 -2.980
11 472.391 7.631 13.306 7.344 -3.525
12 472.544 7.620 13.734 7.690 -3.516
13 472.334 7.643 13.203 7.261 -3.534
14 472.181 7.654 12.775 6.915 -3.542
15 472.363 7.637 13.255 7.303 -3.529
16 283.418 4.582 7.953 4.382 -2.118
201 8313.645 132.762 230.951 127.315 -61.291
202 5320.733 84.967 147.809 81.482 -39.227
203 6650.915 106.209 184.761 101.852 -49.033
204 4988.187 79.657 138.571 76.389 -36.775
------------------------------------------------------

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 36 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Design Calculations
Footing Size

Initial Length (Lo) = 1.000 m

Initial Width (Wo) = 1.000 m

Uplift force due to buoyancy = 0.000 kN


Effect due to adhesion = 0.000 kN

Area from initial length and width, A o = Lo X Wo = 1.000 m2 Min. area required from

bearing pressure, Amin = P / qmax = 74.303 m2

Note: Amin is an initial estimation.


P = Critical Factored Axial Load(without self weight/buoyancy/soil). q max = Respective
Factored Bearing Capacity.

Final Footing Size


Length (L2) = 9.150 m Governing Load Case : # 101

9.150 m Governing Load Case : # 101


Width (W2) =
1.215 m Governing Load Case : # 101
Depth (D2) =

Area (A2) = 83.723 m2

------------------------------------------------------

Pressures at Four Corner

Area of
Pressure at Pressure at Pressure at Pressure at footing in
Load Case corner 1 (q1) corner 2 (q2) corner 3 (q3) corner 4 (q4) uplift (Au)
(kN/m2) (kN/m2) (kN/m2) (kN/m2)

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 37 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

(m2)
101 94.0016 95.6531 98.8619 97.2104 0.000
101 94.0016 95.6531 98.8619 97.2104 0.000
101 93.1672 95.4849 99.7328 97.4151 0.000
101 93.1672 95.4849 99.7328 97.4151 0.000
If Au is zero, there is no uplift and no pressure adjustment is necessary. Otherwise, to account for uplift, areas of negative pressure
will be set to zero and the pressure will be redistributed to remaining corners.
Summary of adjusted Pressures at Four Corner
Pressure at Pressure at Pressure at Pressure at
corner 1 (q1) corner 2 (q2) corner 3 (q3) corner 4 (q4)
Load Case

(kN/m2) (kN/m2) (kN/m2) (kN/m2)

101 94.0016 95.6531 98.8619 97.2104


101 94.0016 95.6531 98.8619 97.2104
101 93.1672 95.4849 99.7328 97.4151
101 93.1672 95.4849 99.7328 97.4151
Details of Out-of-Contact Area
(If Any)
Governing load case = N/A
Plan area of footing = 83.723 sq.m
Area not in contact with soil = 0.000 sq.m

% of total area not in contact = 0.000%

------------------------------------------------------
Check For Stability Against Overturning And Sliding
- Factor of safety against sliding Factor of safety against overturning

Load Case Along X- Along Z- About X- About Z-


No. Direction Direction Direction Direction

1 279.640 161.123 837.199 1530.192


2 4387.270 2542.478 13285.666 24225.613
3 333346.937 36937.624 168025.355 1556162.273
4 110559.130 3960.460 17952.627 515914.763
5 188.486 108.636 564.646 1031.903
6 227.856 130.754 679.254 1247.591
7 228.190 126.895 656.365 1249.729
8 227.531 131.715 684.965 1245.508
9 227.198 135.878 709.933 1243.383
10 227.693 131.233 682.098 1246.548
11 196.884 112.918 586.402 1077.489

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 38 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

12 197.191 109.403 565.571 1079.450


13 196.587 113.795 591.611 1075.586
14 196.282 117.603 614.445 1073.640
15 196.735 113.355 588.995 1076.537
16 307.275 177.045 919.934 1681.411
101 45.618 26.223 136.232 249.691
102 49.194 28.279 146.914 269.269
Critical Load Case And The Governing Factor Of Safety For Overturning and Sliding X Direction
Critical Load Case for Sliding along X-Direction : 101
Governing Disturbing Force : 88.508 kN
Governing Restoring Force : 4037.518 kN
Minimum Sliding Ratio for the Critical Load Case : 45.618
Critical Load Case for Overturning about X-Direction : 101
Governing Overturning Moment : 271.174 kNm
Governing Resisting Moment : 36942.612 kNm
Minimum Overturning Ratio for the Critical Load Case : 136.232
Critical Load Case And The Governing Factor Of Safety For Overturning and Sliding Z Direction
Critical Load Case for Sliding along Z-Direction : 101
Governing Disturbing Force : 153.967 kN
Governing Restoring Force : 4037.518 kN
Minimum Sliding Ratio for the Critical Load Case : 26.223
Critical Load Case for Overturning about Z-Direction : 101

Governing Overturning Moment : -147.953 kNm


Governing Resisting Moment : 36942.612 kNm
Minimum Overturning Ratio for the Critical Load Case : 249.691

------------------------------------------------------

Moment Calculation
Check Trial Depth against moment (w.r.t. X Axis)

Critical Load Case = #201

Effective Depth = = 1.157 m

Governing moment (Mu) = 9088.739 kNm As Per IS 456 2000

ANNEX G G-1.1C

= 0.479107 Limiting Factor1 (K


umax) =

Limiting Factor2 (Rumax) = = 3444.291146 kN/m2

RPEPL-BCW-ME-
Doc.No: - Rev
)=
PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00
PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 39 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Limit Moment Of Resistance (Mumax = 42187.105729 kNm

Mu <= Mumax hence, safe

Check Trial Depth against moment (w.r.t. Z Axis)

Critical Load Case = #201

Effective Depth = = 1.157 m

Governing moment (Mu) = 9000.826 kNm As Per IS 456 2000

ANNEX G G-1.1C

= 0.479107 Limiting Factor1 (K


umax) =

Limiting Factor2 (Rumax) = = 3444.291146 kN/m2

)=
Limit Moment Of Resistance (Mumax
= 42187.105729 kNm

Mu <= Mumax hence, safe

------------------------------------------------------

Shear Calculation
Check Trial Depth for one way shear (Along X Axis)
(Shear Plane Parallel to X Axis)

Critical Load Case = #201

DX = 1.157 m

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 40 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Shear Force(S) = 3030.530 kN

Shear Stress(Tv) = 286.262260 kN/m2

Percentage Of Steel(Pt) = 0.2109

As Per IS 456 2000 Clause 40 Table 19

Shear Strength Of Concrete(Tc) = 338.603 kN/m2

Tv< Tc hence, safe

Check Trial Depth for one way shear (Along Z Axis) (Shear Plane Parallel to Z
Axis)

Critical Load Case = #201

DZ = 1.157 m
Shear Force(S) = 3002.702 kN

Shear Stress(Tv) = 283.633675 kN/m2

Percentage Of Steel(Pt) = 0.2131

As Per IS 456 2000 Clause 40 Table 19

Shear Strength Of Concrete(Tc) = 340.109 kN/m2

Tv< Tc hence, safe

Check Trial Depth for two way shear

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 41 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Critical Load Case = #201


Shear Force(S) = 8102.846 kN

Shear Stress(Tv) = 1201.669 kN/m2


As Per IS 456 2000 Clause 31.6.3.1

Ks = = 1.000

Shear Strength(Tc)= = 1250.0000 kN/m2

Ks x Tc = 1250.0000 kN/m2

Tv<= Ks x Tc hence, safe

------------------------------------------------------

Reinforcement Calculation
Calculation of Maximum Bar Size

Along X Axis

Bar diameter corresponding to max bar size (db) = 32 mm

As Per IS 456 2000 Clause 26.2.1

Development Length(ld) =
= 1.289 m

Allowable Length(ldb) =
= 4.375 m

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 42 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

ldb >=ld hence, safe

Along Z Axis

Bar diameter corresponding to max bar size(d b) = 32 mm

As Per IS 456 2000 Clause 26.2.1

Development Length(ld) = = 1.289 m

Allowable Length(ldb) = = 4.375 m

ldb >=ld hence, safe

Bottom Reinforcement Design

Along Z Axis

For moment w.r.t. X Axis (Mx)

As Per IS 456 2000 Clause 26.5.2.1


Critical Load Case = #201

Minimum Area of Steel (Astmin) = 13340.700 mm2

Calculated Area of Steel (Ast) = 22555.315 mm2

Provided Area of Steel (Ast,Provided) = 22555.315 mm2

Astmin<= Ast,Provided Steel area is accepted

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 43 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Selected bar Size (db) = Ø16

Minimum spacing allowed (Smin) = 56.000 mm

Selected spacing (S) = 80.661 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size...

The reinforcement is accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø16 @ 80.000 mm o.c.

Along X Axis

For moment w.r.t. Z Axis (Mz)

As Per IS 456 2000 Clause 26.5.2.1


Critical Load Case = #201

Minimum Area of Steel (Astmin) = 13340.700 mm2

Calculated Area of Steel (Ast) = 22328.928 mm2

Provided Area of Steel (Ast,Provided) = 22328.928 mm2

Astmin<= Ast,Provided Steel area is accepted

Selected bar Size (db) = Ø16

Minimum spacing allowed (Smin) = = 50.000 mm

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 44 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Selected spacing (S) = 81.387 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size...

The reinforcement is accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø16 @ 80.000 mm o.c.

Top Reinforcement Design

Along Z Axis

Minimum Area of Steel (Astmin) = 13340.700 mm2

Calculated Area of Steel (Ast) = 13307.760 mm2

Provided Area of Steel (Ast,Provided) = 13340.700 mm2

Astmin<= Ast,Provided Steel area is accepted Governing Moment =

3010.874 kNm

Selected bar Size (db) = Ø10

Minimum spacing allowed (Smin) = 50.000 mm

Selected spacing (S) = 53.491 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size... The reinforcement is

accepted.

Based on spacing reinforcement increment; provided reinforcement is

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 45 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Ø10 @ 50 mm o.c.

Along X Axis

Minimum Area of Steel (Astmin) = 13340.700 mm2

Calculated Area of Steel (Ast) = 13307.760 mm2

Provided Area of Steel (Ast,Provided) = 13340.700 mm2

Astmin<= Ast,Provided Steel area is accepted Governing Moment =

3010.874 kNm

Selected bar Size (db) = Ø10

Minimum spacing allowed (Smin) = = 50.000 mm

Selected spacing (S) = 53.491 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size... The reinforcement is

accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø10 @ 50 mm o.c.

------------------------------------------------------

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 46 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Isolated Footing 3

Input Values
Footing Geomtery
Design Type : Calculate Dimension
Footing Thickness (Ft) : 305.000 mm
Footing Length - X (Fl) : 1000.000 mm
Footing Width - Z (Fw) : 1000.000 mm Eccentricity along X (Oxd) : 0.000
mm
Eccentricity along Z (Ozd) : 0.000 mm

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 47 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Column Dimensions
Column Shape : Rectangular
Column Length - X (Pl) : 0.300 m
Column Width - Z (Pw) : 0.300 m

Pedestal
Include Pedestal? No
Pedestal Shape : N/A
Pedestal Height (Ph) : N/A
Pedestal Length - X (Pl) : N/A
Pedestal Width - Z (Pw) : N/A

Design Parameters
Concrete and Rebar Properties
Unit Weight of Concrete : 25.000 kN/m3
Strength of Concrete : 25.000 N/mm2
Yield Strength of Steel : 415.000 N/mm2
Minimum Bar Size : Ø6
Maximum Bar Size : Ø32
Minimum Bar Spacing : 50.000 mm
Maximum Bar Spacing : 500.000 mm
Pedestal Clear Cover (P, CL) : 50.000 mm
Footing Clear Cover (F, CL) : 50.000 mm
Soil Properties
Soil Type : Drained
Unit Weight : 22.000 kN/m3
Soil Bearing Capacity : 100.000 kN/m2
Soil Surcharge : 0.000 kN/m2
Depth of Soil above Footing : 0.000 mm
Cohesion : 0.000 kN/m2
Min Percentage of Slab : 0.000
Sliding and Overturning

Coefficient of Friction : 0.500


Factor of Safety Against Sliding : 1.500
Factor of Safety Against Overturning : 1.500

------------------------------------------------------

Load Combination/s- Service Stress Level

Load Combination Load Combination Title

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 48 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Number
1 DL
2 LL
3 WX
4 WZ

5 Generated Indian Code Genral_Structures 1


6 Generated Indian Code Genral_Structures 2
7 Generated Indian Code Genral_Structures 3
8 Generated Indian Code Genral_Structures 4
9 Generated Indian Code Genral_Structures 5
10 Generated Indian Code Genral_Structures 6
11 Generated Indian Code Genral_Structures 7
12 Generated Indian Code Genral_Structures 8
13 Generated Indian Code Genral_Structures 9
14 Generated Indian Code Genral_Structures 10
15 Generated Indian Code Genral_Structures 11
16 Generated Indian Code Genral_Structures 12
1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000
101
x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL
0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800
102
x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL
Load Combination/s- Strength Level
Load Combination
Load Combination Title
Number
1 DL
2 LL
3 WX
4 WZ
5 Generated Indian Code Genral_Structures 1
6 Generated Indian Code Genral_Structures 2
7 Generated Indian Code Genral_Structures 3
8 Generated Indian Code Genral_Structures 4
9 Generated Indian Code Genral_Structures 5
10 Generated Indian Code Genral_Structures 6
11 Generated Indian Code Genral_Structures 7
12 Generated Indian Code Genral_Structures 8
13 Generated Indian Code Genral_Structures 9
14 Generated Indian Code Genral_Structures 10
15 Generated Indian Code Genral_Structures 11
16 Generated Indian Code Genral_Structures 12
1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500
201
x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL
0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960
202
x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL
1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200
203
x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL
0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900
204
x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL
Applied Loads - Service Stress Level

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 49 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Axial Shear X Shear Z Moment X Moment Z


LC
(kN) (kN) (kN) (kNm) (kNm)
1 249.159 0.539 5.639 3.196 -0.238

2 20.891 0.022 0.334 0.187 -0.009

3 0.018 0.000 0.019 0.015 -0.000

4 -0.084 0.002 -2.632 -0.228 -0.001

5 405.075 0.841 8.961 5.074 -0.370

6 324.082 0.673 7.191 4.077 -0.296

7 323.959 0.674 4.011 3.786 -0.298

8 324.038 0.672 7.146 4.042 -0.296

9 324.161 0.671 10.327 4.333 -0.295

10 324.060 0.673 7.169 4.059 -0.296

11 373.766 0.808 8.487 4.816 -0.357

12 373.612 0.810 4.512 4.452 -0.359


13 373.712 0.808 8.431 4.772 -0.357
14 373.865 0.806 12.407 5.136 -0.356
15 373.739 0.808 8.459 4.794 -0.357
16 224.243 0.485 5.076 2.876 -0.214
101 4388.295 9.290 95.537 55.386 -4.102
102 3510.636 7.432 76.429 44.309 -3.281
Applied Loads - Strength Level
LC Axial Shear X Shear Z Moment X Moment Z
(kN) (kN) (kN) (kNm) (kNm)
1 249.159 0.539 5.639 3.196 -0.238
2 20.891 0.022 0.334 0.187 -0.009
3 0.018 0.000 0.019 0.015 -0.000
4 -0.084 0.002 -2.632 -0.228 -0.001
5 405.075 0.841 8.961 5.074 -0.370
6 324.082 0.673 7.191 4.077 -0.296
7 323.959 0.674 4.011 3.786 -0.298
8 324.038 0.672 7.146 4.042 -0.296
9 324.161 0.671 10.327 4.333 -0.295
10 324.060 0.673 7.169 4.059 -0.296
11 373.766 0.808 8.487 4.816 -0.357
12 373.612 0.810 4.512 4.452 -0.359
13 373.712 0.808 8.431 4.772 -0.357
14 373.865 0.806 12.407 5.136 -0.356
15 373.739 0.808 8.459 4.794 -0.357
16 224.243 0.485 5.076 2.876 -0.214
201 6582.443 13.935 143.305 83.080 -6.153
202 4212.763 8.918 91.715 53.171 -3.938
203 5265.954 11.148 114.644 66.464 -4.922
204 3949.466 8.361 85.983 49.848 -3.692
------------------------------------------------------

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 50 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Design Calculations
Footing Size

Initial Length (Lo) = 1.000 m

Initial Width (Wo) = 1.000 m

Uplift force due to buoyancy = 0.000 kN


Effect due to adhesion = 0.000 kN

Area from initial length and width, A o = Lo X Wo = 1.000 m2 Min. area required from

bearing pressure, Amin = P / qmax = 56.843 m2

Note: Amin is an initial estimation.


P = Critical Factored Axial Load(without self weight/buoyancy/soil). q max = Respective
Factored Bearing Capacity.

Final Footing Size


Length (L2) = 7.850 m Governing Load Case : # 101

7.850 m Governing Load Case : # 101


Width (W2) =
1.061 m Governing Load Case : # 101
Depth (D2) =

Area (A2) = 61.623 m2

------------------------------------------------------

Pressures at Four Corner

Area of
Pressure at Pressure at Pressure at Pressure at footing in
Load Case corner 1 (q1) corner 2 (q2) corner 3 (q3) corner 4 (q4) uplift (Au)
(kN/m2) (kN/m2) (kN/m2) (kN/m2)

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 51 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

(m2)
101 95.5821 95.8248 98.7819 98.5393 0.000
101 95.5491 95.8946 99.7760 99.4305 0.000
101 95.5491 95.8946 99.7760 99.4305 0.000
101 95.5491 95.8946 99.7760 99.4305 0.000
If Au is zero, there is no uplift and no pressure adjustment is necessary. Otherwise, to account for uplift, areas of negative pressure
will be set to zero and the pressure will be redistributed to remaining corners.
Summary of adjusted Pressures at Four Corner
Pressure at Pressure at Pressure at Pressure at
corner 1 (q1) corner 2 (q2) corner 3 (q3) corner 4 (q4)
Load Case

(kN/m2) (kN/m2) (kN/m2) (kN/m2)

101 95.5821 95.8248 98.7819 98.5393


101 95.5491 95.8946 99.7760 99.4305
101 95.5491 95.8946 99.7760 99.4305
101 95.5491 95.8946 99.7760 99.4305
Details of Out-of-Contact Area
(If Any)
Governing load case = N/A
Plan area of footing = 61.623 sq.m
Area not in contact with soil = 0.000 sq.m

% of total area not in contact = 0.000%

------------------------------------------------------
Check For Stability Against Overturning And Sliding
- Factor of safety against sliding Factor of safety against overturning

Load Case Along X- Along Z- About X- About Z-


No. Direction Direction Direction Direction

1 1744.220 166.600 804.953 9125.558


2 37915.395 2468.051 11979.019 204906.603
3 16655611.663 44020.117 187424.343 88171584.189
4 542012.514 309.643 2123.552 2217682.832
5 1210.384 113.549 548.767 6340.442
6 1452.632 135.866 656.348 7609.441
7 1448.784 243.592 955.144 7583.587
8 1452.859 136.707 660.968 7610.609
9 1456.718 94.612 502.638 7636.610
10 1452.741 136.285 658.650 7610.007
11 1239.810 118.044 570.098 6486.550

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 52 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

12 1236.387 222.046 852.446 6463.604


13 1240.009 118.819 574.346 6487.566
14 1243.458 80.753 430.658 6510.705
15 1239.909 118.430 572.214 6487.058
16 1912.333 182.657 882.534 10005.094
101 323.912 31.497 150.970 1695.670
102 345.843 33.629 161.191 1810.480
Critical Load Case And The Governing Factor Of Safety For Overturning and Sliding X Direction
Critical Load Case for Sliding along X-Direction : 101
Governing Disturbing Force : 9.290 kN
Governing Restoring Force : 3009.105 kN
Minimum Sliding Ratio for the Critical Load Case : 323.912
Critical Load Case for Overturning about X-Direction : 101
Governing Overturning Moment : 156.462 kNm
Governing Resisting Moment : 23621.043 kNm
Minimum Overturning Ratio for the Critical Load Case : 150.970
Critical Load Case And The Governing Factor Of Safety For Overturning and Sliding Z Direction
Critical Load Case for Sliding along Z-Direction : 101
Governing Disturbing Force : 95.537 kN
Governing Restoring Force : 3009.105 kN
Minimum Sliding Ratio for the Critical Load Case : 31.497
Critical Load Case for Overturning about Z-Direction : 101

Governing Overturning Moment : -13.930 kNm


Governing Resisting Moment : 23621.043 kNm
Minimum Overturning Ratio for the Critical Load Case : 1695.670

------------------------------------------------------

Moment Calculation
Check Trial Depth against moment (w.r.t. X Axis)

Critical Load Case = #201

Effective Depth = = 1.005 m

Governing moment (Mu) = 6085.340 kNm As Per IS 456 2000

ANNEX G G-1.1C

= 0.479107 Limiting Factor1 (K


umax) =

Limiting Factor2 (Rumax) = = 3444.291146 kN/m2

RPEPL-BCW-ME-
Doc.No: - Rev
)=
PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00
PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 53 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Limit Moment Of Resistance (Mumax = 27308.239555 kNm

Mu <= Mumax hence, safe

Check Trial Depth against moment (w.r.t. Z Axis)

Critical Load Case = #201

Effective Depth = = 1.005 m

Governing moment (Mu) = 5984.518 kNm As Per IS 456 2000

ANNEX G G-1.1C

= 0.479107 Limiting Factor1 (K


umax) =

Limiting Factor2 (Rumax) = = 3444.291146 kN/m2

)=
Limit Moment Of Resistance (Mumax
= 27308.239555 kNm

Mu <= Mumax hence, safe

------------------------------------------------------

Shear Calculation
Check Trial Depth for one way shear (Along X Axis)
(Shear Plane Parallel to X Axis)

Critical Load Case = #201

DX = 1.005 m

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 54 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Shear Force(S) = 2363.686 kN

Shear Stress(Tv) = 299.608402 kN/m2

Percentage Of Steel(Pt) = 0.2169

As Per IS 456 2000 Clause 40 Table 19

Shear Strength Of Concrete(Tc) = 342.769 kN/m2

Tv< Tc hence, safe

Check Trial Depth for one way shear (Along Z Axis) (Shear Plane Parallel to Z
Axis)

Critical Load Case = #201

DZ = 1.005 m
Shear Force(S) = 2326.369 kN

Shear Stress(Tv) = 294.878394 kN/m2

Percentage Of Steel(Pt) = 0.2207

As Per IS 456 2000 Clause 40 Table 19

Shear Strength Of Concrete(Tc) = 345.392 kN/m2

Tv< Tc hence, safe

Check Trial Depth for two way shear

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 55 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Critical Load Case = #201


Shear Force(S) = 6400.529 kN

Shear Stress(Tv) = 1220.055 kN/m2


As Per IS 456 2000 Clause 31.6.3.1

Ks = = 1.000

Shear Strength(Tc)= = 1250.0000 kN/m2

Ks x Tc = 1250.0000 kN/m2

Tv<= Ks x Tc hence, safe

------------------------------------------------------

Reinforcement Calculation
Calculation of Maximum Bar Size

Along X Axis

Bar diameter corresponding to max bar size (db) = 32 mm

As Per IS 456 2000 Clause 26.2.1

Development Length(ld) =
= 1.289 m

Allowable Length(ldb) =
= 3.725 m

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 56 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

ldb >=ld hence, safe

Along Z Axis

Bar diameter corresponding to max bar size(d b) = 32 mm

As Per IS 456 2000 Clause 26.2.1

Development Length(ld) = = 1.289 m

Allowable Length(ldb) = = 3.725 m

ldb >=ld hence, safe

Bottom Reinforcement Design

Along Z Axis

For moment w.r.t. X Axis (Mx)

As Per IS 456 2000 Clause 26.5.2.1


Critical Load Case = #201

Minimum Area of Steel (Astmin) = 9994.620 mm2

Calculated Area of Steel (Ast) = 17408.700 mm2

Provided Area of Steel (Ast,Provided) = 17408.700 mm2

Astmin<= Ast,Provided Steel area is accepted

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 57 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Selected bar Size (db) = Ø12

Minimum spacing allowed (Smin) = 52.000 mm

Selected spacing (S) = 50.575 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size...

The reinforcement is accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø12 @ 50.000 mm o.c.

Along X Axis

For moment w.r.t. Z Axis (Mz)

As Per IS 456 2000 Clause 26.5.2.1


Critical Load Case = #201

Minimum Area of Steel (Astmin) = 9994.620 mm2

Calculated Area of Steel (Ast) = 17109.076 mm2

Provided Area of Steel (Ast,Provided) = 17109.076 mm2

Astmin<= Ast,Provided Steel area is accepted

Selected bar Size (db) = Ø12

Minimum spacing allowed (Smin) = = 50.000 mm

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 58 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Selected spacing (S) = 51.245 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size...

The reinforcement is accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø12 @ 50.000 mm o.c.

Top Reinforcement Design

Along Z Axis

Minimum Area of Steel (Astmin) = 9994.620 mm2

Calculated Area of Steel (Ast) = 9985.200 mm2

Provided Area of Steel (Ast,Provided) = 9994.620 mm2

Astmin<= Ast,Provided Steel area is accepted Governing Moment =

1643.800 kNm

Selected bar Size (db) = Ø10

Minimum spacing allowed (Smin) = 50.000 mm

Selected spacing (S) = 60.945 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size... The reinforcement is

accepted.

Based on spacing reinforcement increment; provided reinforcement is

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 59 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Ø10 @ 60 mm o.c.

Along X Axis

Minimum Area of Steel (Astmin) = 9994.620 mm2

Calculated Area of Steel (Ast) = 10111.002 mm2

Provided Area of Steel (Ast,Provided) = 10111.002 mm2

Astmin<= Ast,Provided Steel area is accepted Governing Moment =

1643.800 kNm

Selected bar Size (db) = Ø10

Minimum spacing allowed (Smin) = = 50.000 mm

Selected spacing (S) = 60.469 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size... The reinforcement is

accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø10 @ 60 mm o.c.

------------------------------------------------------

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 60 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Isolated Footing 4

Input Values
Footing Geomtery
Design Type : Calculate Dimension
Footing Thickness (Ft) : 305.000 mm
Footing Length - X (Fl) : 1000.000 mm
Footing Width - Z (Fw) : 1000.000 mm Eccentricity along X (Oxd) : 0.000
mm
Eccentricity along Z (Ozd) : 0.000 mm

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 61 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Column Dimensions
Column Shape : Rectangular
Column Length - X (Pl) : 0.300 m
Column Width - Z (Pw) : 0.300 m

Pedestal
Include Pedestal? No
Pedestal Shape : N/A
Pedestal Height (Ph) : N/A
Pedestal Length - X (Pl) : N/A
Pedestal Width - Z (Pw) : N/A

Design Parameters
Concrete and Rebar Properties
Unit Weight of Concrete : 25.000 kN/m3
Strength of Concrete : 25.000 N/mm2
Yield Strength of Steel : 415.000 N/mm2
Minimum Bar Size : Ø6
Maximum Bar Size : Ø32
Minimum Bar Spacing : 50.000 mm
Maximum Bar Spacing : 500.000 mm
Pedestal Clear Cover (P, CL) : 50.000 mm
Footing Clear Cover (F, CL) : 50.000 mm
Soil Properties
Soil Type : Drained
Unit Weight : 22.000 kN/m3
Soil Bearing Capacity : 100.000 kN/m2
Soil Surcharge : 0.000 kN/m2
Depth of Soil above Footing : 0.000 mm
Cohesion : 0.000 kN/m2
Min Percentage of Slab : 0.000
Sliding and Overturning

Coefficient of Friction : 0.500


Factor of Safety Against Sliding : 1.500
Factor of Safety Against Overturning : 1.500

------------------------------------------------------

Load Combination/s- Service Stress Level

Load Combination Load Combination Title

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 62 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Number
1 DL
2 LL
3 WX
4 WZ

5 Generated Indian Code Genral_Structures 1


6 Generated Indian Code Genral_Structures 2
7 Generated Indian Code Genral_Structures 3
8 Generated Indian Code Genral_Structures 4
9 Generated Indian Code Genral_Structures 5
10 Generated Indian Code Genral_Structures 6
11 Generated Indian Code Genral_Structures 7
12 Generated Indian Code Genral_Structures 8
13 Generated Indian Code Genral_Structures 9
14 Generated Indian Code Genral_Structures 10
15 Generated Indian Code Genral_Structures 11
16 Generated Indian Code Genral_Structures 12
1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000
101
x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL
0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800
102
x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL
Load Combination/s- Strength Level
Load Combination
Load Combination Title
Number
1 DL
2 LL
3 WX
4 WZ
5 Generated Indian Code Genral_Structures 1
6 Generated Indian Code Genral_Structures 2
7 Generated Indian Code Genral_Structures 3
8 Generated Indian Code Genral_Structures 4
9 Generated Indian Code Genral_Structures 5
10 Generated Indian Code Genral_Structures 6
11 Generated Indian Code Genral_Structures 7
12 Generated Indian Code Genral_Structures 8
13 Generated Indian Code Genral_Structures 9
14 Generated Indian Code Genral_Structures 10
15 Generated Indian Code Genral_Structures 11
16 Generated Indian Code Genral_Structures 12
1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500
201
x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL
0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960
202
x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL
1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200
203
x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL
0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900
204
x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL
Applied Loads - Service Stress Level

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 63 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Axial Shear X Shear Z Moment X Moment Z


LC
(kN) (kN) (kN) (kNm) (kNm)
1 268.368 0.420 -4.172 -1.444 -0.172

2 21.634 0.015 -0.254 -0.091 -0.002

3 0.015 0.000 -0.003 -0.002 -0.000

4 0.087 0.006 -0.271 -0.219 -0.005

5 435.003 0.652 -6.639 -2.302 -0.261

6 348.020 0.521 -5.315 -1.844 -0.209

7 348.107 0.528 -5.636 -2.104 -0.214

8 347.985 0.521 -5.307 -1.839 -0.209

9 347.898 0.515 -4.986 -1.579 -0.203

10 348.003 0.521 -5.311 -1.841 -0.209

11 402.574 0.630 -6.262 -2.169 -0.258

12 402.682 0.638 -6.664 -2.494 -0.264


13 402.530 0.630 -6.253 -2.162 -0.258
14 402.422 0.621 -5.851 -1.837 -0.251
15 402.552 0.630 -6.257 -2.165 -0.258
16 241.531 0.378 -3.754 -1.299 -0.155
101 4719.410 7.226 -72.935 -25.391 -2.927
102 3775.528 5.781 -58.348 -20.312 -2.341
Applied Loads - Strength Level
LC Axial Shear X Shear Z Moment X Moment Z
(kN) (kN) (kN) (kNm) (kNm)
1 268.368 0.420 -4.172 -1.444 -0.172
2 21.634 0.015 -0.254 -0.091 -0.002
3 0.015 0.000 -0.003 -0.002 -0.000
4 0.087 0.006 -0.271 -0.219 -0.005
5 435.003 0.652 -6.639 -2.302 -0.261
6 348.020 0.521 -5.315 -1.844 -0.209
7 348.107 0.528 -5.636 -2.104 -0.214
8 347.985 0.521 -5.307 -1.839 -0.209
9 347.898 0.515 -4.986 -1.579 -0.203
10 348.003 0.521 -5.311 -1.841 -0.209
11 402.574 0.630 -6.262 -2.169 -0.258
12 402.682 0.638 -6.664 -2.494 -0.264
13 402.530 0.630 -6.253 -2.162 -0.258
14 402.422 0.621 -5.851 -1.837 -0.251
15 402.552 0.630 -6.257 -2.165 -0.258
16 241.531 0.378 -3.754 -1.299 -0.155
201 7079.116 10.839 -109.403 -38.086 -4.390
202 4530.634 6.937 -70.018 -24.375 -2.810
203 5663.292 8.671 -87.522 -30.469 -3.512
204 4247.469 6.503 -65.642 -22.852 -2.634
------------------------------------------------------

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 64 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Design Calculations
Footing Size

Initial Length (Lo) = 1.000 m

Initial Width (Wo) = 1.000 m

Uplift force due to buoyancy = 0.000 kN


Effect due to adhesion = 0.000 kN

Area from initial length and width, A o = Lo X Wo = 1.000 m2 Min. area required from

bearing pressure, Amin = P / qmax = 61.554 m2

Note: Amin is an initial estimation.


P = Critical Factored Axial Load(without self weight/buoyancy/soil). q max = Respective
Factored Bearing Capacity.

Final Footing Size


Length (L2) = 8.200 m Governing Load Case : # 101

8.200 m Governing Load Case : # 101


Width (W2) =
1.113 m Governing Load Case : # 101
Depth (D2) =

Area (A2) = 67.240 m2

------------------------------------------------------

Pressures at Four Corner

Area of
Pressure at Pressure at Pressure at Pressure at footing in
Load Case corner 1 (q1) corner 2 (q2) corner 3 (q3) corner 4 (q4) uplift (Au)
(kN/m2) (kN/m2) (kN/m2) (kN/m2)

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 65 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

(m2)
101 99.3463 99.5112 97.9797 97.8148 0.000
101 99.3463 99.5112 97.9797 97.8148 0.000
101 99.3463 99.5112 97.9797 97.8148 0.000
101 99.3463 99.5112 97.9797 97.8148 0.000
If Au is zero, there is no uplift and no pressure adjustment is necessary. Otherwise, to account for uplift, areas of negative pressure
will be set to zero and the pressure will be redistributed to remaining corners.
Summary of adjusted Pressures at Four Corner
Pressure at Pressure at Pressure at Pressure at
corner 1 (q1) corner 2 (q2) corner 3 (q3) corner 4 (q4)
Load Case

(kN/m2) (kN/m2) (kN/m2) (kN/m2)

101 99.3463 99.5112 97.9797 97.8148


101 99.3463 99.5112 97.9797 97.8148
101 99.3463 99.5112 97.9797 97.8148
101 99.3463 99.5112 97.9797 97.8148
Details of Out-of-Contact Area
(If Any)
Governing load case = N/A
Plan area of footing = 67.240 sq.m
Area not in contact with soil = 0.000 sq.m

% of total area not in contact = 0.000%

------------------------------------------------------
Check For Stability Against Overturning And Sliding
- Factor of safety against sliding Factor of safety against overturning

Load Case Along X- Along Z- About X- About Z-


No. Direction Direction Direction Direction

1 2537.819 255.404 1440.346 13716.167


2 64178.928 3707.362 20731.552 417880.157
3 23262260.804 283302.234 1285829.921 120351382.743
4 162049.880 3438.696 14713.635 700618.010
5 1762.556 173.043 975.400 9581.101
6 2119.593 207.961 1172.008 11521.861
7 2092.191 196.122 1085.618 11334.903
8 2119.956 208.267 1174.155 11523.937
9 2148.079 221.669 1275.881 11717.183
10 2119.774 208.113 1173.080 11522.899
11 1798.257 180.850 1019.708 9719.018

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 66 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

12 1774.233 169.967 940.296 9556.933


13 1798.577 181.132 1021.687 9720.814
14 1823.286 193.546 1116.144 9888.626
15 1798.417 180.991 1020.697 9719.915
16 2784.280 280.208 1580.230 15048.224
101 455.454 45.122 254.098 2468.345
102 487.675 48.314 272.074 2642.966
Critical Load Case And The Governing Factor Of Safety For Overturning and Sliding X Direction
Critical Load Case for Sliding along X-Direction : 101
Governing Disturbing Force : 7.226 kN
Governing Restoring Force : 3290.979 kN
Minimum Sliding Ratio for the Critical Load Case : 455.454
Critical Load Case for Overturning about X-Direction : 101
Governing Overturning Moment : -106.201 kNm
Governing Resisting Moment : 26985.534 kNm
Minimum Overturning Ratio for the Critical Load Case : 254.098
Critical Load Case And The Governing Factor Of Safety For Overturning and Sliding Z Direction
Critical Load Case for Sliding along Z-Direction : 101
Governing Disturbing Force : -72.935 kN
Governing Restoring Force : 3290.979 kN
Minimum Sliding Ratio for the Critical Load Case : 45.122
Critical Load Case for Overturning about Z-Direction : 101

Governing Overturning Moment : -10.933 kNm


Governing Resisting Moment : 26985.534 kNm
Minimum Overturning Ratio for the Critical Load Case : 2468.345

------------------------------------------------------

Moment Calculation
Check Trial Depth against moment (w.r.t. X Axis)

Critical Load Case = #201

Effective Depth = = 1.055 m

Governing moment (Mu) = 6810.004 kNm As Per IS 456 2000

ANNEX G G-1.1C

= 0.479107 Limiting Factor1 (K


umax) =

Limiting Factor2 (Rumax) = = 3444.291146 kN/m2

RPEPL-BCW-ME-
Doc.No: - Rev
)=
PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00
PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 67 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Limit Moment Of Resistance (Mumax = 31434.799513 kNm

Mu <= Mumax hence, safe

Check Trial Depth against moment (w.r.t. Z Axis)

Critical Load Case = #201

Effective Depth = = 1.055 m

Governing moment (Mu) = 6742.504 kNm As Per IS 456 2000

ANNEX G G-1.1C

= 0.479107 Limiting Factor1 (K


umax) =

Limiting Factor2 (Rumax) = = 3444.291146 kN/m2

)=
Limit Moment Of Resistance (Mumax
= 31434.799513 kNm

Mu <= Mumax hence, safe

------------------------------------------------------

Shear Calculation
Check Trial Depth for one way shear (Along X Axis)
(Shear Plane Parallel to X Axis)

Critical Load Case = #201

DX = 1.055 m

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 68 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Shear Force(S) = 2525.897 kN

Shear Stress(Tv) = 291.977510 kN/m2

Percentage Of Steel(Pt) = 0.2121

As Per IS 456 2000 Clause 40 Table 19

Shear Strength Of Concrete(Tc) = 339.426 kN/m2

Tv< Tc hence, safe

Check Trial Depth for one way shear (Along Z Axis) (Shear Plane Parallel to Z
Axis)

Critical Load Case = #201

DZ = 1.055 m
Shear Force(S) = 2502.014 kN

Shear Stress(Tv) = 289.216765 kN/m2

Percentage Of Steel(Pt) = 0.2143

As Per IS 456 2000 Clause 40 Table 19

Shear Strength Of Concrete(Tc) = 340.973 kN/m2

Tv< Tc hence, safe

Check Trial Depth for two way shear

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 69 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Critical Load Case = #201


Shear Force(S) = 6885.817 kN

Shear Stress(Tv) = 1204.215 kN/m2


As Per IS 456 2000 Clause 31.6.3.1

Ks = = 1.000

Shear Strength(Tc)= = 1250.0000 kN/m2

Ks x Tc = 1250.0000 kN/m2

Tv<= Ks x Tc hence, safe

------------------------------------------------------

Reinforcement Calculation
Calculation of Maximum Bar Size

Along X Axis

Bar diameter corresponding to max bar size (db) = 32 mm

As Per IS 456 2000 Clause 26.2.1

Development Length(ld) =
= 1.289 m

Allowable Length(ldb) =
= 3.900 m

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 70 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

ldb >=ld hence, safe

Along Z Axis

Bar diameter corresponding to max bar size(d b) = 32 mm

As Per IS 456 2000 Clause 26.2.1

Development Length(ld) = = 1.289 m

Allowable Length(ldb) = = 3.900 m

ldb >=ld hence, safe

Bottom Reinforcement Design

Along Z Axis

For moment w.r.t. X Axis (Mx)

As Per IS 456 2000 Clause 26.5.2.1


Critical Load Case = #201

Minimum Area of Steel (Astmin) = 10951.920 mm2

Calculated Area of Steel (Ast) = 18538.117 mm2

Provided Area of Steel (Ast,Provided) = 18538.117 mm2

Astmin<= Ast,Provided Steel area is accepted

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 71 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Selected bar Size (db) = Ø16

Minimum spacing allowed (Smin) = 56.000 mm

Selected spacing (S) = 87.870 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size...

The reinforcement is accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø16 @ 85.000 mm o.c.

Along X Axis

For moment w.r.t. Z Axis (Mz)

As Per IS 456 2000 Clause 26.5.2.1


Critical Load Case = #201

Minimum Area of Steel (Astmin) = 10951.920 mm2

Calculated Area of Steel (Ast) = 18347.408 mm2

Provided Area of Steel (Ast,Provided) = 18347.408 mm2

Astmin<= Ast,Provided Steel area is accepted

Selected bar Size (db) = Ø16

Minimum spacing allowed (Smin) = = 50.000 mm

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 72 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Selected spacing (S) = 88.835 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size...

The reinforcement is accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø16 @ 85.000 mm o.c.

Top Reinforcement Design

Along Z Axis

Minimum Area of Steel (Astmin) = 10951.920 mm2

Calculated Area of Steel (Ast) = 10922.400 mm2

Provided Area of Steel (Ast,Provided) = 10951.920 mm2

Astmin<= Ast,Provided Steel area is accepted Governing Moment =

1968.826 kNm

Selected bar Size (db) = Ø10

Minimum spacing allowed (Smin) = 50.000 mm

Selected spacing (S) = 58.201 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size... The reinforcement is

accepted.

Based on spacing reinforcement increment; provided reinforcement is

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 73 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Ø10 @ 55 mm o.c.

Along X Axis

Minimum Area of Steel (Astmin) = 10951.920 mm2

Calculated Area of Steel (Ast) = 10922.400 mm2

Provided Area of Steel (Ast,Provided) = 10951.920 mm2

Astmin<= Ast,Provided Steel area is accepted Governing Moment =

1968.826 kNm

Selected bar Size (db) = Ø10

Minimum spacing allowed (Smin) = = 50.000 mm

Selected spacing (S) = 58.201 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size... The reinforcement is

accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø10 @ 55 mm o.c.

------------------------------------------------------

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 74 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Isolated Footing 7

Input Values
Footing Geomtery
Design Type : Calculate Dimension
Footing Thickness (Ft) : 305.000 mm
Footing Length - X (Fl) : 1000.000 mm
Footing Width - Z (Fw) : 1000.000 mm Eccentricity along X (Oxd) : 0.000
mm
Eccentricity along Z (Ozd) : 0.000 mm

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 75 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Column Dimensions
Column Shape : Rectangular
Column Length - X (Pl) : 0.300 m
Column Width - Z (Pw) : 0.300 m

Pedestal
Include Pedestal? No
Pedestal Shape : N/A
Pedestal Height (Ph) : N/A
Pedestal Length - X (Pl) : N/A
Pedestal Width - Z (Pw) : N/A

Design Parameters
Concrete and Rebar Properties
Unit Weight of Concrete : 25.000 kN/m3
Strength of Concrete : 25.000 N/mm2
Yield Strength of Steel : 415.000 N/mm2
Minimum Bar Size : Ø6
Maximum Bar Size : Ø32
Minimum Bar Spacing : 50.000 mm
Maximum Bar Spacing : 500.000 mm
Pedestal Clear Cover (P, CL) : 50.000 mm
Footing Clear Cover (F, CL) : 50.000 mm
Soil Properties
Soil Type : Drained
Unit Weight : 22.000 kN/m3
Soil Bearing Capacity : 100.000 kN/m2
Soil Surcharge : 0.000 kN/m2
Depth of Soil above Footing : 0.000 mm
Cohesion : 0.000 kN/m2
Min Percentage of Slab : 0.000
Sliding and Overturning

Coefficient of Friction : 0.500


Factor of Safety Against Sliding : 1.500
Factor of Safety Against Overturning : 1.500

------------------------------------------------------

Load Combination/s- Service Stress Level

Load Combination Load Combination Title

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 76 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Number
1 DL
2 LL
3 WX
4 WZ

5 Generated Indian Code Genral_Structures 1


6 Generated Indian Code Genral_Structures 2
7 Generated Indian Code Genral_Structures 3
8 Generated Indian Code Genral_Structures 4
9 Generated Indian Code Genral_Structures 5
10 Generated Indian Code Genral_Structures 6
11 Generated Indian Code Genral_Structures 7
12 Generated Indian Code Genral_Structures 8
13 Generated Indian Code Genral_Structures 9
14 Generated Indian Code Genral_Structures 10
15 Generated Indian Code Genral_Structures 11
16 Generated Indian Code Genral_Structures 12
1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000
101
x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL
0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800
102
x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL
Load Combination/s- Strength Level
Load Combination
Load Combination Title
Number
1 DL
2 LL
3 WX
4 WZ
5 Generated Indian Code Genral_Structures 1
6 Generated Indian Code Genral_Structures 2
7 Generated Indian Code Genral_Structures 3
8 Generated Indian Code Genral_Structures 4
9 Generated Indian Code Genral_Structures 5
10 Generated Indian Code Genral_Structures 6
11 Generated Indian Code Genral_Structures 7
12 Generated Indian Code Genral_Structures 8
13 Generated Indian Code Genral_Structures 9
14 Generated Indian Code Genral_Structures 10
15 Generated Indian Code Genral_Structures 11
16 Generated Indian Code Genral_Structures 12
1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500
201
x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL
0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960
202
x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL
1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200
203
x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL
0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900
204
x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL
Applied Loads - Service Stress Level

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 77 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Axial Shear X Shear Z Moment X Moment Z


LC
(kN) (kN) (kN) (kNm) (kNm)
1 206.059 6.874 -21.670 -9.539 -3.175

2 18.002 0.381 -1.004 -0.444 -0.169

3 -0.010 -1.646 -0.024 -0.022 0.080

4 -0.027 -0.044 1.400 0.162 0.033

5 336.091 10.882 -34.011 -14.975 -5.016

6 268.862 6.730 -27.237 -12.007 -3.917

7 268.840 8.653 -25.529 -11.786 -3.974

8 268.885 10.680 -27.180 -11.953 -4.109

9 268.906 8.758 -28.889 -12.174 -4.052

10 268.873 8.705 -27.209 -11.980 -4.013

11 309.074 7.842 -32.541 -14.343 -4.643

12 309.048 10.245 -30.405 -14.067 -4.714


13 309.103 12.779 -32.469 -14.276 -4.883
14 309.130 10.376 -34.605 -14.552 -4.812
15 309.089 10.311 -32.505 -14.309 -4.763
16 185.453 6.186 -19.503 -8.586 -2.858
101 3635.378 117.713 -373.381 -164.852 -54.986
102 2908.302 94.170 -298.704 -131.882 -43.989
Applied Loads - Strength Level
LC Axial Shear X Shear Z Moment X Moment Z
(kN) (kN) (kN) (kNm) (kNm)
1 206.059 6.874 -21.670 -9.539 -3.175
2 18.002 0.381 -1.004 -0.444 -0.169
3 -0.010 -1.646 -0.024 -0.022 0.080
4 -0.027 -0.044 1.400 0.162 0.033
5 336.091 10.882 -34.011 -14.975 -5.016
6 268.862 6.730 -27.237 -12.007 -3.917
7 268.840 8.653 -25.529 -11.786 -3.974
8 268.885 10.680 -27.180 -11.953 -4.109
9 268.906 8.758 -28.889 -12.174 -4.052
10 268.873 8.705 -27.209 -11.980 -4.013
11 309.074 7.842 -32.541 -14.343 -4.643
12 309.048 10.245 -30.405 -14.067 -4.714
13 309.103 12.779 -32.469 -14.276 -4.883
14 309.130 10.376 -34.605 -14.552 -4.812
15 309.089 10.311 -32.505 -14.309 -4.763
16 185.453 6.186 -19.503 -8.586 -2.858
201 5453.067 176.569 -560.071 -247.278 -82.479
202 3489.963 113.004 -358.445 -158.258 -52.786
203 4362.453 141.255 -448.057 -197.822 -65.983
204 3271.840 105.941 -336.042 -148.367 -49.487
------------------------------------------------------

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 78 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Design Calculations
Footing Size

Initial Length (Lo) = 1.000 m

Initial Width (Wo) = 1.000 m

Uplift force due to buoyancy = 0.000 kN


Effect due to adhesion = 0.000 kN

Area from initial length and width, A o = Lo X Wo = 1.000 m2 Min. area required from

bearing pressure, Amin = P / qmax = 46.786 m2

Note: Amin is an initial estimation.


P = Critical Factored Axial Load(without self weight/buoyancy/soil). q max = Respective
Factored Bearing Capacity.

Final Footing Size


Length (L2) = 7.450 m Governing Load Case : # 101

7.450 m Governing Load Case : # 101


Width (W2) =
0.961 m Governing Load Case : # 101
Depth (D2) =

Area (A2) = 55.503 m2

------------------------------------------------------

Pressures at Four Corner

Area of
Pressure at Pressure at Pressure at Pressure at footing in
Load Case corner 1 (q1) corner 2 (q2) corner 3 (q3) corner 4 (q4) uplift (Au)
(kN/m2) (kN/m2) (kN/m2) (kN/m2)

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 79 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

(m2)
101 95.0021 98.7958 87.1615 83.3678 0.000
101 94.5977 99.4661 84.3011 79.4326 0.000
101 95.0021 98.7958 87.1615 83.3678 0.000
101 95.0021 98.7958 87.1615 83.3678 0.000
If Au is zero, there is no uplift and no pressure adjustment is necessary. Otherwise, to account for uplift, areas of negative pressure
will be set to zero and the pressure will be redistributed to remaining corners.
Summary of adjusted Pressures at Four Corner
Pressure at Pressure at Pressure at Pressure at
corner 1 (q1) corner 2 (q2) corner 3 (q3) corner 4 (q4)
Load Case

(kN/m2) (kN/m2) (kN/m2) (kN/m2)

101 95.0021 98.7958 87.1615 83.3678


101 94.5977 99.4661 84.3011 79.4326
101 95.0021 98.7958 87.1615 83.3678
101 95.0021 98.7958 87.1615 83.3678
Details of Out-of-Contact Area
(If Any)
Governing load case = N/A
Plan area of footing = 55.503 sq.m
Area not in contact with soil = 0.000 sq.m

% of total area not in contact = 0.000%

------------------------------------------------------
Check For Stability Against Overturning And Sliding
- Factor of safety against sliding Factor of safety against overturning

Load Case Along X- Along Z- About X- About Z-


No. Direction Direction Direction Direction

1 111.682 35.426 188.754 585.949


2 1769.129 671.025 3569.933 9407.478
3 403.851 27881.406 109364.238 2988.817
4 15132.109 474.728 3294.440 66254.841
5 76.522 24.483 130.441 401.758
6 118.724 29.337 156.246 574.360
7 92.349 31.301 164.254 485.442
8 74.819 29.400 156.695 415.122
9 91.241 27.661 149.392 478.464
10 91.791 29.368 156.471 481.927
11 104.461 25.174 134.079 502.060

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 80 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

12 79.960 26.942 141.285 420.052


13 64.104 25.230 134.482 356.363
14 78.949 23.673 127.937 413.689
15 79.451 25.202 134.280 416.846
16 122.426 38.833 206.912 642.317
101 21.088 6.648 35.390 110.240
102 22.500 7.093 37.759 117.619
Critical Load Case And The Governing Factor Of Safety For Overturning and Sliding X Direction
Critical Load Case for Sliding along X-Direction : 101
Governing Disturbing Force : 117.713 kN
Governing Restoring Force : 2482.332 kN
Minimum Sliding Ratio for the Critical Load Case : 21.088
Critical Load Case for Overturning about X-Direction : 101
Governing Overturning Moment : -522.544 kNm
Governing Resisting Moment : 18493.032 kNm
Minimum Overturning Ratio for the Critical Load Case : 35.390
Critical Load Case And The Governing Factor Of Safety For Overturning and Sliding Z Direction
Critical Load Case for Sliding along Z-Direction : 101
Governing Disturbing Force : -373.381 kN
Governing Restoring Force : 2482.332 kN
Minimum Sliding Ratio for the Critical Load Case : 6.648
Critical Load Case for Overturning about Z-Direction : 101

Governing Overturning Moment : -167.752 kNm


Governing Resisting Moment : 18493.032 kNm
Minimum Overturning Ratio for the Critical Load Case : 110.240

------------------------------------------------------

Moment Calculation
Check Trial Depth against moment (w.r.t. X Axis)

Critical Load Case = #201

Effective Depth = = 0.905 m

Governing moment (Mu) = 5045.448 kNm As Per IS 456 2000

ANNEX G G-1.1C

= 0.479107 Limiting Factor1 (K


umax) =

Limiting Factor2 (Rumax) = = 3444.291146 kN/m2

RPEPL-BCW-ME-
Doc.No: - Rev
)=
PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00
PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 81 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Limit Moment Of Resistance (Mumax = 21015.772382 kNm

Mu <= Mumax hence, safe

Check Trial Depth against moment (w.r.t. Z Axis)

Critical Load Case = #201

Effective Depth = = 0.905 m

Governing moment (Mu) = 4795.614 kNm As Per IS 456 2000

ANNEX G G-1.1C

= 0.479107 Limiting Factor1 (K


umax) =

Limiting Factor2 (Rumax) = = 3444.291146 kN/m2

)=
Limit Moment Of Resistance (Mumax
= 21015.772382 kNm

Mu <= Mumax hence, safe

------------------------------------------------------

Shear Calculation
Check Trial Depth for one way shear (Along X Axis)
(Shear Plane Parallel to X Axis)

Critical Load Case = #201

DX = 0.905 m

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 82 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Shear Force(S) = 2099.480 kN

Shear Stress(Tv) = 311.391559 kN/m2

Percentage Of Steel(Pt) = 0.2262

As Per IS 456 2000 Clause 40 Table 19

Shear Strength Of Concrete(Tc) = 349.151 kN/m2

Tv< Tc hence, safe

Check Trial Depth for one way shear (Along Z Axis) (Shear Plane Parallel to Z
Axis)

Critical Load Case = #201

DZ = 0.905 m
Shear Force(S) = 2000.921 kN

Shear Stress(Tv) = 296.773518 kN/m2

Percentage Of Steel(Pt) = 0.2385

As Per IS 456 2000 Clause 40 Table 19

Shear Strength Of Concrete(Tc) = 357.322 kN/m2

Tv< Tc hence, safe

Check Trial Depth for two way shear

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 83 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Critical Load Case = #201


Shear Force(S) = 5310.407 kN

Shear Stress(Tv) = 1217.397 kN/m2


As Per IS 456 2000 Clause 31.6.3.1

Ks = = 1.000

Shear Strength(Tc)= = 1250.0000 kN/m2

Ks x Tc = 1250.0000 kN/m2

Tv<= Ks x Tc hence, safe

------------------------------------------------------

Reinforcement Calculation
Calculation of Maximum Bar Size

Along X Axis

Bar diameter corresponding to max bar size (db) = 32 mm

As Per IS 456 2000 Clause 26.2.1

Development Length(ld) =
= 1.289 m

Allowable Length(ldb) =
= 3.525 m

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 84 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

ldb >=ld hence, safe

Along Z Axis

Bar diameter corresponding to max bar size(d b) = 32 mm

As Per IS 456 2000 Clause 26.2.1

Development Length(ld) = = 1.289 m

Allowable Length(ldb) = = 3.525 m

ldb >=ld hence, safe

Bottom Reinforcement Design

Along Z Axis

For moment w.r.t. X Axis (Mx)

As Per IS 456 2000 Clause 26.5.2.1


Critical Load Case = #201

Minimum Area of Steel (Astmin) = 8591.340 mm2

Calculated Area of Steel (Ast) = 16078.039 mm2

Provided Area of Steel (Ast,Provided) = 16078.039 mm2

Astmin<= Ast,Provided Steel area is accepted

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 85 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Selected bar Size (db) = Ø12

Minimum spacing allowed (Smin) = 52.000 mm

Selected spacing (S) = 51.676 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size...

The reinforcement is accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø12 @ 50.000 mm o.c.

Along X Axis

For moment w.r.t. Z Axis (Mz)

As Per IS 456 2000 Clause 26.5.2.1


Critical Load Case = #201

Minimum Area of Steel (Astmin) = 8591.340 mm2

Calculated Area of Steel (Ast) = 15249.516 mm2

Provided Area of Steel (Ast,Provided) = 15249.516 mm2

Astmin<= Ast,Provided Steel area is accepted

Selected bar Size (db) = Ø12

Minimum spacing allowed (Smin) = = 50.000 mm

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 86 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Selected spacing (S) = 54.761 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size...

The reinforcement is accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø12 @ 50.000 mm o.c.

Top Reinforcement Design

Along Z Axis

Minimum Area of Steel (Astmin) = 8591.340 mm2

Calculated Area of Steel (Ast) = 8582.400 mm2

Provided Area of Steel (Ast,Provided) = 8591.340 mm2

Astmin<= Ast,Provided Steel area is accepted Governing Moment =

1266.874 kNm

Selected bar Size (db) = Ø10

Minimum spacing allowed (Smin) = 50.000 mm

Selected spacing (S) = 67.339 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size... The reinforcement is

accepted.

Based on spacing reinforcement increment; provided reinforcement is

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 87 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Ø10 @ 65 mm o.c.

Along X Axis

Minimum Area of Steel (Astmin) = 8591.340 mm2

Calculated Area of Steel (Ast) = 9005.868 mm2

Provided Area of Steel (Ast,Provided) = 9005.868 mm2

Astmin<= Ast,Provided Steel area is accepted Governing Moment =

1266.874 kNm

Selected bar Size (db) = Ø10

Minimum spacing allowed (Smin) = = 50.000 mm

Selected spacing (S) = 64.386 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size... The reinforcement is

accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø10 @ 60 mm o.c.

------------------------------------------------------

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 88 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Isolated Footing 9

Input Values
Footing Geomtery
Design Type : Calculate Dimension
Footing Thickness (Ft) : 305.000 mm
Footing Length - X (Fl) : 1000.000 mm
Footing Width - Z (Fw) : 1000.000 mm Eccentricity along X (Oxd) : 0.000
mm
Eccentricity along Z (Ozd) : 0.000 mm

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 89 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Column Dimensions
Column Shape : Rectangular
Column Length - X (Pl) : 0.300 m
Column Width - Z (Pw) : 0.300 m

Pedestal
Include Pedestal? No
Pedestal Shape : N/A
Pedestal Height (Ph) : N/A
Pedestal Length - X (Pl) : N/A
Pedestal Width - Z (Pw) : N/A

Design Parameters
Concrete and Rebar Properties
Unit Weight of Concrete : 25.000 kN/m3
Strength of Concrete : 25.000 N/mm2
Yield Strength of Steel : 415.000 N/mm2
Minimum Bar Size : Ø6
Maximum Bar Size : Ø32
Minimum Bar Spacing : 50.000 mm
Maximum Bar Spacing : 500.000 mm
Pedestal Clear Cover (P, CL) : 50.000 mm
Footing Clear Cover (F, CL) : 50.000 mm
Soil Properties
Soil Type : Drained
Unit Weight : 22.000 kN/m3
Soil Bearing Capacity : 100.000 kN/m2
Soil Surcharge : 0.000 kN/m2
Depth of Soil above Footing : 0.000 mm
Cohesion : 0.000 kN/m2
Min Percentage of Slab : 0.000
Sliding and Overturning

Coefficient of Friction : 0.500


Factor of Safety Against Sliding : 1.500
Factor of Safety Against Overturning : 1.500

------------------------------------------------------

Load Combination/s- Service Stress Level

Load Combination Load Combination Title

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 90 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Number
1 DL
2 LL
3 WX
4 WZ

5 Generated Indian Code Genral_Structures 1


6 Generated Indian Code Genral_Structures 2
7 Generated Indian Code Genral_Structures 3
8 Generated Indian Code Genral_Structures 4
9 Generated Indian Code Genral_Structures 5
10 Generated Indian Code Genral_Structures 6
11 Generated Indian Code Genral_Structures 7
12 Generated Indian Code Genral_Structures 8
13 Generated Indian Code Genral_Structures 9
14 Generated Indian Code Genral_Structures 10
15 Generated Indian Code Genral_Structures 11
16 Generated Indian Code Genral_Structures 12
1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000
101
x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL
0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800
102
x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL
Load Combination/s- Strength Level
Load Combination
Load Combination Title
Number
1 DL
2 LL
3 WX
4 WZ
5 Generated Indian Code Genral_Structures 1
6 Generated Indian Code Genral_Structures 2
7 Generated Indian Code Genral_Structures 3
8 Generated Indian Code Genral_Structures 4
9 Generated Indian Code Genral_Structures 5
10 Generated Indian Code Genral_Structures 6
11 Generated Indian Code Genral_Structures 7
12 Generated Indian Code Genral_Structures 8
13 Generated Indian Code Genral_Structures 9
14 Generated Indian Code Genral_Structures 10
15 Generated Indian Code Genral_Structures 11
16 Generated Indian Code Genral_Structures 12
1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500
201
x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL
0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960
202
x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL
1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200
203
x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL
0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900
204
x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL
Applied Loads - Service Stress Level

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 91 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Axial Shear X Shear Z Moment X Moment Z


LC
(kN) (kN) (kN) (kNm) (kNm)
1 340.836 11.292 19.875 9.905 -5.280

2 24.612 0.660 0.871 0.436 -0.306

3 -0.015 -2.582 -0.014 -0.011 0.067

4 0.053 0.044 -0.068 -0.055 -0.035

5 548.171 17.927 31.120 15.513 -8.379

6 438.519 11.243 24.880 12.397 -6.622

7 438.601 14.394 24.815 12.344 -6.745

8 438.555 17.440 24.912 12.423 -6.784

9 438.473 14.288 24.977 12.477 -6.661

10 438.537 14.341 24.896 12.410 -6.703

11 511.231 13.064 29.793 14.842 -7.820

12 511.334 17.004 29.712 14.775 -7.973


13 511.276 20.810 29.833 14.874 -8.022
14 511.174 16.871 29.914 14.941 -7.868
15 511.254 16.937 29.813 14.858 -7.921
16 306.752 10.162 17.888 8.915 -4.752
101 5969.362 193.895 343.217 171.042 -91.803
102 4775.489 155.116 274.574 136.834 -73.443
Applied Loads - Strength Level
LC Axial Shear X Shear Z Moment X Moment Z
(kN) (kN) (kN) (kNm) (kNm)
1 340.836 11.292 19.875 9.905 -5.280
2 24.612 0.660 0.871 0.436 -0.306
3 -0.015 -2.582 -0.014 -0.011 0.067
4 0.053 0.044 -0.068 -0.055 -0.035
5 548.171 17.927 31.120 15.513 -8.379
6 438.519 11.243 24.880 12.397 -6.622
7 438.601 14.394 24.815 12.344 -6.745
8 438.555 17.440 24.912 12.423 -6.784
9 438.473 14.288 24.977 12.477 -6.661
10 438.537 14.341 24.896 12.410 -6.703
11 511.231 13.064 29.793 14.842 -7.820
12 511.334 17.004 29.712 14.775 -7.973
13 511.276 20.810 29.833 14.874 -8.022
14 511.174 16.871 29.914 14.941 -7.868
15 511.254 16.937 29.813 14.858 -7.921
16 306.752 10.162 17.888 8.915 -4.752
201 8954.042 290.843 514.826 256.564 -137.705
202 5730.587 186.139 329.489 164.201 -88.131
203 7163.234 232.674 411.861 205.251 -110.164
204 5372.426 174.506 308.896 153.938 -82.623
------------------------------------------------------

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 92 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Design Calculations
Footing Size

Initial Length (Lo) = 1.000 m

Initial Width (Wo) = 1.000 m

Uplift force due to buoyancy = 0.000 kN


Effect due to adhesion = 0.000 kN

Area from initial length and width, A o = Lo X Wo = 1.000 m2 Min. area required from

bearing pressure, Amin = P / qmax = 81.133 m2

Note: Amin is an initial estimation.


P = Critical Factored Axial Load(without self weight/buoyancy/soil). q max = Respective
Factored Bearing Capacity.

Final Footing Size


Length (L2) = 9.800 m Governing Load Case : # 101

9.800 m Governing Load Case : # 101


Width (W2) =
1.265 m Governing Load Case : # 101
Depth (D2) =

Area (A2) = 96.040 m2

------------------------------------------------------

Pressures at Four Corner

Area of
Pressure at Pressure at Pressure at Pressure at footing in
Load Case corner 1 (q1) corner 2 (q2) corner 3 (q3) corner 4 (q4) uplift (Au)
(kN/m2) (kN/m2) (kN/m2) (kN/m2)

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 93 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

(m2)
101 90.7700 93.9958 99.8882 96.6625 0.000
101 90.7700 93.9958 99.8882 96.6625 0.000
101 90.7700 93.9958 99.8882 96.6625 0.000
101 90.7700 93.9958 99.8882 96.6625 0.000
If Au is zero, there is no uplift and no pressure adjustment is necessary. Otherwise, to account for uplift, areas of negative pressure
will be set to zero and the pressure will be redistributed to remaining corners.
Summary of adjusted Pressures at Four Corner
Pressure at Pressure at Pressure at Pressure at
corner 1 (q1) corner 2 (q2) corner 3 (q3) corner 4 (q4)
Load Case

(kN/m2) (kN/m2) (kN/m2) (kN/m2)

101 90.7700 93.9958 99.8882 96.6625


101 90.7700 93.9958 99.8882 96.6625
101 90.7700 93.9958 99.8882 96.6625
101 90.7700 93.9958 99.8882 96.6625
Details of Out-of-Contact Area
(If Any)
Governing load case = N/A
Plan area of footing = 96.040 sq.m
Area not in contact with soil = 0.000 sq.m

% of total area not in contact = 0.000%

------------------------------------------------------
Check For Stability Against Overturning And Sliding
- Factor of safety against sliding Factor of safety against overturning

Load Case Along X- Along Z- About X- About Z-


No. Direction Direction Direction Direction

1 149.054 84.681 471.951 845.503


2 2311.987 1750.033 9739.489 13147.404
3 585.848 111419.059 534103.530 4464.241
4 34200.812 22385.537 105452.268 163642.047
5 99.668 57.414 319.966 565.441
6 154.042 69.611 387.980 816.431
7 120.320 69.794 389.194 682.136
8 99.309 69.520 387.394 590.191
9 121.209 69.338 386.191 688.123
10 120.763 69.565 387.687 685.116
11 135.349 59.352 330.824 713.683

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 94 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

12 103.995 59.516 331.906 589.482


13 84.971 59.272 330.303 506.069
14 104.809 59.110 329.232 594.955
15 104.400 59.312 330.564 592.206
16 163.939 93.137 519.081 929.936
101 23.195 13.103 73.030 131.128
102 25.145 14.205 79.171 142.153
Critical Load Case And The Governing Factor Of Safety For Overturning and Sliding X Direction
Critical Load Case for Sliding along X-Direction : 101
Governing Disturbing Force : 193.895 kN
Governing Restoring Force : 4497.311 kN
Minimum Sliding Ratio for the Critical Load Case : 23.195
Critical Load Case for Overturning about X-Direction : 101
Governing Overturning Moment : 603.488 kNm
Governing Resisting Moment : 44072.839 kNm
Minimum Overturning Ratio for the Critical Load Case : 73.030
Critical Load Case And The Governing Factor Of Safety For Overturning and Sliding Z Direction
Critical Load Case for Sliding along Z-Direction : 101
Governing Disturbing Force : 343.217 kN
Governing Restoring Force : 4497.311 kN
Minimum Sliding Ratio for the Critical Load Case : 13.103
Critical Load Case for Overturning about Z-Direction : 101

Governing Overturning Moment : -336.107 kNm


Governing Resisting Moment : 44072.839 kNm
Minimum Overturning Ratio for the Critical Load Case : 131.128

------------------------------------------------------

Moment Calculation
Check Trial Depth against moment (w.r.t. X Axis)

Critical Load Case = #201

Effective Depth = = 1.207 m

Governing moment (Mu) = 10739.278 kNm As Per IS 456 2000

ANNEX G G-1.1C

= 0.479107 Limiting Factor1 (K


umax) =

Limiting Factor2 (Rumax) = = 3444.291146 kN/m2

RPEPL-BCW-ME-
Doc.No: - Rev
)=
PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00
PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 95 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Limit Moment Of Resistance (Mumax = 49173.660108 kNm

Mu <= Mumax hence, safe

Check Trial Depth against moment (w.r.t. Z Axis)

Critical Load Case = #201

Effective Depth = = 1.207 m

Governing moment (Mu) = 10547.859 kNm As Per IS 456 2000

ANNEX G G-1.1C

= 0.479107 Limiting Factor1 (K


umax) =

Limiting Factor2 (Rumax) = = 3444.291146 kN/m2

)=
Limit Moment Of Resistance (Mumax
= 49173.660108 kNm

Mu <= Mumax hence, safe

------------------------------------------------------

Shear Calculation
Check Trial Depth for one way shear (Along X Axis)
(Shear Plane Parallel to X Axis)

Critical Load Case = #201

DX = 1.207 m

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 96 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Shear Force(S) = 3365.092 kN

Shear Stress(Tv) = 284.487792 kN/m2

Percentage Of Steel(Pt) = 0.2121

As Per IS 456 2000 Clause 40 Table 19

Shear Strength Of Concrete(Tc) = 339.433 kN/m2

Tv< Tc hence, safe

Check Trial Depth for one way shear (Along Z Axis) (Shear Plane Parallel to Z
Axis)

Critical Load Case = #201

DZ = 1.207 m
Shear Force(S) = 3308.411 kN

Shear Stress(Tv) = 279.695892 kN/m2

Percentage Of Steel(Pt) = 0.2161

As Per IS 456 2000 Clause 40 Table 19

Shear Strength Of Concrete(Tc) = 342.232 kN/m2

Tv< Tc hence, safe

Check Trial Depth for two way shear

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 97 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Critical Load Case = #201


Shear Force(S) = 8742.307 kN

Shear Stress(Tv) = 1201.561 kN/m2


As Per IS 456 2000 Clause 31.6.3.1

Ks = = 1.000

Shear Strength(Tc)= = 1250.0000 kN/m2

Ks x Tc = 1250.0000 kN/m2

Tv<= Ks x Tc hence, safe

------------------------------------------------------

Reinforcement Calculation
Calculation of Maximum Bar Size

Along X Axis

Bar diameter corresponding to max bar size (db) = 32 mm

As Per IS 456 2000 Clause 26.2.1

Development Length(ld) =
= 1.289 m

Allowable Length(ldb) =
= 4.700 m

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 98 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

ldb >=ld hence, safe

Along Z Axis

Bar diameter corresponding to max bar size(d b) = 32 mm

As Per IS 456 2000 Clause 26.2.1

Development Length(ld) = = 1.289 m

Allowable Length(ldb) = = 4.700 m

ldb >=ld hence, safe

Bottom Reinforcement Design

Along Z Axis

For moment w.r.t. X Axis (Mx)

As Per IS 456 2000 Clause 26.5.2.1


Critical Load Case = #201

Minimum Area of Steel (Astmin) = 14876.400 mm2

Calculated Area of Steel (Ast) = 25560.739 mm2

Provided Area of Steel (Ast,Provided) = 25560.739 mm2

Astmin<= Ast,Provided Steel area is accepted

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 99 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Selected bar Size (db) = Ø16

Minimum spacing allowed (Smin) = 56.000 mm

Selected spacing (S) = 76.252 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size...

The reinforcement is accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø16 @ 75.000 mm o.c.

Along X Axis

For moment w.r.t. Z Axis (Mz)

As Per IS 456 2000 Clause 26.5.2.1


Critical Load Case = #201

Minimum Area of Steel (Astmin) = 14876.400 mm2

Calculated Area of Steel (Ast) = 25087.873 mm2

Provided Area of Steel (Ast,Provided) = 25087.873 mm2

Astmin<= Ast,Provided Steel area is accepted

Selected bar Size (db) = Ø16

Minimum spacing allowed (Smin) = = 50.000 mm

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 100 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Selected spacing (S) = 78.097 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size...

The reinforcement is accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø16 @ 75.000 mm o.c.

Top Reinforcement Design

Along Z Axis

Minimum Area of Steel (Astmin) = 14876.400 mm2

Calculated Area of Steel (Ast) = 14841.120 mm2

Provided Area of Steel (Ast,Provided) = 14876.400 mm2

Astmin<= Ast,Provided Steel area is accepted Governing Moment =

3869.398 kNm

Selected bar Size (db) = Ø10

Minimum spacing allowed (Smin) = 50.000 mm

Selected spacing (S) = 51.543 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size... The reinforcement is

accepted.

Based on spacing reinforcement increment; provided reinforcement is

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 101 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Ø10 @ 50 mm o.c.

Along X Axis

Minimum Area of Steel (Astmin) = 14876.400 mm2

Calculated Area of Steel (Ast) = 14841.120 mm2

Provided Area of Steel (Ast,Provided) = 14876.400 mm2

Astmin<= Ast,Provided Steel area is accepted Governing Moment =

3869.398 kNm

Selected bar Size (db) = Ø10

Minimum spacing allowed (Smin) = = 50.000 mm

Selected spacing (S) = 51.543 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size... The reinforcement is

accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø10 @ 50 mm o.c.

------------------------------------------------------

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 102 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Isolated Footing 10

Input Values
Footing Geomtery
Design Type : Calculate Dimension
Footing Thickness (Ft) : 305.000 mm
Footing Length - X (Fl) : 1000.000 mm
Footing Width - Z (Fw) : 1000.000 mm Eccentricity along X (Oxd) : 0.000
mm
Eccentricity along Z (Ozd) : 0.000 mm

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 103 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Column Dimensions
Column Shape : Rectangular
Column Length - X (Pl) : 0.300 m
Column Width - Z (Pw) : 0.300 m

Pedestal
Include Pedestal? No
Pedestal Shape : N/A
Pedestal Height (Ph) : N/A
Pedestal Length - X (Pl) : N/A
Pedestal Width - Z (Pw) : N/A

Design Parameters
Concrete and Rebar Properties
Unit Weight of Concrete : 25.000 kN/m3
Strength of Concrete : 25.000 N/mm2
Yield Strength of Steel : 415.000 N/mm2
Minimum Bar Size : Ø6
Maximum Bar Size : Ø32
Minimum Bar Spacing : 50.000 mm
Maximum Bar Spacing : 500.000 mm
Pedestal Clear Cover (P, CL) : 50.000 mm
Footing Clear Cover (F, CL) : 50.000 mm
Soil Properties
Soil Type : Drained
Unit Weight : 22.000 kN/m3
Soil Bearing Capacity : 100.000 kN/m2
Soil Surcharge : 0.000 kN/m2
Depth of Soil above Footing : 0.000 mm
Cohesion : 0.000 kN/m2
Min Percentage of Slab : 0.000
Sliding and Overturning

Coefficient of Friction : 0.500


Factor of Safety Against Sliding : 1.500
Factor of Safety Against Overturning : 1.500

------------------------------------------------------

Load Combination/s- Service Stress Level

Load Combination Load Combination Title

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 104 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Number
1 DL
2 LL
3 WX
4 WZ

5 Generated Indian Code Genral_Structures 1


6 Generated Indian Code Genral_Structures 2
7 Generated Indian Code Genral_Structures 3
8 Generated Indian Code Genral_Structures 4
9 Generated Indian Code Genral_Structures 5
10 Generated Indian Code Genral_Structures 6
11 Generated Indian Code Genral_Structures 7
12 Generated Indian Code Genral_Structures 8
13 Generated Indian Code Genral_Structures 9
14 Generated Indian Code Genral_Structures 10
15 Generated Indian Code Genral_Structures 11
16 Generated Indian Code Genral_Structures 12
1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000
101
x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL
0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800
102
x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL
Load Combination/s- Strength Level
Load Combination
Load Combination Title
Number
1 DL
2 LL
3 WX
4 WZ
5 Generated Indian Code Genral_Structures 1
6 Generated Indian Code Genral_Structures 2
7 Generated Indian Code Genral_Structures 3
8 Generated Indian Code Genral_Structures 4
9 Generated Indian Code Genral_Structures 5
10 Generated Indian Code Genral_Structures 6
11 Generated Indian Code Genral_Structures 7
12 Generated Indian Code Genral_Structures 8
13 Generated Indian Code Genral_Structures 9
14 Generated Indian Code Genral_Structures 10
15 Generated Indian Code Genral_Structures 11
16 Generated Indian Code Genral_Structures 12
1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500
201
x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL
0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960
202
x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL
1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200
203
x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL
0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900
204
x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL
Applied Loads - Service Stress Level

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 105 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Axial Shear X Shear Z Moment X Moment Z


LC
(kN) (kN) (kN) (kNm) (kNm)
1 133.803 7.610 3.314 2.084 -3.551

2 14.138 0.412 0.214 0.126 -0.192

3 -0.007 -1.007 0.005 0.005 0.051

4 -0.040 -0.032 -1.310 -0.130 0.024

5 221.912 12.032 5.292 3.315 -5.614

6 177.521 8.418 4.240 2.658 -4.430

7 177.481 9.587 2.661 2.496 -4.462

8 177.538 10.834 4.227 2.646 -4.552

9 177.578 9.664 5.805 2.808 -4.521

10 177.529 9.626 4.233 2.652 -4.491

11 200.694 9.904 4.979 3.134 -5.249

12 200.645 11.366 3.006 2.931 -5.289


13 200.716 12.924 4.963 3.118 -5.402
14 200.765 11.462 6.936 3.321 -5.362
15 200.705 11.414 4.971 3.126 -5.326
16 120.423 6.849 2.983 1.876 -3.195
101 2381.401 131.063 56.518 36.165 -61.563
102 1905.121 104.851 45.214 28.932 -49.250
Applied Loads - Strength Level
LC Axial Shear X Shear Z Moment X Moment Z
(kN) (kN) (kN) (kNm) (kNm)
1 133.803 7.610 3.314 2.084 -3.551
2 14.138 0.412 0.214 0.126 -0.192
3 -0.007 -1.007 0.005 0.005 0.051
4 -0.040 -0.032 -1.310 -0.130 0.024
5 221.912 12.032 5.292 3.315 -5.614
6 177.521 8.418 4.240 2.658 -4.430
7 177.481 9.587 2.661 2.496 -4.462
8 177.538 10.834 4.227 2.646 -4.552
9 177.578 9.664 5.805 2.808 -4.521
10 177.529 9.626 4.233 2.652 -4.491
11 200.694 9.904 4.979 3.134 -5.249
12 200.645 11.366 3.006 2.931 -5.289
13 200.716 12.924 4.963 3.118 -5.402
14 200.765 11.462 6.936 3.321 -5.362
15 200.705 11.414 4.971 3.126 -5.326
16 120.423 6.849 2.983 1.876 -3.195
201 3572.102 196.595 84.776 54.248 -92.344
202 2286.145 125.821 54.257 34.718 -59.100
203 2857.682 157.276 67.821 43.398 -73.875
204 2143.261 117.957 50.866 32.549 -55.406
------------------------------------------------------

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 106 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Design Calculations
Footing Size

Initial Length (Lo) = 1.000 m

Initial Width (Wo) = 1.000 m

Uplift force due to buoyancy = 0.000 kN


Effect due to adhesion = 0.000 kN

Area from initial length and width, A o = Lo X Wo = 1.000 m2 Min. area required from

bearing pressure, Amin = P / qmax = 29.137 m2

Note: Amin is an initial estimation.


P = Critical Factored Axial Load(without self weight/buoyancy/soil). q max = Respective
Factored Bearing Capacity.

Final Footing Size


Length (L2) = 5.750 m Governing Load Case : # 101

5.750 m Governing Load Case : # 101


Width (W2) =
0.761 m Governing Load Case : # 101
Depth (D2) =

Area (A2) = 33.063 m2

------------------------------------------------------

Pressures at Four Corner

Area of
Pressure at Pressure at Pressure at Pressure at footing in
Load Case corner 1 (q1) corner 2 (q2) corner 3 (q3) corner 4 (q4) uplift (Au)
(kN/m2) (kN/m2) (kN/m2) (kN/m2)

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 107 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

(m2)
101 86.1581 94.3425 98.6470 90.4626 0.000
101 86.1581 94.3425 98.6470 90.4626 0.000
101 86.1581 94.3425 98.6470 90.4626 0.000
101 86.1581 94.3425 98.6470 90.4626 0.000
If Au is zero, there is no uplift and no pressure adjustment is necessary. Otherwise, to account for uplift, areas of negative pressure
will be set to zero and the pressure will be redistributed to remaining corners.
Summary of adjusted Pressures at Four Corner
Pressure at Pressure at Pressure at Pressure at
corner 1 (q1) corner 2 (q2) corner 3 (q3) corner 4 (q4)
Load Case

(kN/m2) (kN/m2) (kN/m2) (kN/m2)

101 86.1581 94.3425 98.6470 90.4626


101 86.1581 94.3425 98.6470 90.4626
101 86.1581 94.3425 98.6470 90.4626
101 86.1581 94.3425 98.6470 90.4626
Details of Out-of-Contact Area
(If Any)
Governing load case = N/A
Plan area of footing = 33.063 sq.m
Area not in contact with soil = 0.000 sq.m

% of total area not in contact = 0.000%

------------------------------------------------------
Check For Stability Against Overturning And Sliding
- Factor of safety against sliding Factor of safety against overturning

Load Case Along X- Along Z- About X- About Z-


No. Direction Direction Direction Direction

1 49.959 114.719 475.623 234.581


2 777.735 1498.396 6397.982 3651.187
3 311.180 59429.888 196742.355 2212.737
4 9764.385 239.135 1603.871 37022.130
5 35.258 80.170 332.968 165.548
6 47.760 94.828 393.696 213.828
7 41.932 151.055 512.188 197.074
8 37.110 95.114 395.184 181.104
9 41.603 69.259 320.716 195.155
10 41.766 94.971 394.439 196.110
11 41.761 83.076 344.291 186.432

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 108 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

12 36.388 137.589 456.500 171.028


13 32.004 83.343 345.675 156.481
14 36.087 59.640 277.260 169.276
15 36.237 83.209 344.982 170.148
16 54.534 125.223 519.170 256.059
101 11.475 26.611 109.458 53.743
102 12.073 27.996 115.158 56.542
Critical Load Case And The Governing Factor Of Safety For Overturning and Sliding X Direction
Critical Load Case for Sliding along X-Direction : 101
Governing Disturbing Force : 131.063 kN
Governing Restoring Force : 1503.968 kN
Minimum Sliding Ratio for the Critical Load Case : 11.475
Critical Load Case for Overturning about X-Direction : 101
Governing Overturning Moment : 79.005 kNm
Governing Resisting Moment : 8647.657 kNm
Minimum Overturning Ratio for the Critical Load Case : 109.458
Critical Load Case And The Governing Factor Of Safety For Overturning and Sliding Z Direction
Critical Load Case for Sliding along Z-Direction : 101
Governing Disturbing Force : 56.518 kN
Governing Restoring Force : 1503.968 kN
Minimum Sliding Ratio for the Critical Load Case : 26.611
Critical Load Case for Overturning about Z-Direction : 101

Governing Overturning Moment : -160.907 kNm


Governing Resisting Moment : 8647.657 kNm
Minimum Overturning Ratio for the Critical Load Case : 53.743

------------------------------------------------------

Moment Calculation
Check Trial Depth against moment (w.r.t. X Axis)

Critical Load Case = #201

Effective Depth = = 0.705 m

Governing moment (Mu) = 2361.136 kNm As Per IS 456

2000 ANNEX G G-1.1C

= 0.479107 Limiting Factor1 (K


umax) =

Limiting Factor2 (Rumax) = = 3444.291146 kN/m2

RPEPL-BCW-ME-
Doc.No: - Rev
)=
PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00
PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 109 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Limit Moment Of Resistance (Mumax = 9843.238474 kNm

Mu <= Mumax hence, safe

Check Trial Depth against moment (w.r.t. Z Axis)

Critical Load Case = #201

Effective Depth = = 0.705 m

Governing moment (Mu) = 2417.788 kNm As Per IS 456

2000 ANNEX G G-1.1C

= 0.479107 Limiting Factor1 (K


umax) =

Limiting Factor2 (Rumax) = = 3444.291146 kN/m2

)=
Limit Moment Of Resistance (Mumax
= 9843.238474 kNm

Mu <= Mumax hence, safe

------------------------------------------------------

Shear Calculation
Check Trial Depth for one way shear (Along X Axis)
(Shear Plane Parallel to X Axis)

Critical Load Case = #201

DX = 0.705 m

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 110 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Shear Force(S) = 1283.076 kN

Shear Stress(Tv) = 316.515890 kN/m2

Percentage Of Steel(Pt) = 0.2442

As Per IS 456 2000 Clause 40 Table 19

Shear Strength Of Concrete(Tc) = 361.057 kN/m2

Tv< Tc hence, safe

Check Trial Depth for one way shear (Along Z Axis) (Shear Plane Parallel to Z
Axis)

Critical Load Case = #201

DZ = 0.705 m
Shear Force(S) = 1312.291 kN

Shear Stress(Tv) = 323.722767 kN/m2

Percentage Of Steel(Pt) = 0.2383

As Per IS 456 2000 Clause 40 Table 19

Shear Strength Of Concrete(Tc) = 357.183 kN/m2

Tv< Tc hence, safe

Check Trial Depth for two way shear

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 111 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Critical Load Case = #201


Shear Force(S) = 3462.978 kN

Shear Stress(Tv) = 1221.898 kN/m2


As Per IS 456 2000 Clause 31.6.3.1

Ks = = 1.000

Shear Strength(Tc)= = 1250.0000 kN/m2

Ks x Tc = 1250.0000 kN/m2

Tv<= Ks x Tc hence, safe

------------------------------------------------------

Reinforcement Calculation
Calculation of Maximum Bar Size

Along X Axis

Bar diameter corresponding to max bar size (db) = 32 mm

As Per IS 456 2000 Clause 26.2.1

Development Length(ld) =
= 1.289 m

Allowable Length(ldb) =
= 2.675 m

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 112 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

ldb >=ld hence, safe

Along Z Axis

Bar diameter corresponding to max bar size(d b) = 32 mm

As Per IS 456 2000 Clause 26.2.1

Development Length(ld) = = 1.289 m

Allowable Length(ldb) = = 2.675 m

ldb >=ld hence, safe

Bottom Reinforcement Design

Along Z Axis

For moment w.r.t. X Axis (Mx)

As Per IS 456 2000 Clause 26.5.2.1


Critical Load Case = #201

Minimum Area of Steel (Astmin) = 5250.900 mm2

Calculated Area of Steel (Ast) = 9658.235 mm2

Provided Area of Steel (Ast,Provided) = 9658.235 mm2

Astmin<= Ast,Provided Steel area is accepted

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 113 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Selected bar Size (db) = Ø12

Minimum spacing allowed (Smin) = 52.000 mm

Selected spacing (S) = 66.329 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size...

The reinforcement is accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø12 @ 65.000 mm o.c.

Along X Axis

For moment w.r.t. Z Axis (Mz)

As Per IS 456 2000 Clause 26.5.2.1


Critical Load Case = #201

Minimum Area of Steel (Astmin) = 5250.900 mm2

Calculated Area of Steel (Ast) = 9900.186 mm2

Provided Area of Steel (Ast,Provided) = 9900.186 mm2

Astmin<= Ast,Provided Steel area is accepted

Selected bar Size (db) = Ø12

Minimum spacing allowed (Smin) = = 50.000 mm

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 114 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Selected spacing (S) = 64.805 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size...

The reinforcement is accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø12 @ 60.000 mm o.c.

Top Reinforcement Design

Along Z Axis

Minimum Area of Steel (Astmin) = 5250.900 mm2

Calculated Area of Steel (Ast) = 5237.100 mm2

Provided Area of Steel (Ast,Provided) = 5250.900 mm2

Astmin<= Ast,Provided Steel area is accepted Governing Moment =

449.500 kNm

Selected bar Size (db) = Ø8

Minimum spacing allowed (Smin) = 50.000 mm

Selected spacing (S) = 54.250 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size... The reinforcement is

accepted.

Based on spacing reinforcement increment; provided reinforcement is

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 115 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Ø8 @ 50 mm o.c.

Along X Axis

Minimum Area of Steel (Astmin) = 5250.900 mm2

Calculated Area of Steel (Ast) = 5838.902 mm2

Provided Area of Steel (Ast,Provided) = 5838.902 mm2

Astmin<= Ast,Provided Steel area is accepted Governing Moment =

449.500 kNm

Selected bar Size (db) = Ø10

Minimum spacing allowed (Smin) = = 50.000 mm

Selected spacing (S) = 76.216 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size... The reinforcement is

accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø10 @ 75 mm o.c.

------------------------------------------------------

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 116 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Isolated Footing 11

Input Values
Footing Geomtery
Design Type : Calculate Dimension
Footing Thickness (Ft) : 305.000 mm
Footing Length - X (Fl) : 1000.000 mm
Footing Width - Z (Fw) : 1000.000 mm Eccentricity along X (Oxd) : 0.000
mm
Eccentricity along Z (Ozd) : 0.000 mm

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 117 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Column Dimensions
Column Shape : Rectangular
Column Length - X (Pl) : 0.300 m
Column Width - Z (Pw) : 0.300 m

Pedestal
Include Pedestal? No
Pedestal Shape : N/A
Pedestal Height (Ph) : N/A
Pedestal Length - X (Pl) : N/A
Pedestal Width - Z (Pw) : N/A

Design Parameters
Concrete and Rebar Properties
Unit Weight of Concrete : 25.000 kN/m3
Strength of Concrete : 25.000 N/mm2
Yield Strength of Steel : 415.000 N/mm2
Minimum Bar Size : Ø6
Maximum Bar Size : Ø32
Minimum Bar Spacing : 50.000 mm
Maximum Bar Spacing : 500.000 mm
Pedestal Clear Cover (P, CL) : 50.000 mm
Footing Clear Cover (F, CL) : 50.000 mm
Soil Properties
Soil Type : Drained
Unit Weight : 22.000 kN/m3
Soil Bearing Capacity : 100.000 kN/m2
Soil Surcharge : 0.000 kN/m2
Depth of Soil above Footing : 0.000 mm
Cohesion : 0.000 kN/m2
Min Percentage of Slab : 0.000
Sliding and Overturning

Coefficient of Friction : 0.500


Factor of Safety Against Sliding : 1.500
Factor of Safety Against Overturning : 1.500

------------------------------------------------------

Load Combination/s- Service Stress Level

Load Combination Load Combination Title

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 118 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Number
1 DL
2 LL
3 WX
4 WZ

5 Generated Indian Code Genral_Structures 1


6 Generated Indian Code Genral_Structures 2
7 Generated Indian Code Genral_Structures 3
8 Generated Indian Code Genral_Structures 4
9 Generated Indian Code Genral_Structures 5
10 Generated Indian Code Genral_Structures 6
11 Generated Indian Code Genral_Structures 7
12 Generated Indian Code Genral_Structures 8
13 Generated Indian Code Genral_Structures 9
14 Generated Indian Code Genral_Structures 10
15 Generated Indian Code Genral_Structures 11
16 Generated Indian Code Genral_Structures 12
1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000
101
x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL
0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800
102
x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL
Load Combination/s- Strength Level
Load Combination
Load Combination Title
Number
1 DL
2 LL
3 WX
4 WZ
5 Generated Indian Code Genral_Structures 1
6 Generated Indian Code Genral_Structures 2
7 Generated Indian Code Genral_Structures 3
8 Generated Indian Code Genral_Structures 4
9 Generated Indian Code Genral_Structures 5
10 Generated Indian Code Genral_Structures 6
11 Generated Indian Code Genral_Structures 7
12 Generated Indian Code Genral_Structures 8
13 Generated Indian Code Genral_Structures 9
14 Generated Indian Code Genral_Structures 10
15 Generated Indian Code Genral_Structures 11
16 Generated Indian Code Genral_Structures 12
1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500
201
x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL
0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960
202
x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL
1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200
203
x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL
0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900
204
x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL
Applied Loads - Service Stress Level

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 119 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Axial Shear X Shear Z Moment X Moment Z


LC
(kN) (kN) (kN) (kNm) (kNm)
1 138.286 -8.482 3.414 2.158 3.992

2 14.276 -0.459 0.222 0.137 0.218

3 -0.008 1.008 0.004 0.005 -0.052

4 -0.043 0.035 -1.360 -0.136 -0.027

5 228.843 -13.412 5.454 3.442 6.314

6 183.065 -9.520 4.368 2.759 4.989

7 183.023 -10.688 2.731 2.590 5.019

8 183.083 -11.939 4.358 2.748 5.114

9 183.125 -10.771 5.995 2.917 5.083

10 183.074 -10.729 4.363 2.754 5.051

11 207.418 -11.212 5.128 3.243 5.909

12 207.365 -12.671 3.080 3.032 5.948


13 207.440 -14.236 5.114 3.230 6.066
14 207.493 -12.776 7.161 3.441 6.027
15 207.429 -12.724 5.121 3.236 5.987
16 124.457 -7.634 3.072 1.942 3.592
101 2458.329 -146.210 58.224 37.497 69.229
102 1966.663 -116.968 46.580 29.998 55.383
Applied Loads - Strength Level
LC Axial Shear X Shear Z Moment X Moment Z
(kN) (kN) (kN) (kNm) (kNm)
1 138.286 -8.482 3.414 2.158 3.992
2 14.276 -0.459 0.222 0.137 0.218
3 -0.008 1.008 0.004 0.005 -0.052
4 -0.043 0.035 -1.360 -0.136 -0.027
5 228.843 -13.412 5.454 3.442 6.314
6 183.065 -9.520 4.368 2.759 4.989
7 183.023 -10.688 2.731 2.590 5.019
8 183.083 -11.939 4.358 2.748 5.114
9 183.125 -10.771 5.995 2.917 5.083
10 183.074 -10.729 4.363 2.754 5.051
11 207.418 -11.212 5.128 3.243 5.909
12 207.365 -12.671 3.080 3.032 5.948
13 207.440 -14.236 5.114 3.230 6.066
14 207.493 -12.776 7.161 3.441 6.027
15 207.429 -12.724 5.121 3.236 5.987
16 124.457 -7.634 3.072 1.942 3.592
201 3687.493 -219.316 87.337 56.245 103.843
202 2359.995 -140.362 55.896 35.997 66.460
203 2949.994 -175.452 69.869 44.996 83.075
204 2212.496 -131.589 52.402 33.747 62.306
------------------------------------------------------

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 120 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Design Calculations
Footing Size

Initial Length (Lo) = 1.000 m

Initial Width (Wo) = 1.000 m

Uplift force due to buoyancy = 0.000 kN


Effect due to adhesion = 0.000 kN

Area from initial length and width, A o = Lo X Wo = 1.000 m2 Min. area required from

bearing pressure, Amin = P / qmax = 30.474 m2

Note: Amin is an initial estimation.


P = Critical Factored Axial Load(without self weight/buoyancy/soil). q max = Respective
Factored Bearing Capacity.

Final Footing Size


Length (L2) = 5.900 m Governing Load Case : # 101

5.900 m Governing Load Case : # 101


Width (W2) =
0.811 m Governing Load Case : # 101
Depth (D2) =

Area (A2) = 34.810 m2

------------------------------------------------------

Pressures at Four Corner

Area of
Pressure at Pressure at Pressure at Pressure at footing in
Load Case corner 1 (q1) corner 2 (q2) corner 3 (q3) corner 4 (q4) uplift (Au)
(kN/m2) (kN/m2) (kN/m2) (kN/m2)

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 121 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

(m2)
101 94.1615 85.4872 89.6981 98.3725 0.000
101 94.1615 85.4872 89.6981 98.3725 0.000
101 94.1615 85.4872 89.6981 98.3725 0.000
101 93.8253 82.8776 87.8174 98.7650 0.000
If Au is zero, there is no uplift and no pressure adjustment is necessary. Otherwise, to account for uplift, areas of negative pressure
will be set to zero and the pressure will be redistributed to remaining corners.
Summary of adjusted Pressures at Four Corner
Pressure at Pressure at Pressure at Pressure at
corner 1 (q1) corner 2 (q2) corner 3 (q3) corner 4 (q4)
Load Case

(kN/m2) (kN/m2) (kN/m2) (kN/m2)

101 94.1615 85.4872 89.6981 98.3725


101 94.1615 85.4872 89.6981 98.3725
101 94.1615 85.4872 89.6981 98.3725
101 93.8253 82.8776 87.8174 98.7650
Details of Out-of-Contact Area
(If Any)
Governing load case = N/A
Plan area of footing = 34.810 sq.m
Area not in contact with soil = 0.000 sq.m

% of total area not in contact = 0.000%

------------------------------------------------------
Check For Stability Against Overturning And Sliding
- Factor of safety against sliding Factor of safety against overturning

Load Case Along X- Along Z- About X- About Z-


No. Direction Direction Direction Direction

1 49.599 123.240 504.935 228.876


2 781.957 1616.582 6689.264 3597.155
3 348.815 78177.740 254690.290 2393.750
4 10060.304 258.461 1679.095 37883.653
5 34.746 85.448 350.305 160.309
6 46.546 101.439 415.727 206.169
7 41.459 162.266 545.028 191.451
8 37.116 101.692 417.032 177.123
9 41.141 73.917 336.871 189.648
10 41.299 101.565 416.378 190.545
11 40.608 88.793 363.677 179.459

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 122 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

12 35.929 147.790 486.510 165.948


13 31.983 89.030 364.893 152.907
14 35.639 63.584 291.149 164.304
15 35.783 88.911 364.284 165.122
16 54.204 134.683 551.819 250.128
101 10.811 27.149 110.315 49.776
102 11.413 28.659 116.449 52.543
Critical Load Case And The Governing Factor Of Safety For Overturning and Sliding X Direction
Critical Load Case for Sliding along X-Direction : 101
Governing Disturbing Force : -146.210 kN
Governing Restoring Force : 1580.745 kN
Minimum Sliding Ratio for the Critical Load Case : 10.811
Critical Load Case for Overturning about X-Direction : 101
Governing Overturning Moment : 84.541 kNm
Governing Resisting Moment : 9326.226 kNm
Minimum Overturning Ratio for the Critical Load Case : 110.315
Critical Load Case And The Governing Factor Of Safety For Overturning and Sliding Z Direction
Critical Load Case for Sliding along Z-Direction : 101
Governing Disturbing Force : 58.224 kN
Governing Restoring Force : 1580.745 kN
Minimum Sliding Ratio for the Critical Load Case : 27.149
Critical Load Case for Overturning about Z-Direction : 101

Governing Overturning Moment : 187.365 kNm


Governing Resisting Moment : 9326.226 kNm
Minimum Overturning Ratio for the Critical Load Case : 49.776

------------------------------------------------------

Moment Calculation
Check Trial Depth against moment (w.r.t. X Axis)

Critical Load Case = #201


Effective Depth = = 0.755 m

Governing moment (Mu) = 2508.555 kNm As Per IS 456 2000

ANNEX G G-1.1C

= 0.479107 Limiting Factor1 (K


umax) =

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW


) = SOLAR 4.1MW-ED-CRA-F11-01 00
PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 123 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Limiting Factor2 (Rumax) = = 3444.291146 kN/m2

Limit Moment Of Resistance (Mumax = 11583.447700 kNm

Mu <= Mumax hence, safe

Check Trial Depth against moment (w.r.t. Z Axis)

Critical Load Case = #201


Effective Depth = = 0.755 m

Governing moment (Mu) = 2579.718 kNm As Per IS 456 2000

ANNEX G G-1.1C

= 0.479107 Limiting Factor1 (K


umax) =

Limiting Factor2 (Rumax) = = 3444.291146 kN/m2

)=
Limit Moment Of Resistance (Mumax
= 11583.447700 kNm

Mu <= Mumax hence, safe

------------------------------------------------------

Shear Calculation
Check Trial Depth for one way shear (Along X Axis)
(Shear Plane Parallel to X Axis)

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 124 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Critical Load Case = #201

DX = 0.755 m
Shear Force(S) = 1307.329 kN

Shear Stress(Tv) = 293.485082 kN/m2

Percentage Of Steel(Pt) = 0.2205

As Per IS 456 2000 Clause 40 Table 19

Shear Strength Of Concrete(Tc) = 345.299 kN/m2

Tv< Tc hence, safe

Check Trial Depth for one way shear (Along Z Axis) (Shear Plane Parallel to Z
Axis)

Critical Load Case = #201

DZ = 0.755 m
Shear Force(S) = 1342.852 kN

Shear Stress(Tv) = 301.459611 kN/m2

Percentage Of Steel(Pt) = 0.2142

As Per IS 456 2000 Clause 40 Table 19

Shear Strength Of Concrete(Tc) = 340.919 kN/m2

Tv< Tc hence, safe

Check Trial Depth for two way shear

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 125 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Critical Load Case = #201


Shear Force(S) = 3569.588 kN

Shear Stress(Tv) = 1120.363 kN/m2


As Per IS 456 2000 Clause 31.6.3.1

Ks = = 1.000

Shear Strength(Tc)= = 1250.0000 kN/m2

Ks x Tc = 1250.0000 kN/m2

Tv<= Ks x Tc hence, safe

------------------------------------------------------

Reinforcement Calculation
Calculation of Maximum Bar Size

Along X Axis

Bar diameter corresponding to max bar size (db) = 32 mm

As Per IS 456 2000 Clause 26.2.1

Development Length(ld) =
= 1.289 m

Allowable Length(ldb) =
= 2.750 m

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 126 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

ldb >=ld hence, safe

Along Z Axis

Bar diameter corresponding to max bar size(d b) = 32 mm

As Per IS 456 2000 Clause 26.2.1

Development Length(ld) = = 1.289 m

Allowable Length(ldb) = = 2.750 m

ldb >=ld hence, safe

Bottom Reinforcement Design

Along Z Axis

For moment w.r.t. X Axis (Mx)

As Per IS 456 2000 Clause 26.5.2.1


Critical Load Case = #201

Minimum Area of Steel (Astmin) = 5741.880 mm2

Calculated Area of Steel (Ast) = 9542.047 mm2

Provided Area of Steel (Ast,Provided) = 9542.047 mm2

Astmin<= Ast,Provided Steel area is accepted

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 127 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Selected bar Size (db) = Ø12

Minimum spacing allowed (Smin) = 52.000 mm

Selected spacing (S) = 68.905 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size...

The reinforcement is accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø12 @ 65.000 mm o.c.

Along X Axis

For moment w.r.t. Z Axis (Mz)

As Per IS 456 2000 Clause 26.5.2.1


Critical Load Case = #201

Minimum Area of Steel (Astmin) = 5741.880 mm2

Calculated Area of Steel (Ast) = 9823.418 mm2

Provided Area of Steel (Ast,Provided) = 9823.418 mm2

Astmin<= Ast,Provided Steel area is accepted

Selected bar Size (db) = Ø12

Minimum spacing allowed (Smin) = = 50.000 mm

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 128 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Selected spacing (S) = 67.302 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size...

The reinforcement is accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø12 @ 65.000 mm o.c.

Top Reinforcement Design

Along Z Axis

Minimum Area of Steel (Astmin) = 5741.880 mm2

Calculated Area of Steel (Ast) = 5727.720 mm2

Provided Area of Steel (Ast,Provided) = 5741.880 mm2

Astmin<= Ast,Provided Steel area is accepted Governing Moment =

519.086 kNm

Selected bar Size (db) = Ø8

Minimum spacing allowed (Smin) = 50.000 mm

Selected spacing (S) = 51.257 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size... The reinforcement is

accepted.

Based on spacing reinforcement increment; provided reinforcement is

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 129 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Ø8 @ 50 mm o.c.

Along X Axis

Minimum Area of Steel (Astmin) = 5741.880 mm2

Calculated Area of Steel (Ast) = 5803.810 mm2

Provided Area of Steel (Ast,Provided) = 5803.810 mm2

Astmin<= Ast,Provided Steel area is accepted Governing Moment =

519.086 kNm

Selected bar Size (db) = Ø8

Minimum spacing allowed (Smin) = = 50.000 mm

Selected spacing (S) = 50.365 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size... The reinforcement is

accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø8 @ 50 mm o.c.

------------------------------------------------------

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 130 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Isolated Footing 12

Input Values
Footing Geomtery
Design Type : Calculate Dimension
Footing Thickness (Ft) : 305.000 mm
Footing Length - X (Fl) : 1000.000 mm
Footing Width - Z (Fw) : 1000.000 mm Eccentricity along X (Oxd) : 0.000
mm
Eccentricity along Z (Ozd) : 0.000 mm

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 131 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Column Dimensions
Column Shape : Rectangular
Column Length - X (Pl) : 0.300 m
Column Width - Z (Pw) : 0.300 m

Pedestal
Include Pedestal? No
Pedestal Shape : N/A
Pedestal Height (Ph) : N/A
Pedestal Length - X (Pl) : N/A
Pedestal Width - Z (Pw) : N/A

Design Parameters
Concrete and Rebar Properties
Unit Weight of Concrete : 25.000 kN/m3
Strength of Concrete : 25.000 N/mm2
Yield Strength of Steel : 415.000 N/mm2
Minimum Bar Size : Ø6
Maximum Bar Size : Ø32
Minimum Bar Spacing : 50.000 mm
Maximum Bar Spacing : 500.000 mm
Pedestal Clear Cover (P, CL) : 50.000 mm
Footing Clear Cover (F, CL) : 50.000 mm
Soil Properties
Soil Type : Drained
Unit Weight : 22.000 kN/m3
Soil Bearing Capacity : 100.000 kN/m2
Soil Surcharge : 0.000 kN/m2
Depth of Soil above Footing : 0.000 mm
Cohesion : 0.000 kN/m2
Min Percentage of Slab : 0.000
Sliding and Overturning

Coefficient of Friction : 0.500


Factor of Safety Against Sliding : 1.500
Factor of Safety Against Overturning : 1.500

------------------------------------------------------

Load Combination/s- Service Stress Level

Load Combination Load Combination Title

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 132 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Number
1 DL
2 LL
3 WX
4 WZ

5 Generated Indian Code Genral_Structures 1


6 Generated Indian Code Genral_Structures 2
7 Generated Indian Code Genral_Structures 3
8 Generated Indian Code Genral_Structures 4
9 Generated Indian Code Genral_Structures 5
10 Generated Indian Code Genral_Structures 6
11 Generated Indian Code Genral_Structures 7
12 Generated Indian Code Genral_Structures 8
13 Generated Indian Code Genral_Structures 9
14 Generated Indian Code Genral_Structures 10
15 Generated Indian Code Genral_Structures 11
16 Generated Indian Code Genral_Structures 12
1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000
101
x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL
0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800
102
x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL
Load Combination/s- Strength Level
Load Combination
Load Combination Title
Number
1 DL
2 LL
3 WX
4 WZ
5 Generated Indian Code Genral_Structures 1
6 Generated Indian Code Genral_Structures 2
7 Generated Indian Code Genral_Structures 3
8 Generated Indian Code Genral_Structures 4
9 Generated Indian Code Genral_Structures 5
10 Generated Indian Code Genral_Structures 6
11 Generated Indian Code Genral_Structures 7
12 Generated Indian Code Genral_Structures 8
13 Generated Indian Code Genral_Structures 9
14 Generated Indian Code Genral_Structures 10
15 Generated Indian Code Genral_Structures 11
16 Generated Indian Code Genral_Structures 12
1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500
201
x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL
0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960
202
x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL
1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200
203
x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL
0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900
204
x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL
Applied Loads - Service Stress Level

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 133 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Axial Shear X Shear Z Moment X Moment Z


LC
(kN) (kN) (kN) (kNm) (kNm)
1 337.674 -11.920 19.471 9.741 5.631

2 25.297 -0.695 0.957 0.484 0.332

3 -0.015 2.584 -0.014 -0.011 -0.069

4 0.050 -0.038 -0.074 -0.060 0.029

5 544.456 -18.923 30.642 15.338 8.944

6 435.546 -12.038 24.497 12.257 7.072

7 435.625 -15.183 24.425 12.198 7.190

8 435.583 -18.239 24.530 12.283 7.238

9 435.504 -15.093 24.602 12.342 7.120

10 435.564 -15.138 24.514 12.270 7.155

11 506.488 -14.004 29.186 14.595 8.343

12 506.586 -17.936 29.096 14.521 8.490


13 506.533 -21.755 29.228 14.628 8.549
14 506.435 -17.824 29.318 14.701 8.402
15 506.511 -17.880 29.207 14.611 8.446
16 303.906 -10.728 17.524 8.767 5.068
101 5921.743 -204.810 337.109 168.666 97.939
102 4737.395 -163.848 269.687 134.933 78.351
Applied Loads - Strength Level
LC Axial Shear X Shear Z Moment X Moment Z
(kN) (kN) (kN) (kNm) (kNm)
1 337.674 -11.920 19.471 9.741 5.631
2 25.297 -0.695 0.957 0.484 0.332
3 -0.015 2.584 -0.014 -0.011 -0.069
4 0.050 -0.038 -0.074 -0.060 0.029
5 544.456 -18.923 30.642 15.338 8.944
6 435.546 -12.038 24.497 12.257 7.072
7 435.625 -15.183 24.425 12.198 7.190
8 435.583 -18.239 24.530 12.283 7.238
9 435.504 -15.093 24.602 12.342 7.120
10 435.564 -15.138 24.514 12.270 7.155
11 506.488 -14.004 29.186 14.595 8.343
12 506.586 -17.936 29.096 14.521 8.490
13 506.533 -21.755 29.228 14.628 8.549
14 506.435 -17.824 29.318 14.701 8.402
15 506.511 -17.880 29.207 14.611 8.446
16 303.906 -10.728 17.524 8.767 5.068
201 8882.615 -307.215 505.664 253.000 146.908
202 5684.873 -196.618 323.625 161.920 94.021
203 7106.091 -245.772 404.531 202.400 117.526
204 5329.569 -184.329 303.398 151.800 88.145
------------------------------------------------------

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 134 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Design Calculations
Footing Size

Initial Length (Lo) = 1.000 m

Initial Width (Wo) = 1.000 m

Uplift force due to buoyancy = 0.000 kN


Effect due to adhesion = 0.000 kN

Area from initial length and width, A o = Lo X Wo = 1.000 m2 Min. area required from

bearing pressure, Amin = P / qmax = 80.657 m2

Note: Amin is an initial estimation.


P = Critical Factored Axial Load(without self weight/buoyancy/soil). q max = Respective
Factored Bearing Capacity.

Final Footing Size


Length (L2) = 9.750 m Governing Load Case : # 101

9.750 m Governing Load Case : # 101


Width (W2) =
1.265 m Governing Load Case : # 101
Depth (D2) =

Area (A2) = 95.063 m2

------------------------------------------------------

Pressures at Four Corner

Area of
Pressure at Pressure at Pressure at Pressure at footing in
Load Case corner 1 (q1) corner 2 (q2) corner 3 (q3) corner 4 (q4) uplift (Au)
(kN/m2) (kN/m2) (kN/m2) (kN/m2)

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 135 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

(m2)
101 93.4426 90.0145 95.8164 99.2445 0.000
101 93.4426 90.0145 95.8164 99.2445 0.000
101 93.4426 90.0145 95.8164 99.2445 0.000
101 92.2562 87.6471 95.3301 99.9393 0.000
If Au is zero, there is no uplift and no pressure adjustment is necessary. Otherwise, to account for uplift, areas of negative pressure
will be set to zero and the pressure will be redistributed to remaining corners.
Summary of adjusted Pressures at Four Corner
Pressure at Pressure at Pressure at Pressure at
corner 1 (q1) corner 2 (q2) corner 3 (q3) corner 4 (q4)
Load Case

(kN/m2) (kN/m2) (kN/m2) (kN/m2)

101 93.4426 90.0145 95.8164 99.2445


101 93.4426 90.0145 95.8164 99.2445
101 93.4426 90.0145 95.8164 99.2445
101 92.2562 87.6471 95.3301 99.9393
Details of Out-of-Contact Area
(If Any)
Governing load case = N/A
Plan area of footing = 95.063 sq.m
Area not in contact with soil = 0.000 sq.m

% of total area not in contact = 0.000%

------------------------------------------------------
Check For Stability Against Overturning And Sliding
- Factor of safety against sliding Factor of safety against overturning

Load Case Along X- Along Z- About X- About Z-


No. Direction Direction Direction Direction

1 139.772 85.566 473.941 786.651


2 2171.870 1577.872 8710.335 12187.772
3 579.493 107571.079 512385.633 4391.336
4 39815.149 20257.419 95421.795 190680.755
5 93.510 57.746 319.799 526.199
6 142.469 70.009 387.754 751.854
7 112.956 70.217 389.110 635.296
8 94.033 69.914 387.144 553.356
9 113.628 69.708 385.801 639.740
10 113.291 69.961 387.448 637.510
11 124.995 59.977 332.244 656.724

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 136 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

12 97.597 60.164 333.466 548.983


13 80.463 59.892 331.697 474.606
14 98.210 59.706 330.488 553.045
15 97.903 59.934 331.970 551.006
16 153.728 94.110 521.265 865.199
101 21.767 13.225 73.247 122.097
102 23.595 14.335 79.397 132.348
Critical Load Case And The Governing Factor Of Safety For Overturning and Sliding X Direction
Critical Load Case for Sliding along X-Direction : 101
Governing Disturbing Force : -204.810 kN
Governing Restoring Force : 4458.106 kN
Minimum Sliding Ratio for the Critical Load Case : 21.767
Critical Load Case for Overturning about X-Direction : 101
Governing Overturning Moment : 593.416 kNm
Governing Resisting Moment : 43465.740 kNm
Minimum Overturning Ratio for the Critical Load Case : 73.247
Critical Load Case And The Governing Factor Of Safety For Overturning and Sliding Z Direction
Critical Load Case for Sliding along Z-Direction : 101
Governing Disturbing Force : 337.109 kN
Governing Restoring Force : 4458.106 kN
Minimum Sliding Ratio for the Critical Load Case : 13.225
Critical Load Case for Overturning about Z-Direction : 101

Governing Overturning Moment : 355.995 kNm


Governing Resisting Moment : 43465.740 kNm
Minimum Overturning Ratio for the Critical Load Case : 122.097

------------------------------------------------------

Moment Calculation
Check Trial Depth against moment (w.r.t. X Axis)

Critical Load Case = #201

Effective Depth = = 1.207 m

Governing moment (Mu) = 10594.278 kNm As Per IS 456 2000

ANNEX G G-1.1C

= 0.479107 Limiting Factor1 (K


umax) =

Limiting Factor2 (Rumax) = = 3444.291146 kN/m2

RPEPL-BCW-ME-
Doc.No: - Rev
)=
PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00
PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 137 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Limit Moment Of Resistance (Mumax = 48922.774087 kNm

Mu <= Mumax hence, safe

Check Trial Depth against moment (w.r.t. Z Axis)

Critical Load Case = #201

Effective Depth = = 1.207 m

Governing moment (Mu) = 10424.135 kNm As Per IS 456 2000

ANNEX G G-1.1C

= 0.479107 Limiting Factor1 (K


umax) =

Limiting Factor2 (Rumax) = = 3444.291146 kN/m2

)=
Limit Moment Of Resistance (Mumax
= 48922.774087 kNm

Mu <= Mumax hence, safe

------------------------------------------------------

Shear Calculation
Check Trial Depth for one way shear (Along X Axis)
(Shear Plane Parallel to X Axis)

Critical Load Case = #201

DX = 1.207 m

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 138 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Shear Force(S) = 3331.364 kN

Shear Stress(Tv) = 283.080632 kN/m2

Percentage Of Steel(Pt) = 0.2106

As Per IS 456 2000 Clause 40 Table 19

Shear Strength Of Concrete(Tc) = 338.399 kN/m2

Tv< Tc hence, safe

Check Trial Depth for one way shear (Along Z Axis) (Shear Plane Parallel to Z
Axis)

Critical Load Case = #201

DZ = 1.207 m
Shear Force(S) = 3280.819 kN

Shear Stress(Tv) = 278.785587 kN/m2

Percentage Of Steel(Pt) = 0.2142

As Per IS 456 2000 Clause 40 Table 19

Shear Strength Of Concrete(Tc) = 340.910 kN/m2

Tv< Tc hence, safe

Check Trial Depth for two way shear

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 139 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Critical Load Case = #201


Shear Force(S) = 8670.409 kN

Shear Stress(Tv) = 1191.679 kN/m2


As Per IS 456 2000 Clause 31.6.3.1

Ks = = 1.000

Shear Strength(Tc)= = 1250.0000 kN/m2

Ks x Tc = 1250.0000 kN/m2

Tv<= Ks x Tc hence, safe

------------------------------------------------------

Reinforcement Calculation
Calculation of Maximum Bar Size

Along X Axis

Bar diameter corresponding to max bar size (db) = 32 mm

As Per IS 456 2000 Clause 26.2.1

Development Length(ld) =
= 1.289 m

Allowable Length(ldb) =
= 4.675 m

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 140 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

ldb >=ld hence, safe

Along Z Axis

Bar diameter corresponding to max bar size(d b) = 32 mm

As Per IS 456 2000 Clause 26.2.1

Development Length(ld) = = 1.289 m

Allowable Length(ldb) = = 4.675 m

ldb >=ld hence, safe

Bottom Reinforcement Design

Along Z Axis

For moment w.r.t. X Axis (Mx)

As Per IS 456 2000 Clause 26.5.2.1


Critical Load Case = #201

Minimum Area of Steel (Astmin) = 14800.500 mm2

Calculated Area of Steel (Ast) = 25207.401 mm2

Provided Area of Steel (Ast,Provided) = 25207.401 mm2

Astmin<= Ast,Provided Steel area is accepted

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 141 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Selected bar Size (db) = Ø16

Minimum spacing allowed (Smin) = 56.000 mm

Selected spacing (S) = 77.072 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size...

The reinforcement is accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø16 @ 75.000 mm o.c.

Along X Axis

For moment w.r.t. Z Axis (Mz)

As Per IS 456 2000 Clause 26.5.2.1


Critical Load Case = #201

Minimum Area of Steel (Astmin) = 14800.500 mm2

Calculated Area of Steel (Ast) = 24787.346 mm2

Provided Area of Steel (Ast,Provided) = 24787.346 mm2

Astmin<= Ast,Provided Steel area is accepted

Selected bar Size (db) = Ø16

Minimum spacing allowed (Smin) = = 50.000 mm

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 142 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Selected spacing (S) = 78.325 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size...

The reinforcement is accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø16 @ 75.000 mm o.c.

Top Reinforcement Design

Along Z Axis

Minimum Area of Steel (Astmin) = 14800.500 mm2

Calculated Area of Steel (Ast) = 14765.400 mm2

Provided Area of Steel (Ast,Provided) = 14800.500 mm2

Astmin<= Ast,Provided Steel area is accepted Governing Moment =

3809.241 kNm

Selected bar Size (db) = Ø10

Minimum spacing allowed (Smin) = 50.000 mm

Selected spacing (S) = 51.551 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size... The reinforcement is

accepted.

Based on spacing reinforcement increment; provided reinforcement is

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 143 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Ø10 @ 50 mm o.c.

Along X Axis

Minimum Area of Steel (Astmin) = 14800.500 mm2

Calculated Area of Steel (Ast) = 14765.400 mm2

Provided Area of Steel (Ast,Provided) = 14800.500 mm2

Astmin<= Ast,Provided Steel area is accepted Governing Moment =

3809.241 kNm

Selected bar Size (db) = Ø10

Minimum spacing allowed (Smin) = = 50.000 mm

Selected spacing (S) = 51.551 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size... The reinforcement is

accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø10 @ 50 mm o.c.

------------------------------------------------------

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 144 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Isolated Footing 16

Input Values
Footing Geomtery
Design Type : Calculate Dimension
Footing Thickness (Ft) : 305.000 mm
Footing Length - X (Fl) : 1000.000 mm
Footing Width - Z (Fw) : 1000.000 mm Eccentricity along X (Oxd) : 0.000
mm
Eccentricity along Z (Ozd) : 0.000 mm

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 145 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Column Dimensions
Column Shape : Rectangular
Column Length - X (Pl) : 0.300 m
Column Width - Z (Pw) : 0.300 m

Pedestal
Include Pedestal? No
Pedestal Shape : N/A
Pedestal Height (Ph) : N/A
Pedestal Length - X (Pl) : N/A
Pedestal Width - Z (Pw) : N/A

Design Parameters
Concrete and Rebar Properties
Unit Weight of Concrete : 25.000 kN/m3
Strength of Concrete : 25.000 N/mm2
Yield Strength of Steel : 415.000 N/mm2
Minimum Bar Size : Ø6
Maximum Bar Size : Ø32
Minimum Bar Spacing : 50.000 mm
Maximum Bar Spacing : 500.000 mm
Pedestal Clear Cover (P, CL) : 50.000 mm
Footing Clear Cover (F, CL) : 50.000 mm
Soil Properties
Soil Type : Drained
Unit Weight : 22.000 kN/m3
Soil Bearing Capacity : 100.000 kN/m2
Soil Surcharge : 0.000 kN/m2
Depth of Soil above Footing : 0.000 mm
Cohesion : 0.000 kN/m2
Min Percentage of Slab : 0.000
Sliding and Overturning

Coefficient of Friction : 0.500


Factor of Safety Against Sliding : 1.500
Factor of Safety Against Overturning : 1.500

------------------------------------------------------

Load Combination/s- Service Stress Level

Load Combination Load Combination Title

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 146 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Number
1 DL
2 LL
3 WX
4 WZ

5 Generated Indian Code Genral_Structures 1


6 Generated Indian Code Genral_Structures 2
7 Generated Indian Code Genral_Structures 3
8 Generated Indian Code Genral_Structures 4
9 Generated Indian Code Genral_Structures 5
10 Generated Indian Code Genral_Structures 6
11 Generated Indian Code Genral_Structures 7
12 Generated Indian Code Genral_Structures 8
13 Generated Indian Code Genral_Structures 9
14 Generated Indian Code Genral_Structures 10
15 Generated Indian Code Genral_Structures 11
16 Generated Indian Code Genral_Structures 12
1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000
101
x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL+1.000 x DL
0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800
102
x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL+0.800 x DL
Load Combination/s- Strength Level
Load Combination
Load Combination Title
Number
1 DL
2 LL
3 WX
4 WZ
5 Generated Indian Code Genral_Structures 1
6 Generated Indian Code Genral_Structures 2
7 Generated Indian Code Genral_Structures 3
8 Generated Indian Code Genral_Structures 4
9 Generated Indian Code Genral_Structures 5
10 Generated Indian Code Genral_Structures 6
11 Generated Indian Code Genral_Structures 7
12 Generated Indian Code Genral_Structures 8
13 Generated Indian Code Genral_Structures 9
14 Generated Indian Code Genral_Structures 10
15 Generated Indian Code Genral_Structures 11
16 Generated Indian Code Genral_Structures 12
1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500
201
x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL+1.500 x DL
0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960
202
x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL+0.960 x DL
1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200
203
x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL+1.200 x DL
0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900
204
x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL+0.900 x DL
Applied Loads - Service Stress Level

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 147 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Axial Shear X Shear Z Moment X Moment Z


LC
(kN) (kN) (kN) (kNm) (kNm)
1 215.706 -12.296 -24.390 -10.798 5.808

2 20.362 -0.702 -1.248 -0.552 0.340

3 -0.010 1.647 -0.025 -0.023 -0.082

4 -0.022 0.052 1.299 0.145 -0.043

5 354.101 -19.497 -38.458 -17.025 9.221

6 283.269 -13.621 -30.797 -13.648 7.279

7 283.255 -15.535 -29.207 -13.447 7.325

8 283.293 -17.574 -30.736 -13.593 7.475

9 283.307 -15.660 -32.326 -13.794 7.429

10 283.281 -15.597 -30.767 -13.620 7.377

11 323.543 -15.973 -36.623 -16.232 8.590

12 323.526 -18.366 -34.637 -15.980 8.647


13 323.573 -20.914 -36.548 -16.163 8.834
14 323.591 -18.522 -38.535 -16.414 8.777
15 323.558 -18.444 -36.586 -16.197 8.712
16 194.135 -11.066 -21.951 -9.718 5.227
101 3818.469 -212.066 -421.534 -187.060 100.918
102 3054.775 -169.653 -337.227 -149.648 80.734
Applied Loads - Strength Level
LC Axial Shear X Shear Z Moment X Moment Z
(kN) (kN) (kN) (kNm) (kNm)
1 215.706 -12.296 -24.390 -10.798 5.808
2 20.362 -0.702 -1.248 -0.552 0.340
3 -0.010 1.647 -0.025 -0.023 -0.082
4 -0.022 0.052 1.299 0.145 -0.043
5 354.101 -19.497 -38.458 -17.025 9.221
6 283.269 -13.621 -30.797 -13.648 7.279
7 283.255 -15.535 -29.207 -13.447 7.325
8 283.293 -17.574 -30.736 -13.593 7.475
9 283.307 -15.660 -32.326 -13.794 7.429
10 283.281 -15.597 -30.767 -13.620 7.377
11 323.543 -15.973 -36.623 -16.232 8.590
12 323.526 -18.366 -34.637 -15.980 8.647
13 323.573 -20.914 -36.548 -16.163 8.834
14 323.591 -18.522 -38.535 -16.414 8.777
15 323.558 -18.444 -36.586 -16.197 8.712
16 194.135 -11.066 -21.951 -9.718 5.227
201 5727.703 -318.099 -632.301 -280.590 151.376
202 3665.730 -203.583 -404.673 -179.578 96.881
203 4582.163 -254.479 -505.841 -224.472 121.101
204 3436.622 -190.859 -379.381 -168.354 90.826
------------------------------------------------------

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 148 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Design Calculations
Footing Size

Initial Length (Lo) = 1.000 m

Initial Width (Wo) = 1.000 m

Uplift force due to buoyancy = 0.000 kN


Effect due to adhesion = 0.000 kN

Area from initial length and width, A o = Lo X Wo = 1.000 m2 Min. area required from

bearing pressure, Amin = P / qmax = 49.837 m2

Note: Amin is an initial estimation.


P = Critical Factored Axial Load(without self weight/buoyancy/soil). q max = Respective
Factored Bearing Capacity.

Final Footing Size


Length (L2) = 7.800 m Governing Load Case : # 101

7.800 m Governing Load Case : # 101


Width (W2) =
1.011 m Governing Load Case : # 101
Depth (D2) =

Area (A2) = 60.840 m2

------------------------------------------------------

Pressures at Four Corner

Area of
Pressure at Pressure at Pressure at Pressure at footing in
Load Case corner 1 (q1) corner 2 (q2) corner 3 (q3) corner 4 (q4) uplift (Au)
(kN/m2) (kN/m2) (kN/m2) (kN/m2)

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 149 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

(m2)
101 99.6786 91.7212 76.2463 84.2037 0.000
101 99.3872 93.0673 81.0215 87.3414 0.000
101 99.3872 93.0673 81.0215 87.3414 0.000
101 99.3872 93.0673 81.0215 87.3414 0.000
If Au is zero, there is no uplift and no pressure adjustment is necessary. Otherwise, to account for uplift, areas of negative pressure
will be set to zero and the pressure will be redistributed to remaining corners.
Summary of adjusted Pressures at Four Corner
Pressure at Pressure at Pressure at Pressure at
corner 1 (q1) corner 2 (q2) corner 3 (q3) corner 4 (q4)
Load Case

(kN/m2) (kN/m2) (kN/m2) (kN/m2)

101 99.6786 91.7212 76.2463 84.2037


101 99.3872 93.0673 81.0215 87.3414
101 99.3872 93.0673 81.0215 87.3414
101 99.3872 93.0673 81.0215 87.3414
Details of Out-of-Contact Area
(If Any)
Governing load case = N/A
Plan area of footing = 60.840 sq.m
Area not in contact with soil = 0.000 sq.m

% of total area not in contact = 0.000%

------------------------------------------------------
Check For Stability Against Overturning And Sliding
- Factor of safety against sliding Factor of safety against overturning

Load Case Along X- Along Z- About X- About Z-


No. Direction Direction Direction Direction

1 71.117 35.852 192.760 374.713


2 1106.516 622.214 3346.874 5785.530
3 465.398 30496.160 123641.950 3432.661
4 14731.790 589.966 4111.009 62599.977
5 48.400 24.537 131.926 254.911
6 66.679 29.491 158.513 337.192
7 58.463 31.095 165.177 308.207
8 51.681 29.549 158.927 281.235
9 57.998 28.096 152.749 305.172
10 58.230 29.520 158.720 306.682
11 58.121 25.349 136.244 293.278

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 150 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

12 50.548 26.803 142.277 266.608


13 44.389 25.402 136.619 242.053
14 50.124 24.092 131.047 263.834
15 50.335 25.375 136.432 265.214
16 78.044 39.344 211.536 411.212
101 12.618 6.348 34.105 66.325
102 13.522 6.802 36.548 71.076
Critical Load Case And The Governing Factor Of Safety For Overturning and Sliding X Direction
Critical Load Case for Sliding along X-Direction : 101
Governing Disturbing Force : -212.066 kN
Governing Restoring Force : 2675.819 kN
Minimum Sliding Ratio for the Critical Load Case : 12.618
Critical Load Case for Overturning about X-Direction : 101
Governing Overturning Moment : -611.959 kNm
Governing Resisting Moment : 20871.003 kNm
Minimum Overturning Ratio for the Critical Load Case : 34.105
Critical Load Case And The Governing Factor Of Safety For Overturning and Sliding Z Direction
Critical Load Case for Sliding along Z-Direction : 101
Governing Disturbing Force : -421.534 kN
Governing Restoring Force : 2675.819 kN
Minimum Sliding Ratio for the Critical Load Case : 6.348
Critical Load Case for Overturning about Z-Direction : 101

Governing Overturning Moment : 314.676 kNm


Governing Resisting Moment : 20871.003 kNm Minimum Overturning
Ratio for the Critical Load Case : 66.325

------------------------------------------------------

Moment Calculation
Check Trial Depth against moment (w.r.t. X Axis)

Critical Load Case = #201

Effective Depth = = 0.955 m

Governing moment (Mu) = 5595.441 kNm As Per IS 456 2000

ANNEX G G-1.1C

= 0.479107 Limiting Factor1 (K


umax) =

Limiting Factor2 (Rumax) = = 3444.291146 kN/m2

RPEPL-BCW-ME-
Doc.No: - Rev
)=
PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00
PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 151 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Limit Moment Of Resistance (Mumax = 24501.533686 kNm

Mu <= Mumax hence, safe

Check Trial Depth against moment (w.r.t. Z Axis)

Critical Load Case = #201

Effective Depth = = 0.955 m

Governing moment (Mu) = 5385.415 kNm As Per IS 456 2000

ANNEX G G-1.1C

= 0.479107 Limiting Factor1 (K


umax) =

Limiting Factor2 (Rumax) = = 3444.291146 kN/m2

)=
Limit Moment Of Resistance (Mumax
= 24501.533686 kNm

Mu <= Mumax hence, safe

------------------------------------------------------

Shear Calculation
Check Trial Depth for one way shear (Along X Axis)
(Shear Plane Parallel to X Axis)

Critical Load Case = #201

DX = 0.955 m

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 152 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Shear Force(S) = 2214.786 kN

Shear Stress(Tv) = 297.326579 kN/m2

Percentage Of Steel(Pt) = 0.2175

As Per IS 456 2000 Clause 40 Table 19

Shear Strength Of Concrete(Tc) = 343.234 kN/m2

Tv< Tc hence, safe

Check Trial Depth for one way shear (Along Z Axis) (Shear Plane Parallel to Z
Axis)

Critical Load Case = #201

DZ = 0.955 m
Shear Force(S) = 2135.914 kN

Shear Stress(Tv) = 286.738323 kN/m2

Percentage Of Steel(Pt) = 0.2264

As Per IS 456 2000 Clause 40 Table 19

Shear Strength Of Concrete(Tc) = 349.276 kN/m2

Tv< Tc hence, safe

Check Trial Depth for two way shear

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 153 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Critical Load Case = #201


Shear Force(S) = 5579.425 kN

Shear Stress(Tv) = 1163.811 kN/m2


As Per IS 456 2000 Clause 31.6.3.1

Ks = = 1.000

Shear Strength(Tc)= = 1250.0000 kN/m2

Ks x Tc = 1250.0000 kN/m2

Tv<= Ks x Tc hence, safe

------------------------------------------------------

Reinforcement Calculation
Calculation of Maximum Bar Size

Along X Axis

Bar diameter corresponding to max bar size (db) = 32 mm

As Per IS 456 2000 Clause 26.2.1

Development Length(ld) =
= 1.289 m

Allowable Length(ldb) =
= 3.700 m

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 154 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

ldb >=ld hence, safe

Along Z Axis

Bar diameter corresponding to max bar size(d b) = 32 mm

As Per IS 456 2000 Clause 26.2.1

Development Length(ld) = = 1.289 m

Allowable Length(ldb) = = 3.700 m

ldb >=ld hence, safe

Bottom Reinforcement Design

Along Z Axis

For moment w.r.t. X Axis (Mx)

As Per IS 456 2000 Clause 26.5.2.1


Critical Load Case = #201

Minimum Area of Steel (Astmin) = 9462.960 mm2

Calculated Area of Steel (Ast) = 16861.851 mm2

Provided Area of Steel (Ast,Provided) = 16861.851 mm2

Astmin<= Ast,Provided Steel area is accepted

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 155 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Selected bar Size (db) = Ø12

Minimum spacing allowed (Smin) = 52.000 mm

Selected spacing (S) = 51.597 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size...

The reinforcement is accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø12 @ 50.000 mm o.c.

Along X Axis

For moment w.r.t. Z Axis (Mz)

As Per IS 456 2000 Clause 26.5.2.1


Critical Load Case = #201

Minimum Area of Steel (Astmin) = 9462.960 mm2

Calculated Area of Steel (Ast) = 16204.265 mm2

Provided Area of Steel (Ast,Provided) = 16204.265 mm2

Astmin<= Ast,Provided Steel area is accepted

Selected bar Size (db) = Ø12

Minimum spacing allowed (Smin) = = 50.000 mm

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 156 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Selected spacing (S) = 53.762 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size...

The reinforcement is accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø12 @ 50.000 mm o.c.

Top Reinforcement Design

Along Z Axis

Minimum Area of Steel (Astmin) = 9462.960 mm2

Calculated Area of Steel (Ast) = 9453.600 mm2

Provided Area of Steel (Ast,Provided) = 9462.960 mm2

Astmin<= Ast,Provided Steel area is accepted Governing Moment =

1535.597 kNm

Selected bar Size (db) = Ø10

Minimum spacing allowed (Smin) = 50.000 mm

Selected spacing (S) = 64.083 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size... The reinforcement is

accepted.

Based on spacing reinforcement increment; provided reinforcement is

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 157 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

Ø10 @ 60 mm o.c.

Along X Axis

Minimum Area of Steel (Astmin) = 9462.960 mm2

Calculated Area of Steel (Ast) = 9575.812 mm2

Provided Area of Steel (Ast,Provided) = 9575.812 mm2

Astmin<= Ast,Provided Steel area is accepted Governing Moment =

1535.597 kNm

Selected bar Size (db) = Ø10

Minimum spacing allowed (Smin) = = 50.000 mm

Selected spacing (S) = 63.554 mm

Smin <= S <= Smax and selected bar size < selected maximum bar size... The reinforcement is

accepted.

Based on spacing reinforcement increment; provided reinforcement is

Ø10 @ 60 mm o.c.

------------------------------------------------------

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 158 of 159
DESIGN CALCULATION FOR MCR
BUILDING FOR 4.1 MW AT
MEDINIPUR,W.B.

RPEPL-BCW-ME-
Doc.No: - Rev

PROJECT: DEVELOPMENT OF 4.1MW SOLAR 4.1MW-ED-CRA-F11-01 00


PV PLANT, MEDINIPUR,W.B
Date: 12/10/2021 Page 159 of 159

You might also like