DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
L&T Construction
Water & Effluent Treatment
DATE 9-Nov-17
DESIGN CALCULATION FOR THICKNER
TITLE: RECIRCULATION SUMP, RAJKOT REV A
TAHAL GROUP
TAHAL CONSULTING ENGINEERS INDIA PVT. LTD
DATE 9-Nov-17
DESIGN CALCULATION FOR THICKNER
TITLE: RECIRCULATION SUMP, RAJKOT REV A
CLIENT CONTRACTOR
RAJKOT
MUNICIPAL GIRDHARI LAL AGGARWAL
CORPORATION CONTRACTORS PVT . LTD.
(RMC)
80 MLD CAPACITY SEWAGE TREATMENT PLANT DOCUMENT NO.
PROJECT: BASED ON SBR PROCESS AT MADHAPAR,
RAJKOT GLACPL-RMC-SBR-DC-01
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
DATE 9-Nov-17
DESIGN CALCULATION FOR THICKNER
TITLE: RECIRCULATION SUMP, RAJKOT REV A
MENT NO.
RNAL/STP/20/CDD/018
10-Jan-19
MENT NO.
RMC-SBR-DC-01
9-Nov-17
IA PVT. LTD
MENT NO.
RMC-SBR-DC-01
9-Nov-17
OR
MENT NO.
RMC-SBR-DC-01
MENT NO.
RNAL/STP/20/CDD/018
10-Jan-19
9-Nov-17
A
PROJECT
80 MLD CAPACITY SEWAGE TREATMENT PLANT BASED ON SBR PROCESS AT MADHAPAR, RAJKOT
CLIENT CONSULTANT
RAJKOT MUNICIPAL
CORPORATION (RMC)
DOCUMENT GLACPL-RMC-SBR-DC-01
S No Description Page No
4 DESIGN OF MONORAIL 52
INTRODUCTION & DESIGN BASIS
BASIS
SCOPE OF DESIGN REPORT
Design Method : STAAD model has been prepared for Splitter Box. Design of Wall
W1C and Splitter Box Walls has been done using STAAD results. Hydrodynamic
loads for Splitter Box have been applied in the STAAD model.
Design of other walls has been done using coefficients from IS 3370 (Part 4). Slabs,
Footings and other components have been designed using standard excel sheets.
Hydrodyamnic loads have been added to the calculated moments in Design sheets.
Limiting Crack width has been taken as 0.2 mm
DESIGN CONSTANTS
Contraction Joints
We will go in for Option 1 and therefore no contraction joints will be provided. Crack
widths and spacing of cracks will be controlled by provision of reinforcement.
Expansion Joints
While the temperature decreases from hydration peak to ambient temperature
(considered as 35 oC), the concrete shrinks and the resulting tension will cause
cracking in concrete.
Any increase in temperature beyond the ambient temperature will result in expansion
and the effect on concrete will be to reduce the cracking.
Since the ambient temperature is never expected to rise above the peak hydration
temperature, expansion joints to relieve the compressive stresses in concrete are not
required.
Refer Test order No HIL/NC/TR/17/753 dated 18-09-17 for the tests conducted by
HILTI on 16 mm and 20 mm rebar for rock anchors
A STAAD model has been prepared with the location of anchors as shown in
drawing. Plate of 200 mm thick has been modelled with the uplift load.
Uplift Pressure = (124-123.4+0.2)x10
Self Weight of Base Slab = 25x0.2
Net Uplift Pressure =
As shown in drawing and as modelled in STAAD, rock anchors have been provided
at a distance of 1.0 m from the edge of the foundation.
Rock anchors are not required under the foundation of walls because the pressure
below the founadtion due to self weight of wall is more than the Uplift Pressure
Thickness of wall is varying from 800 mm bottom to 250 mm at 3.6 m from bottom
and for the balance portion thickness is 250 mm
Average thickness of wall for the bottom 3.6 m = 0.5x(800+250)
Thickness of wall for the balance height 1.9 m = 250
Average thickness of footing for 2.4 m inside SBR Basin 0.5x(600+200)
Average thickness of footing for 1.4 m inside SBR Basin 0.5x(600+200)
(3.6x525/1000+1.9x250/1000+2.4x400/1000+1.4x400/1000)x25
Pressure below the founadtion of strip 3.8 m wide (2.4 m + 1.4 m) per m =
Since pressure due to self weight is more than the uplift pressure, anchors are not
required under the foundations
30 N/mm2
500 N/mm2
0.1 mm
400 N/mm2
0.133
10.0 kN/m3
20.0 kN/m3
0.33
50 mm
45 mm
50 mm
25 mm
243.00 m
110 kN/m2
132 kN/m2
15 oC
5 oC
15 oC
1.3 N/mm2
0.26
0.70 E-05
88.0 kN
130.0 kN
1.5
58.7 kN
86.7 kN
8.0 kN/m2
5.0 kN/m2
3.0 kN/m2
525.0 mm
250.0 mm
400.0 mm
400.0 mm
97.1 kN
25.6 kN/m2
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
DESIGN OF WALL W1
NT NO.
L/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
DESIGNED THICKNESS
Height from bottom 0.00 4.50 5.75
Designed Thickness 400 250 250
Provided Thickness 400 250 250
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
4 0.25 0.00 0.00 0.000 0.000 0.000
3 0.25 0.25 1.25 0.313 0.125 0.125
2 0.40 0.25 4.50 1.463 0.165 0.235
1 0.40 0.40 0.00 0.000 0.000 0.000
Total = 1.775 0.158 0.242
10-Jan-19
A
O.
20/CDD/018
10-Jan-19
kN/m
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
+Z Face -Z Face
Min Qx 170 15 FULL1 -110.146 -63.16 149.208 -412.837 18.956 23.489 3.106
Max Qy 150 15 FULL1 1.352 275.816 -16.343 -210.829 15.107 11.716 77.263
Max Sx 182 15 FULL1 108.33 -52.847 154.013 -159.618 -21.961 20.701 2.847
Max Sy 182 15 FULL1 108.33 -52.847 154.013 -159.618 -21.961 20.701 2.847
Max Sxy 158 15 FULL1 -6.326 38.821 25.437 -394.51 92.283 6 9.442
Min Sxy 15 15 FULL1 -5.041 -42.404 15.164 -452.018 -98.762 5.807 9.511
Max Mx 170 15 FULL1 -110.146 -63.16 149.208 -412.837 18.956 23.489 3.106
Min Mx 170 21 EMPT 68.649 32.929 -94.294 -362.814 -41.825 -12.257 -2.192
Max My 150 15 FULL1 1.352 275.816 -16.343 -210.829 15.107 11.716 77.263
Max Mxy 180 15 FULL1 34.001 60.416 101.993 -193.459 -44.308 -2.133 3.384
Min Mxy 172 15 FULL1 -37.635 53.569 88.26 -340.96 76.316 -0.683 3.294
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Max Vertical BM in wall creating tension on Water Face Max My 77.26 kN-m/m
Max Horizontal BM in wall creating tension on Water Face Max Mx 23.49 kN-m/m
Max Vertical BM in wall creating tension on Earth Face Min My 46.88 kN-m/m
Max Horizontal BM in wall creating tension on Earth Face Min Mx 12.26 kN-m/m
Thickness check:
Required effective thickness SQRT(77.26x1000000x1.5/(0.133x30x1000))
Mu / bd2 = 77.26x1.5x10^6/(1000x317^2)
Mu / bd2 = 23.49x1.5x10^6/(1000x319^2)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Refer SP-16 Percentage of reinforcement required, %
Mu / bd2 = 46.88x1.5x10^6/(1000x324^2)
Mu / bd2 = 12.26x1.5x10^6/(1000x324^2)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Vertical Earth Face 656 00-000+12-150 753
Max Qy, (15 FULL1) = 0.276 Min Qy, (15 FULL1) = -0.273
Factored Shear Stress, N/mm2 = 1.5x0.276
Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)
Maximum shear stress in concrete for limit state method of design, tc,max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
W1-1 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)
Horizontal Direction
889x(0.7/100000/2)x(15+15)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
10-Jan-19
nding Moment
Mxy kNm/m
10.431
-8.209
-0.173
-0.016
10.431
-7.414
10.431
3.46
-13.809
13.678
-8.209
5.064
-0.173
-0.186
17.583
-17.372
O.
P/20/CDD/018
10-Jan-19
170 mm
375 mm
656
317.0
1.153
0.278
881
319.0
0.346
O.
P/20/CDD/018
10-Jan-19
A
0.081
258
83.8
105
656
324.0
0.670
0.158
656
324.0
0.175
0.041
133
656
% Ast
0.491%
0.291%
O.
P/20/CDD/018
10-Jan-19
A
0.236%
0.232%
0.414
0.491%
375 mm
250 mm
2.54
3.50
1.245
1695 mm2
0.45
889 mm
0.09 mm
O.
P/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x90)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
77.26 kN-m
9.33
317 mm
51 mm
90 mm
65.4 mm
79.6 mm
6.18 N/mm2
172.0 N/mm2
375 mm
1.07E-03
5.91E-04
4.79E-04
0.085 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W1-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x2.44x(319-46.93)/46.93
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x120)^2+(50+0.5x12)^2)-0.5x12
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
23.49 kN-m
55.88 kN
9.33
268.0 mm
119.1 mm
16.8 kN-m
319 mm
51 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
46.93 mm
2.44 N/mm2
117.8 N/mm2
375 mm
120 mm
76.1 mm
7.10E-04
1.05E-03
-3.39E-04
-0.067 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W1-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x2.14x(319-44.81)/44.81
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x120)^2+(50+0.5x12)^2)-0.5x12
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
20.70 kN-m
57.75 kN
9.33
268.0 mm
119.1 mm
13.8 kN-m
319 mm
51 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
44.81 mm
2.14 N/mm2
109.1 N/mm2
375 mm
120 mm
76.1 mm
6.57E-04
1.06E-03
-3.98E-04
-0.079 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
+Z Face -Z Face
Max Qy 189 15 FULL1 -1.199 93.069 101.837 -256.082 27.349 -16.585 -5.056
Min Sx 196 21 EMPT 107.145 24.982 -125.667 -384.62 -32.653 -18.551 -2.419
Max Sy 221 15 FULL1 190.2 -32.873 203.058 -73.811 18.726 32.894 3.575
Max Sxy 186 15 FULL1 -45.309 54.138 122.69 -316.043 54.586 -9.585 -4.291
Min Sxy 78 15 FULL1 207.486 40.941 246.028 -259.635 -84.149 39.296 4.792
Min Mx 215 15 FULL1 -1.89 26.441 155.691 -275.161 34.914 -23.456 -14.395
Max My 215 21 EMPT 1.239 -9.822 -64.85 -236.313 18.636 12.028 8.963
Min My 215 15 FULL1 -1.89 26.441 155.691 -275.161 34.914 -23.456 -14.395
Max Mxy 193 15 FULL1 67.578 30.588 152.005 -199.45 -23.146 -3.956 -3.519
Min Mxy 185 15 FULL1 -72.946 24.251 147.021 -343.081 52.883 -1.959 -3.026
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Max Vertical BM in wall creating tension on Water Face Max My 8.96 kN-m/m
Max Horizontal BM in wall creating tension on Water Face Max Mx 40.15 kN-m/m
Max Vertical BM in wall creating tension on Earth Face Min My 14.40 kN-m/m
Max Horizontal BM in wall creating tension on Earth Face Min Mx 23.46 kN-m/m
Thickness check:
Required effective thickness SQRT(40.15x1000000x1.5/(0.133x30x1000))
Mu / bd2 = 8.96x1.5x10^6/(1000x267^2)
Mu / bd2 = 40.15x1.5x10^6/(1000x267^2)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Refer SP-16 Percentage of reinforcement required, %
Mu / bd2 = 14.4x1.5x10^6/(1000x274^2)
Mu / bd2 = 23.46x1.5x10^6/(1000x274^2)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Vertical Earth Face 569 00-000+12-150 753
Max Qy, (15 FULL1) = 0.093 Min Qy, (15 FULL1) = -0.091
Factored Shear Stress, N/mm2 = 1.5x0.093
Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)
Maximum shear stress in concrete for limit state method of design, tc,max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
W1-2 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)
Horizontal Direction
622x(0.7/100000/2)x(15+15)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
10-Jan-19
nding Moment
Mxy kNm/m
-3.897
-4.231
-0.327
-0.092
-3.897
3.275
5.484
-6.722
-14.442
-3.897
-4.231
-0.069
0.01
-0.069
16.114
-16.022
O.
P/20/CDD/018
10-Jan-19
123 mm
325 mm
569
267.0
0.189
0.044
569
267.0
0.845
O.
P/20/CDD/018
10-Jan-19
A
0.201
537
118
148
685
274.0
0.288
0.067
569
274.0
0.469
0.110
301
76.1
95
569
% Ast
0.418%
0.611%
O.
P/20/CDD/018
10-Jan-19
A
0.282%
0.275%
0.140
0.418%
325 mm
250 mm
2.14
3.50
0.984
2428 mm2
0.75
622 mm
0.07 mm
O.
P/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
8.96 kN-m
9.33
267 mm
51 mm
180 mm
99.1 mm
63.3 mm
1.09 N/mm2
32.7 N/mm2
325 mm
2.10E-04
7.52E-04
-5.42E-04
-0.117 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W1-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x4.54x(267-59.62)/59.62
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x120)^2+(50+0.5x16)^2)-0.5x16
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
40.15 kN-m
78.65 kN
9.33
216.0 mm
67.0 mm
34.9 kN-m
267 mm
51 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
59.62 mm
4.54 N/mm2
131.5 N/mm2
325 mm
120 mm
75.5 mm
8.42E-04
5.07E-04
3.35E-04
0.064 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W1-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x4.45x(267-59.24)/59.24
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x120)^2+(50+0.5x16)^2)-0.5x16
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
39.30 kN-m
79.95 kN
9.33
216.0 mm
67.0 mm
33.9 kN-m
267 mm
51 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
59.24 mm
4.45 N/mm2
130.0 N/mm2
325 mm
120 mm
75.5 mm
8.31E-04
5.07E-04
3.24E-04
0.062 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
+Z Face -Z Face
Min Qy 234 22 SERVI 79.268 -29.267 117.767 -125.543 -15.436 11.653 1.08
Max Sx 104 15 FULL1 177.529 13.408 245.758 -262.171 -94.764 34.166 4.923
Min Sx 249 21 EMPT 52.556 2.855 -132.185 -246.792 -19.65 -4.98 -0.194
Max Sy 234 15 FULL1 177.53 -28.61 183.752 -77.444 2.791 31.289 3.849
Min Sy 248 21 EMPT 67.583 -8.359 -131.313 -412.382 -85.829 -12.216 -1.797
Max Sxy 105 15 FULL1-152.649 -4.234 143.742 -334.327 98.61 28.029 4.735
Min Sxy 116 15 FULL1 119.656 11.05 101.188 -368.873 -176.309 12.63 1.235
Min Mx 228 15 FULL1 -1.84 4.898 168.519 -279.999 38.541 -23.406 -13.613
Min My 228 15 FULL1 -1.84 4.898 168.519 -279.999 38.541 -23.406 -13.613
Max Mxy 232 15 FULL1 100.754 -12.248 189.584 -202.236 28.111 -3.38 -6.146
Min Mxy 224 15 FULL1-109.667 -11.455 186.652 -304.33 -22.214 -1.309 -4.563
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Max Vertical BM in wall creating tension on Water Face Max My 8.22 kN-m/m
Max Horizontal BM in wall creating tension on Water Face Max Mx 38.52 kN-m/m
Max Vertical BM in wall creating tension on Earth Face Min My 13.61 kN-m/m
Max Horizontal BM in wall creating tension on Earth Face Min Mx 23.41 kN-m/m
Thickness check:
Required effective thickness SQRT(38.52x1000000x1.5/(0.133x30x1000))
Mu / bd2 = 8.22x1.5x10^6/(1000x217^2)
Mu / bd2 = 38.52x1.5x10^6/(1000x217^2)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Refer SP-16 Percentage of reinforcement required, %
Mu / bd2 = 13.61x1.5x10^6/(1000x224^2)
Mu / bd2 = 23.41x1.5x10^6/(1000x224^2)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Vertical Earth Face 481 00-000+12-150 753
Max Qy, (15 FULL1) = 0.028 Min Qy, (22 SERVICE) = -0.029
Factored Shear Stress, N/mm2 = 1.5x0.029
Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)
Maximum shear stress in concrete for limit state method of design, tc,max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
W1-3 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)
Horizontal Direction
530x(0.7/100000/2)x(15+15)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
10-Jan-19
nding Moment
Mxy kNm/m
-2.611
3.071
3.071
0.62
-1.769
0.118
3.146
0.32
2.116
-1.583
-3.008
0.069
-0.072
0.069
6.505
-6.34
O.
P/20/CDD/018
10-Jan-19
120 mm
275 mm
481
217.0
0.262
0.061
481
217.0
1.227
O.
P/20/CDD/018
10-Jan-19
A
0.297
644
93.2
117
761
224.0
0.407
0.095
481
224.0
0.700
0.166
372
69.7
87
481
% Ast
0.515%
0.748%
O.
P/20/CDD/018
10-Jan-19
A
0.347%
0.336%
0.044
0.515%
275 mm
1.05
250 mm
1.74
3.50
0.914
2428 mm2
0.88
530 mm
0.06 mm
O.
P/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
8.22 kN-m
9.33
217 mm
51 mm
180 mm
99.1 mm
56.8 mm
1.42 N/mm2
37.4 N/mm2
275 mm
2.54E-04
6.65E-04
-4.11E-04
-0.084 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W1-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x6.12x(217-56.67)/56.67
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x120)^2+(50+0.5x16)^2)-0.5x16
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
38.52 kN-m
62.15 kN
9.33
166.0 mm
51.5 mm
35.3 kN-m
217 mm
51 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
56.67 mm
6.12 N/mm2
144.2 N/mm2
275 mm
120 mm
75.5 mm
9.82E-04
4.44E-04
5.38E-04
0.099 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W1-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x5.46x(217-55.3)/55.3
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x120)^2+(50+0.5x16)^2)-0.5x16
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
34.17 kN-m
67.65 kN
9.33
166.0 mm
51.5 mm
30.7 kN-m
217 mm
51 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
55.30 mm
5.46 N/mm2
133.0 N/mm2
275 mm
120 mm
75.5 mm
9.03E-04
4.46E-04
4.58E-04
0.084 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
+Z Face -Z Face
Max Qy 124 15 FULL1 0.211 21.794 133.015 -350.303 -36.031 -17.932 -3.976
Min Qy 268 15 FULL1 14.724 -22.111 151.691 -280.076 34.146 -17.249 -3.939
Max Sx 274 16 FULL2 -3.87 14.007 531.897 -65.472 172.643 13.581 2.883
Min Sx 143 22 SERVI 66.328 -6.063 -395.411 -535.896 -280 16.937 2.439
Max Sy 274 16 FULL2 -3.87 14.007 531.897 -65.472 172.643 13.581 2.883
Min Sy 143 22 SERVI 66.328 -6.063 -395.411 -535.896 -280 16.937 2.439
Max Sxy 274 16 FULL2 -3.87 14.007 531.897 -65.472 172.643 13.581 2.883
Min Sxy 143 15 FULL1 103.708 -10.729 -379.933 -532.827 -281.648 25.53 3.41
Max Mx 286 15 FULL1 123.038 -10.169 73.33 -152.131 -3.55 26.751 3.158
Min Mx 280 15 FULL1 1.602 -13.866 158.519 -267.369 12.971 -18.551 -0.885
Max My 261 22 SERVI -111.882 -1.669 -22.339 -347.856 -112.094 25.441 4.99
Min My 267 15 FULL1 -1.628 -22.097 165.24 -281.707 32.15 -18.227 -4.104
Max Mxy 274 16 FULL2 -3.87 14.007 531.897 -65.472 172.643 13.581 2.883
Min Mxy 127 15 FULL1 53.769 18.515 47.07 -345.239 -87.965 -7.391 -2.02
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Max Vertical BM in wall creating tension on Water Face Max My 4.99 kN-m/m
Max Horizontal BM in wall creating tension on Water Face Max Mx 26.75 kN-m/m
Max Vertical BM in wall creating tension on Earth Face Min My 4.10 kN-m/m
Max Horizontal BM in wall creating tension on Earth Face Min Mx 18.55 kN-m/m
Thickness check:
Required effective thickness SQRT(26.75x1000000x1.5/(0.133x30x1000))
Mu / bd2 = 4.99x1.5x10^6/(1000x192^2)
Mu / bd2 = 26.75x1.5x10^6/(1000x194^2)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Refer SP-16 Percentage of reinforcement required, %
Mu / bd2 = 4.1x1.5x10^6/(1000x199^2)
Mu / bd2 = 18.55x1.5x10^6/(1000x200^2)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Vertical Earth Face 438 00-000+12-150 753
Max Qy, (15 FULL1) = 0.022 Min Qy, (15 FULL1) = -0.022
Factored Shear Stress, N/mm2 = 1.5x0.022
Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)
Maximum shear stress in concrete for limit state method of design, tc,max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
W1-4 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)
Horizontal Direction
719x(0.7/100000/2)x(15+15)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
10-Jan-19
nding Moment
Mxy kNm/m
-0.627
-1.401
-0.225
1.116
2.814
0.285
2.814
0.285
2.814
0.572
-1.375
0.225
1.306
0.268
2.814
-1.755
O.
P/20/CDD/018
10-Jan-19
100 mm
250 mm
438
192.0
0.203
0.047
438
194.0
1.066
O.
P/20/CDD/018
10-Jan-19
A
0.256
497
27.4
34
531
199.0
0.155
0.036
438
200.0
0.696
0.165
330
59.6
75
438
% Ast
0.582%
0.378%
O.
P/20/CDD/018
10-Jan-19
A
0.388%
0.264%
0.033
0.582%
250 mm
1.1
250 mm
1.54
3.50
0.898
1280 mm2
0.51
719 mm
0.08 mm
O.
P/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
4.99 kN-m
9.33
192 mm
51 mm
180 mm
99.1 mm
53.3 mm
1.06 N/mm2
25.7 N/mm2
250 mm
1.82E-04
6.24E-04
-4.42E-04
-0.088 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W1-4 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x7.08x(194-42.31)/42.31
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x150)^2+(50+0.5x12)^2)-0.5x12
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
26.75 kN-m
18.25 kN
9.33
144.0 mm
59.3 mm
25.7 kN-m
194 mm
50 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
42.31 mm
7.08 N/mm2
211.4 N/mm2
250 mm
150 mm
87.6 mm
1.45E-03
9.44E-04
5.03E-04
0.097 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W1-4 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x3.87x(194-25.82)/25.82
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x150)^2+(50+0.5x12)^2)-0.5x12
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
13.58 kN-m
133.00 kN
9.33
144.0 mm
59.3 mm
5.7 kN-m
194 mm
50 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
25.82 mm
3.87 N/mm2
210.0 N/mm2
250 mm
150 mm
87.6 mm
1.40E-03
9.92E-04
4.07E-04
0.080 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
10-Jan-19
R
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Es = 2.00E+05 N/mm2
G1 = 0.158 G2 = 0.242
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
m mm mm m mm mm
1-(1x1000x(2x300+300)/((3x(300+300)))/1000)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Horizontal pressure Fill 2 - - -
Weight of Fill 1 on footing 57.50 1.90 -109.25 2.4-0.5
Weight of Fill 2 on footing - - -
Self weight of footing on Fill 1 side 7.50 1.90 -14.25 2.4-0.5
Self weight of footing on Fill 2 side 7.50 0.500 -3.75 0.5
Eccentricity = 0.5x2.4-0.91
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Moment at R (base), kN-m/m = 71.09x0.535-7.5x(1-0.5)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Base Pressure at R (interpolated) = 44.57+((93.26-44.57)/2.4)x(1+0.4)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Total overturning moments (Adding +ve moments) kN-m/m =
Total resisting moments (Adding -ve moments) kN-m/m =
Check for overturning = Resisting/ overturning moments =
Total vertical load P (kN/m) = (-57.5+103+7.5+7.5+3+44.4)
Net moment (kN-m/m) = ABS((77.26-46.88-109.25-51.5-14.25-3.75-3.6-
55.133))
Eccentricity = 0.5x2.4-0.93
MOMENT ENVELOPE
Description Case 1 Case 2 Case 3
Moment at Q (base) = -20.60 21.97 -8.85
Moment at R (base) = 34.31 -12.00 13.36
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Envelope unfactored moments at Q Top 20.60
kN-m/m
Bottom 21.97
Envelope unfactored moments at R Top 12.00
kN-m/m
Bottom 34.31
�
0.5 �fck �1000 �d � � 4.6 �Mu � 106 �
Ast = � 1- 1-
��� �
� fy ��� fck �1000 �d 2 �
�
Min reinforcement is calculated as per the provisions of IS 3370 (Part 2) - 2009
Percentage of min reinforcement % = 0.24
Location Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
unfactor Mu Factor Th D Mu required
M
Reinf
Location Reinforcement Provided
required
Q - Top 360 00-000+12-180 628
Q - Bot 360 00-000+12-150 754
R - Top 360 00-000+12-180 628
R - Bot 507 10-180+16-180 1553
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
DISTRIBUTION REINFORCEMENT
Fill 1 Side, Average th from 0 to 0.5 m (300+0.5x(300+300))/2
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
10-Jan-19
N/mm2
237.850
Overturning moment
kN-m/m
77.26
46.88
6.50
arth Face
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
1+1+0.158+0.242 2.40
+300)x1x25/1000) 7.50
(300+300)))/1000) 0.500
+300)x1x25/1000) 7.50
(300+300)))/1000) 0.500
5.75x10x1 57.50
0.5x1 0.50
5.15x20x1 103.00
0.5x1 0.50
0.158+0.242 0.40 m
300)x0.4x25/1000 3.00
.85+300/1000)x18 208.1
10-Jan-19
2.4-0.5
2.4-0.5
0.5
0.5x0.4+1
1+0.242
77.26
185.98
185.983/77.26 2.41
5-7.5+7.5+3+44.4) 119.90
-3.75-3.6-55.133)) 108.72
108.72/119.9 0.910
0.5x2.4-0.91 0.29
4)x(1-(6x0.29/2.4)) 13.74
6.18-13.74)/2.4)x1 43.92
3.74)/2.4)x(1+0.4) 56.00
)x(1+(6x0.29/2.4)) 86.18
5x(13.74+43.92)x1 28.83
(3x(13.74+43.92)) 0.41
(1-0.5)-57.5x0.5x1 -20.60
0.5x(56+86.18)x1 71.09
6))/(3x(56+86.18)) 0.54
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
A
x0.535-7.5x(1-0.5) 34.31
2.4-0.5
0.5
2.4-0.5
0.5x0.4+1
1+0.158
46.88
268.73
268.727/46.88 5.73
+7.5+7.5+3+44.4) 165.40
4.25+3.6+51.427)) 221.85
221.85/165.4 1.34
2.4-1.341 1.06
0.5x2.4-1.059 0.14
x(1-(6x0.141/2.4)) 44.57
3.26-44.57)/2.4)x1 64.86
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
A
4.57)/2.4)x(1+0.4) 72.97
x(1+(6x0.141/2.4)) 93.26
5x(44.57+64.86)x1 54.72
(3x(44.57+64.86)) 0.47
2x0.47-7.5x(1-0.5) 21.97
5x(72.97+93.26)x1 83.12
(3x(72.97+93.26)) 0.52
(1-0.5)-103x0.5x1 -12.00
2.4-0.5
0.5x1
2.4-0.5
0.5
0.5x0.4+1
1+0.242
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
A
77.26
284.36
3.68
+7.5+7.5+3+44.4) 222.90
.5-14.25-3.75-3.6- 207.10
55.133))
207.103/222.9 0.93
0.93 0.93
0.5x2.4-0.93 0.27
4)x(1-(6x0.27/2.4)) 30.18
30.18+52.246x1 82.43
18+52.246x(1+0.4) 103.32
)x(1+(6x0.27/2.4)) 155.57
5x(30.18+82.43)x1 56.31
(3x(30.18+82.43)) 0.42
(1-0.5)-57.5x0.5x1 -8.85
103.32+155.57)x1 129.45
x(103.32+155.57)) 0.53
(1-0.5)-103x0.5x1 13.36
Case 3
-8.85
13.36
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
RENGTH
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
+0.5x(300+300))/2 300
(0.5x300,250)/100 525
628
+0.5x(300+300))/2 300
(0.5x300,250)/100 525
628
+0.5x(300+300))/2 300
(0.5x300,250)/100 525
628
+0.5x(300+300))/2 300
(0.5x300,250)/100 525
628
88.32
44.40
18.00
57.50
44.4+18+57.5 119.90
0.45
53.96
34.37
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W1-F1 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x150)^2+(50+0.5x12)^2)-0.5x12
(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc fsc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc
Distance from compression face to point where crack width is being calculated, a
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
21.97 kN-m
9.33
244 mm
56 mm
150 mm
87.6 mm
52.4 mm
3.77 N/mm2
128.6 N/mm2
300 mm
8.31E-04
1.06E-03
-2.31E-04
-0.050 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
DESIGN OF WALL W2
NT NO.
L/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
DESIGNED THICKNESS
Height from bottom 0.00 4.50 5.75
Designed Thickness 250 250 250
Provided Thickness 250 250 250
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
4 0.25 0.00 0.00 0.000 0.000 0.000
3 0.25 0.25 1.25 0.313 0.125 0.125
2 0.25 0.25 4.50 1.125 0.125 0.125
1 0.25 0.25 0.00 0.000 0.000 0.000
Total = 1.438 0.125 0.125
10-Jan-19
A
O.
20/CDD/018
10-Jan-19
kN/m
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
+Z Face -Z Face
Max Qy 306 15 FULL1 -55.439 369.302 -84.021 -554.491 -87.577 9.027 52.443
Min Qy 303 21 EMPT -6.71 -180.034 -112.146 -656.808 -14.805 -3.447 -22.177
Max Sx 370 15 FULL1 184.819 -82.875 168.773 -439.205 -161.515 22.209 2.877
Min Sx 287 15 FULL1 24.43 0.469 -136.786 -667.948 216.998 3.371 4.292
Max Sy 314 21 EMPT 3.577 14.457 -51.969 -381.914 -23.742 -2.054 -1.859
Min Sy 296 21 EMPT -4.182 -168.268 -116.588 -704.46 -0.35 -2.726 -18.178
Max Sxy 316 15 FULL1 -32.205 32.082 1.735 -552.745 255.025 2.713 2.298
Min Sxy 341 15 FULL1 32.612 34.882 7.953 -469.142 -222.706 3.257 2.529
Max Mx 370 15 FULL1 184.819 -82.875 168.773 -439.205 -161.515 22.209 2.877
Min Mx 370 21 EMPT -110.572 37.579 -119.613 -395.559 0.613 -11.799 -1.367
Max My 303 15 FULL1 2.371 368.142 -85.315 -579.268 -47.455 9.65 60.136
Min My 304 21 EMPT 1.548 -179.086 -110.017 -645.404 -14.736 -3.501 -22.45
Max Mxy 368 15 FULL1 54.946 49.451 83.033 -460.097 -189.172 -2.346 -4.634
Min Mxy 345 15 FULL1 -45.83 42.434 90.417 -563.03 225.13 -2.867 -3.515
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Max Vertical BM in wall creating tension on Water Face Max My 60.14 kN-m/m
Max Horizontal BM in wall creating tension on Water Face Max Mx 22.21 kN-m/m
Max Vertical BM in wall creating tension on Earth Face Min My 22.45 kN-m/m
Max Horizontal BM in wall creating tension on Earth Face Min Mx 11.80 kN-m/m
Thickness check:
Required effective thickness SQRT(60.14x1000000x1.5/(0.133x30x1000))
Mu / bd2 = 60.14x1.5x10^6/(1000x187.5^2)
Mu / bd2 = 22.21x1.5x10^6/(1000x194^2)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Refer SP-16 Percentage of reinforcement required, %
Mu / bd2 = 22.45x1.5x10^6/(1000x199^2)
Mu / bd2 = 11.8x1.5x10^6/(1000x200^2)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Vertical Earth Face 438 00-000+12-160 706
Max Qy, (15 FULL1) = 0.369 Min Qy, (21 EMPTY) = -0.180
Factored Shear Stress, N/mm2 = 1.5x0.369
Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)
Maximum shear stress in concrete for limit state method of design, tc,max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
W2-1 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)
Horizontal Direction
573x(0.7/100000/2)x(15+15)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
10-Jan-19
nding Moment
Mxy kNm/m
4.238
-3.933
2.256
0.365
4.238
-2.109
-1.063
0.206
-9.393
10.185
4.238
-1.603
-0.163
-0.143
11.724
-11.087
O.
P/20/CDD/018
10-Jan-19
150 mm
250 mm
438
187.5
2.566
0.664
1245
194.0
0.885
O.
P/20/CDD/018
10-Jan-19
A
0.211
409
63.4
79
488
199.0
0.850
0.202
438
200.0
0.443
0.104
208
438
% Ast
2.307%
0.473%
O.
P/20/CDD/018
10-Jan-19
A
0.364%
0.329%
0.554
2.307%
250 mm
1.1
250 mm
1.5
3.50
1.452
1600 mm2
0.64
573 mm
0.06 mm
O.
P/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x80)^2+(50+0.5x25)^2)-0.5x25
(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
60.14 kN-m
9.33
188 mm
51 mm
80 mm
61.7 mm
86.6 mm
8.15 N/mm2
88.6 N/mm2
250 mm
7.17E-04
1.53E-04
5.64E-04
0.091 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x5.42x(194-42.78)/42.78
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x120)^2+(50+0.5x12)^2)-0.5x12
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
22.21 kN-m
42.25 kN
9.33
144.0 mm
59.2 mm
19.7 kN-m
194 mm
50 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
42.78 mm
5.42 N/mm2
159.6 N/mm2
250 mm
120 mm
76.1 mm
1.09E-03
7.54E-04
3.40E-04
0.062 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x5.42x(194-42.78)/42.78
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x120)^2+(50+0.5x12)^2)-0.5x12
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
22.21 kN-m
42.25 kN
9.33
144.0 mm
59.2 mm
19.7 kN-m
194 mm
50 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
42.78 mm
5.42 N/mm2
159.6 N/mm2
250 mm
120 mm
76.1 mm
1.09E-03
7.54E-04
3.40E-04
0.062 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
+Z Face -Z Face
Max Qy 383 15 FULL1 90.885 145.141 1.958 -624.44 13.518 4.776 -12.976
Max Sx 426 15 FULL1 266.934 -35.844 288.838 -333.677 -68.825 37.768 5.077
Min Sx 426 21 EMPT -139.729 10.358 -166.025 -410.801 -13.602 -18.223 -2.399
Max Sy 454 15 FULL1 261.75 -6.295 285.513 -314.909 -30.194 40.251 5.602
Min Sy 433 21 EMPT 46.807 39.842 -77.123 -695.646 -25.445 -2.826 5.577
Max Sxy 373 15 FULL1 -85.091 10.5 164.294 -560.217 193.772 -2.946 -7.126
Min Sxy 396 15 FULL1 96.473 12.189 149.896 -454.068 -150.068 -2.618 -8.636
Max Mx 454 15 FULL1 261.75 -6.295 285.513 -314.909 -30.194 40.251 5.602
Min Mx 454 21 EMPT -129.456 -3.851 -159.585 -413.619 -13.248 -18.601 -2.633
Max My 416 21 EMPT -7.156 -1.88 -117.812 -587.269 3.716 5.538 12.419
Min My 443 15 FULL1 -8.555 11.97 22.703 -534.677 -19.655 -12.192 -31.904
Max Mxy 396 15 FULL1 96.473 12.189 149.896 -454.068 -150.068 -2.618 -8.636
Min Mxy 374 15 FULL1 -34.307 42.149 133.742 -596.428 184.824 -8.318 -10.254
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Max Vertical BM in wall creating tension on Water Face Max My 12.42 kN-m/m
Max Horizontal BM in wall creating tension on Water Face Max Mx 40.25 kN-m/m
Max Vertical BM in wall creating tension on Earth Face Min My 31.90 kN-m/m
Max Horizontal BM in wall creating tension on Earth Face Min Mx 18.60 kN-m/m
Thickness check:
Required effective thickness SQRT(40.25x1000000x1.5/(0.133x30x1000))
Mu / bd2 = 12.42x1.5x10^6/(1000x192^2)
Mu / bd2 = 40.25x1.5x10^6/(1000x190^2)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Refer SP-16 Percentage of reinforcement required, %
Mu / bd2 = 31.9x1.5x10^6/(1000x199^2)
Mu / bd2 = 18.6x1.5x10^6/(1000x197^2)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Vertical Earth Face 581 00-000+12-160 706
Max Qy, (15 FULL1) = 0.145 Min Qy, (15 FULL1) = -0.065
Factored Shear Stress, N/mm2 = 1.5x0.145
Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)
Maximum shear stress in concrete for limit state method of design, tc,max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
W2-2 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)
Horizontal Direction
349x(0.7/100000/2)x(15+15)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
10-Jan-19
nding Moment
Mxy kNm/m
1.152
-1.362
1.071
-2.79
1.152
0.166
-0.509
0.156
-9.714
9.523
-0.509
0.866
0.628
0.568
9.523
-9.837
O.
P/20/CDD/018
10-Jan-19
123 mm
250 mm
438
192.0
0.505
0.118
438
190.0
1.672
O.
P/20/CDD/018
10-Jan-19
A
0.413
785
107.3
134
919
199.0
1.208
0.292
581
197.0
0.719
0.170
335
438
% Ast
0.654%
1.315%
O.
P/20/CDD/018
10-Jan-19
A
0.372%
0.850%
0.218
0.654%
250 mm
1.1
250 mm
1.52
3.50
0.920
4292 mm2
1.72
349 mm
0.04 mm
O.
P/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x160)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
12.42 kN-m
9.33
192 mm
51 mm
160 mm
90.8 mm
55.7 mm
2.51 N/mm2
57.3 N/mm2
250 mm
4.08E-04
5.51E-04
-1.43E-04
-0.027 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x6.43x(190-61.85)/61.85
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x120)^2+(50+0.5x20)^2)-0.5x20
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
40.25 kN-m
71.50 kN
9.33
137.0 mm
53.5 mm
36.4 kN-m
190 mm
53 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
61.85 mm
6.43 N/mm2
111.0 N/mm2
250 mm
120 mm
74.9 mm
8.15E-04
2.64E-04
5.51E-04
0.098 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x6.04x(190-61.41)/61.41
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x120)^2+(50+0.5x20)^2)-0.5x20
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
37.77 kN-m
72.25 kN
9.33
137.0 mm
53.5 mm
33.9 kN-m
190 mm
53 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
61.41 mm
6.04 N/mm2
105.4 N/mm2
250 mm
120 mm
74.9 mm
7.73E-04
2.64E-04
5.08E-04
0.090 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
+Z Face -Z Face
Max Qy 530 16 FULL2 -68.522 127.12 35.432 -692.309 127.765 -26.155 -14.972
Min Qy 531 15 FULL1 -9.019 -89.922 177.583 -675.759 -136.429 -3.778 -19.914
Min Sx 519 21 EMPT 27.808 28.69 -198.51 -487.007 -109.373 3.939 -6.527
Max Sy 536 21 EMPT -33.003 10.474 -129.756 -272.37 -5.415 -0.529 0.16
Min Sy 517 21 EMPT 76.177 111.825 -73.596 -797.847 -162.215 -7.936 -13.033
Max Sxy 515 21 EMPT -41.866 25.297 -141.08 -589.845 203.619 -1.669 -9.712
Min Sxy 518 21 EMPT 53.254 26.919 -161.338 -606.528 -178.109 0.464 -9.598
Max Mx 482 15 FULL1 236.093 18.225 256.639 -316.773 3.277 39.417 5.625
Min Mx 531 16 FULL2 73.408 127.006 41.09 -687.315 -139.034 -27.201 -14.567
Max My 473 21 EMPT -18.627 33.289 -109.685 -567.731 51.274 3.348 7.512
Min My 471 15 FULL1 -7.794 -20.787 23.245 -497.821 -10.665 -12.109 -31.358
Max Mxy 513 15 FULL1 -95.39 -19.713 102.998 -364.237 46.546 4.168 -6.2
Min Mxy 526 16 FULL2 -30.807 -7.302 -102.587 -395.737 -83.459 2.834 -9.678
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Max Vertical BM in wall creating tension on Water Face Max My 7.51 kN-m/m
Max Horizontal BM in wall creating tension on Water Face Max Mx 39.42 kN-m/m
Max Vertical BM in wall creating tension on Earth Face Min My 31.36 kN-m/m
Max Horizontal BM in wall creating tension on Earth Face Min Mx 27.20 kN-m/m
Thickness check:
Required effective thickness SQRT(39.42x1000000x1.5/(0.133x30x1000))
Mu / bd2 = 7.51x1.5x10^6/(1000x192^2)
Mu / bd2 = 39.42x1.5x10^6/(1000x190^2)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Refer SP-16 Percentage of reinforcement required, %
Mu / bd2 = 31.36x1.5x10^6/(1000x199^2)
Mu / bd2 = 27.2x1.5x10^6/(1000x200^2)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Vertical Earth Face 571 00-000+12-160 706
Max Qy, (16 FULL2) = 0.127 Min Qy, (15 FULL1) = -0.090
Factored Shear Stress, N/mm2 = 1.5x0.127
Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)
Maximum shear stress in concrete for limit state method of design, tc,max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
W2-3 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)
Horizontal Direction
382x(0.7/100000/2)x(15+15)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
10-Jan-19
nding Moment
Mxy kNm/m
-2.026
1.85
-3.551
-3.161
1.85
-1.846
2.662
-0.993
-0.796
-0.922
-2.026
0.583
-0.06
0.503
9.017
-8.375
O.
P/20/CDD/018
10-Jan-19
122 mm
250 mm
438
192.0
0.306
0.071
438
190.0
1.638
O.
P/20/CDD/018
10-Jan-19
A
0.404
768
96.4
121
889
199.0
1.188
0.287
571
200.0
1.020
0.245
490
15.4
19
509
% Ast
0.654%
1.315%
O.
P/20/CDD/018
10-Jan-19
A
0.372%
0.329%
0.191
0.654%
250 mm
1.1
250 mm
1.52
3.50
0.920
3275 mm2
1.31
382 mm
0.04 mm
O.
P/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x160)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
7.51 kN-m
9.33
192 mm
51 mm
160 mm
90.8 mm
55.7 mm
1.52 N/mm2
34.7 N/mm2
250 mm
2.47E-04
5.51E-04
-3.04E-04
-0.058 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x6.68x(190-63.65)/63.65
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x120)^2+(50+0.5x20)^2)-0.5x20
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
39.42 kN-m
64.25 kN
9.33
140.0 mm
28.1 mm
37.6 kN-m
190 mm
50 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
63.65 mm
6.68 N/mm2
110.5 N/mm2
250 mm
120 mm
74.9 mm
8.15E-04
2.63E-04
5.52E-04
0.098 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x6.67x(190-63.64)/63.64
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x120)^2+(50+0.5x20)^2)-0.5x20
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
39.34 kN-m
64.25 kN
9.33
140.0 mm
28.1 mm
37.5 kN-m
190 mm
50 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
63.64 mm
6.67 N/mm2
110.3 N/mm2
250 mm
120 mm
74.9 mm
8.14E-04
2.63E-04
5.51E-04
0.098 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
+Z Face -Z Face
Min Qx 580 22 SERVI -364.689 -171.479 -177.407 -705.341 -416.94 32.532 -6.242
Min Qy 580 22 SERVI -364.689 -171.479 -177.407 -705.341 -416.94 32.532 -6.242
Max Sx 593 15 FULL1 -19.202 18.301 255.417 -172.077 -14.278 12.263 -0.064
Min Sx 572 21 EMPT 121.665 12.695 -516.973 -890.06 537.76 1.099 -25.183
Max Sy 593 15 FULL1 -19.202 18.301 255.417 -172.077 -14.278 12.263 -0.064
Min Sy 572 21 EMPT 121.665 12.695 -516.973 -890.06 537.76 1.099 -25.183
Max Sxy 572 21 EMPT 121.665 12.695 -516.973 -890.06 537.76 1.099 -25.183
Min Sxy 573 21 EMPT -115.045 17.871 -489.395 -854.447 -511.45 1.434 -25.26
Max Mx 580 22 SERVI -364.689 -171.479 -177.407 -705.341 -416.94 32.532 -6.242
Min Mx 559 16 FULL2 202.765 142.47 19.054 -755.665 -257.642 -31.864 -23.829
Max My 594 22 SERVI 98.46 -37.94 150.703 -376.916 125.061 26.901 8.333
Min My 586 16 FULL2 -73.66 92.321 -323.363 -835.597 492.076 -29.119 -29.604
Max Mxy 572 21 EMPT 121.665 12.695 -516.973 -890.06 537.76 1.099 -25.183
Min Mxy 573 21 EMPT -115.045 17.871 -489.395 -854.447 -511.45 1.434 -25.26
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Max Vertical BM in wall creating tension on Water Face Max My 8.33 kN-m/m
Max Horizontal BM in wall creating tension on Water Face Max Mx 32.53 kN-m/m
Max Vertical BM in wall creating tension on Earth Face Min My 29.60 kN-m/m
Max Horizontal BM in wall creating tension on Earth Face Min Mx 31.86 kN-m/m
Thickness check:
Required effective thickness SQRT(32.53x1000000x1.5/(0.133x30x1000))
Mu / bd2 = 8.33x1.5x10^6/(1000x192^2)
Mu / bd2 = 32.53x1.5x10^6/(1000x192^2)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Refer SP-16 Percentage of reinforcement required, %
Mu / bd2 = 29.6x1.5x10^6/(1000x199^2)
Mu / bd2 = 31.86x1.5x10^6/(1000x200^2)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Vertical Earth Face 537 00-000+12-160 706
Max Qy, (16 FULL2) = 0.145 Min Qy, (22 SERVICE) = -0.171
Factored Shear Stress, N/mm2 = 1.5x0.171
Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)
Maximum shear stress in concrete for limit state method of design, tc,max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
W2-4 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)
Horizontal Direction
542x(0.7/100000/2)x(15+15)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
10-Jan-19
nding Moment
Mxy kNm/m
4.053
-8.263
-1.453
-8.263
-7.547
15.967
-7.547
15.967
15.967
-16.945
-8.263
-2.5
-3.169
12.723
15.967
-16.945
O.
P/20/CDD/018
10-Jan-19
111 mm
250 mm
438
192.0
0.339
0.079
438
192.0
1.324
O.
P/20/CDD/018
10-Jan-19
A
0.322
618
618
199.0
1.121
0.270
537
200.0
1.195
0.289
578
7.1
587
% Ast
0.654%
0.673%
O.
P/20/CDD/018
10-Jan-19
A
0.368%
0.329%
0.257
0.654%
250 mm
1.1
250 mm
1.54
3.50
0.932
1998 mm2
0.80
542 mm
0.06 mm
O.
P/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x160)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
8.33 kN-m
9.33
192 mm
51 mm
160 mm
90.8 mm
55.7 mm
1.69 N/mm2
38.6 N/mm2
250 mm
2.75E-04
5.51E-04
-2.76E-04
-0.053 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2-4 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x6.63x(192-54.54)/54.54
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x150)^2+(50+0.5x16)^2)-0.5x16
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
32.53 kN-m
1.00 kN
9.33
142.0 mm
46.8 mm
32.5 kN-m
192 mm
50 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
54.54 mm
6.63 N/mm2
139.2 N/mm2
250 mm
150 mm
86.8 mm
9.90E-04
5.19E-04
4.71E-04
0.089 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2-4 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x2.76x(192-40.72)/40.72
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x150)^2+(50+0.5x16)^2)-0.5x16
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
12.26 kN-m
63.75 kN
9.33
142.0 mm
46.8 mm
9.3 kN-m
192 mm
50 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
40.72 mm
2.76 N/mm2
85.4 N/mm2
250 mm
150 mm
86.8 mm
5.91E-04
5.40E-04
5.07E-05
0.010 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
10-Jan-19
R
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Es = 2.00E+05 N/mm2
G1 = 0.125 G2 = 0.125
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
m mm mm m mm mm
1-(1x1000x(2x300+300)/((3x(300+300)))/1000)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Horizontal pressure Fill 2 - - -
Weight of Fill 1 on footing 57.50 1.75 -100.63 2.25-0.5
Weight of Fill 2 on footing - - -
Self weight of footing on Fill 1 side 7.50 1.75 -13.13 2.25-0.5
Self weight of footing on Fill 2 side 7.50 0.500 -3.75 0.5
Eccentricity = 0.5x2.25-0.91
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Moment at R (base), kN-m/m = 64.99x0.533-7.5x(1-0.5)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Base Pressure at R (interpolated) = 19.56+((118.92-19.56)/2.25)x(1+0.25)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Total overturning moments (Adding +ve moments) kN-m/m =
Total resisting moments (Adding -ve moments) kN-m/m =
Check for overturning = Resisting/ overturning moments =
Total vertical load P (kN/m) = (-57.5+103+7.5+7.5+1.875+35.9)
Net moment (kN-m/m) = ABS((60.14-22.45-100.625-51.5-13.125-3.75-
2.109-40.388))
Eccentricity = 0.5x2.25-0.81
MOMENT ENVELOPE
Description Case 1 Case 2 Case 3
Moment at Q (base) = -18.11 13.32 -13.56
Moment at R (base) = 30.88 -3.15 20.20
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Envelope unfactored moments at Q Top 18.11
kN-m/m
Bottom 13.32
Envelope unfactored moments at R Top 3.15
kN-m/m
Bottom 30.88
�
0.5 �fck �1000 �d � � 4.6 �Mu � 106 �
Ast = � 1- 1-
��� �
� fy ��� fck �1000 �d 2 �
�
Min reinforcement is calculated as per the provisions of IS 3370 (Part 2) - 2009
Percentage of min reinforcement % = 0.24
Location Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
unfactor Mu Factor Th D Mu required
M
Reinf
Location Reinforcement Provided
required
Q - Top 360 00-000+12-180 628
Q - Bot 360 00-000+12-160 707
R - Top 360 00-000+12-180 628
R - Bot 454 00-000+16-160 1257
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
DISTRIBUTION REINFORCEMENT
Fill 1 Side, Average th from 0 to 0.5 m (300+0.5x(300+300))/2
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
10-Jan-19
N/mm2
237.850
Overturning moment
kN-m/m
60.14
22.45
6.50
arth Face
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
1+1+0.125+0.125 2.25
+300)x1x25/1000) 7.50
(300+300)))/1000) 0.500
+300)x1x25/1000) 7.50
(300+300)))/1000) 0.500
5.75x10x1 57.50
0.5x1 0.50
5.15x20x1 103.00
0.5x1 0.50
0.125+0.125 0.25 m
00)x0.25x25/1000 1.88
.85+300/1000)x18 208.1
10-Jan-19
2.25-0.5
2.25-0.5
0.5
0.5x0.25+1
1+0.125
60.14
160.00
159.997/60.14 2.66
+7.5+1.875+35.9) 110.28
75-2.109-40.388)) 99.86
99.86/110.28 0.910
0.5x2.25-0.91 0.22
x(1-(6x0.22/2.25)) 20.26
77-20.26)/2.25)x1 45.82
26)/2.25)x(1+0.25) 52.21
x(1+(6x0.22/2.25)) 77.77
5x(20.26+45.82)x1 33.04
(3x(20.26+45.82)) 0.44
(1-0.5)-57.5x0.5x1 -18.11
5x(52.21+77.77)x1 64.99
(3x(52.21+77.77)) 0.53
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
A
x0.533-7.5x(1-0.5) 30.88
2.25-0.5
0.5
2.25-0.5
0.5x0.25+1
1+0.125
22.45
239.62
239.622/22.45 10.67
+7.5+1.875+35.9) 155.78
5+2.109+40.388)) 217.17
217.17/155.78 1.39
2.25-1.394 0.86
0.5x2.25-0.856 0.27
(1-(6x0.269/2.25)) 19.56
92-19.56)/2.25)x1 63.72
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
A
56)/2.25)x(1+0.25) 74.76
1+(6x0.269/2.25)) 118.92
5x(19.56+63.72)x1 41.64
(3x(19.56+63.72)) 0.41
4x0.41-7.5x(1-0.5) 13.32
x(74.76+118.92)x1 96.84
3x(74.76+118.92)) 0.54
(1-0.5)-103x0.5x1 -3.15
2.25-0.5
0.5x1
2.25-0.5
0.5
0.5x0.25+1
1+0.125
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
A
60.14
233.95
3.89
+7.5+1.875+35.9) 213.28
51.5-13.125-3.75- 173.81
2.109-40.388))
173.807/213.28 0.81
0.81 0.81
0.5x2.25-0.81 0.32
x(1-(6x0.32/2.25)) 13.90
13.9+71.902x1 85.80
9+71.902x(1+0.25) 103.78
x(1+(6x0.32/2.25)) 175.68
0.5x(13.9+85.8)x1 49.85
8))/(3x(13.9+85.8)) 0.38
(1-0.5)-57.5x0.5x1 -13.56
103.78+175.68)x1 139.73
x(103.78+175.68)) 0.54
(1-0.5)-103x0.5x1 20.20
Case 3
-13.56
20.20
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
RENGTH
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
+0.5x(300+300))/2 300
(0.5x300,250)/100 525
628
+0.5x(300+300))/2 300
(0.5x300,250)/100 525
628
+0.5x(300+300))/2 300
(0.5x300,250)/100 525
628
+0.5x(300+300))/2 300
(0.5x300,250)/100 525
628
88.32
35.90
16.88
57.50
35.9+16.875+57.5 110.28
0.45
49.62
38.70
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2-F1 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x160)^2+(50+0.5x12)^2)-0.5x12
(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc fsc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc
Distance from compression face to point where crack width is being calculated, a
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
13.32 kN-m
9.33
244 mm
56 mm
160 mm
91.7 mm
51.2 mm
2.35 N/mm2
82.6 N/mm2
300 mm
5.33E-04
1.14E-03
-6.04E-04
-0.120 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
DESIGNED THICKNESS
Height from bottom 0.00 5.75
Designed Thickness 250 250
Provided Thickness 250 250
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
4 0.00 0.00 0.00 0.000 0.000 0.000
3 0.25 0.00 0.00 0.000 0.000 0.000
2 0.25 0.25 5.75 1.438 0.125 0.125
1 0.25 0.25 0.00 0.000 0.000 0.000
Total = 1.438 0.125 0.125
10-Jan-19
A
O.
20/CDD/018
10-Jan-19
kN/m
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
+Z Face -Z Face
Max Qy 604 21 EMPT -8.453 105.252 -104.345 -639.005 48.257 -1.121 -8.016
Min Qy 603 15 FULL1 -2.696 -329.5 -88.381 -650.38 -72.763 6.759 44.672
Min Sx 595 15 FULL1 21.313 7.733 -137.445 -561.987 -250.671 3.357 3.892
Max Sy 621 21 EMPT 78.749 -13.93 -93.658 -417.995 -52.096 -6.872 -0.494
Min Sy 627 22 SERVI -50.056 -133.92 9.764 -730.4 -82.208 -1.472 2.407
Max Sxy 630 21 EMPT -0.876 24.454 -93.236 -621.718 62.77 2.676 6.036
Min Sxy 609 15 FULL1 -35.846 -32.906 -2.827 -499.863 -299.048 2.409 1.992
Min Mx 629 15 FULL1 -11.535 -137.418 -0.909 -667.455 -50.775 -7.403 -6.022
Max My 603 15 FULL1 -2.696 -329.5 -88.381 -650.38 -72.763 6.759 44.672
Min My 605 21 EMPT -2.099 104.838 -104.468 -607.937 50.506 -1.21 -8.652
Max Mxy 623 15 FULL1 -49.855 -43.45 94.227 -549.618 -272.518 -3.754 -3.947
Min Mxy 632 22 SERVI 20.342 -58.632 -53.085 -591.023 -14.438 -2.794 -3.337
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Max Vertical BM in wall creating tension on Water Face Max My 44.67 kN-m/m
Max Horizontal BM in wall creating tension on Water Face Max Mx 20.94 kN-m/m
Max Vertical BM in wall creating tension on Earth Face Min My 8.65 kN-m/m
Max Horizontal BM in wall creating tension on Earth Face Min Mx 7.40 kN-m/m
Thickness check:
Required effective thickness SQRT(44.67x1000000x1.5/(0.133x30x1000))
Mu / bd2 = 44.67x1.5x10^6/(1000x192^2)
Mu / bd2 = 20.94x1.5x10^6/(1000x194^2)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Refer SP-16 Percentage of reinforcement required, %
Mu / bd2 = 8.65x1.5x10^6/(1000x197^2)
Mu / bd2 = 7.4x1.5x10^6/(1000x199^2)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Vertical Earth Face 438 00-000+16-180 1117
Max Qy, (21 EMPTY) = 0.105 Min Qy, (15 FULL1) = -0.330
Factored Shear Stress, N/mm2 = 1.5x0.33
Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)
Maximum shear stress in concrete for limit state method of design, tc,max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
W2A-1 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)
Horizontal Direction
667x(0.7/100000/2)x(15+15)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
10-Jan-19
nding Moment
Mxy kNm/m
1.747
3.898
-0.456
-0.098
3.898
2.14
1.793
2.565
-1.715
9.292
3.898
-2.116
-0.098
-0.061
10.484
-8.571
O.
P/20/CDD/018
10-Jan-19
130 mm
250 mm
438
192.0
1.818
0.452
868
194.0
0.835
O.
P/20/CDD/018
10-Jan-19
A
0.199
386
57
71
457
197.0
0.334
0.078
438
199.0
0.280
0.065
129
438
% Ast
1.163%
0.382%
O.
P/20/CDD/018
10-Jan-19
A
0.576%
0.378%
0.495
1.163%
250 mm
1.1
250 mm
1.54
3.50
1.169
1506 mm2
0.60
667 mm
0.07 mm
O.
P/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x90)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
44.67 kN-m
9.33
192 mm
53 mm
90 mm
65.4 mm
68.5 mm
7.15 N/mm2
120.3 N/mm2
250 mm
8.84E-04
2.99E-04
5.85E-04
0.098 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2A-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x5.63x(194-40.06)/40.06
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x150)^2+(50+0.5x12)^2)-0.5x12
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
20.94 kN-m
38.00 kN
9.33
143.0 mm
71.5 mm
18.2 kN-m
194 mm
51 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
40.06 mm
5.63 N/mm2
180.2 N/mm2
250 mm
150 mm
87.6 mm
1.23E-03
9.51E-04
2.78E-04
0.054 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2A-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x5.63x(194-40.06)/40.06
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x150)^2+(50+0.5x12)^2)-0.5x12
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
20.94 kN-m
38.00 kN
9.33
143.0 mm
71.5 mm
18.2 kN-m
194 mm
51 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
40.06 mm
5.63 N/mm2
180.2 N/mm2
250 mm
150 mm
87.6 mm
1.23E-03
9.51E-04
2.78E-04
0.054 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
+Z Face -Z Face
Max Qy 672 15 FULL1 121.011 100.622 -11.273 -529.99 -19.103 20.504 -13.401
Min Qy 639 15 FULL1 51.673 -121.602 115.918 -714.068 -171.609 -6.771 -11.17
Min Sx 671 21 EMPT -8.423 -14.674 -144.189 -468.033 73.854 3.348 3.485
Min Sy 666 22 SERVI -35.602 -57.311 64.785 -788.361 -2.647 -13.341 -16.841
Max Sxy 668 21 EMPT 21.298 -31.548 -104.7 -638.15 122.04 1.004 2.787
Min Sxy 635 15 FULL1 -152.117 22.634 204.444 -480.192 -250.271 8.001 -2.216
Min Mx 667 15 FULL1 -13.148 -15.201 97.163 -725.213 37.954 -17.063 -22.446
Max My 643 21 EMPT 2.923 0.394 -96.751 -609.654 77.523 3.356 7.134
Min My 667 15 FULL1 -13.148 -15.201 97.163 -725.213 37.954 -17.063 -22.446
Max Mxy 636 15 FULL1 -88.449 -10.998 168.353 -555.266 -249.46 -4.27 -7.221
Min Mxy 645 22 SERVI 45.228 -28.571 -41.628 -581.512 -11.845 -4.096 -8.633
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Max Vertical BM in wall creating tension on Water Face Max My 7.13 kN-m/m
Max Horizontal BM in wall creating tension on Water Face Max Mx 38.93 kN-m/m
Max Vertical BM in wall creating tension on Earth Face Min My 22.45 kN-m/m
Max Horizontal BM in wall creating tension on Earth Face Min Mx 17.06 kN-m/m
Thickness check:
Required effective thickness SQRT(38.93x1000000x1.5/(0.133x30x1000))
Mu / bd2 = 7.13x1.5x10^6/(1000x192^2)
Mu / bd2 = 38.93x1.5x10^6/(1000x190^2)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Refer SP-16 Percentage of reinforcement required, %
Mu / bd2 = 22.45x1.5x10^6/(1000x197^2)
Mu / bd2 = 17.06x1.5x10^6/(1000x197^2)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Vertical Earth Face 438 00-000+16-180 1117
Max Qy, (15 FULL1) = 0.101 Min Qy, (15 FULL1) = -0.122
Factored Shear Stress, N/mm2 = 1.5x0.122
Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)
Maximum shear stress in concrete for limit state method of design, tc,max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
W2A-2 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)
Horizontal Direction
380x(0.7/100000/2)x(15+15)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
10-Jan-19
nding Moment
Mxy kNm/m
-2.25
1.398
-2.25
3.829
1.398
-1.513
0.014
0.102
-2.216
7.42
0.014
-3.254
-2.064
-3.254
9.072
-8.293
O.
P/20/CDD/018
10-Jan-19
121 mm
250 mm
438
192.0
0.290
0.067
438
190.0
1.618
O.
P/20/CDD/018
10-Jan-19
A
0.399
758
105.8
132
890
197.0
0.868
0.207
438
197.0
0.659
0.156
307
36.4
46
438
% Ast
0.582%
1.328%
O.
P/20/CDD/018
10-Jan-19
A
0.588%
0.680%
0.183
0.582%
250 mm
1.1
250 mm
1.52
3.50
0.886
3957 mm2
1.58
380 mm
0.04 mm
O.
P/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
7.13 kN-m
9.33
192 mm
53 mm
180 mm
99.1 mm
53.4 mm
1.53 N/mm2
37.1 N/mm2
250 mm
2.63E-04
6.24E-04
-3.61E-04
-0.072 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2A-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x6.34x(190-62.2)/62.2
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x120)^2+(50+0.5x20)^2)-0.5x20
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
38.93 kN-m
70.50 kN
9.33
137.0 mm
46.4 mm
35.7 kN-m
190 mm
53 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
62.20 mm
6.34 N/mm2
108.5 N/mm2
250 mm
120 mm
74.9 mm
7.97E-04
2.64E-04
5.34E-04
0.095 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2A-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x5.88x(190-61.63)/61.63
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x120)^2+(50+0.5x20)^2)-0.5x20
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
36.01 kN-m
71.50 kN
9.33
137.0 mm
46.4 mm
32.7 kN-m
190 mm
53 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
61.63 mm
5.88 N/mm2
102.0 N/mm2
250 mm
120 mm
74.9 mm
7.49E-04
2.64E-04
4.84E-04
0.086 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
+Z Face -Z Face
Max Qy 698 15 FULL1 298.775 234.523 -13.5 -480.519 -64.646 33.839 11.532
Min Qy 704 21 EMPT -71.111 -108.266 -114.296 -953.393 -219.79 -14.883 -15.772
Min Sx 711 16 FULL2 -13.679 61.928 -272.127 -421.397 -27.986 -8.388 -6.256
Min Sy 705 16 FULL2 55.471 -75.698 -74.052 -960.193 210.415 -13.799 -16.988
Max Sxy 706 21 EMPT 62.034 -19.716 -218.633 -692.624 274.513 -5.599 -12.05
Min Sxy 703 16 FULL2 -61.69 -5.276 -157.915 -690.771 -282.119 -5.944 -12.557
Min Mx 691 15 FULL1 -43.2 2.984 165.746 -872.01 -164.18 -19.152 -21.378
Max My 711 15 FULL1 380.352 -89.238 29.596 -335.363 -45.627 34.239 19.878
Min My 705 22 SERVI 27.331 -17.022 -6.38 -960.162 203.416 -19.125 -22.857
Max Mxy 710 15 FULL1 191.838 8.115 -9.647 -403.706 -35.274 9.143 8.624
Min Mxy 701 15 FULL1-101.044 17.518 39.661 -369.945 -102.984 1.619 -5.888
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Max Vertical BM in wall creating tension on Water Face Max My 19.88 kN-m/m
Max Horizontal BM in wall creating tension on Water Face Max Mx 38.75 kN-m/m
Max Vertical BM in wall creating tension on Earth Face Min My 22.86 kN-m/m
Max Horizontal BM in wall creating tension on Earth Face Min Mx 19.15 kN-m/m
Thickness check:
Required effective thickness SQRT(38.75x1000000x1.5/(0.133x30x1000))
Mu / bd2 = 19.88x1.5x10^6/(1000x192^2)
Mu / bd2 = 38.75x1.5x10^6/(1000x190^2)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Refer SP-16 Percentage of reinforcement required, %
Mu / bd2 = 22.86x1.5x10^6/(1000x197^2)
Mu / bd2 = 19.15x1.5x10^6/(1000x197^2)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Vertical Earth Face 438 00-000+16-180 1117
Max Qy, (15 FULL1) = 0.235 Min Qy, (21 EMPTY) = -0.108
Factored Shear Stress, N/mm2 = 1.5x0.235
Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)
Maximum shear stress in concrete for limit state method of design, tc,max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
W2A-3 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)
Horizontal Direction
380x(0.7/100000/2)x(15+15)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
10-Jan-19
nding Moment
Mxy kNm/m
2.486
-1.392
-0.767
0.595
-1.392
1.313
-2.748
0.635
-0.355
-0.125
-1.392
-0.77
2.486
0.242
4.756
-7.681
O.
P/20/CDD/018
10-Jan-19
121 mm
250 mm
438
192.0
0.809
0.192
438
190.0
1.610
O.
P/20/CDD/018
10-Jan-19
A
0.397
754
92.6
116
870
197.0
0.884
0.211
438
197.0
0.740
0.175
345
62.3
78
438
% Ast
0.582%
1.328%
O.
P/20/CDD/018
10-Jan-19
A
0.588%
0.680%
0.353
0.582%
250 mm
1.1
250 mm
1.52
3.50
0.886
3957 mm2
1.58
380 mm
0.04 mm
O.
P/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
19.88 kN-m
9.33
192 mm
53 mm
180 mm
99.1 mm
53.6 mm
4.24 N/mm2
102.1 N/mm2
250 mm
7.25E-04
6.24E-04
1.01E-04
0.020 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2A-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x6.3x(190-62.93)/62.93
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x120)^2+(50+0.5x20)^2)-0.5x20
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
38.75 kN-m
61.75 kN
9.33
137.0 mm
46.4 mm
35.9 kN-m
190 mm
53 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
62.93 mm
6.30 N/mm2
106.0 N/mm2
250 mm
120 mm
74.9 mm
7.80E-04
2.63E-04
5.17E-04
0.092 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2A-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x6.3x(190-62.93)/62.93
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x120)^2+(50+0.5x20)^2)-0.5x20
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
38.75 kN-m
61.75 kN
9.33
137.0 mm
46.4 mm
35.9 kN-m
190 mm
53 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
62.93 mm
6.30 N/mm2
106.0 N/mm2
250 mm
120 mm
74.9 mm
7.80E-04
2.63E-04
5.17E-04
0.092 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
+Z Face -Z Face
Min Qx 731 22 SERVI -256.619 95.215 -668.128 -1065.13 665.428 -1.739 -20.03
Max Qy 731 15 FULL1 -235.5 97.604 -543.851 -1068.474 673.357 -1.826 -16.818
Max Sx 726 15 FULL1 27.107 0.916 156.901 -217.94 -44.568 10.03 -0.608
Min Sx 730 21 EMPT 102.636 -11.478 -831.51 -1107.535 -701.427 -6.632 -26.138
Max Sy 726 22 SERVI 3.219 2.518 82.052 -217.204 -58.526 8.755 -0.567
Min Sy 730 21 EMPT 102.636 -11.478 -831.51 -1107.535 -701.427 -6.632 -26.138
Max Sxy 731 15 FULL1 -235.5 97.604 -543.851 -1068.474 673.357 -1.826 -16.818
Min Sxy 730 21 EMPT 102.636 -11.478 -831.51 -1107.535 -701.427 -6.632 -26.138
Max Mx 724 15 FULL1 176.216 -304.158 39.837 -481.046 -56.019 23.675 6.69
Min Mx 733 22 SERVI -81.597 31.619 -90.289 -293.091 10.209 -16.833 -2.607
Max My 724 15 FULL1 176.216 -304.158 39.837 -481.046 -56.019 23.675 6.69
Min My 730 21 EMPT 102.636 -11.478 -831.51 -1107.535 -701.427 -6.632 -26.138
Max Mxy 731 21 EMPT -103.458 -11.835 -781.894 -1063.301 669.32 -5.908 -26.107
Min Mxy 730 21 EMPT 102.636 -11.478 -831.51 -1107.535 -701.427 -6.632 -26.138
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Max Vertical BM in wall creating tension on Water Face Max My 6.69 kN-m/m
Max Horizontal BM in wall creating tension on Water Face Max Mx 23.68 kN-m/m
Max Vertical BM in wall creating tension on Earth Face Min My 26.14 kN-m/m
Max Horizontal BM in wall creating tension on Earth Face Min Mx 16.83 kN-m/m
Thickness check:
Required effective thickness SQRT(26.14x1000000x1.5/(0.133x30x1000))
Mu / bd2 = 6.69x1.5x10^6/(1000x192^2)
Mu / bd2 = 23.68x1.5x10^6/(1000x190^2)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Refer SP-16 Percentage of reinforcement required, %
Mu / bd2 = 26.14x1.5x10^6/(1000x197^2)
Mu / bd2 = 16.83x1.5x10^6/(1000x200^2)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Vertical Earth Face 477 00-000+16-180 1117
Max Qy, (15 FULL1) = 0.098 Min Qy, (15 FULL1) = -0.343
Factored Shear Stress, N/mm2 = 1.5x0.343
Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)
Maximum shear stress in concrete for limit state method of design, tc,max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
W2A-4 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)
Horizontal Direction
397x(0.7/100000/2)x(15+15)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
10-Jan-19
nding Moment
Mxy kNm/m
-14.496
14.243
12.308
-2.413
-7.886
-16.143
-6.143
-16.143
12.308
-16.143
4.891
7.475
4.891
-16.143
16.658
-16.143
O.
P/20/CDD/018
10-Jan-19
99 mm
250 mm
438
192.0
0.272
0.063
438
190.0
0.984
O.
P/20/CDD/018
10-Jan-19
A
0.236
448
15
19
467
197.0
1.010
0.242
477
200.0
0.631
0.149
298
438
% Ast
0.582%
1.328%
O.
P/20/CDD/018
10-Jan-19
A
0.588%
0.264%
0.515
0.582%
250 mm
1.1
250 mm
1.52
3.50
0.886
3144 mm2
1.26
397 mm
0.04 mm
O.
P/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
6.69 kN-m
9.33
192 mm
53 mm
180 mm
99.1 mm
53.6 mm
1.43 N/mm2
34.4 N/mm2
250 mm
2.44E-04
6.24E-04
-3.79E-04
-0.075 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2A-4 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x3.92x(190-68.51)/68.51
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x120)^2+(50+0.5x20)^2)-0.5x20
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
23.68 kN-m
10.00 kN
9.33
140.0 mm
23.5 mm
23.4 kN-m
190 mm
50 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
68.51 mm
3.92 N/mm2
57.9 N/mm2
250 mm
120 mm
74.9 mm
4.33E-04
2.59E-04
1.74E-04
0.031 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2A-4 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x1.83x(190-57.01)/57.01
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x120)^2+(50+0.5x20)^2)-0.5x20
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
10.03 kN-m
39.25 kN
9.33
140.0 mm
23.5 mm
9.1 kN-m
190 mm
50 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
57.01 mm
1.83 N/mm2
35.6 N/mm2
250 mm
120 mm
74.9 mm
2.58E-04
2.68E-04
-9.52E-06
-0.002 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
10-Jan-19
R
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Es = 2.00E+05 N/mm2
G1 = 0.125 G2 = 0.125
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
m mm mm m mm mm
1-(1x1000x(2x300+300)/((3x(300+300)))/1000)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Horizontal pressure Fill 2 - - -
Weight of Fill 1 on footing 57.50 1.75 -100.63 2.25-0.5
Weight of Fill 2 on footing - - -
Self weight of footing on Fill 1 side 7.50 1.75 -13.13 2.25-0.5
Self weight of footing on Fill 2 side 7.50 0.500 -3.75 0.5
Eccentricity = 0.5x2.25-1.05
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Moment at R (base), kN-m/m = 54.825x0.514-7.5x(1-0.5)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Base Pressure at R (interpolated) = 10.9+((104.46-10.9)/2.25)x(1+0.25)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Total overturning moments (Adding +ve moments) kN-m/m =
Total resisting moments (Adding -ve moments) kN-m/m =
Check for overturning = Resisting/ overturning moments =
Total vertical load P (kN/m) = (-57.5+77+7.5+7.5+1.875+35.9)
Net moment (kN-m/m) = ABS((44.67-8.65-100.625-38.5-13.125-3.75-2.109-
40.388))
Eccentricity = 0.5x2.25-0.87
MOMENT ENVELOPE
Description Case 1 Case 2 Case 3
Moment at Q (base) = -11.67 8.61 -11.00
Moment at R (base) = 24.44 3.05 20.01
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Envelope unfactored moments at Q Top 11.67
kN-m/m
Bottom 8.61
Envelope unfactored moments at R Top 3.05
kN-m/m
Bottom 24.44
�
0.5 �fck �1000 �d � � 4.6 �Mu � 106 �
Ast = � 1- 1-
��� �
� fy ��� fck �1000 �d 2 �
�
Min reinforcement is calculated as per the provisions of IS 3370 (Part 2) - 2009
Percentage of min reinforcement % = 0.24
Location Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
unfactor Mu Factor Th D Mu required
M
Reinf
Location Reinforcement Provided
required
Q - Top 360 00-000+12-180 628
Q - Bot 360 00-000+16-180 1117
R - Top 360 00-000+12-180 628
R - Bot 360 16-180+16-180 2234
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
DISTRIBUTION REINFORCEMENT
Fill 1 Side, Average th from 0 to 0.5 m (300+0.5x(300+300))/2
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
10-Jan-19
N/mm2
237.850
Overturning moment
kN-m/m
44.67
8.65
6.00
arth Face
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
1+1+0.125+0.125 2.25
+300)x1x25/1000) 7.50
(300+300)))/1000) 0.500
+300)x1x25/1000) 7.50
(300+300)))/1000) 0.500
5.75x10x1 57.50
0.5x1 0.50
3.85x20x1 77.00
0.5x1 0.50
0.125+0.125 0.25 m
00)x0.25x25/1000 1.88
.85+300/1000)x18 208.1
10-Jan-19
2.25-0.5
2.25-0.5
0.5
0.5x0.25+1
1+0.125
44.67
160.00
159.997/44.67 3.58
+7.5+1.875+35.9) 110.28
75-2.109-40.388)) 115.33
115.33/110.28 1.050
0.5x2.25-1.05 0.08
x(1-(6x0.08/2.25)) 38.56
47-38.56)/2.25)x1 47.85
56)/2.25)x(1+0.25) 50.18
x(1+(6x0.08/2.25)) 59.47
5x(38.56+47.85)x1 43.21
(3x(38.56+47.85)) 0.48
(1-0.5)-57.5x0.5x1 -11.67
5x(50.18+59.47)x1 54.83
(3x(50.18+59.47)) 0.51
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
A
x0.514-7.5x(1-0.5) 24.44
2.25-0.5
0.5
2.25-0.5
0.5x0.25+1
1+0.125
8.65
194.12
194.122/8.65 22.44
+7.5+1.875+35.9) 129.78
5+2.109+40.388)) 185.47
185.47/129.78 1.43
2.25-1.429 0.82
0.5x2.25-0.821 0.30
(1-(6x0.304/2.25)) 10.90
4.46-10.9)/2.25)x1 52.48
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
A
.9)/2.25)x(1+0.25) 62.88
1+(6x0.304/2.25)) 104.46
.5x(10.9+52.48)x1 31.69
)/(3x(10.9+52.48)) 0.39
9x0.39-7.5x(1-0.5) 8.61
x(62.88+104.46)x1 83.67
3x(62.88+104.46)) 0.54
5x(1-0.5)-77x0.5x1 3.05
2.25-0.5
0.5x1
2.25-0.5
0.5
0.5x0.25+1
1+0.125
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
A
44.67
207.15
4.64
+7.5+1.875+35.9) 187.28
3.125-3.75-2.109- 162.48
40.388))
162.477/187.28 0.87
0.87 0.87
0.5x2.25-0.87 0.26
x(1-(6x0.26/2.25)) 25.53
25.53+51.298x1 76.83
3+51.298x(1+0.25) 89.65
x(1+(6x0.26/2.25)) 140.95
5x(25.53+76.83)x1 51.18
(3x(25.53+76.83)) 0.42
(1-0.5)-57.5x0.5x1 -11.00
x(89.65+140.95)x1 115.30
3x(89.65+140.95)) 0.54
5x(1-0.5)-77x0.5x1 20.01
Case 3
-11.00
20.01
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
RENGTH
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
+0.5x(300+300))/2 300
(0.5x300,250)/100 525
628
+0.5x(300+300))/2 300
(0.5x300,250)/100 525
628
+0.5x(300+300))/2 300
(0.5x300,250)/100 525
628
+0.5x(300+300))/2 300
(0.5x300,250)/100 525
628
49.36
35.90
16.88
57.50
35.9+16.875+57.5 110.28
0.45
49.62
-0.26
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2A-F1 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc fsc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc
Distance from compression face to point where crack width is being calculated, a
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
8.61 kN-m
9.33
242 mm
56 mm
180 mm
99.1 mm
60.8 mm
1.25 N/mm2
34.8 N/mm2
300 mm
2.29E-04
7.07E-04
-4.77E-04
-0.100 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
10-Jan-19
B
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
DESIGNED THICKNESS
Height from bottom 0.00 8.75
Designed Thickness 250 250
Provided Thickness 250 250
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
4 0.00 0.00 0.00 0.000 0.000 0.000
3 0.25 0.00 0.00 0.000 0.000 0.000
2 0.25 0.25 8.75 2.188 0.125 0.125
1 0.25 0.25 3.85 0.962 0.125 0.125
Total = 3.150 0.125 0.125
10-Jan-19
A
O.
20/CDD/018
10-Jan-19
kN/m
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
+Z Face -Z Face
Max Qy 2652 16 FULL2 25.602 184.574 -67.046 -418.672 38.139 -5.185 -32.169
Min Qy 2650 15 FULL1 4.143 -315.242 -72.979 -495.013 30.175 6.468 42.171
Max Sx 2720 15 FULL1 242.083 15.04 268.845 -88.794 44.607 32.634 3.869
Min Sx 2720 21 EMPT -84.904 -3.128 -145.92 -174.674 20.105 -11.256 -1.855
Max Sy 2720 15 FULL1 242.083 15.04 268.845 -88.794 44.607 32.634 3.869
Min Sy 2646 15 FULL1 30.218 -235.615 -87.45 -565.239 -4.382 6.113 28.536
Max Sxy 2674 15 FULL1 40.18 -33.524 21.39 -226.224 177.978 2.586 0.983
Min Sxy 2708 16 FULL2 43.279 20.148 -20.557 -438.811 -23.411 7.339 7.189
Max Mx 2720 15 FULL1 242.083 15.04 268.845 -88.794 44.607 32.634 3.869
Max My 2650 15 FULL1 4.143 -315.242 -72.979 -495.013 30.175 6.468 42.171
Min My 2651 16 FULL2 -4.427 165.559 -67.132 -431.739 32.037 -5.286 -33.674
Max Mxy 2716 16 FULL2 -26.648 15.722 2.68 -279.873 96.016 5.321 8.949
Min Mxy 2708 16 FULL2 43.279 20.148 -20.557 -438.811 -23.411 7.339 7.189
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Max Vertical BM in wall creating tension on Water Face Max My 42.17 kN-m/m
Max Horizontal BM in wall creating tension on Water Face Max Mx 32.63 kN-m/m
Max Vertical BM in wall creating tension on Earth Face Min My 33.67 kN-m/m
Max Horizontal BM in wall creating tension on Earth Face Min Mx 14.31 kN-m/m
Thickness check:
Required effective thickness SQRT(42.17x1000000x1.5/(0.133x30x1000))
Mu / bd2 = 42.17x1.5x10^6/(1000x192^2)
Mu / bd2 = 32.63x1.5x10^6/(1000x192^2)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Refer SP-16 Percentage of reinforcement required, %
Mu / bd2 = 33.67x1.5x10^6/(1000x197^2)
Mu / bd2 = 14.31x1.5x10^6/(1000x197^2)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Vertical Earth Face 623 16-180+16-180 2233
Max Qy, (16 FULL2) = 0.185 Min Qy, (15 FULL1) = -0.315
Factored Shear Stress, N/mm2 = 1.5x0.315
Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)
Maximum shear stress in concrete for limit state method of design, tc,max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
W2B-1 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)
Horizontal Direction
331x(0.7/100000/2)x(15+15)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
10-Jan-19
nding Moment
Mxy kNm/m
1.331
1.201
1.02
0.135
1.331
-1.113
1.331
1.43
-8.613
-10.223
1.331
0.43
0.135
-0.054
9.477
-10.223
O.
P/20/CDD/018
10-Jan-19
126 mm
250 mm
438
192.0
1.716
0.425
816
192.0
1.328
O.
P/20/CDD/018
10-Jan-19
A
0.323
620
100.9
126
746
197.0
1.301
0.316
623
197.0
0.553
0.130
256
438
% Ast
1.309%
1.020%
O.
P/20/CDD/018
10-Jan-19
A
1.163%
1.020%
0.473
1.309%
250 mm
1.1
250 mm
1.54
3.50
1.237
4020 mm2
1.61
331 mm
0.03 mm
O.
P/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x80)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
42.17 kN-m
9.33
192 mm
53 mm
80 mm
62.5 mm
69.3 mm
6.20 N/mm2
102.4 N/mm2
250 mm
7.54E-04
2.65E-04
4.89E-04
0.081 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2B-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x5.6x(192-55.62)/55.62
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x100)^2+(50+0.5x16)^2)-0.5x16
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
32.63 kN-m
67.25 kN
9.33
139.0 mm
69.5 mm
28.0 kN-m
192 mm
53 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
55.62 mm
5.60 N/mm2
114.4 N/mm2
250 mm
100 mm
68.6 mm
8.15E-04
3.45E-04
4.71E-04
0.081 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2B-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x5.6x(192-55.62)/55.62
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x100)^2+(50+0.5x16)^2)-0.5x16
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
32.63 kN-m
67.25 kN
9.33
139.0 mm
69.5 mm
28.0 kN-m
192 mm
53 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
55.62 mm
5.60 N/mm2
114.4 N/mm2
250 mm
100 mm
68.6 mm
8.15E-04
3.45E-04
4.71E-04
0.081 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
+Z Face -Z Face
Max Qy 2763 15 FULL1 253.458 289.788 -26.448 -193.321 -96.996 21.031 8.499
Max Sx 2780 15 FULL1 125.984 38.448 328.573 -102.808 19.141 13.896 3.723
Min Sx 2779 16 FULL2 226.344 96.204 -316.105 -277.564 93.375 -15.021 -7.651
Max Sy 2778 15 FULL1 308.609 -94.545 -137.219 9.609 107.388 26.16 12.878
Min Sy 2781 17 FULL3 -10.106 -93.943 34.978 -596.153 -71.743 -8.442 -5.704
Max Sxy 2763 16 FULL2-321.968 -424.568 83.995 -71.425 249.326 -38.911 -12.018
Min Sxy 2751 16 FULL2 255.005 -177.631 77.661 -393.071 -159.811 -31.242 -6.75
Max Mx 2735 15 FULL1 208.479 -17.245 249.407 -68.241 -4.217 32.357 4.207
Min Mx 2793 16 FULL2 -321.73 57.109 213.023 -243.579 148.742 -57.158 -11.28
Max My 2766 15 FULL1 -355.47 -98.432 45.855 -364.443 -37.925 31.362 19.76
Min My 2726 15 FULL1 17.116 -3.524 30.274 -466.513 -9.446 -12.54 -22.173
Max Mxy 2746 16 FULL2 -82.481 -23.443 62.921 -275.812 130.092 5.531 6.635
Min Mxy 2723 16 FULL2 65.323 4.578 6.731 -431.122 -44.401 8.502 7.659
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Max Vertical BM in wall creating tension on Water Face Max My 19.76 kN-m/m
Max Horizontal BM in wall creating tension on Water Face Max Mx 32.36 kN-m/m
Max Vertical BM in wall creating tension on Earth Face Min My 22.17 kN-m/m
Max Horizontal BM in wall creating tension on Earth Face Min Mx 57.16 kN-m/m
Thickness check:
Required effective thickness SQRT(57.16x1000000x1.5/(0.133x30x1000))
Mu / bd2 = 19.76x1.5x10^6/(1000x192^2)
Mu / bd2 = 32.36x1.5x10^6/(1000x190^2)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Refer SP-16 Percentage of reinforcement required, %
Mu / bd2 = 22.17x1.5x10^6/(1000x197^2)
Mu / bd2 = 57.16x1.5x10^6/(1000x195^2)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Vertical Earth Face 438 00-000+16-180 1117
Max Qy, (15 FULL1) = 0.290 Min Qy, (16 FULL2) = -0.425
Factored Shear Stress, N/mm2 = 1.5x0.425
Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)
Maximum shear stress in concrete for limit state method of design, tc,max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
W2B-2 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)
Horizontal Direction
292x(0.7/100000/2)x(15+15)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
10-Jan-19
nding Moment
Mxy kNm/m
-1.403
-0.192
8.144
-0.722
0.88
-3.072
7.401
1.972
-0.722
-2.962
3.238
0.75
-2.425
2.865
10.908
-10.385
O.
P/20/CDD/018
10-Jan-19
147 mm
250 mm
438
192.0
0.804
0.191
438
190.0
1.345
O.
P/20/CDD/018
10-Jan-19
A
0.327
621
93.4
117
738
197.0
0.857
0.204
438
195.0
2.255
0.573
1117
79.9
100
1217
% Ast
0.654%
1.449%
O.
P/20/CDD/018
10-Jan-19
A
0.588%
1.464%
0.638
0.654%
250 mm
1.1
250 mm
1.52
3.50
0.920
5710 mm2
2.28
292 mm
0.03 mm
O.
P/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x160)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
19.76 kN-m
9.33
192 mm
53 mm
160 mm
90.8 mm
55.8 mm
4.00 N/mm2
91.1 N/mm2
250 mm
6.49E-04
5.51E-04
9.83E-05
0.019 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2B-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x4.79x(190-62.42)/62.42
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x110)^2+(50+0.5x20)^2)-0.5x20
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
32.36 kN-m
62.25 kN
9.33
135.0 mm
67.5 mm
28.2 kN-m
190 mm
55 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
62.42 mm
4.79 N/mm2
81.6 N/mm2
250 mm
110 mm
71.4 mm
6.00E-04
2.42E-04
3.58E-04
0.062 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2B-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x2.03x(190-51.55)/51.55
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x110)^2+(50+0.5x20)^2)-0.5x20
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
13.90 kN-m
82.25 kN
9.33
135.0 mm
67.5 mm
8.3 kN-m
190 mm
55 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
51.55 mm
2.03 N/mm2
45.4 N/mm2
250 mm
110 mm
71.4 mm
3.25E-04
2.49E-04
7.64E-05
0.013 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
+Z Face -Z Face
Max Qy 2803 15 FULL1 91.183 139.293 5.358 -436.673 144.304 -1.128 -3.706
Max Sx 2808 22 SERVI -289.095 -20.311 228.361 -255.861 116.315 -47.18 -7.093
Min Sx 2796 21 EMPT 185.064 -270.054 -128.516 -698.148 44.593 -0.59 -15.237
Max Sy 2867 22 SERVI -179.002 -7.798 141.419 -63.491 79.219 -19.727 -0.301
Min Sy 2796 21 EMPT 185.064 -270.054 -128.516 -698.148 44.593 -0.59 -15.237
Max Sxy 2818 16 FULL2-171.747 18.638 188.384 -170.476 169.044 33.409 26.32
Min Sxy 2869 22 SERVI 110.14 8.196 -58.296 -226.711 -156.591 -15.78 -3.693
Max Mx 2833 22 SERVI -103.137 -84.509 181.781 -172.407 109.515 37.2 28.163
Max My 2817 22 SERVI 137.276 18.333 199.507 -189.167 -122.323 32.454 31.983
Min My 2796 16 FULL2 528.516 -251.915 95.883 -640.35 122.621 -51.745 -23.052
Max Mxy 2806 15 FULL1 15.594 23.056 -20.41 -269.506 59.387 -1.776 4.166
Min Mxy 2799 15 FULL1 -16.256 43.741 3.837 -398.012 -37.028 -3.433 4.941
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Max Vertical BM in wall creating tension on Water Face Max My 31.98 kN-m/m
Max Horizontal BM in wall creating tension on Water Face Max Mx 37.20 kN-m/m
Max Vertical BM in wall creating tension on Earth Face Min My 23.05 kN-m/m
Max Horizontal BM in wall creating tension on Earth Face Min Mx 54.90 kN-m/m
Thickness check:
Required effective thickness SQRT(54.9x1000000x1.5/(0.133x30x1000))
Mu / bd2 = 31.98x1.5x10^6/(1000x192^2)
Mu / bd2 = 37.2x1.5x10^6/(1000x190^2)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Refer SP-16 Percentage of reinforcement required, %
Mu / bd2 = 23.05x1.5x10^6/(1000x197^2)
Mu / bd2 = 54.9x1.5x10^6/(1000x195^2)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Vertical Earth Face 438 00-000+16-180 1117
Max Qy, (15 FULL1) = 0.139 Min Qy, (15 FULL1) = -0.399
Factored Shear Stress, N/mm2 = 1.5x0.399
Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)
Maximum shear stress in concrete for limit state method of design, tc,max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
W2B-3 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)
Horizontal Direction
292x(0.7/100000/2)x(15+15)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
10-Jan-19
nding Moment
Mxy kNm/m
7.634
-6.115
7.772
4.674
3.664
7.027
-4.532
7.027
6.857
-1.936
0.848
1.146
-5.621
7.634
10.429
-8.123
O.
P/20/CDD/018
10-Jan-19
144 mm
250 mm
438
192.0
1.301
0.316
607
190.0
1.546
O.
P/20/CDD/018
10-Jan-19
A
0.380
722
68.3
85
807
197.0
0.891
0.212
438
195.0
2.166
0.548
1069
79.5
99
1168
% Ast
0.654%
1.449%
O.
P/20/CDD/018
10-Jan-19
A
0.588%
1.464%
0.599
0.654%
250 mm
1.1
250 mm
1.52
3.50
0.920
5710 mm2
2.28
292 mm
0.03 mm
O.
P/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x160)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
31.98 kN-m
9.33
192 mm
53 mm
160 mm
90.8 mm
55.8 mm
6.47 N/mm2
147.3 N/mm2
250 mm
1.05E-03
5.51E-04
4.99E-04
0.096 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2B-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x5.52x(190-64.65)/64.65
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x110)^2+(50+0.5x20)^2)-0.5x20
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
37.20 kN-m
45.50 kN
9.33
135.0 mm
67.5 mm
34.1 kN-m
190 mm
55 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
64.65 mm
5.52 N/mm2
89.2 N/mm2
250 mm
110 mm
71.4 mm
6.59E-04
2.40E-04
4.19E-04
0.073 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2B-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x6.88x(195-66.89)/66.89
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x110)^2+(45+0.5x20)^2)-0.5x20
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
47.18 kN-m
57.00 kN
9.33
135.0 mm
67.5 mm
43.3 kN-m
195 mm
60 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
66.89 mm
6.88 N/mm2
109.8 N/mm2
250 mm
110 mm
67.8 mm
7.84E-04
2.29E-04
5.55E-04
0.090 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
+Z Face -Z Face
Min Qx 2883 22 SERVI -197.345 2.038 168.362 -48.482 73.509 -40.856 -6.319
Max Qy 2885 22 SERVI 23.27 96.453 -31.73 -386.214 -198.975 -0.826 1.751
Min Qy 2892 22 SERVI -6.157 -93.973 195.815 -320.756 -135.536 24.232 3.744
Max Sx 2913 22 SERVI -47.203 31.554 543.002 44.911 132.022 -33.493 -3.371
Min Sx 2907 15 FULL1 -57.452 -51.193 -247.379 -388.695 -274.766 -0.334 -2.526
Max Sy 2913 22 SERVI -47.203 31.554 543.002 44.911 132.022 -33.493 -3.371
Min Sy 2885 20 FULL6 1.914 13.995 -12.428 -403.345 -174.26 0.2 0.82
Max Sxy 2908 20 FULL6 28.468 -29.03 -100.384 -266.306 175.288 -0.756 -3.422
Min Sxy 2907 17 FULL3 -37.62 -36.697 -241.446 -393.773 -280.775 -0.641 -4.219
Max Mx 2877 22 SERVI 2.404 -88.337 205.88 -274.05 -79.385 28.997 9.484
Min Mx 2883 22 SERVI -197.345 2.038 168.362 -48.482 73.509 -40.856 -6.319
Max My 2877 22 SERVI 2.404 -88.337 205.88 -274.05 -79.385 28.997 9.484
Max Mxy 2887 16 FULL2 127.721 -0.68 109.602 -109.987 11.636 -12.118 -1.494
Min Mxy 2897 16 FULL2 -143.23 2.221 261.622 -12.595 99.402 -18.609 -2.403
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Max Vertical BM in wall creating tension on Water Face Max My 9.48 kN-m/m
Max Horizontal BM in wall creating tension on Water Face Max Mx 29.00 kN-m/m
Max Vertical BM in wall creating tension on Earth Face Min My 6.40 kN-m/m
Max Horizontal BM in wall creating tension on Earth Face Min Mx 40.86 kN-m/m
Thickness check:
Required effective thickness SQRT(40.86x1000000x1.5/(0.133x30x1000))
Mu / bd2 = 9.48x1.5x10^6/(1000x192^2)
Mu / bd2 = 29x1.5x10^6/(1000x192^2)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Refer SP-16 Percentage of reinforcement required, %
Mu / bd2 = 6.4x1.5x10^6/(1000x197^2)
Mu / bd2 = 40.86x1.5x10^6/(1000x197^2)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Vertical Earth Face 438 00-000+16-180 1117
Max Qy, (22 SERVICE) = 0.096 Min Qy, (22 SERVICE) = -0.094
Factored Shear Stress, N/mm2 = 1.5x0.096
Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)
Maximum shear stress in concrete for limit state method of design, tc,max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
W2B-4 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)
Horizontal Direction
331x(0.7/100000/2)x(15+15)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
10-Jan-19
nding Moment
Mxy kNm/m
-2.227
-4.734
-0.295
0.383
-5.164
-0.699
-5.164
0.23
1.04
-1.803
0.12
-4.734
0.12
-5.002
6.515
-6.792
O.
P/20/CDD/018
10-Jan-19
124 mm
250 mm
438
192.0
0.386
0.090
438
192.0
1.180
O.
P/20/CDD/018
10-Jan-19
A
0.285
547
77.3
97
644
197.0
0.247
0.057
438
197.0
1.579
0.388
764
63
79
843
% Ast
0.654%
1.020%
O.
P/20/CDD/018
10-Jan-19
A
0.582%
1.020%
0.144
0.654%
250 mm
1.1
250 mm
1.54
3.50
0.932
4020 mm2
1.61
331 mm
0.03 mm
O.
P/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x160)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
9.48 kN-m
9.33
192 mm
53 mm
160 mm
90.8 mm
55.8 mm
1.92 N/mm2
43.7 N/mm2
250 mm
3.12E-04
5.51E-04
-2.39E-04
-0.046 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2B-4 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x4.97x(192-56.46)/56.46
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x100)^2+(50+0.5x16)^2)-0.5x16
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
29.00 kN-m
51.50 kN
9.33
139.0 mm
69.5 mm
25.4 kN-m
192 mm
53 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
56.46 mm
4.97 N/mm2
99.4 N/mm2
250 mm
100 mm
68.6 mm
7.10E-04
3.44E-04
3.66E-04
0.063 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2B-4 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x5.68x(197-51.91)/51.91
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x100)^2+(45+0.5x16)^2)-0.5x16
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
33.49 kN-m
135.75 kN
9.33
139.0 mm
69.5 mm
24.1 kN-m
197 mm
58 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
51.91 mm
5.68 N/mm2
132.2 N/mm2
250 mm
100 mm
64.9 mm
9.03E-04
3.36E-04
5.66E-04
0.092 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
10-Jan-19
R
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Es = 2.00E+05 N/mm2
G1 = 0.125 G2 = 0.125
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
m mm mm m mm mm
1-(1x1000x(2x300+300)/((3x(300+300)))/1000)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Horizontal pressure Fill 2 - - -
Weight of Fill 1 on footing 49.00 1.75 -85.75 2.25-0.5
Weight of Fill 2 on footing - - -
Self weight of footing on Fill 1 side 7.50 1.75 -13.13 2.25-0.5
Self weight of footing on Fill 2 side 7.50 0.500 -3.75 0.5
Eccentricity = 0.5x2.25-1.05
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Moment at R (base), kN-m/m = 71.92x0.514-7.5x(1-0.5)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Base Pressure at R (interpolated) = 59.63+((93.87-59.63)/2.25)x(1+0.25)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Total overturning moments (Adding +ve moments) kN-m/m =
Total resisting moments (Adding -ve moments) kN-m/m =
Check for overturning = Resisting/ overturning moments =
Total vertical load P (kN/m) = (-49+77+7.5+7.5+1.875+78.8)
Net moment (kN-m/m) = ABS((42.17-33.67-85.75-38.5-13.125-3.75-2.109-
88.65))
Eccentricity = 0.5x2.25-1.01
MOMENT ENVELOPE
Description Case 1 Case 2 Case 3
Moment at Q (base) = -0.93 28.53 9.82
Moment at R (base) = 33.23 2.15 18.09
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Envelope unfactored moments at Q Top 0.93
kN-m/m
Bottom 28.53
Envelope unfactored moments at R Top 2.15
kN-m/m
Bottom 33.23
�
0.5 �fck �1000 �d � � 4.6 �Mu � 106 �
Ast = � 1- 1-
��� �
� fy ��� fck �1000 �d 2 �
�
Min reinforcement is calculated as per the provisions of IS 3370 (Part 2) - 2009
Percentage of min reinforcement % = 0.35
Location Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
unfactor Mu Factor Th D Mu required
M
Reinf
Location Reinforcement Provided
required
Q - Top 525 00-000+12-180 628
Q - Bot 525 16-180+16-180 2234
R - Top 525 00-000+12-180 628
R - Bot 525 16-160+16-160 2513
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
DISTRIBUTION REINFORCEMENT
Fill 1 Side, Average th from 0 to 0.5 m (300+0.5x(300+300))/2
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
10-Jan-19
N/mm2
241.700
Overturning moment
kN-m/m
42.17
33.67
44.50
arth Face
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
1+1+0.125+0.125 2.25
+300)x1x25/1000) 7.50
(300+300)))/1000) 0.500
+300)x1x25/1000) 7.50
(300+300)))/1000) 0.500
4.9x10x1 49.00
0.5x1 0.50
3.85x20x1 77.00
0.5x1 0.50
0.125+0.125 0.25 m
00)x0.25x25/1000 1.88
.85+300/1000)x18 208.1
10-Jan-19
2.25-0.5
2.25-0.5
0.5
0.5x0.25+1
1+0.125
42.17
193.38
193.384/42.17 4.59
+7.5+1.875+78.8) 144.68
3.75-2.109-88.65)) 151.21
151.21/144.68 1.050
0.5x2.25-1.05 0.08
x(1-(6x0.08/2.25)) 50.58
02-50.58)/2.25)x1 62.78
58)/2.25)x(1+0.25) 65.82
x(1+(6x0.08/2.25)) 78.02
5x(50.58+62.78)x1 56.68
(3x(50.58+62.78)) 0.48
5x(1-0.5)-49x0.5x1 -0.93
5x(65.82+78.02)x1 71.92
(3x(65.82+78.02)) 0.51
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
A
x0.514-7.5x(1-0.5) 33.23
2.25-0.5
0.5
2.25-0.5
0.5x0.25+1
1+0.125
33.67
242.38
242.384/33.67 7.20
+7.5+1.875+78.8) 172.68
25+2.109+88.65)) 208.71
208.71/172.68 1.21
2.25-1.209 1.04
0.5x2.25-1.041 0.08
(1-(6x0.084/2.25)) 59.63
87-59.63)/2.25)x1 74.85
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
A
63)/2.25)x(1+0.25) 78.65
1+(6x0.084/2.25)) 93.87
5x(59.63+74.85)x1 67.24
(3x(59.63+74.85)) 0.48
4x0.48-7.5x(1-0.5) 28.53
5x(78.65+93.87)x1 86.26
(3x(78.65+93.87)) 0.51
5x(1-0.5)-77x0.5x1 2.15
2.25-0.5
0.5x1
2.25-0.5
0.5
0.5x0.25+1
1+0.125
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
A
42.17
265.55
6.30
+7.5+1.875+78.8) 221.68
3.125-3.75-2.109- 223.38
88.65))
223.384/221.68 1.01
1.01 1.01
0.5x2.25-1.01 0.12
x(1-(6x0.12/2.25)) 67.00
67+28.022x1 95.02
7+28.022x(1+0.25) 102.03
x(1+(6x0.12/2.25)) 130.05
0.5x(67+95.02)x1 81.01
2))/(3x(67+95.02)) 0.47
5x(1-0.5)-49x0.5x1 9.82
102.03+130.05)x1 116.04
x(102.03+130.05)) 0.52
5x(1-0.5)-77x0.5x1 18.09
Case 3
9.82
18.09
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
RENGTH
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
+0.5x(300+300))/2 300
(0.5x300,250)/100 525
628
+0.5x(300+300))/2 300
(0.5x300,250)/100 525
628
+0.5x(300+300))/2 300
(0.5x300,250)/100 525
628
+0.5x(300+300))/2 300
(0.5x300,250)/100 525
628
49.36
78.80
16.88
49.00
78.8+16.875+49 144.68
0.45
65.10
-15.74
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W2B-F1 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x90)^2+(50+0.5x16)^2)-0.5x16
(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc fsc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc
Distance from compression face to point where crack width is being calculated, a
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
28.53 kN-m
9.33
242 mm
56 mm
90 mm
65.4 mm
79.8 mm
3.15 N/mm2
59.7 N/mm2
300 mm
4.05E-04
3.35E-04
7.08E-05
0.010 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
DESIGN OF WALL W3
NT NO.
L/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
DESIGNED THICKNESS
Height from bottom 0.00 1.90
Designed Thickness 250 250
Provided Thickness 250 250
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
4 0.00 0.00 0.00 0.000 0.000 0.000
3 0.25 0.00 0.00 0.000 0.000 0.000
2 0.25 0.25 1.90 0.475 0.125 0.125
1 0.25 0.25 0.00 0.000 0.000 0.000
Total = 0.475 0.125 0.125
10-Jan-19
A
O.
20/CDD/018
10-Jan-19
kN/m
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
+Z Face -Z Face
Min Qx 854 21 EMPT -61.822 -25.05 -178.113 -528.273 -309.781 -1.904 3.977
Max Qy 791 22 SERVI 30.122 35.098 -72.251 -608.749 529.383 -4.585 -1.025
Min Qy 739 21 EMPT 37.241 -100.624 -104.385 -876.25 129.631 -0.293 2.447
Max Sx 846 15 FULL1 -9.927 0.418 273.156 -96.517 -27.662 1.029 0.068
Min Sx 738 22 SERVI 291.885 -86.218 -422.444 -895.599 830.904 -5.232 -0.244
Max Sy 876 21 EMPT -5.129 -1.387 28.574 -42.308 -1.909 0.396 0.137
Min Sy 738 22 SERVI 291.885 -86.218 -422.444 -895.599 830.904 -5.232 -0.244
Max Sxy 738 22 SERVI 291.885 -86.218 -422.444 -895.599 830.904 -5.232 -0.244
Min Sxy 870 21 EMPT 21.101 16.251 -357.3 -864.477 -537.961 1.484 -0.473
Max Mx 844 15 FULL1 -13.854 -4.409 -166.069 -557.024 455.16 3.75 0.813
Min Mx 738 21 EMPT 268.39 -50.432 -164.548 -833.391 779.111 -12.798 -1.055
Max My 778 15 FULL1 -3.202 -22.22 -118.48 -446.417 -13.411 1.007 6.984
Min My 764 22 SERVI 0.841 16.455 -38.206 -760.699 -96.772 -0.257 -2.061
Max Mxy 881 21 EMPT -52.141 -17.779 -138.898 -462.05 -280.229 -0.886 3.611
Min Mxy 860 21 EMPT 57.951 -21.938 -180.349 -508.609 292.022 -1.62 3.8
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Max Vertical BM in wall creating tension on Gallery Face Max My 6.98 kN-m/m
Max Horizontal BM in wall creating tension on Gallery Face Max Mx 3.75 kN-m/m
Max Vertical BM in wall creating tension on Earth Face Min My 2.06 kN-m/m
Max Horizontal BM in wall creating tension on Earth Face Min Mx 12.80 kN-m/m
Thickness check:
Required effective thickness SQRT(12.8x1000000x1.5/(0.133x30x1000))
Mu / bd2 = 6.98x1.5x10^6/(1000x214^2)
Mu / bd2 = 3.75x1.5x10^6/(1000x215^2)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Refer SP-16 Percentage of reinforcement required, %
Mu / bd2 = 2.06x1.5x10^6/(1000x199^2)
Mu / bd2 = 12.8x1.5x10^6/(1000x200^2)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
Vertical Earth Face 438 00-000+12-150 753
Max Qy, (22 SERVICE) = 0.035 Min Qy, (21 EMPTY) = -0.101
Factored Shear Stress, N/mm2 = 1.5x0.101
Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)
Maximum shear stress in concrete for limit state method of design, tc,max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
W3-1 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)
Horizontal Direction
794x(0.7/100000/2)x(15+15)
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF
TITLE: FILTER HOUSE REV A
10-Jan-19
nding Moment
Mxy kNm/m
-0.198
3.393
0.762
0.254
0.18
-0.198
0.576
-0.198
-0.198
-0.251
-0.353
0.75
-0.098
0.07
3.452
-3.397
O.
P/20/CDD/018
10-Jan-19
69 mm
250 mm
438
214.0
0.229
0.053
438
215.0
0.122
O.
P/20/CDD/018
10-Jan-19
A
0.028
60
438
199.0
0.078
0.018
438
200.0
0.480
0.113
226
438
% Ast
0.352%
0.265%
O.
P/20/CDD/018
10-Jan-19
A
0.350%
0.264%
0.152
0.350%
250 mm
1.1
250 mm
1.59
3.50
0.752
1054 mm2
0.42
794 mm
0.08 mm
O.
P/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x150)^2+(30+0.5x12)^2)-0.5x12
(x - d ') bxf c x
Asc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast fst = (m -1) Ast
x Solve these equations to get fc
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
6.98 kN-m
9.33
214 mm
51 mm
150 mm
77.2 mm
48.7 mm
1.47 N/mm2
46.6 N/mm2
250 mm
2.83E-04
8.14E-04
-5.30E-04
-0.084 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W3-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x
= (9.33-1)x0.98x(215-39.92)/39.92
Distance from compression face to point where crack width is being calculated, a
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x150)^2+(30+0.5x10)^2)-0.5x10
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
3.75 kN-m
1.00 kN
9.33
165.0 mm
82.5 mm
3.7 kN-m
215 mm
50 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
d ') = M - N X S
39.92 mm
0.98 N/mm2
35.8 N/mm2
250 mm
150 mm
77.8 mm
2.15E-04
1.20E-03
-9.81E-04
-0.157 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W3-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)
= 527x165/(527+527)
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
= (68.25x527/(527+527))+(1.03x1000/(215-50))
= (68.25x527/(527+527))-(1.03x1000/(215-50))
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x150)^2+(30+0.5x10)^2)-0.5x10
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
1.03 kN-m
68.25 kN
9.33
165.0 mm
82.5 mm
-4.6 kN-m
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
215 mm
50 mm
40.4 kN
27.9 kN
76.6 N/mm2
2.6E+05 mm2
0.26 N/mm2
150 mm
77.8 mm
MENT NO.
NAL/STP/20/CDD/018
10-Jan-19
3.83E-04
1.19E-03
-8.03E-04
-0.187 mm
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
10-Jan-19
R
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Es = 2.00E+05 N/mm2
G1 = 0.125 G2 = 0.125
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
m mm mm m mm mm
0.8-(0.8x1000x(2x300+300)/((3x(300+300)))/1000)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Horizontal pressure Fill 2 - - -
Weight of Fill 1 on footing 0.00 1.45 0.00 1.85-0.4
Weight of Fill 2 on footing - - -
Self weight of footing on Fill 1 side 6.00 1.45 -8.70 1.85-0.4
Self weight of footing on Fill 2 side 6.00 0.400 -2.40 0.4
Eccentricity = 0.5x1.85-0.65
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Moment at R (base), kN-m/m = 16.896x0.435-6x(0.8-0.4)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Base Pressure at R (interpolated) = 9.66+((40.7-9.66)/1.85)x(0.8+0.25)
kN/m m kN-m/m
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Total overturning moments (Adding +ve moments) kN-m/m =
Total resisting moments (Adding -ve moments) kN-m/m =
Check for overturning = Resisting/ overturning moments =
Total vertical load P (kN/m) = (-20.8+6+6+1.875+11.9)
Net moment (kN-m/m) = ABS((6.98-2.06-8.32-8.7-2.4-1.734-11.008))
Eccentricity = 0.5x1.85-0.58
MOMENT ENVELOPE
Description Case 1 Case 2 Case 3
Moment at Q (base) = -0.82 2.19 -0.82
Moment at R (base) = 4.94 0.87 3.85
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
Envelope unfactored moments at Q Top 0.82
kN-m/m
Bottom 2.19
Envelope unfactored moments at R Top 0.87
kN-m/m
Bottom 4.94
�
0.5 �fck �1000 �d � � 4.6 �Mu � 106 �
Ast = � 1- 1-
��� �
� fy ��� fck �1000 �d 2 �
�
Min reinforcement is calculated as per the provisions of IS 3370 (Part 2) - 2009
Percentage of min reinforcement % = 0.24
Location Moment Moment Provided d = D - c' Ast for Min Reinf Reinf
unfactor Mu Factor Th D Mu required
M
Reinf
Location Reinforcement Provided
required
Q - Top 360 00-000+12-180 628
Q - Bot 360 00-000+12-180 628
R - Top 360 00-000+12-180 628
R - Bot 360 00-000+12-180 628
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
DISTRIBUTION REINFORCEMENT
Fill 1 Side, Average th from 0 to 0.4 m (300+0.5x(300+300))/2
DOCUMENT NO.
PROJECT 20 MLD SEWAGE TREATMENT PLANT BASED ON
SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
10-Jan-19
N/mm2
241.700
Overturning moment
kN-m/m
6.98
2.06
5.00
arth Face
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
+0.8+0.125+0.125 1.85
300)x0.8x25/1000) 6.00
(300+300)))/1000) 0.400
300)x0.8x25/1000) 6.00
(300+300)))/1000) 0.400
0 0.00
0.5x0.8 0.40
1.3x20x0.8 20.80
0.5x0.8 0.40
0.125+0.125 0.25 m
00)x0.25x25/1000 1.88
1.7+300/1000)x18 138.8
10-Jan-19
1.85-0.4
1.85-0.4
0.4
0.5x0.25+0.8
0.8+0.125
6.98
23.84
23.842/6.98 3.42
-6+6+1.875+11.9) 25.78
2.4-1.734-11.008)) 16.86
16.86/25.78 0.650
0.5x1.85-0.65 0.28
x(1-(6x0.28/1.85)) 1.28
59-1.28)/1.85)x0.8 12.22
)/1.85)x(0.8+0.25) 15.65
x(1+(6x0.28/1.85)) 26.59
x(1.28+12.22)x0.8 5.40
)/(3x(1.28+12.22)) 0.29
x0.292-6x(0.8-0.4) -0.82
(15.65+26.59)x0.8 16.90
(3x(15.65+26.59)) 0.43
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
A
x0.435-6x(0.8-0.4) 4.94
1.85-0.4
0.4
1.85-0.4
0.5x0.25+0.8
0.8+0.125
2.06
54.00
54.002/2.06 26.21
+6+6+1.875+11.9) 46.58
.7+1.734+11.008)) 51.94
51.94/46.58 1.12
1.85-1.115 0.73
0.5x1.85-0.735 0.19
x(1-(6x0.19/1.85)) 9.66
.7-9.66)/1.85)x0.8 23.08
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
A
)/1.85)x(0.8+0.25) 27.28
x(1+(6x0.19/1.85)) 40.70
x(9.66+23.08)x0.8 13.10
)/(3x(9.66+23.08)) 0.35
1x0.35-6x(0.8-0.4) 2.19
x(27.28+40.7)x0.8 27.19
)/(3x(27.28+40.7)) 0.43
-0.4)-20.8x0.5x0.8 0.87
1.85-0.4
0.5x0.8
1.85-0.4
0.4
0.5x0.25+0.8
0.8+0.125
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
A
6.98
34.22
4.90
+6+6+1.875+11.9) 46.58
2.4-1.734-11.008)) 27.24
27.242/46.58 0.58
0.58 0.58
0.5x1.85-0.58 0.35
x(1-(6x0.35/1.85)) -3.40
-3.4+30.897x0.8 21.32
30.897x(0.8+0.25) 29.04
x(1+(6x0.35/1.85)) 53.76
5x(-3.4+21.32)x0.8 7.17
))/(3x(-3.4+21.32)) 0.22
7x0.22-6x(0.8-0.4) -0.82
(29.04+53.76)x0.8 33.12
(3x(29.04+53.76)) 0.44
-0.4)-20.8x0.5x0.8 3.85
Case 3
-0.82
3.85
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
RENGTH
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
+0.5x(300+300))/2 300
(0.5x300,250)/100 525
628
+0.5x(300+300))/2 300
(0.5x300,250)/100 525
628
+0.5x(300+300))/2 300
(0.5x300,250)/100 525
628
+0.5x(300+300))/2 300
(0.5x300,250)/100 525
628
5.63
11.90
13.88
0.00
11.9+13.875 25.78
0.45
11.60
-5.97
CUMENT NO.
ARNAL/STP/20/CDD/018
10-Jan-19
A
M/S. TATA PROJECTS LIMITED
DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPL-KIPL-JV/KARNAL/STP/20/CDD/018
DATE 10-Jan-19
STRUCTURAL DESIGN CALCULATION OF FILTER
TITLE: HOUSE REV A
W3-F1 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)
acr = maximum spacing of tensile bar from outer edge of concrete (mm)
= SQRT((0.5x180)^2+(50+0.5x12)^2)-0.5x12
(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc fsc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc
Distance from compression face to point where crack width is being calculated, a
10-Jan-19
0.1 mm
30 N/mm2
500 N/mm2
2.7E+04 N/mm2
2.0E+05 N/mm2
2.19 kN-m
9.33
244 mm
36 mm
180 mm
100.0 mm
46.3 mm
0.39 N/mm2
15.5 N/mm2
300 mm
9.97E-05
1.30E-03
-1.20E-03
-0.260 mm