You are on page 1of 124

Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in Zone - II at Kodungaiyur

Project with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas including Operation and Maintenance for ten years
at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

TABE OF CONTENTS

I DESIGN BASIS
II DESIGN OF EXCESS SLUDGE SUMP, DILUTION SUMP AND SUPERNATANT SUMP
1.0 Load Calculation
2.0 Calculation of Hydrodynamic pressure
3.0 Uplift check
4.0 Subgrade Modulus Calculation
5.0 SBC Check
6.0 Design of outer wall
7.0 Design of inner wall
8.0 Design of Raft
9.0 Design of Cantilever Slab
10.0 Design of Monorail Column and Beam
11.0 Design of Staircase Beam
12.0 Design of Monorail
13.0 Design of staircase

Page 1 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage
Treatment Plant in Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with
Project
Power Generation from Bio-Gas including Operation and Maintenance for ten years at
Chennai.
19-EPE-CMWSSB-STP- Prepared Checked Approved Rev
Document
120MLD-ESDSS-SDC-012 APS SVK JTP 0
Number
Structural Design Calculation of Excess sludge sump, Dilution Water Sump and
Title
Supernatant Sump

CHAPTER I

DESIGN BASIS

Page 2 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage
Treatment Plant in Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with
Project
Power Generation from Bio-Gas including Operation and Maintenance for ten years at
Chennai.
19-EPE-CMWSSB-STP- Prepared Checked Approved Rev
Document
120MLD-ESDSS-SDC-012 APS SVK JTP 0
Number
Structural Design Calculation of Excess sludge sump, Dilution Water Sump and
Title
Supernatant Sump

1.1) Design Basis:

This document covers the design of Structural Design Calculation of Excess sludge
sump, Dilution Water Sump and Supernatant Sump

It consists of the following structures:

a) Sump-Walls

b) Raft

c) Staircase

d) Monorail

The water retaining structure have been designed as limited cracked section for
0.2mmcrack width and non-water retaining components are designed in limit state
method.

The Following primary loads are considered in the design of the structure

a) Dead Loads.
b) Hydrostatic pressure (Liquid in Tanks) which is considered as dead loads.
c) Surcharge load
d) Outside side soil and water pressure

Ground Water table:

The ground water table is considered at MFL RL(+)3.200 LVLfor the design of
CCT.
1.2) Material Specifications:

a) Grade of concrete - M35

b) Grade of steel - Fe500

1.3) References:

1) IS: 3370 (Part I – IV) – Code of practice for concrete structures for the storage of
liquids.

2) IS: 456 - 2000 – Code of practice for Plain and Reinforced concrete

Page 3 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage
Treatment Plant in Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with
Project
Power Generation from Bio-Gas including Operation and Maintenance for ten years at
Chennai.
19-EPE-CMWSSB-STP- Prepared Checked Approved Rev
Document
120MLD-ESDSS-SDC-012 APS SVK JTP 0
Number
Structural Design Calculation of Excess sludge sump, Dilution Water Sump and
Title
Supernatant Sump

3) Moody’s chart

1.4) Material Properties:

Material Property Value Units Remarks


Characteristic
35 N/Sq mm IS 456 - 2000
strength
Concrete, M35
Modulus of Elasticity 29580.39 N/Sq mm IS 456 - 2000

High Yield Characteristic


500 N/Sq mm
Strength strength
Reinforcement
bars Modulus of Elasticity 200000 N/Sq mm

1.5) Soil Properties:

Net safe bearing capacity is considered as 200kN/sqm at a foundation depth of 3m


meter below from Natural Ground Level.

1.6) Design Constants:

1) Liquid density ( w) = 10.1kN/m3

2) Soil density (gs) = 17kN/m3

3) Clear Cover to steel

The minimum clear cover to reinforcement in all R.C.C structures shall be as per
IS456: 2000(Clause 26.4, Page no. 46) &IS 3370 (part 1 to 3).

Sl.N Member Details Cover(mm)


o
1 Platform Slab All faces 40

2 Beam Above ground 30

Page 4 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage
Treatment Plant in Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with
Project
Power Generation from Bio-Gas including Operation and Maintenance for ten years at
Chennai.
19-EPE-CMWSSB-STP- Prepared Checked Approved Rev
Document
120MLD-ESDSS-SDC-012 APS SVK JTP 0
Number
Structural Design Calculation of Excess sludge sump, Dilution Water Sump and
Title
Supernatant Sump

3 Column and pedestal All faces 40

4 Base slab Top & bottom 50

Face in contact with 50


earth
5 Wall Face in contact with 40
water

1.7) Design Philosophy:

a) Liquid depth is considered for the full height of the wall irrespective of water
height + free board. However, if there is any wall cut without gate, the water height is
considered as till cut out level + 300mm free board.

b) The Sump is modeled and analyzed with STAAD. The analysis value is arrived from
the STAAD and document is presented with the Crack width checks.

1.8) LOAD COMBINATIONS

1.8.1) LOAD COMBINATIONS


The loading combinations are considered in the design of structures in accordance with the
stipulations in the relevant design codes. The load combinations are mentioned below.

a. TANK FULL (DL + LL + WATER INSIDE)

b. TANK EMPTY (DL + LL + SURCHARGE + OUTSIDE WATER TABLE)

c. OPERATING CONDITION(DL + LL + SURCHARGE + WATER INSIDE + OUTSIDE

WATER TABLE)

d. (1.0) DL+(1.0) (LL)+1(1.0) (Uplift Force)

Page 5 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage
Treatment Plant in Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with
Project
Power Generation from Bio-Gas including Operation and Maintenance for ten years at
Chennai.
19-EPE-CMWSSB-STP- Prepared Checked Approved Rev
Document
120MLD-ESDSS-SDC-012 APS SVK JTP 0
Number
Structural Design Calculation of Excess sludge sump, Dilution Water Sump and
Title
Supernatant Sump

CHAPTER II

DESIGN OF EXCESS SLUDGE SUMP,


DILUTION WATER SUMP AND SUPERNATANT
SUMP

Page 6 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

1.0 LOAD CALCULATION

1) Dead Loads

a) Self weight = Assigned using STAAD command

2) Water & Soil Pressure

Data
Unit Weight of Soil = 17.0 kN/m3

Unit Weight of Water = 10.00 kN/m3

Unit Weight of Sewage = 10.10 kN/m3

Earth Pressure at rest condition (Ko) = 0.33 K o =(1-sin30 ᵒ)/(1+sin30 ᵒ)

Angle of Repose = 30

a) Liquid Pressure inside the tank

Bottom of Sewage level / Top of Raft = 1.80 IL

Top of Sewage level = 6.10 TWL

Height of sewage = 4.30 m


( 6.1 - 1.8 )

i) Sewage Pressure on walls ( As Triangular Load)


a) At bottom of sewage level/ Top of raft = 43.43 kN/m2
( 4.3 x 10.1 )

b) At top of sewage level = 0 kN/m2


( 4.3 x 0 )

Page 7 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

ii) Sewage pressure on base raft ( As UDL Load) = 43.43 kN/m2


( 4.3 x 10.1 )

OUTSIDE WATER TABLE CONDITION IN TANK

The Ground water table is considered at FGL (LVL +3.200)

In Sump:

Level of Water table = 3.20 RL

Thickness of base raft = 0.30 m

Top level of base raft = 1.80 IL

Height of soil below water table = 1.40 m


( 3.2 - 1.8 )

Level of F.G.L = 4.000 EL

Height of soil above water table = 0.80 m


( 4 - 3.2 )

Calculation for Sump:

a)Below Water Table

i) Outisde Soil & Water Pressure on outside walls ( As Triangular Load)


a) At top level of raft = 17.23 kN/m2
( ( 17 - 10 ) x 1.4 x 0.33 ) + ( 1.4 x 10 )

b) At top of water table = 0 kN/m2

ii)Soil Pressure on outside walls ( As UDL Load)


a) At top level of raft = 4.49 kN/m2
( 17 x 0.8 x 0.33 )

b) At top of water table = 4.49 kN/m2

Page 8 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

b)Above Water Table

iii) Soil Pressure on outer walls ( As Triangular Load)

a) At top of water table = 4.49 kN/m2


( 17 x 0.8 x 0.33 )

c) No soil is on outside only water table is considered = 14 kN/m2


(load case 5) ( 1.4 x 10)

d)Uplift Pressure

iv) Uplift Pressure on Base raft = 17 kN/m2


( 3.2 - 1.8 + 0.3 ) x 10

Page 9 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved Rev


19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012
APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

2. Hydro dynamic pressure Calculation :


Height of the tank hw = 4.3 m

Water Level Inside = 3.8 m

Length of the tank L = 19.25 m

Breadth of the tank B = 9m

Grade of concrete M = 35 N/mm2

Grade of steel Fe = 500 N/mm2

Density of concrete = 25 kN/m3

Wall thickness t = 0.25 m

Density of liquid ρ = 9.8 kN/m3

Base Slab area = 173.25 m2

Base Slab thickness tb = 0.3 m

ANALYSIS ALONG X-DIRECTION

1.WEIGHT CALCULATION

a) Weight of tank wall = 1518.44 kN


Mass of tank mw = 154784.91 Kg

b)Weight of Base Slab = 1299.38 kN


Mass of base raft mb = 132454.64 Kg

d)Weight of water = 6451.83 kN


Mass of water = 657678.9 Kg

2.PARAMETER OF SPRING MASS MODEL

Height of water level = 3.8 m


Length of the tank L = 19.25 m

For, h/L (3.35/11) = 0.2

Page 10 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved Rev


19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012
APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

mi/m = 0.23
Hence mi = 151266.15 kg

mc/m = 0.74
Hence mc = 486682.39 kg

hi/h = 0.7
Hence hi/h = 0.38 m
hi = 1.444 m

hc/h = 0.52
hc = 1.98

hi*/h = 2.07
hi* = 7.87

hc*/h = 2.95
hc* = 11.21

Page 11 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved Rev


19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012
APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

3.TIME PERIOD

Time Period of impulsive mode,

Mass of one tank wall is obtained by considering itys inner dimension only,

= 34518.349 kg

= 1.67 m

2
= 27.92 kN/m
As per section 4.3.1.2 , a strip of unit width of wall is considered as cantilever and subjected
to a concentrated force
P = q*h*1
= 120.056 kN
Length of the cantilever is h' = 1.67 m

Hence d =

2
= 2.50E+07 kN/m

Iw= Moment of Inertia of cantilever 0

Page 12 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved Rev


19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012
APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

4
= 1.30E-03 m

Hence d =

= 0.01 m

Time Period of Impulsive mode, = 0.201 sec

Time Period of Convective mode, =

Cc = 4.5 (Section 4.3.2.2 (b) )


= 6.3 sec
4.SEISMIC COEFFICIENT
a.) Design horizontal seismic co-efficient for impulsive mode

Zone Factor Z = 0.16

Response Reduction Factor R = 2.5

Importance Factor I = 1.25

Time Period T = 0.200 sec

For impulsive mode damping 5% = 0.05 cl:4.4 IS 1893 part 2

Average Response Acceleration Sa/g = 4 (1+(15*0.2)


Ah = 0.16
(0.16*1.25*4)/(2*2.5)
b.) Design horizontal seismic co-efficient for Convectinve mode

Zone Factor Z = 0.16

Response Reduction Factor R = 2.5

Importance Factor I = 1.25

Time Period T = 6.30 sec

For convective mode damping 0.50% = 0.005 cl:4.4 IS 1893 part 2

Average Response Acceleration Sa/g = 0.38 (1.36/6.3*1.75)


Ah = 0.02
(0.16*1.25*0.38)/(2*2.5)

Page 13 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved Rev


19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012
APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Multiplying factor of 1.75 is used to obtain sa/g values for 0.5% damping from that
for 5% damping

5.BASE SHEAR

Base shear at the bottom of wall in impulsive mode,

(Ah)i = 0.16 (refer impulsive )


Vi = 480.38 kN

Base shear at the bottom of wall in convective mode,

(Ah)c = 0.02 (refer convective )


Vc = 936.73 kN

Total base shear,


V = 1052.72 kN

6.MOMENT AT BOTTOM OF WALL

Bending moment at the bottom of wall in impulsive mode,


ht = 0

Mi = 1387.53 kN.m

Bending moment at the bottom of wall in Convective mode,

Mc = 189.06 kN.m

Page 14 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved Rev


19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012
APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Total bending moment at the base of the wall = 1400.35 kN.m

7.OVERTURNING MOMENT
Overturning moment at the bottom ofbase slab in impulsive mode,

Mi* = 3088.54 kN.m

Overturning moment at the bottom ofbase slab in convective mode,

Mc* = 1099.06 kN.m

Total Overturning Moment at the bottom of base slab =


3278.26 kN.m

8.HYDRODYNAMIC PRESSURE
Distance of a point on tank wall from the bottom y = 0m

Mass density of liquid ρ = 1000 kg/m3

Circumferential angle φ = 0

(i).Impulsive Hydrodynamic Pressure


Impulsive hydrodynamic pressure on wall is,

Where Qiw,

= 0.87

Where Piw, = 5.87 kN/m2

Impulsive hydrodynamic pressure on the bottom of the slab (y=0)

Page 15 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved Rev


19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012
APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Where Qib,

= 0.02

Impulsive Pressure on the top of base slab (y=0)

Where Pib, = 0.13 kN/m2

(ii).Convective Hydrodynamic Pressure

Convective hydrodynamic pressure on the wall is

At base wall, y =0 ;
Where Qcw,

= 0.331

Where Pcw , = 1250.14 kN/m2

At base wall, y =h ; Where Qcw, = 0.42

Where Pcw , = 1.59 kN/m2

Convective hydrodynamic pressure on the base slab is (Y=0)

Where Qcb,

Page 16 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved Rev


19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012
APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

= 0.29

Where Pcb, = 1.1 kN/m2

9.PRESSURE DUE TO WALL INERTIA


Pressure on tank wall due to its inertia is give by

Pww = 0.39 kN/m2

The pressure is uniformly distributed along the wall height.

Pressure due to vertical excitation


Hydrodynamic pressure on tank wall due to vertical ground acceleration

Av = 0.11

Pv = 4.64 kN/m2

10.MAXIMUM HYDRODYNAMIC PRESSURE

At the base of the wall P = 8 kN/m2

Page 17 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved Rev


19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012
APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

11.MAXIMUM HYDROSTATIC PRESSURE

Hydrostatic pressure = 38.38 kN/m2

From the above calculation, maximum hydrodynamic pressure is about 20.84% of the hydrostatic
pressure. Hence hydrostatic pressure is considered for the design of Sump

Page 18 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in Zone
Project - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.

19-EPE-CMWSSB-STP- Prepared Checked Approved Rev


Document Number
120MLD-ESDSS-SDC-012
APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

UPLIFT CHECK
FGL = 4m
Ground Water table (i.e, at HFL) = 3.2 m
Top of raft = 1.8 m
Thickness of raft = 0.3 m
Bottom of raft (Bottom of PCC) = 1.5 m
Total depth of water = 1.7 m (3.2 - 1.8)
Total depth of soil above raft = 1.4 m (4-2.6)
3
Unit weight of water = 10 kN/m
Unit weight of soil = 17 kN/m3
3
Unit weight of reinforced concrete = 25 kN/m
3
Unit weight of plain concrete/Screed = 24 kN/m
Size of Tank
Length of Long wall (Inner)L1 = 16.75 m (11+5.5+0.25)
Width of short wall (Inner)B1 = 9m
Length of Long wall (Inner)L2 = 5m
Width of short wall (Inner)B2 = 2.5 m
Outer Projection of base slab = 1.2 m
Thickness of wall (Outer) = 0.25 m
Thickness of wall (Inner) = 0.25 m
No. of Inner baffle walls = 1 Nos
Length of baffle walls = 9m
Height of wall = 3.5 m
Uplift Force

Page 19 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in Zone
Project - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.

19-EPE-CMWSSB-STP- Prepared Checked Approved Rev


Document Number
120MLD-ESDSS-SDC-012
APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

= 2
Area of base raft 255.56 m
((16.75+0.25+0.25+1.2+1.2)x(9+0.25+0.25+1.2+1.2)
Uplift force in outer wall = 4344.52 kN
((255.56x1.7x10)

Total Uplift force = 4344.52 kN

Downward force
Weight of outer wall = 1367.19 kN
(2x((16.75+0.25+0.25)x0.25x3.5x25)) +( 2x(9x0.25x3.5x25))
Weight of Inner wall = 196.88 kN
(1x9x0.25x3.5x25)
Weight of raft = 1916.7 kN
= (255.56x0.3x25)

Weight of soil projection = 1822.128


(((16.75+0.25+0.25+1.2+1.2+2.5+0.25)*2*1.2*1.4*17)+((9+0.25+0.25)*1.2*1.4*17))
Total Downward force = 5302.9 kN

(1367.19+196.88+1916.7)
Factor of Safety
The minimum factor of safety against uplift force is 1.2.
Factor of safety against uplift force = 1.22
(5302.9 / 4344.52)

1.22 > 1.2


The Structure is stable against uplift

Page 20 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

4.0 SUBGRADE MODULUS CALCULATION:

FGL/NGL = 4.000 m

Top of raft = 1.8 m

Thickness of raft = 0.3

Net SBC = 200 kN/m2

Height of Surrounding Soil = 2.500 m


(4-1.8+0.3)

Unit weight of soil = 17.00 kN/m3

Gross SBC = 242.5 kN/m2


( 200 + ( 17 x 2.5 ) )

Allowable settlement for Base Raft = 50 mm

Subgrade Modulus = 4850 kN/m2/m


( 242.5 / 50) x 1000

Page 21 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in Zone
Project - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
Document 19-EPE-CMWSSB-STP-120MLD-ESDSS-SDC-
Number 012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

5.0 SBC CHECK

Base Pressure Results from the STAAD Output

Base Pressure = 43.168 kN/m2

Net SBC = 200 kN/m2

Height of Surrounding Soil = 2.2 m (4-1.3+0.45)


3
Unit weight of soil = 17.00 kN/m

Gross SBC = 237.4 kN/m2


( 200 + ( 17 x 2.2 ) )

43.168 kN/m2 < 237.40 kN/m2


Base Pressure is less than Gross SBC.Hence Safe

Page 22 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

6.0 DESIGN OF OUTER WALL-(WALL-1 & WALL-2)

Structural Data:

Unit weight of soil = 3


17 kN/m (As per soil report)
Unit weight of liquid = 10.1 kN/m
3

Unit Weight of Concrete = 25 kN/m


3

Compressive Strength of concrete = M35 N/mm


2

Yield strength of steel = 500 N/mm


2

Modulus of elasticity of steel = 200000 N/mm


2

Depth of the section = 0.3 m


Breadth of the section = 1m
Cover (Water face) = 40 mm
Cover (Soil face) = 50 mm

1) Design of Vertical wall (Water face):

Case 1 Vertical Reinforcement (Water Face)(From 1.800m to 3.200m ):


STAAD Results:

Service Moment @ bottom of wall = 82.77 kN-m


(Group ID G4, Plate ID 4121, Load case 101)
Shear stress @ bottom of wall = 0.572 N/mm
2

(Group ID G4, Plate ID 11635, Load case 101)


Load factor = 1.5

Page 23 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Factored Moment = 124.16 kN-m


Factored Shear stress = 0.858 N/mm
2

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 16
Spacing = 180 mm 180
Cover = 40.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 254 mm

Ast Required =

= 2
Ast Required for Moment 1205.53 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))
Minimum Reinforcement = 525.000 mm
2

= 2
Ast Provided 1745.333 mm

(1000/180*0.7854*12*12) +(1000/180*0.7854*16*16)
Hence Provided Ast is ok

Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 1745.330 mm
Bar diameter, 'db' = 14 mm

Maximum bar spacing, 'S' = 90 mm


Cover to tension reinforcement = 40.00 mm
Applied Moment at service condition, 'M' = 82.77 kN-m

Page 24 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Effective depth, 'd' = 254 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.69 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 88.40 mm
Effective Cover, 'dc' = 47 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 58.07 mm

Lever arm 'Z' = 224.53 mm


(254-(88.403/3))
2
Steel Stress, 'fs' = 211.21 N/mm

(((82.77*10^6)/224.53)/1745.33)
2
Concrete stress 'fc' = 8.34 N/mm

(2*82.77*10^6)/(1000*88.403*224.53)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00105605 mm
(211.21/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0013494 mm
(((300-88.403)/(254-88.403))*0.00105605)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0002582 mm
Average strain at the level Considered εm = 0.0010912 mm
Crack Width

Crack width, 'w' = 0.162 mm


Hence safe against crack width

(0.162 < 0.2)

Page 25 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Case 2 Vertical Reinforcement (Water Face)(From 3.200m to 4m Lvl) :

STAAD Results:

Service Moment @ bottom of wall = 15.289 kN-m


(Group ID G6 , Plate ID 2431, Load case 101)
Shear stress @ bottom of wall = 0.15 N/mm
2

(Group ID G6 , Plate ID 2340, Load case 101)


Load factor = 1.5
Factored Moment = 22.93 kN-m
Factored Shear stress = 0.225 kN

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 0
Spacing = 180 mm 180
Cover = 40.00 mm
Depth of the section = 230.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 184 mm

Ast Required =

= 2
Ast Required for Moment 293.17 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 115 mm
(IF(230>500,250,230/2))

Page 26 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Minimum Reinforcement = 402.500 mm


2

= 2
Ast Provided 628.320 mm

(1000/180*0.7854*12*12) +(1000/180*0.7854*0*0)
Hence Provided Ast is ok

Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 230 mm
2
Area of tension reinforcement, 'Ast' = 628.320 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 180 mm


Cover to tension reinforcement = 40.00 mm
Applied Moment at service condition, 'M' = 15.289 kN-m

Effective depth, 'd' = 184 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.34 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 48.06 mm
Effective Cover, 'dc' = 46 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 95.07 mm

Lever arm 'Z' = 167.98 mm


(184-(48.058/3))
2
Steel Stress, 'fs' = 144.86 N/mm

(((15.289*10^6)/167.98)/628.32)
2
Concrete stress 'fc' = 3.79 N/mm

(2*15.289*10^6)/(1000*48.058*167.98)

Page 27 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Distance 'a' = 230 mm


Strain Es in steel for the stress of = 0.00072430 mm
(144.86/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0009694 mm
(((230-48.058)/(184-48.058))*0.0007243)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 230 mm


Strain due to stiffening effect of concrete ε2 = 0.0006459 mm
Average strain at the level Considered εm = 0.0003235 mm
Crack Width

Crack width, 'w' = 0.057 mm


Hence safe against crack width

(0.057 < 0.2)

Case 3 Vertical Reinforcement (Water Face)(From 400m to 6.1m Lvl) :

STAAD Results:

Page 28 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Service Moment @ bottom of wall = 14.642 kN-m


(Group ID G5 , Plate ID 2467, Load case 101)
Shear stress @ bottom of wall = 0.115 N/mm
2

(Group ID G5 , Plate ID 2484, Load case 101)


Load factor = 1.5
Factored Moment = 21.96 kN-m
Factored Shear stress = 0.1725 kN

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 10 mm 0
Spacing = 180 mm 180
Cover = 40.00 mm
Depth of the section = 200.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 155 mm

Ast Required =

= 2
Ast Required for Moment 336.13 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 100 mm
(IF(200>500,250,200/2))
Minimum Reinforcement = 350.000 mm
2

= 2
Ast Provided 436.333 mm

(1000/180*0.7854*10*10) +(1000/180*0.7854*0*0)
Hence Provided Ast is ok
Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 200 mm
2
Area of tension reinforcement, 'Ast' = 436.330 mm
Bar diameter, 'db' = 10 mm

Maximum bar spacing, 'S' = 180 mm


Cover to tension reinforcement = 40.00 mm

Page 29 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Applied Moment at service condition, 'M' = 14.642 kN-m

Effective depth, 'd' = 155 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.28 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 37.27 mm
Effective Cover, 'dc' = 45 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 95.62 mm

Lever arm 'Z' = 142.58 mm


(155-(37.27/3))
2
Steel Stress, 'fs' = 235.36 N/mm

(((14.642*10^6)/142.58)/436.33)
2
Concrete stress 'fc' = 5.51 N/mm

(2*14.642*10^6)/(1000*37.27*142.58)
Distance 'a' = 200 mm
Strain Es in steel for the stress of = 0.00117680 mm
(235.36/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0016266 mm
(((200-37.27)/(155-37.27))*0.0011768)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 200 mm


Strain due to stiffening effect of concrete ε2 = 0.0008592 mm
Average strain at the level Considered εm = 0.0007674 mm
Crack Width

Crack width, 'w' = 0.131 mm


Hence safe against crack width

Page 30 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

(0.131 < 0.2)

Horizontal Reinforcement (Water Face)(From 1.8m to 3.2m Lvl) :

STAAD Results:

Service Moment @ bottom of wall = 35.302 kN-m


(Group ID G4 , Plate ID 4605, Load case 101)
Load factor = 1.5
Factored Moment = 52.953 kN-m

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 0
Spacing = 125 mm 200
Cover = 40.00 mm
Depth of the section = 240.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 188 mm

Ast Required =

= 2
Ast Required for Moment 682.99 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 120 mm
(IF(240>500,250,240/2))

Page 31 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Minimum Reinforcement = 420.000 mm


2

= 2
Ast Provided 904.781 mm

(1000/125*0.7854*12*12) +(1000/200*0.7854*0*0)
Hence Provided Ast is ok

Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 240 mm
2
Area of tension reinforcement, 'Ast' = 904.780 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 125 mm


Cover to tension reinforcement = 40.00 mm
Applied Moment at service condition, 'M' = 35.302 kN-m

Effective depth, 'd' = 188 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.48 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 56.68 mm
Effective Cover, 'dc' = 46 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 71.60 mm

Lever arm 'Z' = 169.11 mm


(188-(56.681/3))
2
Steel Stress, 'fs' = 230.73 N/mm

(((35.302*10^6)/169.11)/904.78)
2
Concrete stress 'fc' = 7.37 N/mm

(2*35.302*10^6)/(1000*56.681*169.11)

Page 32 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Distance 'a' = 240 mm


Strain Es in steel for the stress of = 0.00115365 mm
(230.73/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0016105 mm
(((240-56.681)/(188-56.681))*0.00115365)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 240 mm


Strain due to stiffening effect of concrete ε2 = 0.0004714 mm
Average strain at the level Considered εm = 0.0011391 mm
Crack Width

Crack width, 'w' = 0.182 mm


Hence safe against crack width

(0.182 < 0.2)

Horizontal Reinforcement (Water Face)(From 3.2m to 4m Lvl) :

STAAD Results:

Page 33 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Service Moment @ bottom of wall = 39.976 kN-m


(Group ID G6, Plate ID 4781, Load case 101)
Load factor = 1.5
Factored Moment = 59.964 kN-m

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 0
Spacing = 100 mm 200
Cover = 40.00 mm
Depth of the section = 220.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 168 mm

Ast Required =

= 2
Ast Required for Moment 887.57 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 110 mm
(IF(220>500,250,220/2))
Minimum Reinforcement = 385.000 mm
2

= 2
Ast Provided 1130.976 mm

(1000/100*0.7854*12*12) +(1000/200*0.7854*0*0)
Hence Provided Ast is ok

Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 220 mm
2
Area of tension reinforcement, 'Ast' = 1130.980 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 100 mm


Cover to tension reinforcement = 40.00 mm
Applied Moment at service condition, 'M' = 39.976 kN-m

Page 34 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Effective depth, 'd' = 168 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.67 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 0.00 mm
Effective Cover, 'dc' = 46 mm
acr (SQRT((s/2)2+dc2)-(db/2) = 61.94 mm

Lever arm 'Z' = 168.00 mm


(168-(0/3))
2
Steel Stress, 'fs' = 210.39 N/mm

(((39.976*10^6)/168)/1130.98)
Concrete stress 'fc' = #DIV/0! N/mm2

(2*39.976*10^6)/(1000*0*168)
Distance 'a' = 220 mm
Strain Es in steel for the stress of = 0.00105195 mm
(210.39/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0013776 mm
(((220-0)/(168-0))*0.00105195)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 220 mm


Strain due to stiffening effect of concrete ε2 = 0.0004246 mm
Average strain at the level Considered εm = 0.0009530 mm
Crack Width

Crack width, 'w' = 0.148 mm


Hence safe against crack width

(0.148 < 0.2)

Page 35 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Horizontal Reinforcement (Water Face)(From 4m to 6.1m Lvl) :

STAAD Results:

Service Moment @ bottom of wall = 53.436 kN-m


(Group ID G5, Plate ID 11092, Load case 101)
Load factor = 1.5
Factored Moment = 80.154 kN-m

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 16 mm 0
Spacing = 100 mm 200
Cover = 40.00 mm
Depth of the section = 200.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 146 mm

Ast Required =

= 2
Ast Required for Moment 1475.04 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 100 mm
(IF(200>500,250,200/2))
Minimum Reinforcement = 350.000 mm
2

= 2
Ast Provided 2010.624 mm

Page 36 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

(1000/100*0.7854*16*16) +(1000/200*0.7854*0*0)
Hence Provided Ast is ok

Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 200 mm
2
Area of tension reinforcement, 'Ast' = 2010.620 mm
Bar diameter, 'db' = 16 mm

Maximum bar spacing, 'S' = 100 mm


Cover to tension reinforcement = 40.00 mm
Applied Moment at service condition, 'M' = 53.436 kN-m

Effective depth, 'd' = 146 mm


Percentage of Reinforcement( Pt =Ast/bd) = 1.38 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 0.00 mm
Effective Cover, 'dc' = 48 mm
acr (SQRT((s/2)2+dc2)-(db/2) = 61.31 mm

Lever arm 'Z' = 146.00 mm


(146-(0/3))
2
Steel Stress, 'fs' = 182.03 N/mm

(((53.436*10^6)/146)/2010.62)
Concrete stress 'fc' = #DIV/0! N/mm2

(2*53.436*10^6)/(1000*0*146)
Distance 'a' = 200 mm
Strain Es in steel for the stress of = 0.00091015 mm

Page 37 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

(182.03/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0012468 mm
(((200-0)/(146-0))*0.00091015)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 200 mm


Strain due to stiffening effect of concrete ε2 = 0.0002271 mm
Average strain at the level Considered εm = 0.0010197 mm
Crack Width

Crack width, 'w' = 0.155 mm


Hence safe against crack width

(0.155 < 0.2)

Case 2 Vertical Reinforcement (Soil Face)(From 1.800m to 3.2m Lvl) :

Service Moment @ bottom of wall = 14.455 kN-m


(Group ID G4, Plate ID 9855, Load case 102)
Load factor = 1.5
Factored Moment = 21.6825 kN-m

Page 38 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 16
Spacing = 180 mm 180
Cover = 50.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 244 mm

Ast Required =

= 2
Ast Required for Moment 137.3 mm

Minimum Reinforcement = 0.25 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))
Minimum Reinforcement = 375.000 mm
2

= 2
Ast Provided 1745.333 mm

(1000/180*0.7854*12*12) +(1000/180*0.7854*16*16)
Hence Provided Ast is ok
Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 1745.330 mm
Bar diameter, 'db' = 14 mm

Maximum bar spacing, 'S' = 180 mm


Cover to tension reinforcement = 50.00 mm
Applied Moment at service condition, 'M' = 0 kN-m

Page 39 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Effective depth, 'd' = 244 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.72 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 86.28 mm
Effective Cover, 'dc' = 57 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 99.53 mm

Lever arm 'Z' = 215.24 mm


(244-(86.276/3))
2
Steel Stress, 'fs' = 0 N/mm

(((0*10^6)/215.24)/1745.33)
2
Concrete stress 'fc' = 0 N/mm

(2*0*10^6)/(1000*86.276*215.24)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00000000 mm
(0/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0000000 mm
(((300-86.276)/(244-86.276))*0)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0002766 mm
Average strain at the level Considered εm = -0.0002766 mm
Crack Width

Crack width, 'w' = -0.056 mm


Hence safe against crack width

(-0.056<0.2)

Page 40 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Case 2 Vertical Reinforcement (Soil Face)(From 3.200m to 4m Lvl) :

STAAD Results:

Service Moment @ bottom of wall = 2.759 kN-m


(Group ID G6, Plate ID 11254, Load case 102)
Load factor = 1.5
Factored Moment = 4.1385 kN-m
Reinforcement = Dia 1 + Dia 2
Rebar diameter = 12 mm 0
Spacing = 180 mm 180
Cover = 50.00 mm
Depth of the section = 230.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 174 mm

Ast Required =

= 2
Ast Required for Moment 54.93 mm

Minimum Reinforcement = 0.24 %


Depth of surface zone = 115 mm
(IF(230>500,250,230/2))
Minimum Reinforcement = 276.000 mm
2

= 2
Ast Provided 628.320 mm

(1000/180*0.7854*12*12) +(1000/180*0.7854*0*0)
Hence Provided Ast is ok
Check for Crack width

Page 41 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump
2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 230 mm
2
Area of tension reinforcement, 'Ast' = 628.320 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 180 mm


Cover to tension reinforcement = 50.00 mm
Applied Moment at service condition, 'M' = 2.759 kN-m

Effective depth, 'd' = 174 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.36 %

Neutral axis depth, 'X' bX2/2 = mAst(d-X) = 46.54 mm


Effective Cover, 'dc' = 56 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 100.00 mm

Lever arm 'Z' = 158.49 mm


(174-(46.536/3))
2
Steel Stress, 'fs' = 27.71 N/mm

(((2.759*10^6)/158.49)/628.32)
2
Concrete stress 'fc' = 0.75 N/mm

(2*2.759*10^6)/(1000*46.536*158.49)
Distance 'a' = 230 mm
Strain Es in steel for the stress of = 0.00013855 mm
(27.71/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0001994 mm
(((230-46.536)/(174-46.536))*0.00013855)
Strain due to stiffening effect of concrete ε2

Page 42 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

For a limiting design surface crack width of 0.2mm

a' distance = 230 mm


Strain due to stiffening effect of concrete ε2 = 0.0007005 mm
Average strain at the level Considered εm = -0.0005011 mm
Crack Width

Crack width, 'w' = -0.097 mm


Hence safe against crack width

(-0.097<0.2)

Case 2 Vertical Reinforcement (Soil Face)(From 4.00m to 6.1m Lvl) :

STAAD Results:

Service Moment @ bottom of wall = 3.867 kN-m


(Group ID G5 , Plate ID 8980, Load case 102)
Load factor = 1.5
Factored Moment = 5.8005 kN-m
Reinforcement = Dia 1 + Dia 2
Rebar diameter = 10 mm 0
Spacing = 180 mm 180
Cover = 50.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 245 mm

Page 43 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Ast Required =

= 2
Ast Required for Moment 54.6 mm

Minimum Reinforcement = 0.24 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))
Minimum Reinforcement = 360.000 mm
2

= 2
Ast Provided 436.333 mm

(1000/180*0.7854*10*10) +(1000/180*0.7854*0*0)
Hence Provided Ast is ok
Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 436.330 mm
Bar diameter, 'db' = 10 mm

Maximum bar spacing, 'S' = 180 mm


Cover to tension reinforcement = 50.00 mm
Applied Moment at service condition, 'M' = 3.867 kN-m

Effective depth, 'd' = 245 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.18 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 48.19 mm
Effective Cover, 'dc' = 55 mm
acr (SQRT((s/2)2+dc2)-(db/2) = 100.48 mm

Lever arm 'Z' = 228.94 mm

Page 44 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

(245-(48.188/3))
2
Steel Stress, 'fs' = 38.71 N/mm

(((3.867*10^6)/228.94)/436.33)
2
Concrete stress 'fc' = 0.7 N/mm

(2*3.867*10^6)/(1000*48.188*228.94)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00019355 mm
(38.71/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0002476 mm
(((300-48.188)/(245-48.188))*0.00019355)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0012307 mm
Average strain at the level Considered εm = -0.0009831 mm
Crack Width

Crack width, 'w' = -0.212 mm


Hence safe against crack width

(-0.212<0.2)

Horizontal Reinforcement (Soil Face)(From 1.8m to 3.2m Lvl) :

STAAD Results:

Page 45 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Service Moment @ bottom of wall = 8.107 kN-m


(Group ID G4, Plate ID 3402, Load case 102)
Load factor = 1.5
Factored Moment = 12.1605 kN-m

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 0
Spacing = 125 mm 200
Cover = 40.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 254 mm

Ast Required =

= 2
Ast Required for Moment 110.76 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))
Minimum Reinforcement = 525.000 mm
2

= 2
Ast Provided 904.781 mm

(1000/125*0.7854*12*12) +(1000/200*0.7854*0*0)
Hence Provided Ast is ok

Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 904.780 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 125 mm


Cover to tension reinforcement = 40.00 mm
Applied Moment at service condition, 'M' = 8.107 kN-m

Page 46 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Effective depth, 'd' = 254 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.36 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 67.54 mm
Effective Cover, 'dc' = 46 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 71.60 mm

Lever arm 'Z' = 231.49 mm


(254-(67.541/3))
2
Steel Stress, 'fs' = 38.71 N/mm

(((8.107*10^6)/231.49)/904.78)
2
Concrete stress 'fc' = 1.04 N/mm

(2*8.107*10^6)/(1000*67.541*231.49)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00019355 mm
(38.71/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0002413 mm
(((300-67.541)/(254-67.541))*0.00019355)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0005338 mm
Average strain at the level Considered εm = -0.0002925 mm
Crack Width

Crack width, 'w' = -0.049 mm


Hence safe against crack width

(-0.049 < 0.2)

Page 47 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Horizontal Reinforcement (Soil Face)(From 3.2m to 4m Lvl) :


STAAD Results:

Service Moment @ bottom of wall = 7.235 kN-m


(Group ID G6,, Plate ID 5618, Load case 102)
Load factor = 1.5
Factored Moment = 10.8525 kN-m

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 0
Spacing = 100 mm 200
Cover = 40.00 mm
Depth of the section = 210.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 164 mm

Ast Required =

= 2
Ast Required for Moment 154.2 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 105 mm
(IF(210>500,250,210/2))
Minimum Reinforcement = 367.500 mm
2

= 2
Ast Provided 1130.976 mm

(1000/100*0.7854*12*12) +(1000/200*0.7854*0*0)
Hence Provided Ast is ok
Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2

Page 48 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Modulus Elasticity of Steel Es = 200000 N/mm2


Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 210 mm
2
Area of tension reinforcement, 'Ast' = 1130.980 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 100 mm


Cover to tension reinforcement = 40.00 mm
Applied Moment at service condition, 'M' = 7.235 kN-m

Effective depth, 'd' = 164 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.69 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 0.00 mm
Effective Cover, 'dc' = 46 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 61.94 mm

Lever arm 'Z' = 164.00 mm


(164-(0/3))
2
Steel Stress, 'fs' = 39.01 N/mm

(((7.235*10^6)/164)/1130.98)
Concrete stress 'fc' = #DIV/0! N/mm2

(2*7.235*10^6)/(1000*0*164)
Distance 'a' = 210 mm
Strain Es in steel for the stress of = 0.00019505 mm
(39.01/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0002498 mm
(((210-0)/(164-0))*0.00019505)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 210 mm


Strain due to stiffening effect of concrete ε2 = 0.0003963 mm
Average strain at the level Considered εm = -0.0001465 mm

Page 49 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Crack Width

Crack width, 'w' = -0.023 mm


Hence safe against crack width

(-0.023 < 0.2)


Horizontal Reinforcement (Soil Face)(From 4m to 6.1m Lvl) :
STAAD Results:

Service Moment @ bottom of wall = 2.732 kN-m


(Group ID G5, Plate ID 5135, Load case 102)
Load factor = 1.5
Factored Moment = 4.098 kN-m

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 16 mm 0
Spacing = 100 mm 200
Cover = 40.00 mm
Depth of the section = 200.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 152 mm

Ast Required =

= 2
Ast Required for Moment 62.35 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 100 mm
(IF(200>500,250,200/2))
Minimum Reinforcement = 350.000 mm
2

= 2
Ast Provided 2010.624 mm

Page 50 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

(1000/100*0.7854*16*16) +(1000/200*0.7854*0*0)
Hence Provided Ast is ok

Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 200 mm
2
Area of tension reinforcement, 'Ast' = 2010.620 mm
Bar diameter, 'db' = 16 mm

Maximum bar spacing, 'S' = 100 mm


Cover to tension reinforcement = 40.00 mm
Applied Moment at service condition, 'M' = 2.732 kN-m

Effective depth, 'd' = 152 mm


Percentage of Reinforcement( Pt =Ast/bd) = 1.32 %

Neutral axis depth, 'X' bX2/2 = mAst(d-X) = 0.00 mm


Effective Cover, 'dc' = 48 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 61.31 mm

Lever arm 'Z' = 152.00 mm


(152-(0/3))
2
Steel Stress, 'fs' = 8.94 N/mm

(((2.732*10^6)/152)/2010.62)
Concrete stress 'fc' = #DIV/0! N/mm2

Page 51 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

(2*2.732*10^6)/(1000*0*152)
Distance 'a' = 200 mm
Strain Es in steel for the stress of = 0.00004470 mm
(8.94/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0000588 mm
(((200-0)/(152-0))*0.0000447)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 200 mm


Strain due to stiffening effect of concrete ε2 = 0.0002181 mm
Average strain at the level Considered εm = -0.0001593 mm
Crack Width

Crack width, 'w' = -0.024 mm


Hence safe against crack width

(-0.024 < 0.2)

Check for shear for 300 thk wall

Unfactored Shear stress = 0.572 N/mm


2

Factored Shear stress = 0.858 N/mm


2

Percentage of Reinforcement = 0.69 %


(100*1745.33333333333/1000/254)
Design shear strength = 0.6 N/mm
2

Enhanced shear strength = 1.2 N/mm


2

(as per Clause 40.5 IS 456-2000)


Hence safe against shear
(1.2 > 0.858)

Page 52 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

6.0 DESIGN OF OUTER WALL-(WALL-3)

Structural Data:

Unit weight of soil = 3


17 kN/m (As per soil report)
Unit weight of liquid = 10.1 kN/m
3

Unit Weight of Concrete = 25 kN/m


3

Compressive Strength of concrete = M35 N/mm


2

Yield strength of steel = 500 N/mm


2

Modulus of elasticity of steel = 200000 N/mm


2

Depth of the section = 0.3 m


Breadth of the section = 1m
Cover (Water face) = 40 mm
Cover (Soil face) = 50 mm

1) Design of Vertical wall (Water face):

Case 1 Vertical Reinforcement (Water Face)(From 1.800m to 3.200m ):


STAAD Results:

Service Moment @ bottom of wall = 50.053 kN-m


(Group ID G8 , Plate ID 2107, Load case 101)
Shear stress @ bottom of wall = 0.255 N/mm
2

(Group ID G8 , Plate ID 2107, Load case 101)


Load factor = 1.5

Page 53 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Factored Moment = 75.08 kN-m


Factored Shear stress = 0.3825 N/mm
2

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 12
Spacing = 200 mm 200
Cover = 40.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 254 mm

Ast Required =

= 2
Ast Required for Moment 707.73 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))
Minimum Reinforcement = 525.000 mm
2

= 2
Ast Provided 1130.976 mm

(1000/200*0.7854*12*12) +(1000/200*0.7854*12*12)
Hence Provided Ast is ok

Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 1130.980 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 100 mm


Cover to tension reinforcement = 40.00 mm
Applied Moment at service condition, 'M' = 50.053 kN-m

Page 54 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Effective depth, 'd' = 254 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.45 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 74.16 mm
Effective Cover, 'dc' = 46 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 61.94 mm

Lever arm 'Z' = 229.28 mm


(254-(74.161/3))
2
Steel Stress, 'fs' = 193.02 N/mm

(((50.053*10^6)/229.28)/1130.98)
2
Concrete stress 'fc' = 5.89 N/mm

(2*50.053*10^6)/(1000*74.161*229.28)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00096510 mm
(193.02/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0012120 mm
(((300-74.161)/(254-74.161))*0.0009651)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0004179 mm
Average strain at the level Considered εm = 0.0007941 mm
Crack Width

Crack width, 'w' = 0.124 mm


Hence safe against crack width

(0.124 < 0.2)

Page 55 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Case 2 Vertical Reinforcement (Water Face)(From 3.200m to 4m Lvl) :

STAAD Results:

Service Moment @ bottom of wall = 15.29 kN-m


(Group ID G7, Plate ID 2431, Load case 101)
Shear stress @ bottom of wall = 0.15 N/mm
2

(Group ID G7 , Plate ID 2340, Load case 101)


Load factor = 1.5
Factored Moment = 22.94 kN-m
Factored Shear stress = 0.225 kN

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 0
Spacing = 200 mm 180
Cover = 40.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 254 mm

Ast Required =

= 2
Ast Required for Moment 210.12 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))

Page 56 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Minimum Reinforcement = 525.000 mm


2

= 2
Ast Provided 565.488 mm

(1000/200*0.7854*12*12) +(1000/180*0.7854*0*0)
Hence Provided Ast is ok

Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 565.490 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 200 mm


Cover to tension reinforcement = 40.00 mm
Applied Moment at service condition, 'M' = 15.29 kN-m

Effective depth, 'd' = 254 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.22 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 55.14 mm
Effective Cover, 'dc' = 46 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 104.07 mm

Lever arm 'Z' = 235.62 mm


(254-(55.143/3))
2
Steel Stress, 'fs' = 114.76 N/mm

(((15.29*10^6)/235.62)/565.49)
2
Concrete stress 'fc' = 2.35 N/mm

(2*15.29*10^6)/(1000*55.143*235.62)

Page 57 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Distance 'a' = 300 mm


Strain Es in steel for the stress of = 0.00057380 mm
(114.76/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0007065 mm
(((300-55.143)/(254-55.143))*0.0005738)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0008886 mm
Average strain at the level Considered εm = -0.0001821 mm
Crack Width

Crack width, 'w' = -0.037 mm


Hence safe against crack width

(-0.037 < 0.2)

Case 3 Vertical Reinforcement (Water Face)(From 400m to 6.1m Lvl) :

STAAD Results:

Page 58 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Service Moment @ bottom of wall = 14.643 kN-m


(Group ID G9 , Plate ID 2467, Load case 101)
Shear stress @ bottom of wall = 0.115 N/mm
2

(Group ID G9 _WALL3 Top , Plate ID 2484, Load case 101)


Load factor = 1.5
Factored Moment = 21.96 kN-m
Factored Shear stress = 0.1725 kN

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 0
Spacing = 200 mm 180
Cover = 40.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 254 mm

Ast Required =

= 2
Ast Required for Moment 201.04 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))
Minimum Reinforcement = 525.000 mm
2

= 2
Ast Provided 565.488 mm

(1000/200*0.7854*12*12) +(1000/180*0.7854*0*0)
Hence Provided Ast is ok
Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 565.490 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 200 mm


Cover to tension reinforcement = 40.00 mm

Page 59 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Applied Moment at service condition, 'M' = 14.643 kN-m

Effective depth, 'd' = 254 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.22 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 55.14 mm
Effective Cover, 'dc' = 46 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 104.07 mm

Lever arm 'Z' = 235.62 mm


(254-(55.143/3))
2
Steel Stress, 'fs' = 109.9 N/mm

(((14.643*10^6)/235.62)/565.49)
2
Concrete stress 'fc' = 2.25 N/mm

(2*14.643*10^6)/(1000*55.143*235.62)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00054950 mm
(109.9/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0006766 mm
(((300-55.143)/(254-55.143))*0.0005495)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0008886 mm
Average strain at the level Considered εm = -0.0002120 mm
Crack Width

Crack width, 'w' = -0.043 mm


Hence safe against crack width

Page 60 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

(-0.043 < 0.2)

Horizontal Reinforcement (Water Face)(From 1.8m to 3.2m Lvl) :

STAAD Results:

Service Moment @ bottom of wall = 24.306 kN-m


(Group ID G8, Plate ID 2269, Load case 101)
Load factor = 1.5
Factored Moment = 36.459 kN-m

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 0
Spacing = 200 mm 200
Cover = 40.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 248 mm

Ast Required =

= 2
Ast Required for Moment 344.83 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))

Page 61 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Minimum Reinforcement = 525.000 mm


2

= 2
Ast Provided 565.488 mm

(1000/200*0.7854*12*12) +(1000/200*0.7854*0*0)
Hence Provided Ast is ok

Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 565.490 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 200 mm


Cover to tension reinforcement = 40.00 mm
Applied Moment at service condition, 'M' = 24.306 kN-m

Effective depth, 'd' = 248 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.23 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 54.41 mm
Effective Cover, 'dc' = 46 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 104.07 mm

Lever arm 'Z' = 229.86 mm


(248-(54.408/3))
2
Steel Stress, 'fs' = 186.99 N/mm

(((24.306*10^6)/229.86)/565.49)
2
Concrete stress 'fc' = 3.89 N/mm

(2*24.306*10^6)/(1000*54.408*229.86)

Page 62 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Distance 'a' = 300 mm


Strain Es in steel for the stress of = 0.00093495 mm
(186.99/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0011861 mm
(((300-54.408)/(248-54.408))*0.00093495)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0009183 mm
Average strain at the level Considered εm = 0.0002678 mm
Crack Width

Crack width, 'w' = 0.055 mm


Hence safe against crack width

(0.055 < 0.2)

Horizontal Reinforcement (Water Face)(From 3.2m to 4m Lvl) :

STAAD Results:

Page 63 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Service Moment @ bottom of wall = 27.477 kN-m


(Group ID 7, Plate ID 2413, Load case 101)
Load factor = 1.5
Factored Moment = 41.2155 kN-m

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 0
Spacing = 175 mm 200
Cover = 40.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 248 mm

Ast Required =

= 2
Ast Required for Moment 390.88 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))
Minimum Reinforcement = 525.000 mm
2

= 2
Ast Provided 646.272 mm

(1000/175*0.7854*12*12) +(1000/200*0.7854*0*0)
Hence Provided Ast is ok

Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 646.270 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 175 mm


Cover to tension reinforcement = 40.00 mm
Applied Moment at service condition, 'M' = 27.477 kN-m

Page 64 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Effective depth, 'd' = 248 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.26 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 0.00 mm
Effective Cover, 'dc' = 46 mm
acr (SQRT((s/2)2+dc2)-(db/2) = 92.85 mm

Lever arm 'Z' = 248.00 mm


(248-(0/3))
2
Steel Stress, 'fs' = 171.44 N/mm

(((27.477*10^6)/248)/646.27)
Concrete stress 'fc' = #DIV/0! N/mm2

(2*27.477*10^6)/(1000*0*248)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00085720 mm
(171.44/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0010369 mm
(((300-0)/(248-0))*0.0008572)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0009359 mm
Average strain at the level Considered εm = 0.0001010 mm
Crack Width

Crack width, 'w' = 0.021 mm


Hence safe against crack width

(0.021 < 0.2)

Page 65 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Horizontal Reinforcement (Water Face)(From 4m to 6.1m Lvl) :

STAAD Results:

Service Moment @ bottom of wall = 40.423 kN-m


(Group ID G9 , Plate ID 8928, Load case 101)
Load factor = 1.5
Factored Moment = 60.6345 kN-m

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 0
Spacing = 150 mm 200
Cover = 40.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 248 mm

Ast Required =

= 2
Ast Required for Moment 581.57 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))
Minimum Reinforcement = 525.000 mm
2

= 2
Ast Provided 753.984 mm

Page 66 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

(1000/150*0.7854*12*12) +(1000/200*0.7854*0*0)
Hence Provided Ast is ok

Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 753.980 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 150 mm


Cover to tension reinforcement = 40.00 mm
Applied Moment at service condition, 'M' = 40.423 kN-m

Effective depth, 'd' = 248 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.3 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 0.00 mm
Effective Cover, 'dc' = 46 mm
acr (SQRT((s/2)2+dc2)-(db/2) = 81.98 mm

Lever arm 'Z' = 248.00 mm


(248-(0/3))
2
Steel Stress, 'fs' = 216.18 N/mm

(((40.423*10^6)/248)/753.98)
Concrete stress 'fc' = #DIV/0! N/mm2

(2*40.423*10^6)/(1000*0*248)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00108090 mm

Page 67 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

(216.18/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0013075 mm
(((300-0)/(248-0))*0.0010809)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0008022 mm
Average strain at the level Considered εm = 0.0005053 mm
Crack Width

Crack width, 'w' = 0.097 mm


Hence safe against crack width

(0.097 < 0.2)

Page 68 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

6.0 DESIGN OF OUTER WALL-(WALL-4 )

Structural Data:

Unit weight of soil = 3


17 kN/m (As per soil report)
Unit weight of liquid = 10.1 kN/m
3

Unit Weight of Concrete = 25 kN/m


3

Compressive Strength of concrete = M35 N/mm


2

Yield strength of steel = 500 N/mm


2

Modulus of elasticity of steel = 200000 N/mm


2

Depth of the section = 0.3 m


Breadth of the section = 1m
Cover (Water face) = 40 mm
Cover (Soil face) = 50 mm

1) Design of Vertical wall (Water face):

Case 1 Vertical Reinforcement (Water Face)(From 1.800m to 3.200m ):


STAAD Results:

Service Moment @ bottom of wall = 38.849 kN-m


(Group ID G12 _, Plate ID 11635, Load case 101)
Shear stress @ bottom of wall = 0.572 N/mm
2

(Group ID G12 , Plate ID 11635, Load case 101)


Load factor = 1.5

Page 69 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Factored Moment = 58.27 kN-m


Factored Shear stress = 0.858 N/mm
2

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 12
Spacing = 200 mm 200
Cover = 40.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 254 mm

Ast Required =

= 2
Ast Required for Moment 544.06 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))
Minimum Reinforcement = 525.000 mm
2

= 2
Ast Provided 1130.976 mm

(1000/200*0.7854*12*12) +(1000/200*0.7854*12*12)
Hence Provided Ast is ok

Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 1130.980 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 100 mm


Cover to tension reinforcement = 40.00 mm
Applied Moment at service condition, 'M' = 38.849 kN-m

Page 70 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Effective depth, 'd' = 254 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.45 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 74.16 mm
Effective Cover, 'dc' = 46 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 61.94 mm

Lever arm 'Z' = 229.28 mm


(254-(74.161/3))
2
Steel Stress, 'fs' = 149.82 N/mm

(((38.849*10^6)/229.28)/1130.98)
2
Concrete stress 'fc' = 4.57 N/mm

(2*38.849*10^6)/(1000*74.161*229.28)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00074910 mm
(149.82/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0009407 mm
(((300-74.161)/(254-74.161))*0.0007491)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0004179 mm
Average strain at the level Considered εm = 0.0005228 mm
Crack Width

Crack width, 'w' = 0.081 mm


Hence safe against crack width

(0.081 < 0.2)

Page 71 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Case 2 Vertical Reinforcement (Water Face)(From 3.200m to 4m Lvl) :

STAAD Results:

Service Moment @ bottom of wall = 8.527 kN-m


(Group ID G11, Plate ID 3744, Load case 101)
Shear stress @ bottom of wall = 0.021 N/mm
2

(Group ID G11 , Plate ID 11739, Load case 101)


Load factor = 1.5
Factored Moment = 12.79 kN-m
Factored Shear stress = 0.0315 kN

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 0
Spacing = 200 mm 180
Cover = 40.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 254 mm

Ast Required =

= 2
Ast Required for Moment 116.53 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))

Page 72 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Minimum Reinforcement = 525.000 mm


2

= 2
Ast Provided 565.488 mm

(1000/200*0.7854*12*12) +(1000/180*0.7854*0*0)
Hence Provided Ast is ok

Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 565.490 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 200 mm


Cover to tension reinforcement = 40.00 mm
Applied Moment at service condition, 'M' = 8.527 kN-m

Effective depth, 'd' = 254 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.22 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 55.14 mm
Effective Cover, 'dc' = 46 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 104.07 mm

Lever arm 'Z' = 235.62 mm


(254-(55.143/3))
2
Steel Stress, 'fs' = 64 N/mm

(((8.527*10^6)/235.62)/565.49)
2
Concrete stress 'fc' = 1.31 N/mm

(2*8.527*10^6)/(1000*55.143*235.62)

Page 73 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Distance 'a' = 300 mm


Strain Es in steel for the stress of = 0.00032000 mm
(64/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0003940 mm
(((300-55.143)/(254-55.143))*0.00032)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0008886 mm
Average strain at the level Considered εm = -0.0004946 mm
Crack Width

Crack width, 'w' = -0.101 mm


Hence safe against crack width

(-0.101 < 0.2)

Case 3 Vertical Reinforcement (Water Face)(From 400m to 6.1m Lvl) :

STAAD Results:

Page 74 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Service Moment @ bottom of wall = 12.585 kN-m


(Group ID G10, Plate ID 8999, Load case 101)
Shear stress @ bottom of wall = 0.037 N/mm
2

(Group ID G10 , Plate ID 11875, Load case 101)


Load factor = 1.5
Factored Moment = 18.88 kN-m
Factored Shear stress = 0.0555 kN

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 0
Spacing = 200 mm 180
Cover = 40.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 254 mm

Ast Required =

= 2
Ast Required for Moment 172.56 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))
Minimum Reinforcement = 525.000 mm
2

= 2
Ast Provided 565.488 mm

(1000/200*0.7854*12*12) +(1000/180*0.7854*0*0)
Hence Provided Ast is ok
Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 565.490 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 200 mm


Cover to tension reinforcement = 40.00 mm

Page 75 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Applied Moment at service condition, 'M' = 12.585 kN-m

Effective depth, 'd' = 254 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.22 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 55.14 mm
Effective Cover, 'dc' = 46 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 104.07 mm

Lever arm 'Z' = 235.62 mm


(254-(55.143/3))
2
Steel Stress, 'fs' = 94.45 N/mm

(((12.585*10^6)/235.62)/565.49)
2
Concrete stress 'fc' = 1.94 N/mm

(2*12.585*10^6)/(1000*55.143*235.62)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00047225 mm
(94.45/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0005815 mm
(((300-55.143)/(254-55.143))*0.00047225)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0008886 mm
Average strain at the level Considered εm = -0.0003071 mm
Crack Width

Crack width, 'w' = -0.063 mm


Hence safe against crack width

Page 76 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

(-0.063 < 0.2)

Horizontal Reinforcement (Water Face)(From 1.8m to 3.2m Lvl) :

STAAD Results:

Service Moment @ bottom of wall = 15.213 kN-m


(Group ID G12 , Plate ID 11715, Load case 101)
Load factor = 1.5
Factored Moment = 22.8195 kN-m

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 0
Spacing = 200 mm 200
Cover = 40.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 248 mm

Ast Required =

= 2
Ast Required for Moment 214.18 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))

Page 77 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Minimum Reinforcement = 525.000 mm


2

= 2
Ast Provided 565.488 mm

(1000/200*0.7854*12*12) +(1000/200*0.7854*0*0)
Hence Provided Ast is ok

Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 565.490 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 200 mm


Cover to tension reinforcement = 40.00 mm
Applied Moment at service condition, 'M' = 15.213 kN-m

Effective depth, 'd' = 248 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.23 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 54.41 mm
Effective Cover, 'dc' = 46 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 104.07 mm

Lever arm 'Z' = 229.86 mm


(248-(54.408/3))
2
Steel Stress, 'fs' = 117.04 N/mm

(((15.213*10^6)/229.86)/565.49)
2
Concrete stress 'fc' = 2.43 N/mm

(2*15.213*10^6)/(1000*54.408*229.86)

Page 78 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Distance 'a' = 300 mm


Strain Es in steel for the stress of = 0.00058520 mm
(117.04/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0007424 mm
(((300-54.408)/(248-54.408))*0.0005852)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0009183 mm
Average strain at the level Considered εm = -0.0001759 mm
Crack Width

Crack width, 'w' = -0.036 mm


Hence safe against crack width

(-0.036 < 0.2)

Horizontal Reinforcement (Water Face)(From 3.2m to 4m Lvl) :

STAAD Results:

Page 79 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Service Moment @ bottom of wall = 19.195 kN-m


(Group ID G11, Plate ID 11763, Load case 101)
Load factor = 1.5
Factored Moment = 28.7925 kN-m

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 0
Spacing = 175 mm 200
Cover = 40.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 248 mm

Ast Required =

= 2
Ast Required for Moment 271.15 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))
Minimum Reinforcement = 525.000 mm
2

= 2
Ast Provided 646.272 mm

(1000/175*0.7854*12*12) +(1000/200*0.7854*0*0)
Hence Provided Ast is ok

Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 646.270 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 175 mm


Cover to tension reinforcement = 40.00 mm
Applied Moment at service condition, 'M' = 19.195 kN-m

Page 80 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Effective depth, 'd' = 248 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.26 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 0.00 mm
Effective Cover, 'dc' = 46 mm
acr (SQRT((s/2)2+dc2)-(db/2) = 92.85 mm

Lever arm 'Z' = 248.00 mm


(248-(0/3))
2
Steel Stress, 'fs' = 119.76 N/mm

(((19.195*10^6)/248)/646.27)
Concrete stress 'fc' = #DIV/0! N/mm2

(2*19.195*10^6)/(1000*0*248)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00059880 mm
(119.76/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0007244 mm
(((300-0)/(248-0))*0.0005988)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0009359 mm
Average strain at the level Considered εm = -0.0002115 mm
Crack Width

Crack width, 'w' = -0.044 mm


Hence safe against crack width

(-0.044 < 0.2)

Page 81 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Horizontal Reinforcement (Water Face)(From 4m to 6.1m Lvl) :

STAAD Results:

Service Moment @ bottom of wall = 19.892 kN-m


(Group ID G10 Plate ID 11827, Load case 101)
Load factor = 1.5
Factored Moment = 29.838 kN-m

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 0
Spacing = 150 mm 200
Cover = 40.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 248 mm

Ast Required =

= 2
Ast Required for Moment 281.16 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))
Minimum Reinforcement = 525.000 mm
2

= 2
Ast Provided 753.984 mm

Page 82 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

(1000/150*0.7854*12*12) +(1000/200*0.7854*0*0)
Hence Provided Ast is ok

Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 753.980 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 150 mm


Cover to tension reinforcement = 40.00 mm
Applied Moment at service condition, 'M' = 19.892 kN-m

Effective depth, 'd' = 248 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.3 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 0.00 mm
Effective Cover, 'dc' = 46 mm
acr (SQRT((s/2)2+dc2)-(db/2) = 81.98 mm

Lever arm 'Z' = 248.00 mm


(248-(0/3))
2
Steel Stress, 'fs' = 106.38 N/mm

(((19.892*10^6)/248)/753.98)
Concrete stress 'fc' = #DIV/0! N/mm2

(2*19.892*10^6)/(1000*0*248)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00053190 mm

Page 83 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

(106.38/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0006434 mm
(((300-0)/(248-0))*0.0005319)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0008022 mm
Average strain at the level Considered εm = -0.0001588 mm
Crack Width

Crack width, 'w' = -0.031 mm


Hence safe against crack width

(-0.031 < 0.2)


Case 1 Vertical Reinforcement (Soil Face) (From 1.800m to 3.200m) :

STAAD Results:

Service Moment @ bottom of wall = 8.884 kN-m


(Group ID G12, Plate ID 11635, Load case 102)
Load factor = 1.5
Factored Moment = 13.326 kN-m

Page 84 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 12
Spacing = 200 mm 200
Cover = 50.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 244 mm

Ast Required =

= 2
Ast Required for Moment 126.5 mm

Minimum Reinforcement = 0.25 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))
Minimum Reinforcement = 375.000 mm
2

= 2
Ast Provided 1130.976 mm

(1000/200*0.7854*12*12) +(1000/200*0.7854*12*12)
Hence Provided Ast is ok
Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 1130.980 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 100 mm


Cover to tension reinforcement = 50.00 mm
Applied Moment at service condition, 'M' = 8.884 kN-m

Page 85 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Effective depth, 'd' = 244 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.46 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 72.44 mm
Effective Cover, 'dc' = 56 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 69.07 mm

Lever arm 'Z' = 219.86 mm


(244-(72.435/3))
2
Steel Stress, 'fs' = 35.73 N/mm

(((8.884*10^6)/219.86)/1130.98)
2
Concrete stress 'fc' = 1.12 N/mm

(2*8.884*10^6)/(1000*72.435*219.86)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00017865 mm
(35.73/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0002370 mm
(((300-72.435)/(244-72.435))*0.00017865)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0004448 mm
Average strain at the level Considered εm = -0.0002078 mm
Crack Width

Crack width, 'w' = -0.037 mm


Hence safe against crack width

(-0.037<0.2)

Page 86 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Case 2 Vertical Reinforcement (Soil Face)(From 3.200m to 4m Lvl) :

STAAD Results:

Service Moment @ bottom of wall = 2.786 kN-m


(Group ID G11_, Plate ID 3671, Load case 102)
Load factor = 1.5
Factored Moment = 4.179 kN-m
Reinforcement = Dia 1 + Dia 2
Rebar diameter = 12 mm 0
Spacing = 200 mm 180
Cover = 50.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 244 mm

Ast Required =

= 2
Ast Required for Moment 39.47 mm

Minimum Reinforcement = 0.24 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))
Minimum Reinforcement = 360.000 mm
2

= 2
Ast Provided 565.488 mm

(1000/200*0.7854*12*12) +(1000/180*0.7854*0*0)
Hence Provided Ast is ok
Check for Crack width

Page 87 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump
2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 565.490 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 200 mm


Cover to tension reinforcement = 50.00 mm
Applied Moment at service condition, 'M' = 2.786 kN-m

Effective depth, 'd' = 244 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.23 %

Neutral axis depth, 'X' bX2/2 = mAst(d-X) = 53.91 mm


Effective Cover, 'dc' = 56 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 108.61 mm

Lever arm 'Z' = 226.03 mm


(244-(53.913/3))
2
Steel Stress, 'fs' = 21.8 N/mm

(((2.786*10^6)/226.03)/565.49)
2
Concrete stress 'fc' = 0.46 N/mm

(2*2.786*10^6)/(1000*53.913*226.03)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00010900 mm
(21.8/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0001411 mm
(((300-53.913)/(244-53.913))*0.000109)
Strain due to stiffening effect of concrete ε2

Page 88 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0009390 mm
Average strain at the level Considered εm = -0.0007979 mm
Crack Width

Crack width, 'w' = -0.176 mm


Hence safe against crack width

(-0.176<0.2)

Case 2 Vertical Reinforcement (Soil Face)(From 4.00m to 6.1m Lvl) :

STAAD Results:

Service Moment @ bottom of wall = 3.862 kN-m


(Group ID G10_, Plate ID 8980, Load case 102)
Load factor = 1.5
Factored Moment = 5.793 kN-m
Reinforcement = Dia 1 + Dia 2
Rebar diameter = 12 mm 0
Spacing = 200 mm 180
Cover = 50.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 244 mm

Page 89 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Ast Required =

= 2
Ast Required for Moment 54.76 mm

Minimum Reinforcement = 0.24 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))
Minimum Reinforcement = 360.000 mm
2

= 2
Ast Provided 565.488 mm

(1000/200*0.7854*12*12) +(1000/180*0.7854*0*0)
Hence Provided Ast is ok
Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 565.490 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 200 mm


Cover to tension reinforcement = 50.00 mm
Applied Moment at service condition, 'M' = 3.862 kN-m

Effective depth, 'd' = 244 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.23 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 53.91 mm
Effective Cover, 'dc' = 56 mm
acr (SQRT((s/2)2+dc2)-(db/2) = 108.61 mm

Lever arm 'Z' = 226.03 mm

Page 90 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

(244-(53.913/3))
2
Steel Stress, 'fs' = 30.22 N/mm

(((3.862*10^6)/226.03)/565.49)
2
Concrete stress 'fc' = 0.63 N/mm

(2*3.862*10^6)/(1000*53.913*226.03)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00015110 mm
(30.22/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0001956 mm
(((300-53.913)/(244-53.913))*0.0001511)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0009390 mm
Average strain at the level Considered εm = -0.0007434 mm
Crack Width

Crack width, 'w' = -0.164 mm


Hence safe against crack width

(-0.164<0.2)

Horizontal Reinforcement (Soil Face)(From 1.8m to 3.2m Lvl) :

STAAD Results:

Page 91 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Service Moment @ bottom of wall = 8.098 kN-m


(Group ID G12, Plate ID 3402, Load case 101)
Load factor = 1.5
Factored Moment = 12.147 kN-m

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 0
Spacing = 200 mm 200
Cover = 40.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 254 mm

Ast Required =

= 2
Ast Required for Moment 110.63 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))
Minimum Reinforcement = 525.000 mm
2

= 2
Ast Provided 565.488 mm

(1000/200*0.7854*12*12) +(1000/200*0.7854*0*0)
Hence Provided Ast is ok

Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 565.490 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 200 mm


Cover to tension reinforcement = 40.00 mm
Applied Moment at service condition, 'M' = 8.098 kN-m

Page 92 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Effective depth, 'd' = 254 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.22 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 55.14 mm
Effective Cover, 'dc' = 46 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 104.07 mm

Lever arm 'Z' = 235.62 mm


(254-(55.143/3))
2
Steel Stress, 'fs' = 60.78 N/mm

(((8.098*10^6)/235.62)/565.49)
2
Concrete stress 'fc' = 1.25 N/mm

(2*8.098*10^6)/(1000*55.143*235.62)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00030390 mm
(60.78/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0003742 mm
(((300-55.143)/(254-55.143))*0.0003039)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0008886 mm
Average strain at the level Considered εm = -0.0005144 mm
Crack Width

Crack width, 'w' = -0.105 mm


Hence safe against crack width

(-0.105 < 0.2)

Page 93 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Horizontal Reinforcement (Soil Face)(From 3.2m to 4m Lvl) :


STAAD Results:

Service Moment @ bottom of wall = 4.531 kN-m


(Group ID G11 _, Plate ID 11731, Load case 101)
Load factor = 1.5
Factored Moment = 4.55 kN-m

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 0
Spacing = 175 mm 200
Cover = 40.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 254 mm

Ast Required =

= 2
Ast Required for Moment 41.28 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))
Minimum Reinforcement = 525.000 mm
2

= 2
Ast Provided 646.272 mm

(1000/175*0.7854*12*12) +(1000/200*0.7854*0*0)
Hence Provided Ast is ok
Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2

Page 94 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Modulus Elasticity of Steel Es = 200000 N/mm2


Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 646.270 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 200 mm


Cover to tension reinforcement = 40.00 mm
Applied Moment at service condition, 'M' = 4.531 kN-m

Effective depth, 'd' = 254 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.25 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 0.00 mm
Effective Cover, 'dc' = 46 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 104.07 mm

Lever arm 'Z' = 254.00 mm


(254-(0/3))
2
Steel Stress, 'fs' = 27.6 N/mm

(((4.531*10^6)/254)/646.27)
Concrete stress 'fc' = #DIV/0! N/mm2

(2*4.531*10^6)/(1000*0*254)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00013800 mm
(27.6/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0001630 mm
(((300-0)/(254-0))*0.000138)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0009138 mm
Average strain at the level Considered εm = -0.0007508 mm

Page 95 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Crack Width

Crack width, 'w' = -0.164 mm


Hence safe against crack width

(-0.164 < 0.2)


Horizontal Reinforcement (Soil Face)(From 4m to 6.1m Lvl) :
STAAD Results:

Service Moment @ bottom of wall = 2.7 kN-m


(Group ID G10 Plate ID 11906, Load case 101)
Load factor = 1.5
Factored Moment = 4.05 kN-m

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 0
Spacing = 150 mm 200
Cover = 40.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 254 mm

Ast Required =

= 2
Ast Required for Moment 36.73 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))
Minimum Reinforcement = 525.000 mm
2

= 2
Ast Provided 753.984 mm

Page 96 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

(1000/150*0.7854*12*12) +(1000/200*0.7854*0*0)
Hence Provided Ast is ok

Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 753.980 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 200 mm


Cover to tension reinforcement = 40.00 mm
Applied Moment at service condition, 'M' = 2.7 kN-m

Effective depth, 'd' = 254 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.3 %

Neutral axis depth, 'X' bX2/2 = mAst(d-X) = 0.00 mm


Effective Cover, 'dc' = 46 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 104.07 mm

Lever arm 'Z' = 254.00 mm


(254-(0/3))
2
Steel Stress, 'fs' = 14.1 N/mm

(((2.7*10^6)/254)/753.98)
Concrete stress 'fc' = #DIV/0! N/mm2

Page 97 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

(2*2.7*10^6)/(1000*0*254)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00007050 mm
(14.1/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0000833 mm
(((300-0)/(254-0))*0.0000705)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0007832 mm
Average strain at the level Considered εm = -0.0006999 mm
Crack Width

Crack width, 'w' = -0.153 mm


Hence safe against crack width

(-0.153 < 0.2)

Check for shear for 300 thk wall

Unfactored Shear stress = 0.572 N/mm


2

Factored Shear stress = 0.858 N/mm


2

Percentage of Reinforcement = 0.45 %


(100*1130.976/1000/254)
Design shear strength = 0.47 N/mm
2

Enhanced shear strength = 0.94 N/mm


2

(as per Clause 40.5 IS 456-2000)


Hence safe against shear
(0.94 > 0.858)

Page 98 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved Rev


19-EPE-CMWSSB-STP-120MLD-ESDSS-
Document Number
SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump.

8.0 DESIGN OF RAFT


(This reinforcement will be at inside the tank) - Group - RAFTINSIDE
Structural Data:

Unit weight of soil = 3


17 kN/m (As per soil report)
Unit weight of liquid = 10.1 kN/m
3

Unit Weight of Concrete = 25 kN/m


3

Compressive Strength of concrete = M35 N/mm


2

Yield strength of steel = 500 N/mm


2

Modulus of elasticity of steel = 200000 N/mm


2

Depth of the section = 0.3 m


Breadth of the section = 1m
Cover (Water face) = 50 mm
Cover (Soil face) = 50 mm

1) Design of Raft (300 Thk)

Top Reinforcement Along X direction

STAAD Results:

Page 99 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved Rev


19-EPE-CMWSSB-STP-120MLD-ESDSS-
Document Number
SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump.

Service Moment @ face of wall = 46.967 kN-m


(Group ID G3, Plate ID 793, Load case 11) - Spring Support staad
Shear stress @ bottom of wall = 0.198 N/mm
2

(Group ID G3, Plate ID 7982, Load case 101)


Load factor = 1.5
Factored Moment = 70.45 kN-m
Factored Shear stress = 0.297 N/mm
2

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 0
Spacing = 125 mm 200
Cover = 50.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 244 mm

Ast Required =

= 2
Ast Required for Moment 691.81 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))
Minimum Reinforcement = 525.000 mm
2

= 2
Ast Provided 904.781 mm

(1000/125*0.7854*12*12) +(1000/200*0.7854*0*0)
Hence Provided Ast is ok
Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2

Page 100 of 124


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved Rev


19-EPE-CMWSSB-STP-120MLD-ESDSS-
Document Number
SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump.

Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 904.780 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 125 mm


Cover to tension reinforcement = 50.00 mm
Applied Moment at service condition, 'M' = 46.967 kN-m

Effective depth, 'd' = 244 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.37 %

Neutral axis depth, 'X' bX2/2 = mAst(d-X) = 65.99 mm


Effective Cover, 'dc' = 56 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 77.92 mm

Lever arm 'Z' = 222.00 mm


(244-(65.992/3))
2
Steel Stress, 'fs' = 233.83 N/mm

(((46.967*10^6)/222)/904.78)
2
Concrete stress 'fc' = 6.41 N/mm

(2*46.967*10^6)/(1000*65.992*222)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00116915 mm
(233.83/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0015370 mm

Page 101 of 124


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved Rev


19-EPE-CMWSSB-STP-120MLD-ESDSS-
Document Number
SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump.

(((300-65.992)/(244-65.992))*0.00116915)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0005667 mm
Average strain at the level Considered εm = 0.0009703 mm
Crack Width

Crack width, 'w' = 0.183 mm


Hence safe against crack width

(0.183 < 0.2)

Check for shear for 450 thk raft

Unfactored Shear stress = 0.198 N/mm


2

Factored Shear stress = 0.297 N/mm


2

Factored Shear stress for eff. depth = 0.24 N/mm


2

Percentage of Reinforcement = 0.37 %


(100*904.7808/1000/244)
Design shear strength = 0.42 N/mm
2

Enchanced Design shear strength = 0.84 N/mm


2

(as per Clause 40.5 IS 456-2000)


Hence safe against shear
(0.84 > 0.24)

Page 102 of 124


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved Rev


19-EPE-CMWSSB-STP-120MLD-ESDSS-
Document Number
SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump.

Top Reinforcement Along Y direction

STAAD Results:

Service Moment @ face of wall = 39.276 kN-m


(Group ID G3 Plate ID 1567, Load case 11) - Spring Support staad
Shear stress @ bottom of wall = 0.276 N/mm
2

(Group ID G3 Plate ID 7675, Load case 11) - Spring Support staad


Load factor = 1.5
Factored Moment = 58.91 kN-m
Factored Shear stress = 0.414 N/mm
2

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 0
Spacing = 150 mm 200
Cover = 50.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 244 mm

Page 103 of 124


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved Rev


19-EPE-CMWSSB-STP-120MLD-ESDSS-
Document Number
SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump.

Ast Required =

= 2
Ast Required for Moment 574.37 mm

Minimum Reinforcement = 0.35 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))
Minimum Reinforcement = 525.000 mm
2

= 2
Ast Provided 753.984 mm

(1000/150*0.7854*12*12) +(1000/200*0.7854*0*0)
Hence Provided Ast is ok
Check for Crack width
2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 753.980 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 150 mm


Cover to tension reinforcement = 50.00 mm
Applied Moment at service condition, 'M' = 39.276 kN-m

Page 104 of 124


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved Rev


19-EPE-CMWSSB-STP-120MLD-ESDSS-
Document Number
SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump.

Effective depth, 'd' = 244 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.31 %

Neutral axis depth, 'X' bX2/2 = mAst(d-X) = 61.07 mm


Effective Cover, 'dc' = 56 mm
2 2
acr (SQRT((s/2) +dc )-(db/2) = 87.60 mm

Lever arm 'Z' = 223.64 mm


(244-(61.07/3))
2
Steel Stress, 'fs' = 232.92 N/mm

(((39.276*10^6)/223.64)/753.98)
2
Concrete stress 'fc' = 5.75 N/mm

(2*39.276*10^6)/(1000*61.07*223.64)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00116460 mm
(232.92/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0015211 mm
(((300-61.07)/(244-61.07))*0.0011646)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0006898 mm
Average strain at the level Considered εm = 0.0008313 mm
Crack Width

Crack width, 'w' = 0.166 mm


Hence safe against crack width

(0.166 < 0.2)

Page 105 of 124


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved Rev


19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

8.0 DESIGN OF RAFT


(This reinforcement will be at cantilever porjection) - Group RAFTOUTSIDE
Structural Data:

Unit weight of soil = 3


17 kN/m (As per soil report)
Unit weight of liquid = 10.1 kN/m
3

Unit Weight of Concrete = 25 kN/m


3

Compressive Strength of concrete = M35 N/mm


2

Yield strength of steel = 500 N/mm


2

Modulus of elasticity of steel = 200000 N/mm


2

Depth of the section = 0.3 m


Breadth of the section = 1m
Cover (Water face) = 50 mm
Cover (Soil face) = 50 mm

1) Design of Raft (300 Thk)

Bottom Steel (Along cantilever direction)


STAAD Results:

Page 106 of 124


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved Rev


19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Service Moment @ face of wall = 25.915 kN-m


(Group ID G2, Plate ID 7668, Load case 101) - Spring Support staad
Shear stress @ bottom of wall = 0.276 N/mm
2

(Group ID G2, Plate ID 8163, Load case 101) - Spring Support staad
Load factor = 1.5
Factored Moment = 38.87 kN-m
Factored Shear stress = 0.414 N/mm
2

Reinforcement = Dia 1 + Dia 2


Rebar diameter = 12 mm 0
Spacing = 175 mm 250
Cover = 50.00 mm
Depth of the section = 300.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 244 mm

Ast Required =

= 2
Ast Required for Moment 374.45 mm

Minimum Reinforcement = 0.25 %


Depth of surface zone = 150 mm
(IF(300>500,250,300/2))
Minimum Reinforcement = 375.000 mm
2

= 2
Ast Provided 646.272 mm

(1000/175*0.7854*12*12) +(1000/250*0.7854*0*0)
Hence Provided Ast is ok

Check for Crack width

2
Characteristic cube strength of concrete, fck = M35 N/mm
Yield Strength of steel, fy = 500 N/mm2
Modulus Elasticity of concrete Ec= 5000xSQRT(fck) = 29580.39892 N/mm2
Modulus Elasticity of Steel Es = 200000 N/mm2
Page 107 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved Rev


19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Modulur Ratio, m, Es/Ec = 13.52

Breadth of Section, 'b' = 1000 mm


Depth of section, 'h' = 300 mm
2
Area of tension reinforcement, 'Ast' = 646.270 mm
Bar diameter, 'db' = 12 mm

Maximum bar spacing, 'S' = 175 mm


Cover to tension reinforcement = 50.00 mm
Applied Moment at service condition, 'M' = 25.915 kN-m

Effective depth, 'd' = 244 mm


Percentage of Reinforcement( Pt =Ast/bd) = 0.26 %
2
Neutral axis depth, 'X' bX /2 = mAst(d-X) = 57.14 mm
Effective Cover, 'dc' = 56 mm
acr (SQRT((s/2)2+dc2)-(db/2) = 97.89 mm

Lever arm 'Z' = 224.95 mm


(244-(57.143/3))
2
Steel Stress, 'fs' = 178.26 N/mm

(((25.915*10^6)/224.95)/646.27)
2
Concrete stress 'fc' = 4.03 N/mm

(2*25.915*10^6)/(1000*57.143*224.95)
Distance 'a' = 300 mm
Strain Es in steel for the stress of = 0.00089130 mm
(178.26/200000)
Strain at the level considered ε1 = (h-x)/(d-x)*εs
Strain at the level considered ε1 = 0.0011584 mm
Page 108 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved Rev


19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

(((300-57.143)/(244-57.143))*0.0008913)
Strain due to stiffening effect of concrete ε2

For a limiting design surface crack width of 0.2mm

a' distance = 300 mm


Strain due to stiffening effect of concrete ε2 = 0.0008140 mm
Average strain at the level Considered εm = 0.0003444 mm
Crack Width

Crack width, 'w' = 0.073 mm


Hence safe against crack width

(0.073 < 0.2)

Check for shear for 300 thk raft

Unfactored Shear stress = 0.276 N/mm


2

Factored Shear stress = 0.414 N/mm


2

Factored Shear stress for eff. depth = 0.34 N/mm


2

Percentage of Reinforcement = 0.26 %


(100*646.272/1000/244)
Design shear strength = 0.64 N/mm
2

Enchanced Design shear strength = 1.28 N/mm


2

(as per Clause 40.5 IS 456-2000)


Hence safe against shear
(1.28 > 0.34)

Page 109 of 124


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in Zone -
Project II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas including
Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved REV


19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

4. DESIGN OF RAFT SLAB

Panel reference:- Length - 11m x Breath - 9m


Grade of Concrete = M35
Grade of Steel Fe500
Cover to Main reinforcement = 50mm
Sizes of the panel L1 = 11.000 m
L2 = 9.000 m
Sizes of the panel L1 = 11.245 m
L2 = 9.244 m
Ratio ly/lx = 1.22
Thickness of the slab = 300 mm
Thickness of the slab = 300 mm

Finishing = 0.00 KN/m2


2
Water Load = 17.00 KN/m
Total Load = 9.50 KN/m2

Boundary condition Interior Panel

Shorter direction
Moment coefficients
Positive = 0.033
Negative = 0.044
Moment Values
Positive = 26.51
Negative = 35.442
% of Reinforcement (pt)
Positive = 0.142
Negative = 0.192
Area of Reinforcement (Ast)
Positive = 347.0
Negative = 469.6
Design Results along short span
Detailing for Bar dia (mm) Spacing req (mm)Spacing pro (mm)
Positive Steel 10 218 c/c 200 c/c
Negative Steel 12 240 c/c 125 c/c
Longer direction
Moment coefficients
Positive = 0.024
Negative = 0.032
Moment Values
Positive = 19.483

Page 110 of 124


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in Zone -
Project II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas including
Operation and Maintenance for ten years at Chennai.

Prepared Checked Approved REV


19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Negative = 25.977
% of Reinforcement (pt)
Positive = 0.113
Negative = 0.155
Area of Reinforcement (Ast)
Positive = 275.9
Negative = 378.4

Design Results along long span


Detailing for Bar dia (mm) Spacing req (mm)Spacing pro (mm)
Positive Steel 10 218 c/c 200 c/c
Negative Steel 12 295 c/c 150 c/c

Maximum allowable spacing = 735 mm


Distribution Reinforcement = Y10 at 200 c/c (Minimum steel)

Check for Deflection

Ast provided = 10 @ 200 c/c


Ultimate Moment M = 39.77 KNm
Effective depth d = 245 mm
Mu/bd2 = 0.6625

Modification factor = 0.55+(477-fs)/(120*(0.9+M/bd2)) <=2


fs = (2*fy*As req)/(3* As prov)
= 1.79
Allowable Deflection = 1.79*23 = 41.17 mm
Actual Deflection L/d = 37.731 mm SAFE
< 41
Check for Shear
Shear Vu = 80.121 kN
Tau v= Vu/bd = 0.33 N/mm^2
pt provided = 0.1602
Tau c = 0.3 N/mm^2
Enhanced Shear Strength = 0.6 N/mm^2
< 0.33 N/mm^2 SAFE

SLAB RESULT:
Provided slab thickness 300 mm

Top Reinforcement (Support)


Provide 12 mm dia reinforcement at 125 mm c/c along shorter direction as a main reinforcement
Provide 12 mm dia reinforcement at 150 mm c/c along longer direction as a main reinforcement

Page 111 of 124


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant
Project in Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from
Bio-Gas including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant
Title
Sump
DESIGN OF PLATFORM SLAB
CANTILEVER SLAB (Projected slab)
Compressive Strength of concrete = 35 N/mm2
Yield strength of steel = 500 N/mm2
Unit weight of water = 9.8 KN/m3
Cantilever slab =
Span of the slab, l = 0.5 m (Cantilever projection )
Thickness of the slab, D = 125 mm
Cover to reinforcement = 25 mm
Effective Depth of Slab at Midspan = 95 mm (125-25-10/2)
2
Total Load, w = 3.13 KN/m (125/1000*25)
Total load, (wd) = 3.13 KN/m2 (3.13)
2
Live load (Wl) = 5 KN/m
Total load = 8.13 KN/m2 (3.75+5)
Bending Moment at support = 1.524 KN-m/m
(1.5*8.13*0.5^2/2
REINFORCEMENT CALCULATION:

Tension Reinforcement
Rebar diameter = 10 mm 0
Spacing = 200 mm 200
Cover = 25.00 mm
Depth of the section = 125.00 mm
Breadth of the section = 1000.00 mm
Effective depth = 95 mm
Mu/bd2 = 0.169
For M35 and Fe500, percentage of reinforcement,
Percentage of reinforcement (pt) = 0.5*Fck/Fy*(1- (1-(Mu/bd2)*4.589/Fck)* 100
= 0.039 %
Ast = Pt/100*b*d
= 0.039/100*1000*1000
Ast Required = 37.05 mm2

2
Ast Required for Moment = 37.05 mm
Minimum Reinforcement = 0.3 %
Depth of surface zone = 62.5 mm
Page 112 of 124
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant
Project in Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from
Bio-Gas including Operation and Maintenance for ten years at Chennai.
Prepared Checked Approved Rev
19-EPE-CMWSSB-STP-120MLD-
Document Number
ESDSS-SDC-012 APS SVK JTP 0

Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant
Title
Sump
(IF(125>500,250,125/2))
Minimum Reinforcement = 187.500 mm
2

2
Ast Provided = 392.700 mm
(1000/200*0.7854*10*10) +(1000/200*0.7854*0*0)
Hence Provided Ast is ok
Provide Y10 at 200mm c/c as main reinforcement and Y8 at 200mm c/c as distribution reinforcement

Page 113 of 124


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage
Treatment Plant in Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with
Project
Power Generation from Bio-Gas including Operation and Maintenance for ten years at
Chennai.

19-EPE-CMWSSB-STP-120MLD- Prepared Checked Approved Rev


Document Number
ESDSS-SDC-012
APS SVK JTP 0
Structural Design Calculation of Excess sludge sump,Dilution Water Sump and
Title
Supernatant Sump

9.0 DESIGN OF MONORAIL COLUMN

Design Results of column C1

Provide is 8 Nos of 12 dia bar. Hence Safe

Page 114 of 124


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage
Treatment Plant in Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with
Project
Power Generation from Bio-Gas including Operation and Maintenance for ten years at
Chennai.

19-EPE-CMWSSB-STP-120MLD- Prepared Checked Approved Rev


Document Number
ESDSS-SDC-012
APS SVK JTP 0
Structural Design Calculation of Excess sludge sump,Dilution Water Sump and
Title

10.0 DESIGN OF MONORAIL BEAM

Design Results of Beam B1

Top Reinforcement = 2-Y16

Bottom Reinforcement = 2-Y16

Shear Reinforcement = Y8 @ 100C/C

Hence Safe

Page 115 of 124


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage
Treatment Plant in Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with
Project
Power Generation from Bio-Gas including Operation and Maintenance for ten years at
Chennai.

19-EPE-CMWSSB-STP-120MLD- Prepared Checked Approved Rev


Document Number
ESDSS-SDC-012
APS SVK JTP 0
Structural Design Calculation of Excess sludge sump,Dilution Water Sump and
Title
Supernatant Sump

DESIGN OF STAIRCASE BEAM

Design Results of beam B2

Top Reinforcement = 2-Y16

Bottom Reinforcement = 2-Y12

Shear Reinforcement = Y8 @ 100C/C

Page 116 of 124


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in Zone - II at
Project Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas including Operation
and Maintenance for ten years at Chennai.

19-EPE-CMWSSB-STP-120MLD- Prepared Checked Approved Rev


Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Capacity of Crane = 0.5 MT

Span of the Monorail girder = 5.5 m


(deducting bearing length 200 mm) = 5.5 m
Cantilever projection = 1m
Load Factor = 1.1
Maximun wheel load = 0.5 MT
Weight of rail = 10 Kg/m

Analysis of Wheel Load

5 kN

A B

2.75m 2.75m

Consider the case - One of the Wheel load acts at Mid point & other out of span

Maximum Moment
Wheel moment
Due to Point Load (WL/4) = 8 KNm

Dead load
(wt of rail+wt of girder+self wt 1 KN/m) = 0.35 KN/m

Moment (wL2/8) = 1.32 KNm

Maximun Moment = 8.883 KNm

Cantilever moment = 5.67 KNm

Page 117 of 124


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in Zone - II at
Project Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas including Operation
and Maintenance for ten years at Chennai.

19-EPE-CMWSSB-STP-120MLD- Prepared Checked Approved Rev


Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Shear force
Maximum Shear force in the gantry girder occurs when one of the wheels is exactly over the support

Max. Shear force


(0.5+0.5*(5.5-5.5/5.5)) = 5.00 KN
25% Impact factor (1.25 *5) = 6.25 KN
Self wt UDL (wL/2) = 0.96 KN

Total Load = 7.21 KN


Total wt
Design Procedure 24.9 kg

Select the Section


Channel at top Plate at top most Plate at bottom
ISMB200 NOT REQ NOT REQ Thk NOT REQ Thk
(Above channel)
Mass 0.249 KN/m 0 KN/m 0 KN/m 0 KN/m
2 2 2
Area 32.33 cm 0 cm 0 cm 0 cm2
Depth 20 cm 0 cm 0 0
Breadth 10 cm 0 cm 0 cm 0 cm
Thickness of
Web (tw) 0.57 cm 0 cm
Flange (tf) 1.08 cm 0 cm 0 cm 0 cm
Moment of Inertia
4 4 4 4
Hor axis Ixx 2235.40 cm4 0 cm4 0 cm4 0 cm4
Ver axis Iyy 150.00 cm4 0 cm4 0 cm4 0 cm4

Location of Horizontal N.A for the built-up section


I - Section
2
A1 = 32.33 cm
y1 (top) = 10 cm

Channel section
2
A2 = 0 cm

Page 118 of 124


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in Zone - II at
Project Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas including Operation
and Maintenance for ten years at Chennai.

19-EPE-CMWSSB-STP-120MLD- Prepared Checked Approved Rev


Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

*y2 (top) = 0 cm (From Table)

Top plate
2
A3 = 0 cm
*y3 (top) = 0 cm

Bottom plate
2
A4 = 0 cm
*y4 (top) = 20 cm

Total depth of the section


(depth of I-sec + tw of channel+Thickness of top&bot plate) D = 20.00 cm

C.G of whole section


(A1*y1+A2*y2+A3*y3+A4*y4)/(A1+A2+A3+A4) Y(top) = 10.00 cm
Y(bot) = 10.00 cm
C.G aboout minor = 5.00 cm
M.I about X-X axis
2 4
I section (Ixx+A*h ) Ixx1 = 2,235.4 cm
2
Channel (Iyy+A*h ) Ixx2 = - cm4
2
Top Plate(Ixx+A*h ) Ixx3 = - cm4
2
Bot Plate (Ixx+A*h ) Ixx4 = - cm4

4
Total M.I Ixx = 2,235.4 cm
4
Iyy 150 cm

Section Modulus (Zxx)


3
(Ixx/Ytop) Zxx(top) = 223.54 cm
3
(Ixx/Ybot) Zxx(bot) = 223.54 cm
3
Zyy = 30 cm
Check for Bending stress in Tension
2
Actual stress in bottom fibre = 39.7 N/mm
(M / Z bot)
2
Allowable stress in bending = 165 N/mm
(0.66fy)

Page 119 of 124


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in Zone - II at
Project Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas including Operation
and Maintenance for ten years at Chennai.

19-EPE-CMWSSB-STP-120MLD- Prepared Checked Approved Rev


Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

39.7 < 165 Safe Hence Ok

Check for Bending stress in Compression for simply supported

fcb = K1 ( X + K2Y) * C2/C1

Lesser & greater distance from N.A to extreme fibre


c1 = 10.00 cm
c2 = 10.00 cm

Iyy of Compression flange only [Iyy(I-sec)/2+Ixx(ch)]

Iyc = 75 cm4

psi (Ψ) = 1 (since section remain constant)


K1 = 1 (from table)

omega (ω) = 0.500 (Iyc/Iyy)


K2 = 0.0000 (from table)

Radius of gyration √(Iyy/A)


ry = 2.15 cm
Slenderness l/ry = 255.814
Y = 40.495
(26.5*10^5)/(l/ry)2

(l T / ry D) = 13.814

X = 131.477
Y√(1+(1/20)*(l*T/ry*D)2)

2
fcb = 131.477 N/mm
2
Permissible comp stress = 68.00 N/mm
(0.66*fcb*fy)/(fcb^1.4+fy^1.4)^(1/1.4)
2
Actual comp stress = 39.74 N/mm

Page 120 of 124


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in Zone - II at
Project Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas including Operation
and Maintenance for ten years at Chennai.

19-EPE-CMWSSB-STP-120MLD- Prepared Checked Approved Rev


Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

(M / Z top)

39.74 < 68.00 Safe & Hence Ok


Check for Bending stress in Compression for cantilever
Effective length factor 1
fcb = K1 ( X + K2Y) * C2/C1

Lesser & greater distance from N.A to extreme fibre


c1 = 10.00 cm
c2 = 10.00 cm

Iyy of Compression flange only [Iyy(I-sec)/2+Ixx(ch)]


4
Iyc = 75 cm

psi (Ψ) = 1 (since section remain constant)


K1 = 1 (from table)

omega (ω) = 0.50 (Iyc/Iyy)


K2 = 0.0000 (from table)

Radius of gyration √(Iyy/A)


ry = 2.15 cm
Slenderness l/ry = 46.512
Y = 1224.943
(26.5*10^5)/(l/ry)2

(l T / ry D) = 2.51

X = 1404.908
Y√(1+(1/20)*(l*T/ry*D)2)

fcb = 1404.908 N/mm2

2
Permissible comp stress = 155.23N/mm
(0.66*fcb*fy)/(fcb^1.4+fy^1.4)^(1/1.4)

Page 121 of 124


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in Zone - II at
Project Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas including Operation
and Maintenance for ten years at Chennai.

19-EPE-CMWSSB-STP-120MLD- Prepared Checked Approved Rev


Document Number
ESDSS-SDC-012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

2
Actual comp stress = 25.39N/mm
(M / Z bottom)

25.39 < 155.23 Safe & Hence Ok


Check for Shear stress

Total Shear = 7.21 KN


2
Actual shear stress (V/bd) = 6.325N/mm
2
Permissible shear stress
(0.4fy) = 100N/mm

6.325 < 100 Safe & Hence OK


Check for Bending Stress (For Cantilever Case)

2
Allowable bending tensile stress = 165N/mm
2
Actual tensile bending stress due to cantilever moment = 25.38N/mm
In tension 25.38/165 = 0.15 < 1, OK SAFE.
In compression 25.385/155.23 = 0.16 < 1, OK SAFE.

Check for Deflection (Simply supported case)

Deflection for Wheel load on Midspan


(WL3/48EI) = 3.88 mm

Allowable deflection (L/500) = 11.00 mm

3.876 < 11 Safe & Hence OK


Check for Deflection (Cantilever case)
Deflection for Wheel load at free end
(WL3/3EI) = 0.373
Allowable deflection (L/500) = 2.00 mm

0.373 < 2 Safe & Hence OK

Page 122 of 124


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in Zone - II at Kodungaiyur
Project with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas including Operation and Maintenance for ten
years at Chennai.

Document 19-EPE-CMWSSB-STP-120MLD-ESDSS-SDC- Prepared Checked Approved REV


Number 012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

9 DESIGN OF STAIRCASE

Fck Fy Cover Safety


N/mm2 N/mm2 mm factor
35 500 25 1.5

DESIGN

Tread = 250 mm
Riser (Max) = 175 mm
Thickness of slab assumed, D = 175 mm
Effective Depth (175-25-10/2) = 145 mm
No of treads = 11
No of risers = 11
Span of flight = 2750 mm
Width of landing 1 = 0 mm
Width of landing 2 = 1200 mm
Total Span = 3950 mm

Load Calculation:

Self wt of inclined Slab (175/1000*25) = 4.38 kN/m2


Self wt of Slab on horizontal (4.38*SQRT(250^2+175^2)/250) = 5.35 kN/m2
DL of each step on horizontal (0.5*250*175/250/1000*25) = 2.19 kN/m2
Floor finish = 1.20 kN/m2

Flight location
2
Total Dead Load (5.35+2.19+1.2) = 8.74 kN/m
2
Live Load = 5.00 kN/m

Landing location
2
Total Dead Load (4.38+1.2) = 5.58 kN/m
2
Live Load = 5.00 kN/m

Factored load
Flight location
2
Total Dead Load, Wu,DL1 (8.74*1.5) = 13.11 kN/m
2
Live Load , Wu,LL1 (5*1.5) = 7.50 kN/m
2
Total load = 20.61 kN/m

Landing location
2
Total Dead Load , Wu,DL2 (5.58*1.5) = 8.37 kN/m
2
Live Load , Wu,LL2 (5*1.5) = 7.50 kN/m
2
Total load = 15.87 kN/m
DL = 13.11 kN/m DL = 13.11 kN/m
LL = 7.50 kN/m LL = 7.50 kN/m DL = 8.37 kN/m
LL = 7.50 kN/m
A C
B
2750 mm 1200 mm
Ra Rb

Page 123 of 124


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in Zone - II at Kodungaiyur
Project with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas including Operation and Maintenance for ten
years at Chennai.

Document 19-EPE-CMWSSB-STP-120MLD-ESDSS-SDC- Prepared Checked Approved REV


Number 012 APS SVK JTP 0

Title Structural Design Calculation of Excess sludge sump,Dilution Water Sump and Supernatant Sump

Load comb
A B (1.5DL + 1.5 LL)

Main Reinforcement:
Mu1 dpro pt,req pt,min f1 Spacing pt,pro Pt req < Pt pro
R
kNm mm % % mm mm % SAFE
34.18 1.63 145 0.41 0.12 10 125 0.43

Distribution Reinforcement:
pt,min f1 Spacing pt,pro
% mm mm %
0.12 8 200 0.144

Deflection Control Check:


pt,pro dreq dpro d req < d pro
fs k l /d ratio
% mm mm SAFE
0.43 272 1.14 20 120.61 145

Load Rxn to be applied in STAAD model Support A = 7.19 kN/m


Load Rxn to be applied in STAAD model Support B = 4.68 kN/m

Page 124 of 124