Treatment Plant in Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with
Project
Power Generation from Bio-Gas including Operation and Maintenance for ten years at
Chennai.
Document 19-EPE-CMWSSB-STP- Prepared Checked Approved Rev
Number 120MLD-PST-I-STR-0 ABI SVK/JTP 0
Structural Design Calculation of Primary sludge thickener I for 120MLD STP at
Title kodungaiyur
CHAPTER I
DESIGN BASIS
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage
Treatment Plant in Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with
Project
Power Generation from Bio-Gas including Operation and Maintenance for ten years at
Chennai.
Document 19-EPE-CMWSSB-STP- Prepared Checked Approved Rev
Number 120MLD-PST-I-STR-0 ABI SVK/JTP 0
Structural Design Calculation of Primary sludge thickener I for 120MLD STP at
Title kodungaiyur
This document covers the design of primary sludge thickener for 120 MLD STP at
Kodungaiyur.
b) Launder
c) Feed well
d) Central Pier
e) Grade slab
The water retaining structure has been designed as limited cracked section for 0.2mm crack
width and non-water retaining components are designed in limit state method.
The following primary loads are considered in the design of the structure
a) Dead Loads.
b) Hydrostatic pressure (Liquid in Tanks) which is considered as dead loads.
c) Surcharge load
d) Outside side soil and water pressure
1.3) References:
1) IS: 3370 (Part I – IV) – Code of practice for concrete structures for the storage of liquids.
2) IS: 456 - 2000 – Code of practice for Plain and Reinforced concrete
3) Moody’s chart
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage
Treatment Plant in Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with
Project
Power Generation from Bio-Gas including Operation and Maintenance for ten years at
Chennai.
Document 19-EPE-CMWSSB-STP- Prepared Checked Approved Rev
Number 120MLD-PST-I-STR-0 ABI SVK/JTP 0
Structural Design Calculation of Primary sludge thickener I for 120MLD STP at
Title kodungaiyur
3) Clear Cover to steel - The minimum clear cover to reinforcement in all R.C.C structures
shall be as per IS456: 2000 (Clause 26.4, Page no. 46) & IS 3370 (part 1 to 3).
Philosophy:
a) Liquid depth is considered for the full height of the wall irrespective of water height + free
board.
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage
Treatment Plant in Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with
Project
Power Generation from Bio-Gas including Operation and Maintenance for ten years at
Chennai.
Document 19-EPE-CMWSSB-STP- Prepared Checked Approved Rev
Number 120MLD-PST-I-STR-0 ABI SVK/JTP 0
Structural Design Calculation of Primary sludge thickener I for 120MLD STP at
Title kodungaiyur
b) The main wall is modeled and analyzed with STAAD. The analysis value is arrived from the
STAAD and document is presented with the Crack width checks.
c) Base slab of the clarifier is considered to be the slab on grade with a prop effect to the
main wall
The loading combinations are considered in the design of structures in accordance with the
stipulations in the relevant design codes. The load combinations are mentioned below.
CHAPTER II