You are on page 1of 85

PROJECT: 3 MLD

SEWAGE TREATMENT CONTRACTOR: M/S


CLIENT: CANTONMENT
PLANT BASED ON AQUATECH SOLUTIONS PVT.
BOARD, JHANSI
SBR TECHNOLOGY LTD.
AT JHANSI

DESIGN CALCULATION OF
RAW SEWAGE PUMPING STATION
OF SPS – 2 FOR
3 MLD STP BASED ON SBR
TECHNOLOGY AT JHANSI

Page 1 of 85
DESIGN CALCULATION FOR Checked Approved
Doc. No. : - CIVIL - 14 RAW SEWAGE PUMPING by by
STATION OF SPS – 2
Rev. No. 00 MKM MKM
PROJECT: 3MLD STP BASED ON SBR
TECHNOLOGY AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS PVT
BOARD JHANSI
LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2

INDEX
SR. NO. TITLE PAGE NO.

1 DESIGN BASIS 3

2 REFERENCES 5

3 DESIGN OF MONORAIL 7

3 DESIGN OF SLAB 10

4 DESIGN OF STAIRCASE 17

5 DESIGN OF WALLS 20

6 DESIGN OF BEAMS 52

7 DESIGN OF COLUMNS 69

8 DESIGN OF RAFT 73
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2

DESIGN BASIS

Page 3 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
CLIENT: CANTONMENT AT JHANSI CONTRACTOR: M/s AQUATECH
BOARD JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2

DESIGN BASIS

DESIGN DATA:
Concrete grade : M 30 ( FOR LIQUID RETAINING STRUCTURE)

M 25 ( FOR NON-LIQUID RETAINING STRUCTURES )

Steel grade : Fe 500

Density of Concrete = 2.5 T/m^3

Density of PCC = 2.4 T/m^3

Density of Water = 1.0 T/m^3

Density of Soil (Dry) = 2.0 T/m^3

Angle of Internal friction, φ= 30⁰

Coefficient of Active Earth Pressure = Ka = 0.33

FGL = = E.L 239.9

Minimum clear cover to concrete element:


a) Slabs = 30 mm
b) Plinth beam = 40 mm
b) Beam = 40 mm
c) Column = 40 mm
d) Foundation = 60 mm

Seismic Load :

Ah= (ZI/2R ) (Sa/g)

Seismic Zone = Zone II


Zone Factor, Z = 0.10
Sa/g = 2.5 maximum As per cl. 6.4.5 of IS:1893
Importance factor, I = 1.25
Response Reduction Factor, R = 3.0

Wind Load :

Basic Wind Speed VB = 47 m/s


K1 = 1.0
K2 = 1.0
K3 = 1.0
Design wind speed (VZ) = VB x K1 x K2 x K3
= 47 x 1 x 1 x 1
= 47 m/sec
Design wind speed = 0.6 x VZ^2
= 1325.4 N/m^2
= 0.1325 T/m^2

Page 4 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2

REFERENCES

Page 5 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
CLIENT: CANTONMENT AT JHANSI CONTRACTOR: M/s AQUATECH
BOARD JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2

REFERENCES - CODES & STANDARDS :

IS 456 - 2000 :- Code of practice for Plain & Reinforced Concrete

IS 3370 - ( Part I ) : 2009 :-Code of practice for concrete structure for the storage of liquids : General Requirements

IS 3370 - ( Part II ) : 2009 :-Code of practice for concrete structure for the storage of liquids : R C Structures

IS 3370 - ( Part IV ) : 2009 :-Code of practice for concrete structure for the storage of liquids : Design Charts

IS -1893 ( part 1 ) - 2002, IS-1893 ( part4 ) - 2005

IS- 875 Part 1 : Dead Load

IS - 875 Part 2 : Imposed Load

IS - 875 Part 3 : Wind Load

IS 800 - 2007 :- Code of practice for general construction in steel

Page 6 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2

DESIGN OF MONORAIL

Page 7 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

DESIGN OF MONORAIL (1.5 T CAPACITY) 0

LOAD ON MONORAIL = 1.5 T


IMPACT FACTOR 10 % = 0.15 T (Ref. IS 800-1984)
Therefore, TOTAL LOAD = 1.65 T
Horizontal load = 4 % of vertical = 0.06 T (Ref. IS 807-1976)

S/w of beam
0.037 T/m
1.65 T

Shear
1.7 T
( Assuming load at support )
l= 2.800 m

1.65 x 2.8 0.037 x 2.8 ²


M max. = + = 1.19 Tm (BM. X)
4 8
M max.= 0.06 x 2.8
= 0.04 Tm (BM. Y)
(Hori.) 4

Maximum shear
( Assuming load at one end )
0.037 x 2.800
Vmax. = 1.65 + = 1.7 T.
2

Try section ISMB 250


Weight = 37.3 Kg/m = 0.0373 T/m
Ixx = 5131.6 cm4
3
Zxx = 410.5 cm
3
Zyy = 53.5 cm
T = 12.5 mm
ryy = 26.5 mm

Check for deflection

∆ Calc. = 5 x wxl4 + Pxl


3

384 EI 48 x E I

5x 3.6591 x 280 4 16500 x 280 3


∆ Calc. =
384 7
+ 7
x 2.1 x 10 x 5131.6 48 x 2.1 x 10 x 5131.6

= 0.073 cm
l 280.0
∆ Permissible. =
500
=
500
= 0.56 cm
∆ cal < ∆ Permissible Hence ok
D 250 Leff. 2800
= = 20.00 = = 105.67
T 12.5 ryy 26.5

From 6.1B, IS800 - 1984 σbc (perm.) = 126.2 N/mm² )

σbc (cal.) = Mv 1.19 x 10^7


= = 28.99 N/mm²
Zxx 410.5 x 10³

σbc (cal.) = Mh 0.04 x 10^7


= = 7.477 N/mm²
Zyy 53.50 x 10³

Calculated Stress Ratio = 28.99 + 7.477


= 0.290 < 1
126.165
Hence ok

Page 8 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

DESIGN OF MONORAIL (1.5 T CAPACITY)

LOAD ON MONORAIL = 1.5 T


IMPACT FACTOR 10 % = 0.15 T (Ref. IS 800-1976)
THEREFORE TOTAL LOAD = 1.65 T
Horizontal load = 4 % of vertical = 0.06 T (Ref. IS 807-1976)
S/w of beam
0.0373 T/m
1.65 T

Shear
1.69 T

1.2 m

0.0373 x 1.2 ²
M max. = 1.65 x 1.2 + = 2.01 Tm (BM. X)
2
M max.=
0.06 x 1.2 = 0.07 Tm (BM. Y)
(Hori.)

Maximum shear
Vmax. = 1.65 + 0.0373 x 1.2 = 1.69 T

Try section ISMB 250


Ixx = 5131.6 cm4
Zxx = 410.5 cm3
Zyy = 53.5 cm3
T = 12.5 mm
ryy = 26.5 mm

Check for deflection


δcal = wxl3 + Pxl3
8XEI 3 xEI

3.73 x 120 3 16500 x 120 3

∆ Calc. =
8 7 + 7
x 2.1 x 10 x 5131.6 3 x 2.1 x 10 x 5131.6

= 0.088 cm
l 120
∆ Permissible. =
500
=
500
= 0.24 cm

d cal < d Permissible Hence ok


D 250 Leff. 1200
= = 20.00 = = 45.29
T 12.5 ryy 26.5

From 6.1B, IS800 - 1984 σbc (perm.) = 158 N/mm² )

σbc (cal.) = Mv 2.01 x 10^7


= = 48.889 N/mm²
Zxx 410.5 x 10³

σbc (cal.) = Mh 0.07 x 10^7


= = 13.085 N/mm²
Zyy 53.50 x 10³

Calculated Stress Ratio = 48.889 + 13.085


= 0.393 < 1
158.00
Hence ok

Page 9 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2

DESIGN OF SLAB

Page 10 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: JHANSI CONTRACTOR: M/s
CANTONMENT AQUATECH SOLUTIONS
BOARD JHANSI DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING PVT LTD.
STATION OF SPS-2

DESIGN OF CANTILEVER PLATFORM SLAB OVER MECHANICAL SCREEN : (TOC 240.4)

Concrete grade = M 30 Steel Grade = Fe 500


Clear cover = 30 mm @ Top & bottom
Partial safety factor for DL = 1.5
Partial safety factor for LL = 1.5
Density of concrete = 2.5 T/m3
Depth D = 150 mm
Breadth B = 1000 mm
d = 116 mm
Span = 0.700 m 0.500 T/m (DEAD LOAD)
0.500 T/m (LIVE LOAD)

shear V =
(DL) 0.350 KN
(LL) 0.350 KN
0.700
Loading on slab
Dead load
1) Self weight of slab = 0.375 T/m²
2) Floor Finish = 0.125 T/m²
0.500 T/m²
Live load
3) Live load = 0.500 T/m²

Total D.L = 0.500 T/m² Total L.L = 0.500 T/m²

0.500 x 0.7 ^2
Moment for DL = = 0.123 Tm/m
2

0.5 x 0.70 ^2
Moment for LL= = 0.123 Tm/m
2

Total Moment = 0.123 + 0.123 = 0.245 Tm/m

Total factored moment ( Mu ) =( 0.123 x 1.5 ) + ( 0.123 x 1.5 )

= 0.368 Tm/m
Mu / bd^2 = 0.273

Pt % = 0.063 %

Ast reqd. =
0 .5 f ck 1 − 1 − 4.6 M 2u bd
fy f ck bd

Ast = (0.5x30/500) x [ 1 - √ ( 1-(4.6x0.245x1.5x10^7)/ ( 30x1000x116^2) ) ] x (1000x116)

Ast reqd. = 74 mm^2/m

Pt min = 0.12 %

0.12
Ast min = x 1000 x 150 = 180 mm^2/m
100

Page 11 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: JHANSI CONTRACTOR: M/s
CANTONMENT AQUATECH SOLUTIONS
BOARD JHANSI DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING PVT LTD.
STATION OF SPS-2

SUMMARY :
PROVIDE D = 150 mm

Provide 8 tor @ 150 c/c at top in short direction.


(Provided Ast. = 335 mm^2/m)
Provide 8 tor @ 200 c/c at bottom b/w & top in long direction.
(Provided Ast. = 251 mm^2/m)

Shear check:

Total factored load ( w ) = ( 0.5 x 1.5 ) + ( 0.5 x 1.5 )


= ( 0.75 + 0.75 )
= 1.5 T/m²
Vu max = (w X lx )
= ( 1.5 X 0.7 ) = 1.05 T/m
τvu = 1.05 x 10^4 / ( 1000 x 116 )
τvu = 0.091 N/mm^2

Pt provided = 0.289 %
τc = 0.393 N/mm^2
τc > τvu
Hence safe

Check for deflection

Ast req. = 180 mm^2/m


Ast prov. = 335 mm^2/m

Area of c/s of steel required


fs= 0.58 x fy x
Area of c/s of steel provided
180
fs= 0.58 x 500 x = 156
335
Percentage tension reinfocement = 0.289 %
Modification factor = 2.0 ( IS 456, fig - 4 )

Span 700
= = 3.02 < 7
Effective depth X M.F. 116 x 2
( Permissible values for slab as per IS
456, Clause no. 23.2.1 )

Hence safe

Page 12 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION
OF SPS-2

DESIGN OF ONE WAY SLAB IN WET WELL : (AT TOC 240.4)

Concrete grade = M 30 Steel Grade = Fe 500


Clear cover = 30 mm @ Top & bottom
Partial safety factor for DL = 1.5
Partial safety factor for LL = 1.5
Density of concrete = 2.5 T/m3
Depth D = 150 mm
Breadth B = 1000 mm
d = 116 mm
Length of span. (lx) = 1.3 m

Loading on slab

Dead load

1) Self weight of slab = 0.15 X 2.5 T/m³ = 0.375 T/m²

2) Floor finish = 0.125 T/m²

0.5 T/m²
Live load

3) Live load = 0.5 T/m²

Total D.L = 0.5 T/m² Total L..L = 0.5 T/m²

Total Load = 1 T/m²

0.5 X 1.3 ^2 0.5 X 1.30 ^2


Moment for DL = = 0.11 Tm/m, Moment for LL = = 0.11 Tm/m
8 8

Total Moment = 0.11 + 0.11 = 0.22 Tm/m

Total Factored Moment ( Mu ) = ( 0.11 X 1.5 ) + ( 0.11 X 1.5 )

= 0.33 Tm/m

Mu / bd^2 = 0.245

Pt % = 0.057 %

Ast reqd. = 66 mm^2/m

Pt min 0.12 %

Ast min = 0.12


X 1000 X 150 = 180 mm^2/m
100
SUMMARY :

PROVIDE D = 150 mm

Provide 8 tor @ 200 c/c along short span @ bottom


(Provided Ast. = 251 mm^2/m)
Provide 8 tor @ 200 c/c along short span @ top
(Provided Ast. = 251 mm^2/m)
Provide 8 tor @ 200 c/c along long span @ bottom & top
(Provided Ast. = 251 mm^2/m)

Page 13 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION
OF SPS-2

Shear check:

Total factored load ( w ) = ( 0.5 x 1.5 ) + ( 0.5 x 1.5 )


= ( 0.75 + 0.75 )
= 1.5 T/m²
Vu max = (w X lx ) / 2
= ( 1.5 X 1.3 ) / 2.0 = 0.975 T/m
τvu = 0.975 x 10^4 / ( 1000 x 116 )
τvu = 0.084 N/mm^2

Pt provided = 0.216 %
τc = 0.346 N/mm^2
τc > τvu
Hence safe

Check for deflection

Ast req. = 180 mm^2/m


Ast prov. = 251 mm^2/m

Area of c/s of steel required


fs= 0.58 x fy x
Area of c/s of steel provided
180
f s = 0.58 x 500 x = 208
251
Percentage tension reinfocement = 0.22%
Modification factor = 2.00 ( IS 456, fig - 4 )

Span 1300 ( Permissible values for slab as per IS


= = 5.6 < 20
Effective depth X M.F. 116 x 2 456, Clause no. 23.2.1 )
Hence safe

Page 14 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2

DESIGN OF SLAB OF STARICASE CHAMBER

Concrete grade = M 30 Steel Grade = Fe 500


Clear cover = 30 mm @ Top & bottom
Partial safety factor for DL = 1.5
Partial safety factor for LL = 1.5
Density of concrete = 2.5 T/m3

Edge Condition [ D = DISCONTINUOUS, C = CONTINUOUS ]


Left edge = D
Right edge = D 2.3
Top edge = D D
Bottom edge = D

Depth D = 150 mm 2 D D
Breadth B = 1000 mm
d = 116 D
Four Edges Discontinous

Short span. (lx) = 2 m ly


= 1.150 < 2 Hence Two way slab
Long span. (ly) = 2.3 m lx

Loading on slab

Dead load

1) Self weight of slab = 0.15 X 2.5 T/m³ = 0.375 T/m²

2) Floor finish = 0.125 T/m²

0.500 T/m²
Live load
`
1) Live load = 0.5 T/m²

Total D.L = 0.5 T/m² Total L.L = 0.5 T/m²

Total factored load ( w ) = ( 0.5 X 1.5 ) + ( 0.5 X 1.5 )


= ( 0.75 + 0.75 )
= 1.50 T/m²

Moment due to Dead Load ( MDL) (Ref : IS 456:2000, Table 26, page no 91.)

Short span +ve moment = 0.0680 X 0.50 T/m² X 2² = 0.136 Tm/m

Short span -ve moment = 0.0000 X 0.50 T/m² X 2² = 0.000 Tm/m

Long span +ve moment = 0.0560 X 0.50 T/m² X 2² = 0.112 Tm/m

Long span -ve moment = 0.0000 X 0.50 T/m² X 2² = 0.000 Tm/m

Moment due to Live Load ( MLL )

Short span +ve moment = 0.0680 X 0.50 T/m² X 2² = 0.136 Tm/m

Short span -ve moment = 0.0000 X 0.50 T/m² X 2² = 0.000 Tm/m

Long span +ve moment = 0.0560 X 0.50 T/m² X 2² = 0.112 Tm/m

Long span -ve moment = 0.0000 X 0.50 T/m² X 2² = 0.000 Tm/m

Page 15 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2

Summary of Design moment

Total Moment Mu Location d Mu/bd^2 Pt reqd Ast reqd


(MDL + MLL) ( MDL X 1.5 + MLL x 1.5 ) mm
Tm/m Tm/m

0.272 0.408 Short span +ve moment 116 0.303 0.071 % 82 mm^2/m

0.000 0.000 Short span -ve moment 116 0.000 0.000 % 0 mm^2/m

0.224 0.336 Long span +ve moment 108 0.288 0.067 % 72 mm^2/m

0.000 0.000 Long span -ve moment 108 0.000 0.000 % 0 mm^2/m

Ast min = 0.12


X 1000 X 150 = 180 mm^2/m
100

SUMMARY :

PROVIDE D = 150 mm

Provide 8 tor @ 200 c/c along short span @ bottom


(Provided Ast. = 251 mm^2/m)
Provide 8 tor @ 200 c/c along short span @ top
(Provided Ast. = 251 mm^2/m)
Provide 8 tor @ 200 c/c along long span @ bottom
(Provided Ast. = 251 mm^2/m)
Provide 8 tor @ 200 c/c along long span @ top
(Provided Ast. = 251 mm^2/m)

Shear check:

Area of contribution for long side Area of contribution for short side
= ( 2 X 2.3 - 2 X 2^ 2 / 4 ) / 2 = 2 ^ 2 /4
= 1.3 m^2 = 1 m^2

Total factored shear force along long side Total factored shear force along short side
= 1.3 m^2 X 1.5 T/m^2 = 1 m^2 X 1.5 T/m^2
= 1.95 T = 1.5 T

Factored shear per m along long side Factored shear per m along short side
= 1.95 T / 2.3 m = 1.5 T / 2 m
= 0.85 T/m = 0.75 T/m

Vu max = 0.85 T/m


τvu = 0.9 X 10^4 /( 1000 X 116 )
τvu = 0.0733 N/mm^2

Pt provided = 0.216 %

τc = 0.346 N/mm^2
τc > τvu
Hence safe

Check for deflection

Ast req. = 180 mm^2/m


Ast prov. = 251 mm^2/m

Area of c/s of steel required


fs = 0.58 X fy X
Area of c/s of steel provided
180
fs = 0.58 X 500 X = 208 N/mm^2
251
Percentage tension reinfocement = 0.22%

Modification factor = 1.9 ( IS 456, fig - 4 )

Span 2000
= = 9.07 < 20
Effective depth X M.F. 116 X 1.90
( Permissible value for slab as per
IS:456-2000 Clause 23.2.1 )

Hence safe

Page 16 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2

DESIGN OF STAIRCASE

Page 17 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION
OF SPS-2

DESIGN OF STAIRCASE

INPUT DATA :
Concrete grade = M 30 Steel Grade = Fe 500
Clear cover = 30 mm Top
Clear cover = 30 mm Bottom
Thickness (D) = 150 mm
Breadth (b) = 1000 mm
Length ( L ) = 2.3 m
Riser = 170 mm
Tread = 250 mm
Partial safety factor for load = 1.5

1.292 t/m^2

DL = 0.91 1.5 T/m


LL = 0.58 L = 2.3

Loading on Staircase :

1) Self Weight of staircase = 0.15 X 2.5 T/m^3 = 0.454 T/m^2


cos 34.22 0
2) Step. Load = 0.5 X 0.170 X 2.5 T/m^3 = 0.213 T/m^2
3) Floor Finish = 0.125 T/m^2
4) Live Load = 0.5 T/m^2
Total load = 1.292 T/m^2

Total factored Load = ( 1.292 X 1.5 ) = 1.938 T/m^2

Mu = W X L ^2 / 8
= 1.28 Tm/m

Mu/bd^2 = 0.969 b = 1000 mm


d = 150 - 30 - 5
Pt % = 0.232 d = 115 mm
Ast = 267 mm^2/m

Pt% min = 0.12


Ast min. = 180 mm^2/m

SHEAR CHECK

Vu = w X L /2 = 2.229 T/m
τvu = Vu /bd = 0.194 N/mm^2
Pt % provided = 0.342
τc = 0.423 N/mm^2

τc > τvu
Hence safe

SUMMARY :

Provided D = 150 mm
Provide 10 tor @ 200 c/c main steel
(Provided Ast. = 393 mm^2/m)
Provide 8 tor @ 200 c/c dist. Steel.
(Provided Ast. = 251 mm^2/m)

Page 18 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION
OF SPS-2
Check for deflection

Ast req. = 267 mm^2/m


Ast prov. = 393 mm^2/m

Area of c/s of steel required


fs= 0.58 x fy x
Area of c/s of steel provided
267
fs= 0.58 x 500 x = 197
393
Percentage tension reinfocement = 0.34%

Modification factor = 1.8 ( IS 456, fig - 4 )

Span 2300
= 11.11 < 20
Effective depth X M.F. 115 x 1.8
Hence safe
( Permissible value for simply supported slab as per IS 456,Clause no. 23.2.1 )

Page 19 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2

DESIGN OF WALLS

Page 20 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2

DESIGN OF LONG WALL OF RECEIVING CHAMBER : (SHORT WALL SIMILAR)


Length of long wall = 2m
Concrete grade = M 30 Steel Grade = Fe 500
Clear cover = 45 mm on inside face
Clear cover = 45 mm on outside face
D @ bottom = 300 mm btm to D = 300 mm Top
Breadth ( b ) = 1000 mm
Angle of internal friction = 30 deg.
Coefficient of active earth pressure (Ka) = 0.33
3
wt. of soil = 2 T/m
2
Surcharge = 1 T/m
Density of liquid = 1 T/m^3
WALL TOP WATER LVL.
Free 240.4 240.4
Service Water level
Fixed FGL 237.2
(Typ) 239.90
4.20 1.00
3.70

=b
236.20
Surcharge Pressure =
0.33 x 1 = 0.330 T/sqm Water Pressure for strength =
2 =2a 1.0 T/m^3* 4.2
Earth Pressure = [ ( 2 - 1 ) X 0.33 + 1 ] x 0 = 4.2
= 0.00 T/sq m
= { 2 x 0.33 x 3.7 }
= 2.442 t/sq m Water Pressure for serviceability =
1.0 T/m^3* 1.00
=1
Moment due to water Pressure for strength condition: T/sq m
a / b = 0.238
(Refer Moody's chart fig.no 04 Plate fixed along three edges,Free at top)

A) M max @ Bottom (-ve) Vertical inside = Coefficient * p * b^2


= 0.0100 x 4.20 x 4.20 x 4.20 = 0.74 Tm/m +
T/sq m = 0.74 Tm/m
After moment
B) M max @ 0.4h (-ve) Horizontal inside = Coefficient * p * b^2 distribution
= 0.0106 x 4.20 x 4.20 x 4.20 = 0.79 Tm/m 0 Tm/m
T/sq m (REF PAGE NO. )

C) M max @ 0.2h (+ve) Vertical outside = Coefficient * p * b^2


= 0.0029 x 4.20 x 4.20 x 4.20 = 0.21 Tm/m
T/sq m

D) M max @ 0.4h (+ve) Horizontal outside = Coefficient * p * b^2


= 0.00531 x 4.20 x 4.20 x 4.20 = 0.39 Tm/m 0 Tm/m
T/sq m (REF PAGE NO. )

Moment due to water Pressure for serviceability condition :


a / b = 1.000
(Refer Moody's chart fig.no 04 Plate fixed along three edges,Free at top)

A) M max @ Bottom (-ve) Vertical inside = Coefficient * p * b^2


= 0.0845 x 1.00 x 1.00 x 1.00 = 0.08 Tm/m +
T/sq m = 0.08 Tm/m
After moment
B) M max @ 1h (-ve) Horizontal inside = Coefficient * p * b^2 distribution
= 0.0644 x 1.00 x 1.00 x 1.00 = 0.06 Tm/m 0 Tm/m
T/sq m (REF PAGE NO. )

C) M max @ 0.6h (+ve) Vertical outside = Coefficient * p * b^2


= 0.0159 x 1.00 x 1.00 x 1.00 = 0.02 Tm/m
T/sq m

D) M max @ 1h (+ve) Horizontal outside = Coefficient * p * b^2


= 0.02760 x 1.00 x 1.00 x 1.00 = 0.03 Tm/m 0 Tm/m
T/sq m (REF PAGE NO. )

Page 21 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2

Moment due to earth Pressure :


a / b = 0.270

(Refer Moody's chart fig.no 04 plate fixed along three edges,free at top)

A) M max @ Bottom (-ve) vertical outside = Coefficient * p * b^2


= 0.0122 x 2.44 x 3.70 3.700 = 0.41 Tm/m
t/sq m
B) M max @ 0.4h (-ve) horizontal outside = Coefficient * p * b^2
= 0.0129 x 2.44 x 3.70 3.700 = 0.43 Tm/m
t/sq m
C) M max @ 0.2h (+ve) vertical inside = Coefficient * p * b^2
= 0.0034 x 2.44 x 3.7 3.700 = 0.11 Tm/m
t/sq m
D) M max @ 0.4h (+ve) horizontal inside = Coefficient * p * b^2
= 0.0064 x 2.44 x 3.7 3.700 = 0.21 Tm/m
t/sq m

Moment due to surcharge :

a/b = 0.270
(Refer moody's chart fig.no:1 plate fixed along three edges,free at top)

A) M max vertical @ bottom (-ve) outside = Coefficient * p * b^2


= 0.016 X 0.33 X 3.70 ^2 = 0.07 tm/m
t/sq m

B) M max @ 1.0 h (-ve) horizontal outside = Coefficient * p * b^2


= 0.025 X 0.33 X 3.7 ^2 = 0.113 tm/m
t/sq m

C) M max @ 0.4h (+ve) vertical inside = Coefficient * p * b^2


= 0.0038 X 0.33 X 3.7 ^2 = 0.02 tm/m
t/sq m

D) M max @ 1.0 h (+ve) horizontal inside = Coefficient * p * b^2


= 0.0131 X 0.33 X 3.7 ^2 = 0.059 tm/m
t/sq m

Total moment due to earth and surcharge:

A) M max vertical @ bottom (-ve) outside


= 0.41 + 0.07 = 0.48 tm/m
After moment
B) M max horizontal (-ve) outside distribution
= 0.43 + 0.113 = 0.54 tm/m 0 Tm/m
(REF PAGE NO. )
C) M max vertical (+ve) inside
= 0.11 + 0.02 = 0.13 tm/m

D) M max horizontal (+ve) inside


= 0.21 + 0.059 = 0.27 tm/m 0 Tm/m
(REF PAGE NO. )

d req = Mumax x 10^7/( 0.133 xb x fck)

d required for water moment

d req = (0.74x 1.5 x10^7) / ( 0.133 x 1000 x 30) 5.27 cm


Bottom Bottom = 52.74 mm
(Inside)

Provide D = 300 mm d = 250 mm

d req = (0.79x 1.5 x10^7) / ( 0.133 x 1000 x 30) 5.45 cm


1.0H 1.0H = 54.5 mm
(Inside)

Provide D = 300 mm d = 240 mm

Page 22 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2

d required for earth + surcharge moment :-

d req = (0.48x 1.5 x10^7) / ( 0.133 x 1000 x 30) 4.248 cm


Bottom Bottom = 42.48 mm

provide D = 300 mm d = 250 mm

d req = (0.543x 1.5 x10^7) / ( 0.133 x 1000 x 30) 4.436 cm


0.4h 0.4h = 44.36 mm

provide D = 300 mm d = 240 mm

Ast = 0 .5 f ck 1 − 1 − 4 .6 M u2 bd
fy f ck bd

Reinforcement required due to water moment:-


A) Ast reqd. @ Bottom Vertical inside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x0.74x10^7)/ ( 1000x30x250^2) ) ] x (1000x250)


= 103 mm^2/m

B) Ast reqd. @ 0.4h Horizontal inside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x0.79x10^7)/ ( 1000x30x240^2) ) ] x (1000x240)


= 114 mm^2/m

C) Ast reqd. @ 0.2h Vertical outside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x0.21x10^7)/ ( 1000x30x250^2) ) ] x (1000x250)


= 29 mm^2/m

D) Ast reqd. @ 0.4h Horizontal outside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x0.39x10^7)/ ( 1000x30x240^2) ) ] x (1000x240)


= 56 mm^2/m

Reinforcement required due to earth + surcharge:-

A) Ast reqd. @ Bottom Vertical outside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x0.48x10^7)/ ( 1000x30x250^2) ) ] x (1000x250)


= 67 mm^2/m
B) Ast reqd. @ 0.4h horizontal outside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x0.543x10^7)/ ( 1000x30x240^2) ) ] x (1000x240)


= 78 mm^2/m
C) Ast reqd. @ 0.2h vertical inside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x0.13x10^7)/ ( 1000x30x240^2) ) ] x (1000x240)


= 18 mm^2/m
D) Ast reqd. @ 0.4h horizontal inside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x0.269x10^7)/ ( 1000x30x240^2) ) ] x (1000x240)


= 39 mm^2/m

Page 23 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2

To find axial Tension in wall (water)


Rx @0.2h (for strength condition)
= 0.1441 x 4.20 x 4.20 = 2.54 T/M
T/M^2

Rx @0.8h (for serviceability condition)


= 0.2564 x 1.00 x 1.00 = 0.26 T/M
T/M^2

To find shear at base of wall


SHEAR AT BASE OF WALL = Ry(due to water) (for strength condition)
= 0.1864 x 4.20 x 4.2 = 1.64 T/M
2 T/M^2

SHEAR AT BASE OF WALL = Ry(due to water) (for serviceability condition)


= 0.4584 x 1.00 x 1 = 0.23 T/M
2 T/M^2

SHEAR AT BASE OF WALL(DUE TO EARTH) =

= 0.2061 x 2.44 x 3.70 = 0.93 T/M


2 T/M^2

SHEAR AT BASE OF WALL = Ry(due to surcharge)


= 0.2478 * 0.33 * 3.70 = 0.15 T/M
2 T/M^2

Minimum reinforcement reqd.


As per Cl.8.1.1 of IS 3370(part-2) : 2009
0.24 300
x 1000 x = 360 mm^2/m
100 2

SUMMARY :
A) From Bottom to Top = 300 mm to 300 mm

D @ bottom = 300
Provide 10 tor @ 200 c/c vertical inside upto midheight
(Provided Ast. = 393 mm^2/m)
Provide 10 tor @ 150 c/c horizontal inside
(Provided Ast. = 524 mm^2/m)
Provide 10 tor @ 200 c/c Vertical outside upto 1.35m ht from bottom
(Provided Ast. = 393 mm^2/m)
Provide 10 tor @ 150 c/c horizontal outside
(Provided Ast. = 524 mm^2/m)

Shear check :-
Water
Shear V = 1.64 T/M
Vu = 1.64 x 1.50 = 2.460
τvu = Vu / bd
=( 2.46 X 10^4 ) / ( 1000 x 250 )
= 0.098 N/mm^2
Pt provided = 0.157 %
τc = 0.300 N/mm^2
τc > τvu
HENCE SAFE
Soil + Surcharge
Shear V = 1.08 T/M
Vu = 1.08 x 1.50 = 1.620
τvu = Vu / bd
=( 1.62 X 10^4 ) / ( 1000 x 250 )
= 0.065 N/mm^2
Pt provided = 0.157 %
τc = 0.300 N/mm^2
τc > τvu
HENCE SAFE

Page 24 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

CRACK WIDTH CALCULATIONS - FLEXURE

FOR WATER Vertical steel Horizontal


Inside steel
Location For Crack Width Check @ bottom @ 0.8h
INPUT
fck= 30 N/mm2 30
fy= 500 N/mm2 500
Area of reinforcement " As " = 393 mm2 2011
b= 1000 mm 1000
h= 300 mm 300
d= 250 mm 247
Minimum cover to tension reinforcement " CO " = 45 mm 45
Bar spacing " S " = 200.0 mm 100
Bar dia " DIA " = 10.00 mm 16
" acr " =(((S/2)^2+(CO+DIA/2)^2)^(1/2)-DIA/2) as default or enter other value = 106.8 mm 64.9
"acr " is distance from the point considered to the surface of the nearest longitudinal
bar
Applied moment " M "= 0.08 Tm

Tension- "T"=
CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61
" r " = As/bd = 0.002 0.008
depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d = 48.12 mm 94.61

" Z " = d-(x/3) = 234 215


Reinforcement stress " fs " = Ms/(As*Z) +0.5Ts/As = 8.71 N/mm2 0
Concrete stress " fc " = (fs*As)/(0.5*b*x) = 0.14 N/mm2 0.00
Strain at soffit of concrete beam/slab- " e1 " = (fs/Es)*(h-x)/(d-x) = 0.0001 0.0000
Strain due to stiffening effect of concrete between cracks " e2 " =
e2 = b.(h-x)2/(3.Es.As.(d-x)) for crack widths of 0.2 mm Used Used
2
e2 = 1.5.b.(h-x) /(3.Es.As.(d-x)) for crack widths of 0.1 mm n/a n/a
e2 = 0.0013 0.0002
Average strain for calculation of crack width- " em "= e1-e2 = 0.0000 0.0000

Calculated crack width, " w " = 3.acr.em/(1+2.(acr-c)/(h-x))


CALCULATED CRACK WIDTH, 'w' = 0.0000 mm 0.0000
Crack width Less than 0.2mm OK OK
-ve sign indiactes uncracked section

Page 25 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

CRACK WIDTH CALCULATIONS - FLEXURE

Horizontal steel Horizontal


inside (water) steel
Location For Crack Width Check 0.4h @ 0.8h
INPUT
fck= 30 N/mm2 30
fy= 500 N/mm2 500
Area of reinforcement " As " = 524 mm2 2011
b= 1000 mm 1000
h= 300 mm 300
d= 240 mm 247
Minimum cover to tension reinforcement " CO " = 45 mm 45
Bar spacing " S " = 150 mm 100
Bar dia " DIA " = 10 mm 16
" acr " =(((S/2)^2+(CO+DIA/2)^2)^(1/2)-DIA/2) as default or enter other value = 85.1 mm 64.9
"acr " is distance from the point considered to the surface of the nearest longitudinal
bar
Applied moment " M "= 0.06 Tm

Tension- "T"= 0.26


CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61
" r " = As/bd = 0.002 0.008
depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d = 53.42 mm 94.61

" Z " = d-(x/3) = 222 215


Reinforcement stress " fs " = Ms/(As*Z) +0.5Ts/As = 7.64 N/mm2 0
Concrete stress " fc " = (fs*As)/(0.5*b*x) = 0.15 N/mm2 0.00
Strain at soffit of concrete beam/slab- " e1 " = (fs/Es)*(h-x)/(d-x) = 0.0001 0.0000
Strain due to stiffening effect of concrete between cracks " e2 " =
e2 = b.(h-x)2/(3.Es.As.(d-x)) for crack widths of 0.2 mm Used Used
2
e2 = 1.5.b.(h-x) /(3.Es.As.(d-x)) for crack widths of 0.1 mm n/a n/a
e2 = 0.0010 0.0002
Average strain for calculation of crack width- " em "= e1-e2 = 0.0000 0.0000

Calculated crack width, " w " = 3.acr.em/(1+2.(acr-c)/(h-x))


CALCULATED CRACK WIDTH, 'w' = 0.0000 mm 0.0000
Crack width Less than 0.2mm OK OK
-ve sign indiactes uncracked section

Page 26 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

CRACK WIDTH CALCULATIONS - FLEXURE

FOR EARTH Vertical steel Horizontal


Outside steel
Location For Crack Width Check @ bottom @ 0.8h
INPUT
fck= 30 N/mm2 30
fy= 500 N/mm2 500
Area of reinforcement " As " = 393 mm2 2011
b= 1000 mm 1000
h= 300 mm 300
d= 250 mm 247
Minimum cover to tension reinforcement " CO " = 45 mm 45
Bar spacing " S " = 200 mm 100
Bar dia " DIA " = 10 mm 16
" acr " =(((S/2)^2+(CO+DIA/2)^2)^(1/2)-DIA/2) as default or enter other value = 106.8 mm 64.9
"acr " is distance from the point considered to the surface of the nearest longitudinal
bar
Applied moment " M "= 0.48 Tm

Tension- "T"=
CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61
" r " = As/bd = 0.002 0.008
depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d = 48.12 mm 94.61

" Z " = d-(x/3) = 234 215


Reinforcement stress " fs " = Ms/(As*Z) +0.5Ts/As = 52.24 N/mm2 0
Concrete stress " fc " = (fs*As)/(0.5*b*x) = 0.85 N/mm2 0.00
Strain at soffit of concrete beam/slab- " e1 " = (fs/Es)*(h-x)/(d-x) = 0.0003 0.0000
Strain due to stiffening effect of concrete between cracks " e2 " =
e2 = b.(h-x)2/(3.Es.As.(d-x)) for crack widths of 0.2 mm Used Used
2
e2 = 1.5.b.(h-x) /(3.Es.As.(d-x)) for crack widths of 0.1 mm n/a n/a
e2 = 0.0013 0.0002
Average strain for calculation of crack width- " em "= e1-e2 = 0.0000 0.0000

Calculated crack width, " w " = 3.acr.em/(1+2.(acr-c)/(h-x))


CALCULATED CRACK WIDTH, 'w' = 0.0000 mm 0.0000
Crack width Less than 0.2mm OK OK
-ve sign indiactes uncracked section

Page 27 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

CRACK WIDTH CALCULATIONS - FLEXURE

Horizontal steel Horizontal


outside (earth) steel
Location For Crack Width Check @ 1h @ 0.8h
INPUT
fck= 30 N/mm2 30
fy= 500 N/mm2 500
Area of reinforcement " As " = 524 mm2 2011
b= 1000 mm 1000
h= 300 mm 300
d= 240 mm 247
Minimum cover to tension reinforcement " CO " = 45 mm 45
Bar spacing " S " = 150 mm 100
Bar dia " DIA " = 10 mm 16
" acr " =(((S/2)^2+(CO+DIA/2)^2)^(1/2)-DIA/2) as default or enter other value = 85.1 mm 64.9
"acr " is distance from the point considered to the surface of the nearest longitudinal
bar
Applied moment " M "= 0.54 Tm

Tension- "T"= 0.00


CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61
" r " = As/bd = 0.002 0.008
2 0.5
depth to neutral axis, "x" = (-a.r +((a.r) + 2.a.r) .d = 53.42 mm 94.61

" Z " = d-(x/3) = 222 215


Reinforcement stress " fs " = Ms/(As*Z) +0.5Ts/As = 46.67 N/mm2 0
Concrete stress " fc " = (fs*As)/(0.5*b*x) = 0.91 N/mm2 0.00
Strain at soffit of concrete beam/slab- " e1 " = (fs/Es)*(h-x)/(d-x) = 0.0003 0.0000
Strain due to stiffening effect of concrete between cracks " e2 " =
e2 = b.(h-x)2/(3.Es.As.(d-x)) for crack widths of 0.2 mm Used Used
e2 = 1.5.b.(h-x)2/(3.Es.As.(d-x)) for crack widths of 0.1 mm n/a n/a
e2 = 0.0010 0.0002
Average strain for calculation of crack width- " em "= e1-e2 = 0.0000 0.0000

Calculated crack width, " w " = 3.acr.em/(1+2.(acr-c)/(h-x))


CALCULATED CRACK WIDTH, 'w' = 0.0000 mm 0.0000
Crack width Less than 0.2mm OK OK
-ve sign indiactes uncracked section

Page 28 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2

DESIGN OF WALL OF STAIRCASE CHAMBER :


Length of long wall = 5.4 m
Concrete grade = M 30 Steel Grade = Fe 500
Clear cover = 45 mm on inside face
Clear cover = 45 mm on outside face
D @ bottom = 300 mm btm to D = 300 mm Top
Breadth ( b ) = 1000 mm
Angle of internal friction = 30 deg.
Coefficient of active earth pressure (Ka) = 0.33
3
wt. of soil = 2 T/m
2
Surcharge = 1 T/m
Density of liquid = 1 T/m^3
WALL TOP WATER LVL.
Free 240.4 240.4
Service Water level
Fixed FGL 237.35
(Typ) 239.90
3.05 0.00
2.55

=b
237.35
Surcharge Pressure =
0.33 x 1 = 0.330 T/sqm Water Pressure for strength =
5.4 =2a 1.0 T/m^3* 3.05
Earth Pressure = [ ( 2 - 1 ) X 0.33 + 1 ] x 0 = 3.05
= 0.00 T/sq m
= { 2 x 0.33 x 2.55 }
= 1.683 t/sq m Water Pressure for serviceability =
1.0 T/m^3* 0.00
=0

Moment due to earth Pressure :


a / b = 1.059

(Refer Moody's chart fig.no 04 plate fixed along three edges,free at top)

A) M max @ Bottom (-ve) vertical outside = Coefficient * p * b^2


= 0.0894 x 1.68 x 2.55 2.550 = 0.98 Tm/m
t/sq m
B) M max @ 0.6h (-ve) horizontal outside = Coefficient * p * b^2
= 0.0669 x 1.68 x 2.55 2.550 = 0.73 Tm/m
t/sq m
C) M max @ 0.6h (+ve) vertical inside = Coefficient * p * b^2
= 0.0151 x 1.68 x 2.55 2.550 = 0.17 Tm/m
t/sq m
D) M max @ 1h (+ve) horizontal inside = Coefficient * p * b^2
= 0.0272 x 1.68 x 2.55 2.550 = 0.30 Tm/m
t/sq m

Page 29 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2

Moment due to surcharge :

a/b = 1.059
(Refer moody's chart fig.no:1 plate fixed along three edges,free at top)

A) M max vertical @ bottom (-ve) outside = Coefficient * p * b^2


= 0.222 X 0.33 X 2.55 ^2 = 0.48 tm/m
t/sq m

B) M max @ 1.0 h (-ve) horizontal outside = Coefficient * p * b^2


= 0.269 X 0.33 X 2.55 ^2 = 0.577 tm/m
t/sq m

C) M max @ 1h (+ve) vertical inside = Coefficient * p * b^2


= 0.0234 X 0.33 X 2.55 ^2 = 0.05 tm/m
t/sq m

D) M max @ 1.0 h (+ve) horizontal inside = Coefficient * p * b^2


= 0.0991 X 0.33 X 2.55 ^2 = 0.213 tm/m
t/sq m

Total moment due to earth and surcharge:

A) M max vertical @ bottom (-ve) outside


= 0.98 + 0.48 = 1.46 tm/m
After moment
B) M max horizontal (-ve) outside distribution
= 0.73 + 0.577 = 1.31 tm/m 0 Tm/m
(REF PAGE NO. )
C) M max vertical (+ve) inside
= 0.17 + 0.05 = 0.22 tm/m

D) M max horizontal (+ve) inside


= 0.30 + 0.213 = 0.51 tm/m 0 Tm/m
(REF PAGE NO. )

d req = Mumax x 10^7/( 0.133 xb x fck)

d required for earth + surcharge moment :-

d req = (1.46x 1.5 x10^7) / ( 0.133 x 1000 x 30) 7.409 cm


Bottom Bottom = 74.09 mm

provide D = 300 mm d = 250 mm

d req = (1.307x 1.5 x10^7) / ( 0.133 x 1000 x 30) 6.882 cm


0.6h 0.6h = 68.82 mm

provide D = 300 mm d = 240 mm

Ast = 0 .5 f ck 1 − 1 − 4 .6 M u2 bd
fy f ck bd

Page 30 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2
Reinforcement required due to earth + surcharge:-

A) Ast reqd. @ Bottom Vertical outside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x1.46x10^7)/ ( 1000x30x250^2) ) ] x (1000x250)


= 204 mm^2/m
B) Ast reqd. @ 0.6h horizontal outside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x1.307x10^7)/ ( 1000x30x240^2) ) ] x (1000x240)


= 190 mm^2/m
C) Ast reqd. @ 0.6h vertical inside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x0.22x10^7)/ ( 1000x30x240^2) ) ] x (1000x240)


= 30 mm^2/m
D) Ast reqd. @ 1h horizontal inside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x0.513x10^7)/ ( 1000x30x240^2) ) ] x (1000x240)


= 74 mm^2/m

To find shear at base of wall


SHEAR AT BASE OF WALL(DUE TO EARTH) =

= 0.4639 x 1.68 x 2.55 = 1 T/M


2 T/M^2

SHEAR AT BASE OF WALL = Ry(due to surcharge)


= 0.8647 * 0.33 * 2.55 = 0.36 T/M
2 T/M^2

Minimum reinforcement reqd.


As per Cl.8.1.1 of IS 3370(part-2) : 2009
0.24 300
x 1000 x = 360 mm^2/m
100 2

SUMMARY :
A) From Bottom to Top = 300 mm to 300 mm

D @ bottom = 300
Provide 10 tor @ 200 c/c vertical inside upto midheight
(Provided Ast. = 393 mm^2/m)
Provide 10 tor @ 150 c/c horizontal inside
(Provided Ast. = 524 mm^2/m)
Provide 10 tor @ 200 c/c Vertical outside upto 1.35m ht from bottom
(Provided Ast. = 393 mm^2/m)
Provide 10 tor @ 150 c/c horizontal outside
(Provided Ast. = 524 mm^2/m)
Shear check :-
Water
Shear V = 1.71 T/M
Vu = 1.71 x 1.50 = 2.565
τvu = Vu / bd
=( 2.565 X 10^4 ) / ( 1000 x 250 )
= 0.103 N/mm^2
Pt provided = 0.157 %
τc = 0.300 N/mm^2
τc > τvu
HENCE SAFE
Soil + Surcharge
Shear V = 1.36 T/M
Vu = 1.36 x 1.50 = 2.040
τvu = Vu / bd
=( 2.04 X 10^4 ) / ( 1000 x 250 )
= 0.082 N/mm^2
Pt provided = 0.157 %
τc = 0.300 N/mm^2
τc > τvu Page 31 of 85
HENCE SAFE
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

CRACK WIDTH CALCULATIONS - FLEXURE

FOR EARTH Vertical steel Horizontal


Outside steel
Location For Crack Width Check @ bottom @ 0.8h
INPUT
fck= 30 N/mm2 30
fy= 500 N/mm2 500
Area of reinforcement " As " = 393 mm2 2011
b= 1000 mm 1000
h= 300 mm 300
d= 250 mm 247
Minimum cover to tension reinforcement " CO " = 45 mm 45
Bar spacing " S " = 200 mm 100
Bar dia " DIA " = 10 mm 16
" acr " =(((S/2)^2+(CO+DIA/2)^2)^(1/2)-DIA/2) as default or enter other value = 106.8 mm 64.9
"acr " is distance from the point considered to the surface of the nearest longitudinal
bar
Applied moment " M "= 1.46 Tm

Tension- "T"=
CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61
" r " = As/bd = 0.002 0.008
depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d = 48.12 mm 94.61

" Z " = d-(x/3) = 234 215


Reinforcement stress " fs " = Ms/(As*Z) +0.5Ts/As = 158.91 N/mm2 0
Concrete stress " fc " = (fs*As)/(0.5*b*x) = 2.59 N/mm2 0.00
Strain at soffit of concrete beam/slab- " e1 " = (fs/Es)*(h-x)/(d-x) = 0.0010 0.0000
Strain due to stiffening effect of concrete between cracks " e2 " =
e2 = b.(h-x)2/(3.Es.As.(d-x)) for crack widths of 0.2 mm Used Used
2
e2 = 1.5.b.(h-x) /(3.Es.As.(d-x)) for crack widths of 0.1 mm n/a n/a
e2 = 0.0013 0.0002
Average strain for calculation of crack width- " em "= e1-e2 = 0.0000 0.0000

Calculated crack width, " w " = 3.acr.em/(1+2.(acr-c)/(h-x))


CALCULATED CRACK WIDTH, 'w' = 0.0000 mm 0.0000
Crack width Less than 0.2mm OK OK
-ve sign indiactes uncracked section

Page 32 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

CRACK WIDTH CALCULATIONS - FLEXURE

Horizontal steel Horizontal


outside (earth) steel
Location For Crack Width Check @ 1h @ 0.8h
INPUT
fck= 30 N/mm2 30
fy= 500 N/mm2 500
Area of reinforcement " As " = 524 mm2 2011
b= 1000 mm 1000
h= 300 mm 300
d= 240 mm 247
Minimum cover to tension reinforcement " CO " = 45 mm 45
Bar spacing " S " = 150 mm 100
Bar dia " DIA " = 10 mm 16
" acr " =(((S/2)^2+(CO+DIA/2)^2)^(1/2)-DIA/2) as default or enter other value = 85.1 mm 64.9
"acr " is distance from the point considered to the surface of the nearest longitudinal
bar
Applied moment " M "= 1.31 Tm

Tension- "T"= 0.00


CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61
" r " = As/bd = 0.002 0.008
2 0.5
depth to neutral axis, "x" = (-a.r +((a.r) + 2.a.r) .d = 53.42 mm 94.61

" Z " = d-(x/3) = 222 215


Reinforcement stress " fs " = Ms/(As*Z) +0.5Ts/As = 112.34 N/mm2 0
Concrete stress " fc " = (fs*As)/(0.5*b*x) = 2.20 N/mm2 0.00
Strain at soffit of concrete beam/slab- " e1 " = (fs/Es)*(h-x)/(d-x) = 0.0007 0.0000
Strain due to stiffening effect of concrete between cracks " e2 " =
e2 = b.(h-x)2/(3.Es.As.(d-x)) for crack widths of 0.2 mm Used Used
e2 = 1.5.b.(h-x)2/(3.Es.As.(d-x)) for crack widths of 0.1 mm n/a n/a
e2 = 0.0010 0.0002
Average strain for calculation of crack width- " em "= e1-e2 = 0.0000 0.0000

Calculated crack width, " w " = 3.acr.em/(1+2.(acr-c)/(h-x))


CALCULATED CRACK WIDTH, 'w' = 0.0000 mm 0.0000
Crack width Less than 0.2mm OK OK
-ve sign indiactes uncracked section

Page 33 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING SOLUTIONS PVT LTD.
STATION OF SPS-2

DESIGN OF WALL OF SCREEN CHANNEL :


Length of long wall = 4 m
Concrete grade = M 30 Steel Grade = Fe 500
Clear cover = 45 mm on inside face
Clear cover = 45 mm on outside face
D @ bottom = 300 mm btm to D = 300 mm Top
Breadth ( b ) = 1000 mm
Angle of internal friction = 30 deg.
Coefficient of active earth pressure (Ka) = 0.33
3
wt. of soil = 2 T/m
2
Surcharge = 1 T/m
Density of liquid = 1 T/m^3
WALL TOP WATER LVL.
Free 240.4 240.4

Fixed FGL Service Water level


(Typ) 239.90 = 237.15
3.85
3.35

=b 0.60
236.55
Surcharge Pressure =
0.33 x 1 = 0.330 T/sqm Water Pressure for strength =
4 =2a 1.0 T/m^3* 3.85
Earth Pressure = [ ( 2 - 1 ) X 0.33 + 1 ] x 0 = 3.85
= 0.00 T/sq m
= { 2 x 0.33 x 3.35 }
= 2.211 t/sq m Water Pressure for serviceability =
1.0 T/m^3* 0.60
= 0.6
Moment due to water Pressure for strength condition: T/sq m
a / b = 0.519
(Refer Moody's chart fig.no 04 Plate fixed along three edges,Free at top)

A) M max @ Bottom (-ve) Vertical inside = Coefficient * p * b^2


= 0.0345 x 3.85 x 3.85 x 3.85 = 1.97 Tm/m + 0 Tm/m
T/sq m = 1.97 Tm/m Platform mmt
After moment
B) M max @ 0.6h (-ve) Horizontal inside = Coefficient * p * b^2 distribution
= 0.0285 x 3.85 x 3.85 x 3.85 = 1.62 Tm/m 0 Tm/m
T/sq m (REF PAGE NO. )

C) M max @ 0.4h (+ve) Vertical outside = Coefficient * p * b^2


= 0.0107 x 3.85 x 3.85 x 3.85 = 0.61 Tm/m
T/sq m

D) M max @ 0.6h (+ve) Horizontal outside = Coefficient * p * b^2


= 0.01363 x 3.85 x 3.85 x 3.85 = 0.78 Tm/m 0 Tm/m
T/sq m (REF PAGE NO. )

Page 34 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING SOLUTIONS PVT LTD.
STATION OF SPS-2
Moment due to earth Pressure :
a / b = 0.597

(Refer Moody's chart fig.no 04 plate fixed along three edges,free at top)

A) M max @ Bottom (-ve) vertical outside = Coefficient * p * b^2


= 0.0425 x 2.21 x 3.35 3.350 = 1.06 Tm/m
t/sq m
B) M max @ 0.6h (-ve) horizontal outside = Coefficient * p * b^2
= 0.0332 x 2.21 x 3.35 3.350 = 0.82 Tm/m
t/sq m
C) M max @ 0.4h (+ve) vertical inside = Coefficient * p * b^2
= 0.0119 x 2.21 x 3.35 3.350 = 0.3 Tm/m
t/sq m
D) M max @ 0.6h (+ve) horizontal inside = Coefficient * p * b^2
= 0.0154 x 2.21 x 3.35 3.350 = 0.38 Tm/m
t/sq m

Moment due to surcharge :

a/b = 0.597
(Refer moody's chart fig.no:1 plate fixed along three edges,free at top)

A) M max vertical @ bottom (-ve) outside = Coefficient * p * b^2


= 0.080 X 0.33 X 3.35 ^2 = 0.30 tm/m
t/sq m

B) M max @ 1.0 h (-ve) horizontal outside = Coefficient * p * b^2


= 0.122 X 0.33 X 3.35 ^2 = 0.452 tm/m
t/sq m

C) M max @ 0.6h (+ve) vertical inside = Coefficient * p * b^2


= 0.0176 X 0.33 X 3.35 ^2 = 0.07 tm/m
t/sq m

D) M max @ 1.0 h (+ve) horizontal inside = Coefficient * p * b^2


= 0.0578 X 0.33 X 3.35 ^2 = 0.214 tm/m
t/sq m

Total moment due to earth and surcharge:

A) M max vertical @ bottom (-ve) outside


= 1.06 + 0.30 = 1.36 tm/m
After moment
B) M max horizontal (-ve) outside distribution
= 0.82 + 0.452 = 1.27 tm/m 0 Tm/m
(REF PAGE NO. )
C) M max vertical (+ve) inside
= 0.3 + 0.07 = 0.37 tm/m

D) M max horizontal (+ve) inside


= 0.38 + 0.214 = 0.59 tm/m 0 Tm/m
(REF PAGE NO. )

Page 35 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING SOLUTIONS PVT LTD.
STATION OF SPS-2

d req = Mumax x 10^7/( 0.133 xb x fck)

d required for water moment

d req = (1.97x 1.5 x10^7) / ( 0.133 x 1000 x 30) 8.61 cm


Bottom Bottom = 86.06 mm
(Inside)

Provide D = 300 mm d = 250 mm

d req = (1.62x 1.5 x10^7) / ( 0.133 x 1000 x 30) 7.80 cm


1.0H 1.0H = 78.04 mm
(Inside)

Provide D = 300 mm d = 240 mm

d required for earth + surcharge moment :-

d req = (1.36x 1.5 x10^7) / ( 0.133 x 1000 x 30) 7.15 cm


Bottom Bottom = 71.5 mm

provide D = 300 mm d = 250 mm

d req = (1.272x 1.5 x10^7) / ( 0.133 x 1000 x 30) 6.789 cm


0.6h 0.6h = 67.89 mm

provide D = 300 mm d = 240 mm

Ast = 0 .5 f ck 1 − 1 − 4 .6 M u2 bd
fy f ck bd

Reinforcement required due to water moment:-


A) Ast reqd. @ Bottom Vertical inside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x1.97x10^7)/ ( 1000x30x250^2) ) ] x (1000x250)


= 277 mm^2/m

B) Ast reqd. @ 0.6h Horizontal inside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x1.62x10^7)/ ( 1000x30x240^2) ) ] x (1000x240)


= 237 mm^2/m

C) Ast reqd. @ 0.4h Vertical outside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x0.61x10^7)/ ( 1000x30x250^2) ) ] x (1000x250)


= 85 mm^2/m

D) Ast reqd. @ 0.6h Horizontal outside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x0.78x10^7)/ ( 1000x30x240^2) ) ] x (1000x240)


= 113 mm^2/m

Page 36 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING SOLUTIONS PVT LTD.
STATION OF SPS-2
Reinforcement required due to earth + surcharge:-

A) Ast reqd. @ Bottom Vertical outside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x1.36x10^7)/ ( 1000x30x250^2) ) ] x (1000x250)


= 190 mm^2/m
B) Ast reqd. @ 0.6h horizontal outside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x1.272x10^7)/ ( 1000x30x240^2) ) ] x (1000x240)


= 185 mm^2/m
C) Ast reqd. @ 0.4h vertical inside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x0.37x10^7)/ ( 1000x30x240^2) ) ] x (1000x240)


= 51 mm^2/m
D) Ast reqd. @ 0.6h horizontal inside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x0.594x10^7)/ ( 1000x30x240^2) ) ] x (1000x240)


= 86 mm^2/m

To find axial Tension in wall (water)


Rx @0.2h (for strength condition)
= 0.2430 x 3.85 x 3.85 = 3.6 T/M
T/M^2

To find shear at base of wall


SHEAR AT BASE OF WALL = Ry(due to water) (for strength condition)
= 0.3298 x 3.85 x 3.85 = 2.44 T/M
2 T/M^2

SHEAR AT BASE OF WALL(DUE TO EARTH) =

= 0.3554 x 2.21 x 3.35 = 1.32 T/M


2 T/M^2

SHEAR AT BASE OF WALL = Ry(due to surcharge)


= 0.5407 * 0.33 * 3.35 = 0.3 T/M
2 T/M^2

Minimum reinforcement reqd.


As per Cl.8.1.1 of IS 3370(part-2) : 2009
0.24 300
x 1000 x = 360 mm^2/m
100 2

SUMMARY :
A) From Bottom to Top = 300 mm to 300 mm

D @ bottom = 300
Provide 10 tor @ 200 c/c vertical inside upto midheight
(Provided Ast. = 393 mm^2/m)
Provide 10 tor @ 150 c/c horizontal inside
(Provided Ast. = 524 mm^2/m)
Provide 10 tor @ 200 c/c Vertical outside upto 1.35m ht from bottom
(Provided Ast. = 393 mm^2/m)
Provide 10 tor @ 150 c/c horizontal outside
(Provided Ast. = 524 mm^2/m)

Page 37 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING SOLUTIONS PVT LTD.
STATION OF SPS-2

Shear check :-
Water
Shear V = 2.44 T/M
Vu = 2.44 x 1.50 = 3.660
τvu = Vu / bd
=( 3.66 X 10^4 ) / ( 1000 x 250 )
= 0.146 N/mm^2
Pt provided = 0.157 %
τc = 0.300 N/mm^2
τc > τvu
HENCE SAFE
Soil + Surcharge
Shear V = 1.62 T/M
Vu = 1.62 x 1.50 = 2.430
τvu = Vu / bd
=( 2.43 X 10^4 ) / ( 1000 x 250 )
= 0.097 N/mm^2
Pt provided = 0.157 %
τc = 0.300 N/mm^2
τc > τvu
HENCE SAFE

PARTITION WALL OF SCREEN CHANNEL


FOR WALL DEPTH = 400 mm

Minimum reinforcement reqd.


As per Cl.8.1.1 of IS 3370(part-2) : 2009
0.24 400
x 1000 x = 480 mm^2/m
100 2
For Avg thk = 400 mm

SUMMARY :
A) From Bottom to Top = 400 mm

D @ bottom = 400
Provide 10 tor @ 150 c/c vertical inside upto midheight
(Provided Ast. = 524 mm^2/m)
Provide 10 tor @ 150 c/c horizontal inside
(Provided Ast. = 524 mm^2/m)
Provide 10 tor @ 150 c/c Vertical outside upto 1.35m ht from bottom
(Provided Ast. = 524 mm^2/m)
Provide 10 tor @ 150 c/c horizontal outside
(Provided Ast. = 524 mm^2/m)

Page 38 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

CRACK WIDTH CALCULATIONS - FLEXURE

FOR WATER Vertical steel Horizontal


Inside steel
Location For Crack Width Check @ bottom @ 0.8h
INPUT
fck= 30 N/mm2 30
fy= 500 N/mm2 500
Area of reinforcement " As " = 393 mm2 2011
b= 1000 mm 1000
h= 300 mm 300
d= 250 mm 247
Minimum cover to tension reinforcement " CO " = 45 mm 45
Bar spacing " S " = 200.0 mm 100
Bar dia " DIA " = 10.00 mm 16
" acr " =(((S/2)^2+(CO+DIA/2)^2)^(1/2)-DIA/2) as default or enter other value = 106.8 mm 64.9
"acr " is distance from the point considered to the surface of the nearest longitudinal
bar
Applied moment " M "= 1.97 Tm

Tension- "T"=
CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61
" r " = As/bd = 0.002 0.008
depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d = 48.12 mm 94.61

" Z " = d-(x/3) = 234 215


Reinforcement stress " fs " = Ms/(As*Z) +0.5Ts/As = 214.42 N/mm2 0
Concrete stress " fc " = (fs*As)/(0.5*b*x) = 3.50 N/mm2 0.00
Strain at soffit of concrete beam/slab- " e1 " = (fs/Es)*(h-x)/(d-x) = 0.0013 0.0000
Strain due to stiffening effect of concrete between cracks " e2 " =
e2 = b.(h-x)2/(3.Es.As.(d-x)) for crack widths of 0.2 mm Used Used
2
e2 = 1.5.b.(h-x) /(3.Es.As.(d-x)) for crack widths of 0.1 mm n/a n/a
e2 = 0.0013 0.0002
Average strain for calculation of crack width- " em "= e1-e2 = 0.0000 0.0000

Calculated crack width, " w " = 3.acr.em/(1+2.(acr-c)/(h-x))


CALCULATED CRACK WIDTH, 'w' = 0.0008 mm 0.0000
Crack width Less than 0.2mm OK OK
-ve sign indiactes uncracked section

Page 39 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

CRACK WIDTH CALCULATIONS - FLEXURE

Horizontal steel Horizontal


inside (water) steel
Location For Crack Width Check 0.6h @ 0.8h
INPUT
fck= 30 N/mm2 30
fy= 500 N/mm2 500
Area of reinforcement " As " = 524 mm2 2011
b= 1000 mm 1000
h= 300 mm 300
d= 240 mm 247
Minimum cover to tension reinforcement " CO " = 45 mm 45
Bar spacing " S " = 150 mm 100
Bar dia " DIA " = 10 mm 16
" acr " =(((S/2)^2+(CO+DIA/2)^2)^(1/2)-DIA/2) as default or enter other value = 85.1 mm 64.9
"acr " is distance from the point considered to the surface of the nearest longitudinal
bar
Applied moment " M "= 1.62 Tm

Tension- "T"= 2.44


CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61
" r " = As/bd = 0.002 0.008
depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d = 53.42 mm 94.61

" Z " = d-(x/3) = 222 215


Reinforcement stress " fs " = Ms/(As*Z) +0.5Ts/As = 162.55 N/mm2 0
Concrete stress " fc " = (fs*As)/(0.5*b*x) = 3.19 N/mm2 0.00
Strain at soffit of concrete beam/slab- " e1 " = (fs/Es)*(h-x)/(d-x) = 0.0011 0.0000
Strain due to stiffening effect of concrete between cracks " e2 " =
e2 = b.(h-x)2/(3.Es.As.(d-x)) for crack widths of 0.2 mm Used Used
2
e2 = 1.5.b.(h-x) /(3.Es.As.(d-x)) for crack widths of 0.1 mm n/a n/a
e2 = 0.0010 0.0002
Average strain for calculation of crack width- " em "= e1-e2 = 0.0000 0.0000

Calculated crack width, " w " = 3.acr.em/(1+2.(acr-c)/(h-x))


CALCULATED CRACK WIDTH, 'w' = 0.0071 mm 0.0000
Crack width Less than 0.2mm OK OK
-ve sign indiactes uncracked section

Page 40 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

CRACK WIDTH CALCULATIONS - FLEXURE

FOR EARTH Vertical steel Horizontal


Outside steel
Location For Crack Width Check @ bottom @ 0.8h
INPUT
fck= 30 N/mm2 30
fy= 500 N/mm2 500
Area of reinforcement " As " = 393 mm2 2011
b= 1000 mm 1000
h= 300 mm 300
d= 250 mm 247
Minimum cover to tension reinforcement " CO " = 45 mm 45
Bar spacing " S " = 200 mm 100
Bar dia " DIA " = 10 mm 16
" acr " =(((S/2)^2+(CO+DIA/2)^2)^(1/2)-DIA/2) as default or enter other value = 106.8 mm 64.9
"acr " is distance from the point considered to the surface of the nearest longitudinal
bar
Applied moment " M "= 1.36 Tm

Tension- "T"=
CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61
" r " = As/bd = 0.002 0.008
depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d = 48.12 mm 94.61

" Z " = d-(x/3) = 234 215


Reinforcement stress " fs " = Ms/(As*Z) +0.5Ts/As = 148.03 N/mm2 0
Concrete stress " fc " = (fs*As)/(0.5*b*x) = 2.42 N/mm2 0.00
Strain at soffit of concrete beam/slab- " e1 " = (fs/Es)*(h-x)/(d-x) = 0.0009 0.0000
Strain due to stiffening effect of concrete between cracks " e2 " =
e2 = b.(h-x)2/(3.Es.As.(d-x)) for crack widths of 0.2 mm Used Used
2
e2 = 1.5.b.(h-x) /(3.Es.As.(d-x)) for crack widths of 0.1 mm n/a n/a
e2 = 0.0013 0.0002
Average strain for calculation of crack width- " em "= e1-e2 = 0.0000 0.0000

Calculated crack width, " w " = 3.acr.em/(1+2.(acr-c)/(h-x))


CALCULATED CRACK WIDTH, 'w' = 0.0000 mm 0.0000
Crack width Less than 0.2mm OK OK
-ve sign indiactes uncracked section

Page 41 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

CRACK WIDTH CALCULATIONS - FLEXURE

Horizontal steel Horizontal


outside (earth) steel
Location For Crack Width Check @ 1h @ 0.8h
INPUT
fck= 30 N/mm2 30
fy= 500 N/mm2 500
Area of reinforcement " As " = 524 mm2 2011
b= 1000 mm 1000
h= 300 mm 300
d= 240 mm 247
Minimum cover to tension reinforcement " CO " = 45 mm 45
Bar spacing " S " = 150 mm 100
Bar dia " DIA " = 10 mm 16
" acr " =(((S/2)^2+(CO+DIA/2)^2)^(1/2)-DIA/2) as default or enter other value = 85.1 mm 64.9
"acr " is distance from the point considered to the surface of the nearest longitudinal
bar
Applied moment " M "= 1.27 Tm

Tension- "T"= 0.00


CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61
" r " = As/bd = 0.002 0.008
2 0.5
depth to neutral axis, "x" = (-a.r +((a.r) + 2.a.r) .d = 53.42 mm 94.61

" Z " = d-(x/3) = 222 215


Reinforcement stress " fs " = Ms/(As*Z) +0.5Ts/As = 109.33 N/mm2 0
Concrete stress " fc " = (fs*As)/(0.5*b*x) = 2.14 N/mm2 0.00
Strain at soffit of concrete beam/slab- " e1 " = (fs/Es)*(h-x)/(d-x) = 0.0007 0.0000
Strain due to stiffening effect of concrete between cracks " e2 " =
e2 = b.(h-x)2/(3.Es.As.(d-x)) for crack widths of 0.2 mm Used Used
e2 = 1.5.b.(h-x)2/(3.Es.As.(d-x)) for crack widths of 0.1 mm n/a n/a
e2 = 0.0010 0.0002
Average strain for calculation of crack width- " em "= e1-e2 = 0.0000 0.0000

Calculated crack width, " w " = 3.acr.em/(1+2.(acr-c)/(h-x))


CALCULATED CRACK WIDTH, 'w' = 0.0000 mm 0.0000
Crack width Less than 0.2mm OK OK
-ve sign indiactes uncracked section

Page 42 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2

DESIGN OF LONG WALL OF WET WELL : (SHORT WALL SIMILAR)


Length of long wall = 4m
Concrete grade = M 30 Steel Grade = Fe 500
Clear cover = 45 mm on inside face
Clear cover = 45 mm on outside face
D @ bottom = 300 mm btm to D = 300 mm Top
Breadth ( b ) = 1000 mm
Angle of internal friction = 30 deg.
Coefficient of active earth pressure (Ka) = 0.33
3
wt. of soil = 2 T/m
2
Surcharge = 1 T/m
Density of liquid = 1 T/m^3
WALL TOP WATER LVL.
Free 240.4 240.4
Service Water level
Fixed FGL 236.5
(Typ) 239.90
5.60 1.70
5.10

=b
234.80
Surcharge Pressure =
0.33 x 1 = 0.330 T/sqm Water Pressure for strength =
4 =2a 1.0 T/m^3* 5.6
Earth Pressure = [ ( 2 - 1 ) X 0.33 + 1 ] x 0 = 5.6
= 0.00 T/sq m
= { 2 x 0.33 x 5.1 }
= 3.366 t/sq m Water Pressure for serviceability =
1.0 T/m^3* 1.70
= 1.7
Moment due to water Pressure for strength condition: T/sq m
a / b = 0.357
(Refer Moody's chart fig.no 04 Plate fixed along three edges,Free at top)

A) M max @ Bottom (-ve) Vertical inside = Coefficient * p * b^2


= 0.0187 x 5.60 x 5.60 x 5.60 = 3.28 Tm/m +
T/sq m = 3.28 Tm/m
After moment
B) M max @ 0.4h (-ve) Horizontal inside = Coefficient * p * b^2 distribution
= 0.0194 x 5.60 x 5.60 x 5.60 = 3.42 Tm/m 0 Tm/m
T/sq m (REF PAGE NO. )

C) M max @ 0.2h (+ve) Vertical outside = Coefficient * p * b^2


= 0.0048 x 5.60 x 5.60 x 5.60 = 0.85 Tm/m
T/sq m

D) M max @ 0.4h (+ve) Horizontal outside = Coefficient * p * b^2


= 0.00930 x 5.60 x 5.60 x 5.60 = 1.63 Tm/m 0 Tm/m
T/sq m (REF PAGE NO. )

Moment due to water Pressure for serviceability condition :


a / b = 1.176
(Refer Moody's chart fig.no 04 Plate fixed along three edges,Free at top)

A) M max @ Bottom (-ve) Vertical inside = Coefficient * p * b^2


= 0.0992 x 1.70 x 1.70 x 1.70 = 0.49 Tm/m +
T/sq m = 0.49 Tm/m
After moment
B) M max @ 0.4h (-ve) Horizontal inside = Coefficient * p * b^2 distribution
= 0.0719 x 1.70 x 1.70 x 1.70 = 0.35 Tm/m 0 Tm/m
T/sq m (REF PAGE NO. )

C) M max @ 0.8h (+ve) Vertical outside = Coefficient * p * b^2


= 0.0136 x 1.70 x 1.70 x 1.70 = 0.07 Tm/m
T/sq m

D) M max @ 1h (+ve) Horizontal outside = Coefficient * p * b^2


= 0.02626 x 1.70 x 1.70 x 1.70 = 0.13 Tm/m 0 Tm/m
T/sq m (REF PAGE NO. )

Page 43 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2

Moment due to earth Pressure :


a / b = 0.392

(Refer Moody's chart fig.no 04 plate fixed along three edges,free at top)

A) M max @ Bottom (-ve) vertical outside = Coefficient * p * b^2


= 0.0217 x 3.37 x 5.10 5.100 = 1.9 Tm/m
t/sq m
B) M max @ 0.4h (-ve) horizontal outside = Coefficient * p * b^2
= 0.0217 x 3.37 x 5.10 5.100 = 1.9 Tm/m
t/sq m
C) M max @ 0.4h (+ve) vertical inside = Coefficient * p * b^2
= 0.0067 x 3.37 x 5.1 5.100 = 0.59 Tm/m
t/sq m
D) M max @ 0.4h (+ve) horizontal inside = Coefficient * p * b^2
= 0.0103 x 3.37 x 5.1 5.100 = 0.90 Tm/m
t/sq m

Moment due to surcharge :

a/b = 0.392
(Refer moody's chart fig.no:1 plate fixed along three edges,free at top)

A) M max vertical @ bottom (-ve) outside = Coefficient * p * b^2


= 0.032 X 0.33 X 5.10 ^2 = 0.28 tm/m
t/sq m

B) M max @ 1.0 h (-ve) horizontal outside = Coefficient * p * b^2


= 0.053 X 0.33 X 5.1 ^2 = 0.455 tm/m
t/sq m

C) M max @ 0.4h (+ve) vertical inside = Coefficient * p * b^2


= 0.0089 X 0.33 X 5.1 ^2 = 0.08 tm/m
t/sq m

D) M max @ 1.0 h (+ve) horizontal inside = Coefficient * p * b^2


= 0.0272 X 0.33 X 5.1 ^2 = 0.234 tm/m
t/sq m

Total moment due to earth and surcharge:

A) M max vertical @ bottom (-ve) outside


= 1.9 + 0.28 = 2.18 tm/m
After moment
B) M max horizontal (-ve) outside distribution
= 1.9 + 0.455 = 2.36 tm/m 0 Tm/m
(REF PAGE NO. )
C) M max vertical (+ve) inside
= 0.59 + 0.08 = 0.67 tm/m

D) M max horizontal (+ve) inside


= 0.90 + 0.234 = 1.13 tm/m 0 Tm/m
(REF PAGE NO. )

Page 44 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2

d req = Mumax x 10^7/( 0.133 xb x fck)

d required for water moment

d req = (3.28x 1.5 x10^7) / ( 0.133 x 1000 x 30) 11.10 cm


Bottom Bottom = 111.04 mm
(Inside)

Provide D = 300 mm d = 250 mm

d req = (3.42x 1.5 x10^7) / ( 0.133 x 1000 x 30) 11.34 cm


1.0H 1.0H = 113.39 mm
(Inside)

Provide D = 300 mm d = 240 mm

d required for earth + surcharge moment :-

d req = (2.18x 1.5 x10^7) / ( 0.133 x 1000 x 30) 9.053 cm


Bottom Bottom = 90.53 mm

provide D = 300 mm d = 250 mm

d req = (2.355x 1.5 x10^7) / ( 0.133 x 1000 x 30) 9.237 cm


0.4h 0.4h = 92.37 mm

provide D = 300 mm d = 240 mm

Ast = 0 .5 f ck 1 − 1 − 4 .6 M u2 bd
fy f ck bd

Reinforcement required due to water moment:-


A) Ast reqd. @ Bottom Vertical inside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x3.28x10^7)/ ( 1000x30x250^2) ) ] x (1000x250)


= 467 mm^2/m

B) Ast reqd. @ 0.4h Horizontal inside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x3.42x10^7)/ ( 1000x30x240^2) ) ] x (1000x240)


= 510 mm^2/m

C) Ast reqd. @ 0.2h Vertical outside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x0.85x10^7)/ ( 1000x30x250^2) ) ] x (1000x250)


= 118 mm^2/m

D) Ast reqd. @ 0.4h Horizontal outside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x1.63x10^7)/ ( 1000x30x240^2) ) ] x (1000x240)


= 238 mm^2/m

Page 45 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2

Reinforcement required due to earth + surcharge:-

A) Ast reqd. @ Bottom Vertical outside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x2.18x10^7)/ ( 1000x30x250^2) ) ] x (1000x250)


= 307 mm^2/m
B) Ast reqd. @ 0.4h horizontal outside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x2.355x10^7)/ ( 1000x30x240^2) ) ] x (1000x240)


= 347 mm^2/m
C) Ast reqd. @ 0.4h vertical inside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x0.67x10^7)/ ( 1000x30x240^2) ) ] x (1000x240)


= 93 mm^2/m
D) Ast reqd. @ 0.4h horizontal inside

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.5x1.134x10^7)/ ( 1000x30x240^2) ) ] x (1000x240)


= 165 mm^2/m

To find axial Tension in wall (water)


Rx @0.4h (for strength condition)
= 0.2022 x 5.60 x 5.60 = 6.34 T/M
T/M^2

Rx @0.8h (for serviceability condition)


= 0.2692 x 1.70 x 1.70 = 0.78 T/M
T/M^2

To find shear at base of wall


SHEAR AT BASE OF WALL = Ry(due to water) (for strength condition)
= 0.2545 x 5.60 x 5.6 = 3.99 T/M
2 T/M^2

SHEAR AT BASE OF WALL = Ry(due to water) (for serviceability condition)


= 0.4747 x 1.70 x 1.7 = 0.69 T/M
2 T/M^2

SHEAR AT BASE OF WALL(DUE TO EARTH) =

= 0.2725 x 3.37 x 5.10 = 2.34 T/M


2 T/M^2

SHEAR AT BASE OF WALL = Ry(due to surcharge)


= 0.3568 * 0.33 * 5.10 = 0.3 T/M
2 T/M^2

Minimum reinforcement reqd.


As per Cl.8.1.1 of IS 3370(part-2) : 2009
0.24 300
x 1000 x = 360 mm^2/m
100 2

SUMMARY :
A) From Bottom to Top = 300 mm to 300 mm

D @ bottom = 300
Provide 10 tor @ 150 c/c vertical inside upto midheight
(Provided Ast. = 524 mm^2/m)
Provide 10 tor @ 150 c/c horizontal inside
(Provided Ast. = 524 mm^2/m)
Provide 10 tor @ 150 c/c Vertical outside upto 1.35m ht from bottom
(Provided Ast. = 524 mm^2/m)
Provide 10 tor @ 150 c/c horizontal outside
(Provided Ast. = 524 mm^2/m)

Page 46 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CLIENT: CANTONMENT BOARD CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2

Shear check :-
Water
Shear V = 3.99 T/M
Vu = 3.99 x 1.50 = 5.985
τvu = Vu / bd
=( 5.985 X 10^4 ) / ( 1000 x 250 )
= 0.239 N/mm^2
Pt provided = 0.21 %
τc = 0.341 N/mm^2
τc > τvu
HENCE SAFE
Soil + Surcharge
Shear V = 2.64 T/M
Vu = 2.64 x 1.50 = 3.960
τvu = Vu / bd
=( 3.96 X 10^4 ) / ( 1000 x 250 )
= 0.158 N/mm^2
Pt provided = 0.21 %
τc = 0.341 N/mm^2
τc > τvu
HENCE SAFE

Page 47 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

CRACK WIDTH CALCULATIONS - FLEXURE

FOR WATER Vertical steel Horizontal


Inside steel
Location For Crack Width Check @ bottom @ 0.8h
INPUT
fck= 30 N/mm2 30
fy= 500 N/mm2 500
Area of reinforcement " As " = 524 mm2 2011
b= 1000 mm 1000
h= 300 mm 300
d= 250 mm 247
Minimum cover to tension reinforcement " CO " = 45 mm 45
Bar spacing " S " = 150.0 mm 100
Bar dia " DIA " = 10.00 mm 16
" acr " =(((S/2)^2+(CO+DIA/2)^2)^(1/2)-DIA/2) as default or enter other value = 85.1 mm 64.9
"acr " is distance from the point considered to the surface of the nearest longitudinal
bar
Applied moment " M "= 0.49 Tm

Tension- "T"=
CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61
" r " = As/bd = 0.002 0.008
depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d = 54.66 mm 94.61

" Z " = d-(x/3) = 232 215


Reinforcement stress " fs " = Ms/(As*Z) +0.5Ts/As = 40.38 N/mm2 0
Concrete stress " fc " = (fs*As)/(0.5*b*x) = 0.77 N/mm2 0.00
Strain at soffit of concrete beam/slab- " e1 " = (fs/Es)*(h-x)/(d-x) = 0.0003 0.0000
Strain due to stiffening effect of concrete between cracks " e2 " =
e2 = b.(h-x)2/(3.Es.As.(d-x)) for crack widths of 0.2 mm Used Used
2
e2 = 1.5.b.(h-x) /(3.Es.As.(d-x)) for crack widths of 0.1 mm n/a n/a
e2 = 0.0010 0.0002
Average strain for calculation of crack width- " em "= e1-e2 = 0.0000 0.0000

Calculated crack width, " w " = 3.acr.em/(1+2.(acr-c)/(h-x))


CALCULATED CRACK WIDTH, 'w' = 0.0000 mm 0.0000
Crack width Less than 0.2mm OK OK
-ve sign indiactes uncracked section

Page 48 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

CRACK WIDTH CALCULATIONS - FLEXURE

Horizontal steel Horizontal


inside (water) steel
Location For Crack Width Check 0.4h @ 0.8h
INPUT
fck= 30 N/mm2 30
fy= 500 N/mm2 500
Area of reinforcement " As " = 524 mm2 2011
b= 1000 mm 1000
h= 300 mm 300
d= 240 mm 247
Minimum cover to tension reinforcement " CO " = 45 mm 45
Bar spacing " S " = 150 mm 100
Bar dia " DIA " = 10 mm 16
" acr " =(((S/2)^2+(CO+DIA/2)^2)^(1/2)-DIA/2) as default or enter other value = 85.1 mm 64.9
"acr " is distance from the point considered to the surface of the nearest longitudinal
bar
Applied moment " M "= 0.35 Tm

Tension- "T"= 0.78


CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61
" r " = As/bd = 0.002 0.008
depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d = 53.42 mm 94.61

" Z " = d-(x/3) = 222 215


Reinforcement stress " fs " = Ms/(As*Z) +0.5Ts/As = 37.53 N/mm2 0
Concrete stress " fc " = (fs*As)/(0.5*b*x) = 0.74 N/mm2 0.00
Strain at soffit of concrete beam/slab- " e1 " = (fs/Es)*(h-x)/(d-x) = 0.0002 0.0000
Strain due to stiffening effect of concrete between cracks " e2 " =
e2 = b.(h-x)2/(3.Es.As.(d-x)) for crack widths of 0.2 mm Used Used
2
e2 = 1.5.b.(h-x) /(3.Es.As.(d-x)) for crack widths of 0.1 mm n/a n/a
e2 = 0.0010 0.0002
Average strain for calculation of crack width- " em "= e1-e2 = 0.0000 0.0000

Calculated crack width, " w " = 3.acr.em/(1+2.(acr-c)/(h-x))


CALCULATED CRACK WIDTH, 'w' = 0.0000 mm 0.0000
Crack width Less than 0.2mm OK OK
-ve sign indiactes uncracked section

Page 49 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

CRACK WIDTH CALCULATIONS - FLEXURE

FOR EARTH Vertical steel Horizontal


Outside steel
Location For Crack Width Check @ bottom @ 0.8h
INPUT
fck= 30 N/mm2 30
fy= 500 N/mm2 500
Area of reinforcement " As " = 524 mm2 2011
b= 1000 mm 1000
h= 300 mm 300
d= 250 mm 247
Minimum cover to tension reinforcement " CO " = 45 mm 45
Bar spacing " S " = 150 mm 100
Bar dia " DIA " = 10 mm 16
" acr " =(((S/2)^2+(CO+DIA/2)^2)^(1/2)-DIA/2) as default or enter other value = 85.1 mm 64.9
"acr " is distance from the point considered to the surface of the nearest longitudinal
bar
Applied moment " M "= 2.18 Tm

Tension- "T"=
CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61
" r " = As/bd = 0.002 0.008
depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d = 54.66 mm 94.61

" Z " = d-(x/3) = 232 215


Reinforcement stress " fs " = Ms/(As*Z) +0.5Ts/As = 179.63 N/mm2 0
Concrete stress " fc " = (fs*As)/(0.5*b*x) = 3.44 N/mm2 0.00
Strain at soffit of concrete beam/slab- " e1 " = (fs/Es)*(h-x)/(d-x) = 0.0011 0.0000
Strain due to stiffening effect of concrete between cracks " e2 " =
e2 = b.(h-x)2/(3.Es.As.(d-x)) for crack widths of 0.2 mm Used Used
2
e2 = 1.5.b.(h-x) /(3.Es.As.(d-x)) for crack widths of 0.1 mm n/a n/a
e2 = 0.0010 0.0002
Average strain for calculation of crack width- " em "= e1-e2 = 0.0001 0.0000

Calculated crack width, " w " = 3.acr.em/(1+2.(acr-c)/(h-x))


CALCULATED CRACK WIDTH, 'w' = 0.0283 mm 0.0000
Crack width Less than 0.2mm OK OK
-ve sign indiactes uncracked section

Page 50 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

CRACK WIDTH CALCULATIONS - FLEXURE

Horizontal steel Horizontal


outside (earth) steel
Location For Crack Width Check @ 1h @ 0.8h
INPUT
fck= 30 N/mm2 30
fy= 500 N/mm2 500
Area of reinforcement " As " = 524 mm2 2011
b= 1000 mm 1000
h= 300 mm 300
d= 240 mm 247
Minimum cover to tension reinforcement " CO " = 45 mm 45
Bar spacing " S " = 150 mm 100
Bar dia " DIA " = 10 mm 16
" acr " =(((S/2)^2+(CO+DIA/2)^2)^(1/2)-DIA/2) as default or enter other value = 85.1 mm 64.9
"acr " is distance from the point considered to the surface of the nearest longitudinal
bar
Applied moment " M "= 2.36 Tm

Tension- "T"= 0.00


CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61
" r " = As/bd = 0.002 0.008
2 0.5
depth to neutral axis, "x" = (-a.r +((a.r) + 2.a.r) .d = 53.42 mm 94.61

" Z " = d-(x/3) = 222 215


Reinforcement stress " fs " = Ms/(As*Z) +0.5Ts/As = 202.42 N/mm2 0
Concrete stress " fc " = (fs*As)/(0.5*b*x) = 3.97 N/mm2 0.00
Strain at soffit of concrete beam/slab- " e1 " = (fs/Es)*(h-x)/(d-x) = 0.0013 0.0000
Strain due to stiffening effect of concrete between cracks " e2 " =
e2 = b.(h-x)2/(3.Es.As.(d-x)) for crack widths of 0.2 mm Used Used
e2 = 1.5.b.(h-x)2/(3.Es.As.(d-x)) for crack widths of 0.1 mm n/a n/a
e2 = 0.0010 0.0002
Average strain for calculation of crack width- " em "= e1-e2 = 0.0003 0.0000

Calculated crack width, " w " = 3.acr.em/(1+2.(acr-c)/(h-x))


CALCULATED CRACK WIDTH, 'w' = 0.0579 mm 0.0000
Crack width Less than 0.2mm OK OK
-ve sign indiactes uncracked section

Page 51 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2

DESIGN OF BEAMS

Page 52 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS PVT
BOARD JHANSI
LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

DESIGN OF BEAM FB1

INPUT DATA
Grade of concrete = M 30 Steel Grade = Fe 500
clear cover = 40 mm TOP
clear cover = 40 mm BOTTOM
Provide depth(D) = 450 mm.
BEAM WIDTH = 300 mm.

S.W of beam + Load from Slab =


0.84 T/m
T T

2.000

0.838 T 0.838 T

Loading on beam:
1) S.W. of BEAM = 0.45 X 0.3 X 2.5 t/m^3 = 0.338 T/m

2) Load from slab = 1 X 1 t/m^2 = 0.500 T/m


2

Max BM = ( W X L^2 /8 )
Design moment = 0.419 Tm Max moment

Mu/bd^2 = 0.13 b= 300 mm


d= 450 -40 -6
d= 404 mm
Pt = 0.03 % (refer SP 16)

pt,min = % 0.2 % as per IS13920 - pt min = 0.24 x √ fck / fy

Ast . = 36 mm^2
Ast MIN . = 242 mm^2
SUMMARY:
PROVIDE B= 300 mm
PROVIDE D= 450 mm

Provide 2 tor 12 @ bottom


+ 1 tor 16 m2 )
( Ast.Provided = 427 mm^2)
Provide 3 tor 12 @ top
( Ast.Provided = mm^2 )
339 mm^2)

SHEAR DESIGN
Vmax = 0.838 T
Vu = 1.26 T

τvu = Vu/bd= 1.256 X 10^4 / ( 300 X 404 )


= 0.1037 N/mm^2

Pt % provided = 0.35 %
τc = 0.43 N/mm^2

tv < tc hence provide nominal shear reinforcement.

DESIGN SHEAR REINFORCEMENT


Sv = 0.87 x fy x Asv / ( b X ( τvu - τc ) )
= ( 0.87 x 415 x 2 x 50.27) / ( 300 x ( 0.1037 - 0.43 ))
= Provide minimum shear reinforcement

MINIMUM SHEAR REINFORCEMENT

Sv = 0.87 X fy X Asv / 0.4 X b


= 302 mm

Provide 2 - Legged 8 tor @ 150 mm c/c Stirrups

Page 53 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS PVT
BOARD JHANSI
LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

DESIGN OF BEAM FB2

INPUT DATA
Grade of concrete = M 30 Steel Grade = Fe 500
clear cover = 40 mm TOP
clear cover = 40 mm BOTTOM
Provide depth(D) = 450 mm.
BEAM WIDTH = 300 mm.

Staircase Load = = 1.500 T /m S.W of beam + Load from Slab =


0.84 T/m
T T

2.300

2.630 T 1.77 T

Loading on beam:
1) S.W. of BEAM = 0.45 X 0.3 X 2.5 t/m^3 = 0.338 T/m

2) Load from slab = 1 X 1 t/m^2 = 0.500 T/m


2
3) Staircase load = = 1.500 T/m

Max BM = ( W X L^2 /8 )
Design moment = 1.300 Tm Max moment (REFFER STAAD)

Mu/bd^2 = 0.4 b= 300 mm


d= 450 -40 -6
d= 404 mm
Pt = 0.09 % (refer SP 16)

pt,min = % 0.2 % as per IS13920 - pt min = 0.24 x √ fck / fy

Ast . = 109 mm^2


Ast MIN . = 242 mm^2
SUMMARY:
PROVIDE B= 300 mm
PROVIDE D= 450 mm

Provide 2 tor 12 @ bottom


+ 1 tor 16 m2 )
( Ast.Provided = 427 mm^2)
Provide 3 tor 12 @ top
( Ast.Provided = mm^2 )
339 mm^2)

SHEAR DESIGN
Vmax = 2.630 T
Vu = 3.95 T

τvu = Vu/bd= 3.945 X 10^4 / ( 300 X 404 )


= 0.3255 N/mm^2

Pt % provided = 0.35 %
τc = 0.43 N/mm^2

tv < tc hence provide nominal shear reinforcement.

DESIGN SHEAR REINFORCEMENT


Sv = 0.87 x fy x Asv / ( b X ( τvu - τc ) )
= ( 0.87 x 415 x 2 x 50.27) / ( 300 x ( 0.3255 - 0.43 ))
= Provide minimum shear reinforcement

MINIMUM SHEAR REINFORCEMENT

Sv = 0.87 X fy X Asv / 0.4 X b


= 302 mm

Provide 2 - Legged 8 tor @ 150 mm c/c Stirrups

Page 54 of 85
****************************************************
* *
* STAAD.Pro CONNECT Edition *
* Version 22.02.00.26 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= NOV 22, 2019 *
* Time= 14:16:28 *
* *
* Licensed to: *
****************************************************

1. STAAD PLANE
INPUT FILE: Z:\P5WQSH~6\DATA\I87AJT~9\SFC\SX8NNX~5\JHANSI\D3Z4KL~O\2IDNU4~Q\BEAMS\FB2\FB2.STD
2. START JOB INFORMATION
3. ENGINEER DATE 24­SEP­19
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. UNIT METER MTON
7. JOINT COORDINATES
8. 1 0 0 0; 2 2.3 0 0
9. MEMBER INCIDENCES
10. 1 1 2
11. DEFINE MATERIAL START
12. ISOTROPIC CONCRETE
13. E 2.21467E+06
14. POISSON 0.17
15. DENSITY 2.40262
16. ALPHA 1E­05
17. DAMP 0.05
18. TYPE CONCRETE
19. STRENGTH FCU 2812.28
20. END DEFINE MATERIAL
21. MEMBER PROPERTY AMERICAN
22. 1 PRIS YD 0.45 ZD 0.3
23. CONSTANTS
24. MATERIAL CONCRETE ALL
25. SUPPORTS
26. 1 2 PINNED
27. LOAD 1 LOADTYPE DEAD TITLE LOAD CASE 1
28. SELFWEIGHT Y ­1
29. MEMBER LOAD
30. 1 UNI GY ­0.84 0 2.3
31. 1 UNI GY ­1.5 0 1.15
32. PERFORM ANALYSIS PRINT STATICS CHECK

P R O B L E M S T A T I S T I C S
­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­

NUMBER OF JOINTS 2 NUMBER OF MEMBERS 1


NUMBER OF PLATES 0 NUMBER OF SOLIDS 0
NUMBER OF SURFACES 0 NUMBER OF SUPPORTS 2

Using 64­bit analysis engine.

SOLVER USED IS THE OUT­OF­CORE BASIC SOLVER

ORIGINAL/FINAL BAND­WIDTH= 1/ 1/ 2 DOF


TOTAL PRIMARY LOAD CASES = 1, TOTAL DEGREES OF FREEDOM = 2
TOTAL LOAD COMBINATION CASES = 0 SO FAR.

Page 55 of 85
SIZE OF STIFFNESS MATRIX = 0 DOUBLE KILO­WORDS
REQRD/AVAIL. DISK SPACE = 12.0/********* MB

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO. 1


LOADTYPE DEAD TITLE LOAD CASE 1

CENTER OF FORCE BASED ON Y FORCES ONLY (METE).


(FORCES IN NON­GLOBAL DIRECTIONS WILL INVALIDATE RESULTS)

X = 0.924728065E+00
Y = 0.000000000E+00
Z = 0.000000000E+00
TOTAL APPLIED LOAD 1

***TOTAL APPLIED LOAD ( MTON METE ) SUMMARY (LOADING 1 )


SUMMATION FORCE­X = 0.00
SUMMATION FORCE­Y = ­4.40
SUMMATION FORCE­Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN­


MX= 0.00 MY= 0.00 MZ= ­4.07

TOTAL REACTION LOAD 1

***TOTAL REACTION LOAD( MTON METE ) SUMMARY (LOADING 1 )


SUMMATION FORCE­X = 0.00
SUMMATION FORCE­Y = 4.40
SUMMATION FORCE­Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN­


MX= 0.00 MY= 0.00 MZ= 4.07

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING 1)


MAXIMUMS AT NODE
X = 0.00000E+00 0
Y = 0.00000E+00 0
Z = 0.00000E+00 0
RX= 0.00000E+00 0
RY= 0.00000E+00 0
RZ= ­2.02770E­04 1

************ END OF DATA FROM INTERNAL STORAGE ************

33. PRINT MAXFORCE ENVELOPE ALL


MAXFORCE ENVELOPE ALL

MEMBER FORCE ENVELOPE


­­­­­­­­­­­­­­­­­­­­­

ALL UNITS ARE MTON METE

MAX AND MIN FORCE VALUES AMONGST ALL SECTION LOCATIONS

MEMB FY/ DIST LD MZ/ DIST LD


FZ DIST LD MY DIST LD FX DIST LD

Page 56 of 85
1 MAX 2.63 0.00 1 0.00 0.00 1
0.00 0.00 1 0.00 0.00 1 0.00 0.00 1
MIN ­1.77 2.30 1 ­1.30 0.96 1
0.00 2.30 1 0.00 2.30 1 0.00 2.30 1

********** END OF FORCE ENVELOPE FROM INTERNAL STORAGE **********

34. PRINT SUPPORT REACTION ALL


SUPPORT REACTION ALL

SUPPORT REACTIONS ­UNIT MTON METE STRUCTURE TYPE = PLANE


­­­­­­­­­­­­­­­­­

JOINT LOAD FORCE­X FORCE­Y FORCE­Z MOM­X MOM­Y MOM Z

1 1 0.00 2.63 0.00 0.00 0.00 0.00


2 1 0.00 1.77 0.00 0.00 0.00 0.00

************** END OF LATEST ANALYSIS RESULT **************

35. FINISH

*********** END OF THE STAAD.Pro RUN ***********

**** DATE= NOV 22,2019 TIME= 14:16:35 ****

************************************************************
* For technical assistance on STAAD.Pro, please visit *
* http://www.bentley.com/en/support/ *
* *
* Details about additional assistance from *
* Bentley and Partners can be found at program menu *
* Help­>Technical Support *
* *
* Copyright (c) 1997­2017 Bentley Systems, Inc. *
* http://www.bentley.com *
************************************************************

Page 57 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS PVT
BOARD JHANSI
LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

DESIGN OF BEAM FB3

INPUT DATA
Grade of concrete = M 30 Steel Grade = Fe 500
clear cover = 40 mm TOP
clear cover = 40 mm BOTTOM
Provide depth(D) = 450 mm.
BEAM WIDTH = 300 mm.

S.W of beam + Load from Slab =


1.38 T/m
T T

2.800

1.936 T 1.936 T

Loading on beam:
1) S.W. of BEAM = 0.45 X 0.3 X 2.5 t/m^3 = 0.338 T/m

2) Load from slab = 1.27 X 1 t/m^2 = 0.635 T/m


2

3) Cantilever Platform = 1 X 0.41 = 0.4100 T/m

Max BM = ( W X L^2 /8 )
Design moment = 1.355 Tm Max moment

Mu/bd^2 = 0.42 b= 300 mm


d= 450 -40 -6
d= 404 mm
Pt = 0.1 % (refer SP 16)

pt,min = % 0.2 % as per IS13920 - pt min = 0.24 x √ fck / fy

Ast . = 121 mm^2


Ast MIN . = 242 mm^2
SUMMARY:
PROVIDE B= 300 mm
PROVIDE D= 450 mm

Provide 2 tor 12 @ bottom


+ 1 tor 16 m2 )
( Ast.Provided = 427 mm^2)
Provide 3 tor 12 @ top
( Ast.Provided = mm^2 )
339 mm^2)

SHEAR DESIGN
Vmax = 1.936 T
Vu = 2.90 T

τvu = Vu/bd= 2.903 X 10^4 / ( 300 X 404 )


= 0.2395 N/mm^2

Pt % provided = 0.35 %
τc = 0.43 N/mm^2

tv < tc hence provide nominal shear reinforcement.

DESIGN SHEAR REINFORCEMENT


Sv = 0.87 x fy x Asv / ( b X ( τvu - τc ) )
= ( 0.87 x 415 x 2 x 50.27) / ( 300 x ( 0.2395 - 0.43 ))
= Provide minimum shear reinforcement

MINIMUM SHEAR REINFORCEMENT

Sv = 0.87 X fy X Asv / 0.4 X b


= 302 mm

Provide 2 - Legged 8 tor @ 150 mm c/c Stirrups

Page 58 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS PVT
BOARD JHANSI
LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

DESIGN OF BEAM FB4

INPUT DATA
Grade of concrete = M 30 Steel Grade = Fe 500
clear cover = 40 mm TOP
clear cover = 40 mm BOTTOM
Provide depth(D) = 600 mm.
BEAM WIDTH = 300 mm.

Staircase Load = 0.000 S.W of beam =


0.84 T 1.77 T 0.45 T/m
T T

1.3m
2m
4.3m

2.500 T 2.040 T

Loading on beam:
1) S.W. of BEAM = 0.6 X 0.3 X 2.5 t/m^3 = 0.450 T/m

2) Load From FB1 = = 0.838 T

3) Load From FB2 = = 1.77 T


2) Load from slab = 0 1 = 0.000 T/m
Max BM = ( W X L^2 /8 )
Design moment = 3.360 Tm Max moment (REFFER STAAD)

Mu/bd^2 = 0.55 b= 300 mm


d= 600 -40 -8
d= 552 mm
Pt = 0.13 % (refer SP 16)

pt,min = % 0.2 % as per IS13920 - pt min = 0.24 x √ fck / fy

Ast . = 215 mm^2


Ast MIN . = 331 mm^2
SUMMARY:
PROVIDE B= 300 mm
PROVIDE D= 600 mm

Provide 2 tor 16 @ bottom


+ 1 tor 12 m2 )
( Ast.Provided = 515 mm^2)
Provide 3 tor 12 @ top
( Ast.Provided = mm^2 )
339 mm^2)

SHEAR DESIGN
Vmax = 2.500 T
Vu = 3.75 T

τvu = Vu/bd= 3.750 X 10^4 / ( 300 X 552 )


= 0.2264 N/mm^2

Pt % provided = 0.31 %
τc = 0.41 N/mm^2

tv < tc hence provide nominal shear reinforcement.

DESIGN SHEAR REINFORCEMENT


Sv = 0.87 x fy x Asv / ( b X ( τvu - τc ) )
= ( 0.87 x 415 x 2 x 50.27) / ( 300 x ( 0.2264 - 0.41 ))
= Provide minimum shear reinforcement

MINIMUM SHEAR REINFORCEMENT

Sv = 0.87 X fy X Asv / 0.4 X b


= 302 mm

Provide 2 - Legged 8 tor @ 150 mm c/c Stirrups

Page 59 of 85
****************************************************
* *
* STAAD.Pro CONNECT Edition *
* Version 22.02.00.26 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= NOV 23, 2019 *
* Time= 11:16: 9 *
* *
* Licensed to: *
****************************************************

1. STAAD PLANE
INPUT FILE: Z:\P5WQSH~6\DATA\I87AJT~9\SFC\SX8NNX~5\JHANSI\D3Z4KL~O\2IDNU4~Q\BEAMS\FB4\FB4.STD
2. START JOB INFORMATION
3. ENGINEER DATE 24­SEP­19
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. UNIT METER MTON
7. JOINT COORDINATES
8. 1 0 0 0; 2 4.30001 0 0
9. MEMBER INCIDENCES
10. 1 1 2
11. DEFINE MATERIAL START
12. ISOTROPIC CONCRETE
13. E 2.21467E+06
14. POISSON 0.17
15. DENSITY 2.40262
16. ALPHA 1E­05
17. DAMP 0.05
18. TYPE CONCRETE
19. STRENGTH FCU 2812.28
20. END DEFINE MATERIAL
21. MEMBER PROPERTY AMERICAN
22. 1 PRIS YD 0.6 ZD 0.3
23. CONSTANTS
24. MATERIAL CONCRETE ALL
25. SUPPORTS
26. 1 2 PINNED
27. LOAD 1 LOADTYPE DEAD TITLE LOAD CASE 1
28. MEMBER LOAD
29. 1 UNI GY ­0.45 0 4.3
30. 1 CON GY ­0.84 1.3 0
31. 1 CON GY ­1.77 2 0
32. PERFORM ANALYSIS PRINT STATICS CHECK

P R O B L E M S T A T I S T I C S
­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­

NUMBER OF JOINTS 2 NUMBER OF MEMBERS 1


NUMBER OF PLATES 0 NUMBER OF SOLIDS 0
NUMBER OF SURFACES 0 NUMBER OF SUPPORTS 2

Using 64­bit analysis engine.

SOLVER USED IS THE OUT­OF­CORE BASIC SOLVER

ORIGINAL/FINAL BAND­WIDTH= 1/ 1/ 2 DOF


TOTAL PRIMARY LOAD CASES = 1, TOTAL DEGREES OF FREEDOM = 2
TOTAL LOAD COMBINATION CASES = 0 SO FAR.
SIZE OF STIFFNESS MATRIX = 0 DOUBLE KILO­WORDS
REQRD/AVAIL. DISK SPACE = 12.0/********* MB

Page 60 of 85
STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO. 1
LOADTYPE DEAD TITLE LOAD CASE 1

CENTER OF FORCE BASED ON Y FORCES ONLY (METE).


(FORCES IN NON­GLOBAL DIRECTIONS WILL INVALIDATE RESULTS)

X = 0.193448862E+01
Y = 0.000000000E+00
Z = 0.000000000E+00
TOTAL APPLIED LOAD 1

***TOTAL APPLIED LOAD ( MTON METE ) SUMMARY (LOADING 1 )


SUMMATION FORCE­X = 0.00
SUMMATION FORCE­Y = ­4.54
SUMMATION FORCE­Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN­


MX= 0.00 MY= 0.00 MZ= ­8.79

TOTAL REACTION LOAD 1

***TOTAL REACTION LOAD( MTON METE ) SUMMARY (LOADING 1 )


SUMMATION FORCE­X = 0.00
SUMMATION FORCE­Y = 4.54
SUMMATION FORCE­Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN­


MX= 0.00 MY= 0.00 MZ= 8.79

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING 1)


MAXIMUMS AT NODE
X = 0.00000E+00 0
Y = 0.00000E+00 0
Z = 0.00000E+00 0
RX= 0.00000E+00 0
RY= 0.00000E+00 0
RZ= ­3.77021E­04 1

************ END OF DATA FROM INTERNAL STORAGE ************

33. PRINT MAXFORCE ENVELOPE ALL


MAXFORCE ENVELOPE ALL

MEMBER FORCE ENVELOPE


­­­­­­­­­­­­­­­­­­­­­

ALL UNITS ARE MTON METE

MAX AND MIN FORCE VALUES AMONGST ALL SECTION LOCATIONS

MEMB FY/ DIST LD MZ/ DIST LD


FZ DIST LD MY DIST LD FX DIST LD

1 MAX 2.50 0.00 1 0.00 0.00 1


0.00 0.00 1 0.00 0.00 1 0.00 0.00 1
MIN ­2.04 4.30 1 ­3.36 2.15 1
0.00 4.30 1 0.00 4.30 1 0.00 4.30 1

********** END OF FORCE ENVELOPE FROM INTERNAL STORAGE **********

Page 61 of 85
34. PRINT SUPPORT REACTION ALL
SUPPORT REACTION ALL

SUPPORT REACTIONS ­UNIT MTON METE STRUCTURE TYPE = PLANE


­­­­­­­­­­­­­­­­­

JOINT LOAD FORCE­X FORCE­Y FORCE­Z MOM­X MOM­Y MOM Z

1 1 0.00 2.50 0.00 0.00 0.00 0.00


2 1 0.00 2.04 0.00 0.00 0.00 0.00

************** END OF LATEST ANALYSIS RESULT **************

35. FINISH

*********** END OF THE STAAD.Pro RUN ***********

**** DATE= NOV 23,2019 TIME= 11:16:13 ****

************************************************************
* For technical assistance on STAAD.Pro, please visit *
* http://www.bentley.com/en/support/ *
* *
* Details about additional assistance from *
* Bentley and Partners can be found at program menu *
* Help­>Technical Support *
* *
* Copyright (c) 1997­2017 Bentley Systems, Inc. *
* http://www.bentley.com *
************************************************************

Page 62 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS PVT
BOARD JHANSI
LTD.

DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

DESIGN OF BEAM MB1

INPUT DATA
Grade of concrete = M 30 Steel Grade = Fe 500
clear cover = 40 mm TOP
clear cover = 40 mm BOTTOM
Provide depth(D) = 450 mm.
BEAM WIDTH = 300 mm.

S.W of beam + Load from Slab + Staircase Load =


2.56 T/m
T T

2.300

2.941 T 2.941 T

Loading on beam:
1) S.W. of BEAM = 0.45 X 0.3 X 2.5 t/m^3 = 0.338 T/m

2) Load From Landing Slab = 1.3 X 1 T /m^2 X = 0.6500 T/m


2
3) Staircase Load = = 1.5700 T/m

Max BM = ( W X L^2 /8 )
Design moment = 1.691 Tm Max moment

Mu/bd^2 = 0.52 b= 300 mm


d= 450 -40 -6
d= 404 mm
Pt = 0.12 % (refer SP 16)

pt,min = % 0.219 % as per IS13920 - pt min = 0.24 x √ fck / fy

Ast . = 145 mm^2


Ast MIN . = 266 mm^2
SUMMARY:
PROVIDE B= 300 mm
PROVIDE D= 450 mm

Provide 3 tor 12 @ bottom


tor mm^2 )
( Ast.Provided = 339 mm^2)
Provide 3 tor 12 @ top
( Ast.Provided = mm^2 )
339 mm^2)

SHEAR DESIGN
Vmax = 2.941 T
Vu = 4.41 T

τvu = Vu/bd= 4.412 X 10^4 / ( 300 X 404 )


= 0.3640 N/mm^2

Pt % provided = 0.28 %
τc = 0.39 N/mm^2

tv < tc hence provide nominal shear reinforcement.

DESIGN SHEAR REINFORCEMENT


Sv = 0.87 x fy x Asv / ( b X ( τvu - τc ) )
= ( 0.87 x 415 x 2 x 50.27) / ( 300 x ( 0.3640 - 0.39 ))
= Provide minimum shear reinforcement

MINIMUM SHEAR REINFORCEMENT

Sv = 0.87 X fy X Asv / 0.4 X b


= 302 mm

Provide 2 - Legged 8 tor @ 175 mm c/c Stirrups

Page 63 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS PVT
BOARD JHANSI
LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

DESIGN OF BEAM RB2 (SIMILAR RB1 )

INPUT DATA
Grade of concrete = M 25 Steel Grade = Fe 500
clear cover = 40 mm TOP
clear cover = 40 mm BOTTOM
Provide depth(D) = 300 mm.
BEAM WIDTH = 300 mm.

Load from Monorail =


3.370 T S.W of beam =
0.23 T/m
T T

0.500
1.500

2.580 T 1.460 T

Loading on beam:
1) S.W. of BEAM = 0.3 X 0.3 X 2.5 t/m^3 = 0.225 T/m

2) Load from Monorail = 1.69 1.68 = 3.370 T

Max BM = ( W X L^2 /8 )
Design moment = 1.230 Tm Max moment (REFFER STAAD OUTPUT)

Mu/bd^2 = 0.95 b= 300 mm


d= 300 -40 -6
d= 254 mm
Pt = 0.23 % (refer SP 16)

pt,min = % 0.2 % as per IS13920 - pt min = 0.24 x √ fck / fy

Ast . = 175 mm^2


Ast MIN . = 152 mm^2
SUMMARY:
PROVIDE B= 300 mm
PROVIDE D= 300 mm

Provide 3 tor 12 @ bottom


+ tor ( Ast.Providedm2
= ) 339 mm^2)
Provide 3 tor 12 @ top
( Ast.Provided = mm^2 )
339 mm^2)

SHEAR DESIGN
Vmax = 2.580 T
Vu = 3.87 T

τvu = Vu/bd= 3.870 X 10^4 / ( 300 X 254 )


= 0.5079 N/mm^2

Pt % provided = 0.45 %
τc = 0.47 N/mm^2

tv > tc hence provide shear reinforcement

DESIGN SHEAR REINFORCEMENT


Sv = 0.87 x fy x Asv / ( b X ( τvu - τc ) )
= ( 0.87 x 415 x 2 x 50.27) / ( 300 x ( 0.5079 - 0.47 ))
= 2897

MINIMUM SHEAR REINFORCEMENT

Sv = 0.87 X fy X Asv / 0.4 X b


= 302 mm

Provide 2 - Legged 8 tor @ 175 mm c/c Stirrups

Page 64 of 85
****************************************************
* *
* STAAD.Pro V8i SELECTseries4 *
* Version 20.07.09.31 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= SEP 24, 2019 *
* Time= 14:42:12 *
* *
* USER ID: *
****************************************************

1. STAAD PLANE
INPUT FILE: RB1.STD
2. START JOB INFORMATION
3. ENGINEER DATE 24­SEP­19
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. UNIT METER MTON
7. JOINT COORDINATES
8. 1 0 0 0; 2 1.5 0 0
9. MEMBER INCIDENCES
10. 1 1 2
11. DEFINE MATERIAL START
12. ISOTROPIC CONCRETE
13. E 2.21467E+006
14. POISSON 0.17
15. DENSITY 2.40262
16. ALPHA 1E­005
17. DAMP 0.05
18. TYPE CONCRETE
19. STRENGTH FCU 2812.28
20. END DEFINE MATERIAL
21. MEMBER PROPERTY AMERICAN
22. 1 PRIS YD 0.3 ZD 0.3
23. CONSTANTS
24. MATERIAL CONCRETE ALL
25. SUPPORTS
26. 1 2 PINNED
27. LOAD 1 LOADTYPE DEAD TITLE LOAD CASE 1
28. SELFWEIGHT Y ­1
29. MEMBER LOAD
30. 1 UNI GY ­0.23
31. 1 CON GY ­3.37 0.5
32. PERFORM ANALYSIS PRINT STATICS CHECK

P R O B L E M S T A T I S T I C S
­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­

NUMBER OF JOINTS 2 NUMBER OF MEMBERS 1


NUMBER OF PLATES 0 NUMBER OF SOLIDS 0
NUMBER OF SURFACES 0 NUMBER OF SUPPORTS 2

SOLVER USED IS THE IN­CORE ADVANCED SOLVER

TOTAL PRIMARY LOAD CASES = 1, TOTAL DEGREES OF FREEDOM = 2

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO. 1


LOADTYPE DEAD TITLE LOAD CASE 1

Page 65 of 85
CENTER OF FORCE BASED ON Y FORCES ONLY (METE).
(FORCES IN NON­GLOBAL DIRECTIONS WILL INVALIDATE RESULTS)

X = 0.541427017E+00
Y = 0.000000000E+00
Z = 0.000000000E+00
TOTAL APPLIED LOAD 1

***TOTAL APPLIED LOAD ( MTON METE ) SUMMARY (LOADING 1 )


SUMMATION FORCE­X = 0.00
SUMMATION FORCE­Y = ­4.04
SUMMATION FORCE­Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN­


MX= 0.00 MY= 0.00 MZ= ­2.19

TOTAL REACTION LOAD 1

***TOTAL REACTION LOAD( MTON METE ) SUMMARY (LOADING 1 )


SUMMATION FORCE­X = 0.00
SUMMATION FORCE­Y = 4.04
SUMMATION FORCE­Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN­


MX= 0.00 MY= 0.00 MZ= 2.19

MAXIMUM DISPLACEMENTS ( CM /RADIANS) (LOADING 1)


MAXIMUMS AT NODE
X = 0.00000E+00 0
Y = 0.00000E+00 0
Z = 0.00000E+00 0
RX= 0.00000E+00 0
RY= 0.00000E+00 0
RZ= ­3.58526E­04 1

************ END OF DATA FROM INTERNAL STORAGE ************

33. PRINT MAXFORCE ENVELOPE ALL


MAXFORCE ENVELOPE ALL

MEMBER FORCE ENVELOPE


­­­­­­­­­­­­­­­­­­­­­

ALL UNITS ARE MTON METE

MAX AND MIN FORCE VALUES AMONGST ALL SECTION LOCATIONS

MEMB FY/ DIST LD MZ/ DIST LD


FZ DIST LD MY DIST LD FX DIST LD

1 MAX 2.58 0.00 1 0.00 0.00 1


0.00 0.00 1 0.00 0.00 1 0.00 0.00 1
MIN ­1.46 1.50 1 ­1.23 0.50 1
0.00 1.50 1 0.00 1.50 1 0.00 1.50 1

********** END OF FORCE ENVELOPE FROM INTERNAL STORAGE **********

34. PRINT SUPPORT REACTION ALL


SUPPORT REACTION ALL

Page 66 of 85
SUPPORT REACTIONS ­UNIT MTON METE STRUCTURE TYPE = PLANE
­­­­­­­­­­­­­­­­­

JOINT LOAD FORCE­X FORCE­Y FORCE­Z MOM­X MOM­Y MOM Z

1 1 0.00 2.58 0.00 0.00 0.00 0.00


2 1 0.00 1.46 0.00 0.00 0.00 0.00

************** END OF LATEST ANALYSIS RESULT **************

35. FINISH

*********** END OF THE STAAD.Pro RUN ***********

**** DATE= SEP 24,2019 TIME= 14:42:16 ****

************************************************************
* For questions on STAAD.Pro, please contact *
* Bentley Systems or Partner offices *
* *
* Telephone Web / Email *
* USA +1 (714) 974­2500 *
* UK +44 (0) 808 101 9246 *
* SINGAPORE +65 6225­6158 *
* FRANCE +33 (0) 1 55238400 *
* GERMANY +49 0931 40468 *
* INDIA +91 (033) 4006­2021 *
* JAPAN +81 (03)5952­6500 http://www.ctc­g.co.jp *
* CHINA +86 21 6288 4040 *
* THAILAND +66 (0)2645­1018/19 partha.p@reisoftwareth.com*
* *
* Worldwide http://selectservices.bentley.com/en­US/ *
* *
************************************************************

Page 67 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS PVT
BOARD JHANSI
LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

DESIGN OF BEAM RB 3 (SIMILAR RB4 )

INPUT DATA
Grade of concrete = M 25 Steel Grade = Fe 500
clear cover = 40 mm TOP
clear cover = 40 mm BOTTOM
Provide depth(D) = 300 mm.
BEAM WIDTH = 300 mm.

S.W of beam =
0.23 T/m
T T

2.800

0.315 T 0.315 T

Loading on beam:
1) S.W. of BEAM = 0.3 X 0.3 X 2.5 t/m^3 = 0.225 T/m

Max BM = ( W X L^2 /8 )
Design moment = 0.221 Tm Max moment

Mu/bd^2 = 0.17 b= 300 mm


d= 300 -40 -6
d= 254 mm
Pt = 0.04 % (refer SP 16)

pt,min = % 0.2 % as per IS13920 - pt min = 0.24 x √ fck / fy

Ast . = 30 mm^2
Ast MIN . = 152 mm^2
SUMMARY:
PROVIDE B= 300 mm
PROVIDE D= 300 mm

Provide 3 tor 12 @ bottom


+ tor ( Ast.Providedm2
= ) 339 mm^2)
Provide 3 tor 12 @ top
( Ast.Provided = mm^2 )
339 mm^2)

SHEAR DESIGN
Vmax = 0.315 T
Vu = 0.47 T

τvu = Vu/bd= 0.473 X 10^4 / ( 300 X 254 )


= 0.0620 N/mm^2

Pt % provided = 0.45 %
τc = 0.47 N/mm^2

tv < tc hence provide nominal shear reinforcement.

DESIGN SHEAR REINFORCEMENT


Sv = 0.87 x fy x Asv / ( b X ( τvu - τc ) )
= ( 0.87 x 415 x 2 x 50.27) / ( 300 x ( 0.0620 - 0.47 ))
= Provide minimum shear reinforcement

MINIMUM SHEAR REINFORCEMENT

Sv = 0.87 X fy X Asv / 0.4 X b


= 302 mm

Provide 2 - Legged 8 tor @ 175 mm c/c Stirrups

Page 68 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2

DESIGN OF COLUMNS

Page 69 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF PVT LTD.
SPS-2

DESIGN OF COLUMN SC1

1) S.W. of column = 0.300 X 0.300 X ( 244.700 - 240.4 ) X 2.5 T/m^3 = 0.970 T

2) Load from beam RB1 = 2.580 T

3) Load from beam RB3 = 0.225 T

Total load = 3.780 T


Say = 4.000 T

Unsupported length of column = 244.700 -240.40 - 0.3 = 4.000 m

Eff. length in X-direction = 4.000 X 1.2 = 4.80 m

Eff. length in Y-direction = 4.000 X 1.2 = 4.80 m

Earthquake base shear :

Z = 0.1 I = 1.25 R = 3
Sa/g = 2.5

Ah = Z X I x Sa = 0.052
2R g

Moment due to earthquake = 0.052 X 4.00 X 4.300 = 0.448 Tm


2

Page 70 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT AQUATECH
BOARD JHANSI SOLUTIONS PVT
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF
LTD.
SPS-2

Design of column with biaxial bending.


fck = M 30
Column No = SC1 Fe = 500
0
Input data :
UNFACTORED LOAD (P) : 4T
MOMENT DUE TO EARTHQUAKE : 0.448 Tm
LOAD FACTOR : 1.5

Column Size =>


Length (D) = 300 mm
breadth (B) = 300 mm
Concrete Grade = M 25
Effective Length for bending parallel to =>
Larger dimentions (lex) = 4.80 m
Shorter dimentions (ley) = 4.80 m

Unsupported Length (lux) = 4m


Unsupported Length (luy) = 4m
Loading =>
Factored Load (Pu) = 59 Kn
Factored Moment in direction of =>
Larger direction Moment = 0.000 Kn-m

Shorter direction Moment = 6.591 Kn-m

Reinforcement will be distributed equally on four sides.


Result
lex/D = 16.00 > 12 Slender Column
ley/B = 16.00 > 12 Slender Column

Therefore Column is slender


From Table I (clause 3.4)……from SP 16
For
lex/D = 16.00 ….. Value of ex/D = 0.128
ley/B = 16.00 ….. Value of ey/B = 0.128

Hence, Additional moments,


Max = Pu x ex = 2.27 Kn-m
May = Pu x ey = 2.27 Kn-m

Area of con.req. under direct compression = 6555.6 mm^2 ie.P/6cc


6cc = 6 N/mm^2
( 4 - Y 16 )
Assume steel percentage p = 0.9 ( 0 - Y 16 )
Reinforcement will be distributed equally on four sides.

Gross area (Ag) = 90000 sqmm

from chart 63 of SP 16

Puz/Ag = 16.5 N/sqmm

Hence Puz = 1485 Kn

Assume dia of bar = 16 mm


Cover (d') = 48 mm

Page 71 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT AQUATECH
BOARD JHANSI SOLUTIONS PVT
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF
LTD.
SPS-2

d'/D =(about xx axis) = 0.160

Chart/table for d'/D = 0.15


will be used
similarly,
d'/B =(about yy axis) = 0.160

Chart/table for d'/D = 0.15


will be used

INITITAL MOMENTS:
Mux" = 0.000 Kn-m ……… 1
Muy" = 6.59 Kn-m………. 2
calculating minimum eccentricity moments,

ex = ( l/500 + D/30 ) = 18.00 mm < 20 mm


ey = (l/500 + B/30 ) = 18.00 mm < 20 mm
final eccentricity,
ex = 20.00 mm
ey = 20.00 mm

Moments due to minimum eccentricity :


Mux" = Pu x ex = 1.1800 Kn-m…………….3
Muy" = Pu x ey = 1.1800 Kn-m ……………4

Hence initial moments will be higher of 1,2 and 3,4 above

Mux" = 1.180 Kn-m ……higher of 1 and 3


Muy" = 6.591 Kn-m ……higher of 2 and 4

Total Moments for which column is to be designed ,

Mux = Max + Mux" = 3.45 Kn-m [Adding slenderness moment]


Muy = May + Muy" = 8.86 Kn-m [Adding slenderness moment]

The section to be checked for biaxial bending ,


Pu / (fck x B x D ) = 0.0260

p/fck = 0.0356

referring to Chart for d'/D = 0.15 …. For xx axis

Mux1 / (fck x B x D x D ) = 0.075

Mux1 = 50.625 Kn-m

referring to Chart for d'/D = 0.15 …..For y y axis

Muy1 / (fck x B x B x D ) = 0.075

Muy1 = 50.625 Kn-m

Hence ratio =>


Mux/Mux1 = 0.068061
Muy/Muy1 = 0.17495
Pu/Puz = 0.03973
referring to chart 64 of SP16
For above values of (Muy/Muy1) and (Pu / Puz )

value of Mux/Mux1 = 0.95 ….this value is greater than above value , hence ok
.
Steel provided is satisfactory

Page 72 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY
AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH
BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE
PUMPING STATION OF SPS-2

DESIGN OF RAFT

Page 73 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CONTRACTOR: M/s AQUATECH
CLIENT: CANTONMENT BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2

LOAD ON RAFT : ( FOR RECEIVING CHAMBER, SCREEN CHAMBER & STAIRCASE CHAMBER )

SR. NO. WORK ITEM UNIT CALCULATION TOTAL

L B H NOS. Density
A TOTAL DEAD LOAD MT 90

LOAD CALCULATION
(a) Walls 60.72

Mechanical Screen Channel Walls


External Wall 4.000 X 0.300 X 3.850 X 1 X 2.5 = 11.55
External Wall 4.000 X 0.300 X 1.300 X 1 X 2.5 = 3.90
Partition Wall 4.000 X 0.400 X 1.300 X 1 X 2.5 = 5.20

Receiving Chamber
Long Wall 2.600 X 0.300 X 4.200 X 2 X 2.5 = 16.38
Short Wall 1.000 X 0.300 X 4.200 X 2 X 2.5 = 6.30

Walls Near Staircase


Long Wall 5.600 X 0.300 X 3.050 X 1 X 2.5 = 12.81
Short Wall 2.000 X 0.300 X 3.050 X 1 X 2.5 = 4.58

Total 60.72

(b) Slab 6.15

Slab At TOC 240.4


Slab at FB1 1.700 X 1.000 X - X 1 X 0.5 = 0.85
Slab at FB2 2.000 X 2.000 X - X 1 X 0.5 = 2.00
Cantilever slab over Receiving Chamber 2.000 X 0.450 X - X 1 X 0.5 = 0.45
Cantilever slab over Mechanical Screen 2.000 X 0.700 X - X 1 X 0.5 = 0.70

Slab At TOC 237.35 1.700 X 1.000 X - X 1 X 0.5 = 0.85

Mid Landing Slab 2.000 X 1.300 X - X 1 X 0.5 = 1.30

Total 6.15

(c) Beams 3.08

MB1 2.000 X 0.300 X 0.300 X 1 X 2.5 = 0.45


FB1 1.700 X 0.300 X 0.300 X 1 X 2.5 = 0.38
FB2 2.000 X 0.300 X 0.300 X 1 X 2.5 = 0.45
FB4 4.000 X 0.300 X 0.600 X 1 X 2.5 = 1.80
Total 3.08

Page 74 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
JHANSI
CONTRACTOR: M/s AQUATECH
CLIENT: CANTONMENT BOARD JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2

LOAD ON RAFT : ( FOR RECEIVING CHAMBER, SCREEN CHAMBER & STAIRCASE CHAMBER )

SR. NO. WORK ITEM UNIT CALCULATION TOTAL

L B H NOS. Density
(d) Staircase 2.38

Flight 1 2.000 X 0.150 X 1.000 X 1 X 2.5 = 0.75


Flight 2 2.000 X 0.150 X 1.000 X 1 X 2.5 = 0.75

Riser & Tread for Flight 1 & 2 0.5 0.25 X 0.175 X 1.000 X 16 X 2.5 = 0.88

Total = 2.38

Gate and Screen Loads 4.00

Gate Load 2.00


Screen Load 2.00

Total = 4.00

(e) PCC in Screen Channel 1.22

PCC in Screen Chamber 0.500 X 1.700 X 0.300 X 2 X 2.4 = 1.22

Total 1.22

(f) Raft 12.45

Receiving Chamber 3.200 X 2.100 X 0.300 X 1 X 2.5 = 5.04


Screen Channel 3.800 X 2.600 X 0.300 X 1 X 2.5 = 7.41
Staircase Chamber 2.900 X 5.900 X 0.300 X 1 X 2.5 = 12.83
Total 12.45

TOTAL LOAD = = 90.00 T


TOTAL DEAD WEIGHT ABOVE RAFT TOP
FOR RAFT DESIGN = 90.0 - 12.5 - 4 - 1.22 = 72.33 T
(SW OF RAFT) (PCC/RCC/PLUM Filling/Gate,Screen Loads)

Page 75 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CLIENT: CANTONMENT BOARD JHANSI 0.000
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF
SPS-2

LOAD ON RAFT : ( FOR RECEIVING CHAMBER, SCREEN CHAMBER & STAIRCASE CHAMBER )

SR. NO. WORK ITEM UNIT CALCULATION TOTAL

L B H NOS. Density
A TOTAL LIVE LOAD MT 9

LOAD CALCULATION
(a) Slab 6.15

Slab At TOC 240.4


Slab at FB1 1.700 X 1.000 X - X 1 X 0.5 = 0.85
Slab at FB2 2.000 X 2.000 X - X 1 X 0.5 = 2.00
Cantilever slab over Receiving Chamber 2.000 X 0.450 X - X 1 X 0.5 = 0.45
Cantilever slab over Mechanical Screen 2.000 X 0.700 X - X 1 X 0.5 = 0.70
0.00
Slab At TOC 237.35 1.700 X 1.000 X - X 1 X 0.5 = 0.85

Mid Landing Slab 2.000 X 1.300 X - X 1 X 0.5 = 1.30

Total 6.15

(b) Staircase 2.00

Flight 1 2.000 X - X 1.000 X 1 X 0.5 = 1.00


Flight 2 2.000 X - X 1.000 X 1 X 0.5 = 1.00

TOTAL LOAD = = 2.00 T

Page 76 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

DESIGN OF RAFT FOR RECEIVING CHAMBER, SCREEN CHAMBER & STAIRCASE CHAMBER

INPUT DATA
Grade of concrete = 30
Steel Grade : Fe 500
clear cover = 60 mm @ bottom
clear cover = 60 mm @ top

Thickness of raft of Receiving Chamber = 300 mm = 0.3 m

Thickness of raft of Screen Chamber = 300 mm = 0.3 m

Thickness of raft of Staircase Chamber = 300 mm = 0.3 m

Toe projection for Receiving chamber raft


Left = 0.30 m
Bottom = 0.20 m
Right = 0.30 m
Top = 0.30 m

Toe projection for Screen chamber raft


Left = 0.30 m
Bottom = 0.00 m
Right = 0.30 m
Top = 0.00 m

Toe projection for Staircase chamber raft


Left = 0.30 m
Bottom = 0.00 m
Right = 0.00 m
Top = 0.30 m

Load :

1) Total Dead Load ( REFER LOAD CALCULATION PAGE ) = 72.33

2) Total Live Load ( REFER LOAD CALCULATION PAGE ) = 9.00

Total = 81.33 T
Say = 82.00 T
BASE SLAB AREA =

Receiving Chamber raft area = 5.6 x 4.9 = 6.72 m^2

Screen Channel raft area = 8 x 5.55 = 9.88 m^2

Staircase Raft Area = 17.11 m^2

TOTAL AREA = = 33.71 m^2

SOIL PRESSURE

Soil pressure = Load / Area = 82.00 / 33.71 = 2.433 T/m^2

Page 77 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

DESIGN OF RAFT :

2.300
lx

Max. BM = W x l^2 / 8 (Due to Soil pressure)

= 2.43 x 2.300 ^2
= 1.609 Tm/m
8

Moment due to soil pressure = 1.609 Tm/m


Add water moment = 1.97 Tm/m

Total Moment = 1.609 + 1.97 = 3.579 Tm/m @

Wall Moment due to water @ junction on raft = 1.97 Tm/m

Therefore Design moment @ top = 3.58 Tm/m

d req = Mumax x 10^7/( 0.133 xb x fck)

d req = 3.58 x 1.5 x 10^7 / (0.133 x 1000 x 30) = 11.6 cm


= 116.0 mm

provide D = 300 mm d = 235 mm

Ast @ top short direction = 0 .5 f ck 1 − 1 − 4 .6 M u


2 bd
fy f ck bd

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x3.579x1.5x10^7)/ ( 30x1000x235^2) ) ] x (1000x235)


= 547 mm^2/m

Wall Moment due to earth = 1.36 Tm/m @ Bottom

d req = 1.36 x 1.5 x 10^7 / (0.133 x 1000 x 30) = 7.15 cm


= 71.5 mm

provide D = 300 mm d = 235 mm

Ast @ bottom short direction = 0 .5 f ck 1 − 1 − 4 .6 M u


2 bd
fy f ck bd

= (0.5x30/500) x [ 1 - √ ( 1-(4.6x1.36x1.5x10^7)/ ( 30x1000x235^2) ) ] x (1000x235)


= 203 mm^2/m

Page 78 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT
AQUATECH SOLUTIONS
BOARD JHANSI
PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

Shear check:

Factored Load = 2.433 x 1.5 = 3.650 T/m²

Vu max = (w X lx / 2 )
= ( 3.650 x 2.300) 2
= 4.197 T/m
τvu = 4.197 X 10^4 / ( 1000 x 235 )
τvu = 0.179 N/mm^2
Pt provided = 0.33 %
τc = 0.4 N/mm^2
τc > τvu Hence safe

Minimum reinforcement reqd.


As per Cl.8.1.1 of IS 3370(part-2) : 2009
0.24 300 mm
x 1000 x = 360 mm^2/m
100 2

For thk = 300 mm

Provide D = 300 mm

Provide 10 tor @ 100 c/c along short span @ top


(Provided Ast. = 785 mm^2/m)
Provide 10 tor @ 200 c/c along short span @ Bottom
(Provided Ast. = 393 mm^2/m)
Provide 10 tor @ 200 c/c along long span @ top & bottom
(Provided Ast. = 393 mm^2/m)

Page 79 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2

CRACK WIDTH CALCULATIONS - FLEXURE

HOOP
B/F
Location For Crack Width Check TOP BOTTOM -@ 2.975
INPUT
fck= 30 N/mm2 30 30
2
fy= 500 N/mm 500 500
Area of reinforcement " As " = 785 mm2 393 1340
b= 1000 mm 1000 1000
h= 300 mm 300 600
d= 235 mm 235 532
Minimum cover to tension reinforcement " CO " = 60 mm 60 60
Bar spacing " S " = 100 mm 200 150
Bar dia " DIA " = 10 mm 10 16
" acr " =(((S/2)^2+(CO+DIA/2)^2)^(1/2)-DIA/2) as default or enter other value = 77.0 mm 114.3 93.2
"acr " is distance from the point considered to the surface of the nearest
longitudinal bar
Applied moment " M "= 3.58 Tm 1.36

Tension- "T"= 2.4 0


CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61 14.61
" r " = As/bd = 0.003 0.002 0.003
depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d = 62.83 mm 46.49 126.05

" Z " = d-(x/3) = 214 220 490


Reinforcement stress " fs " = Ms/(As*Z) +0.5Ts/As = 228.28 N/mm2 158 0
Concrete stress " fc " = (fs*As)/(0.5*b*x) = 5.70 N/mm2 2.67 0.00
Strain at soffit of concrete beam/slab- " e1 " = (fs/Es)*(h-x)/(d-x) = 0.0016 0.0011 0.0000
Strain due to stiffening effect of concrete between cracks " e2 " =
e2 = b.(h-x)2/(3.Es.As.(d-x)) for crack widths of 0.2 mm Used Used Used
2
e2 = 1.5.b.(h-x) /(3.Es.As.(d-x)) for crack widths of 0.1 mm n/a n/a n/a
e2 = 0.0007 0.0014 0.0007
Average strain for calculation of crack width- " em "= e1-e2 = 0.0009 -0.0004 -0.0007

Calculated crack width, " w " = 3.acr.em/(1+2.(acr-c)/(h-x))


CALCULATED CRACK WIDTH, 'w' = 0.1775 mm -0.0927 -0.2000
Crack width Less than 0.2mm OK OK OK
-ve sign indiactes uncracked section

Page 80 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT BOARD JHANSI AQUATECH
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SOLUTIONS PVT LTD.
SPS-2

LOAD ON RAFT : FOR WET WELL

SR. NO. WORK ITEM UNIT CALCULATION TOTAL

L B H NOS. Density
A TOTAL DEAD LOAD MT 84

LOAD CALCULATION
(a) Walls

Wet Well
Long Wall 4.000 X 0.300 X 4.800 X 2 X 2.5 = 28.80
Long Wall (Dip Portion) 1.200 X 0.300 X 0.800 X 2 X 2.5 = 1.44
Short Wall 3.100 X 0.300 X 4.800 X 2 X 2.5 = 22.32

Total 52.56 T
(b) Slab

Slab At TOC 240.4


1.530 X 2.500 X - X 1 X 0.5 = 1.91
Total 1.91 T

(c) Beams

FB3 2.500 X 0.300 X 0.300 X 1 X 2.5 = 0.56


RB3, RB4 2.500 X 0.300 X 0.300 X 2 X 2.5 = 1.13
RB1, RB2 1.200 X 0.300 X 0.300 X 2 X 2.5 = 0.54
Total = 2.23 T

(d) Column
SC1 0.300 X 0.300 X 4.300 X 4 X 2.5 = 3.87

Total = 3.87 T
(e) Pedestral
PD1 0.400 X 0.200 X 0.550 X 3 X 2.5 = 0.33

Total = 0.33 T

(f) Monorail
Weight
Length
(Kg/m)
Monorail ISMB 250 4.000 X - X - X 1 X 37.3 = 149.20

Total Load in
= 0.15 T
MT

(g) Raft

Wet Well 5.200 X 3.700 X 0.400 X 1 X 2.5 = 19.24


(Inside Wall ) 3.700 X 0.400 X 0.400 X 2 X 2.5 = 2.96
Total 22.20 T

TOTAL LOAD = = 84.00 T


TOTAL DEAD WEIGHT ABOVE RAFT TOP
FOR RAFT DESIGN = 84.0 - 22.2 - 0.33 - 0.00 = 61.00 T
(SW OF RAFT) (PCC/RCC/PLUM Filling/Gate,Screen Loads)

Page 81 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI
CONTRACTOR: M/s
CLIENT: CANTONMENT BOARD JHANSI AQUATECH SOLUTIONS
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF PVT LTD.
SPS-2

LOAD ON RAFT :

SR. NO. WORK ITEM UNIT CALCULATION TOTAL

L B H NOS. Density
A TOTAL LIVE LOAD MT 4

LOAD CALCULATION
(a) Slab

Slab At TOC 240.4


1.530 X 2.500 X - X 1 X 0.50 1.91 T
Total 1.91 T

(b) Monorail

Live Load on Monorail = 1.65 T

Total 1.65 T

TOTAL LOAD = = 4.00 T

Page 82 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT BOARD
AQUATECH
JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

DESIGN OF RAFT OF WET WELL

INPUT DATA
Grade of concrete = M 30
Steel Grade : Fe 500
clear cover = 60 mm @ bottom
clear cover = 60 mm @ top
Provide depth(D) = 400 mm

2.800 D ly /lx = 1.54 < 2 hence design


Lx D as two way slab

( FOUR EDGES DISCONTINUOUS )


(Refer IS:456 2000 Table26 page 91)
D
4.300
Ly

LOAD ON SLAB :-

REFER LOAD CALCULATIONS :

Toe projection
Top = 0.30 m
Bottom = 0.30 m
Left = 0.30 m
Right = 0.30 m

TOTAL BASE SLAB AREA 5.20 m x 3.70 m = 19.240 m^2

DL LL
TOTAL LOAD = 61.00 + 4.00 = 65.00 T

Soil pressure = P / A = 3.38 T/m^2 3.38 T/m^2

Soil Pressure due to load (P) = 3.380 T/m^2 ( REFER LOAD CALCULATIONS )

Max.BM due to Soil pressure :


Positive moment at mid span = coefficient* P* (lx)^2 = 0.091 X 3.380 X 2.80 x 2.80
Short span 2.40 Tm/m + 3.28 Tm/m
( WALL MOMENT )
= 5.68 Tm/m

Positive moment at mid span = coefficient* P* (lx)^2 = 0.056 X 3.380 X 2.80 x 2.80
Long span 1.48 Tm/m + 3.28 Tm/m
( WALL MOMENT )
= 4.76 Tm/m

Tension in slab due to water pressure = 4.00 T/M ( Along short direction )

Moment due to earth from wall = 2.180 TM/M

Page 83 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT JHANSI CONTRACTOR: M/s
CLIENT: CANTONMENT BOARD
AQUATECH
JHANSI
SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING STATION OF SPS-2

d req = Mumax x 10^7/( 0.133 xb x fck)

d req = 5.68 x1.5 x 10^7 / (0.133 x 1000 x 35) = 13.53 cm


= 135.3 mm

provide D = 400 mm d = 334 mm

Ast @ top = 0 . 5 f ck 1 − 1 − 4 .6 M u
short span 2 bd
f y f ck bd
= (0.5x30/500) x [ 1 - √ ( 1-(4.6x5.68x1.5x10^7)/ ( 30x1000x334^2) ) ] x (1000x334)
= 605.0 mm^2/m

Ast @ top = 0 . 5 f ck 1 − 1 − 4 .6 M u
Long span 2 bd
f y f ck bd
= (0.5x30/500) x [ 1 - √ ( 1-(4.6x4.76x1.5x10^7)/ ( 30x1000x334^2) ) ] x (1000x334)
= 504.4 mm^2/m

Ast @ bottom due to earth mmt = 0 . 5 f ck 1 − 1 − 4 .6 M u


2 bd
f y f ck bd
= (0.5x30/500) x [ 1 - √ ( 1-(4.6x2.18x1.5x10^7)/ ( 30x1000x334^2) ) ] x (1000x334)
= 227.8 mm^2/m

Shear check:
Total factored load ( w ) = 3.380 X 1.5 = 5.07 T/m^2

Area of contribution for long side Area of contribution for short side
= ( 4.3 X 2.8 - 2 X 2.8^ 2 / 4 ) / 2 = 2.8 ^ 2 /4
= 4.06 m^2 = 1.96 m^2

Total factored shear force along long side Total factored shear force along short side
= 4.06 m^2 X 5.07 T/m^2 = 1.96 m^2 X 5.07 T/m^2
= 20.58 T = 9.94 T

Factored shear per m along long side Factored shear per m along short side
= 20.58 T / 4.3 m = 9.94 m / 2.8 m
= 4.79 T/m = 3.55 T/m

Vu max = 4.79 T/m


τvu = 4.79 X 10^4 / ( 1000 X 334 )
τvu = 0.14 N/mm^2
Pt provided = 0.169 %
τc = 0.31 N/mm^2
τc > τvu Hence safe

Minimum reinforcement reqd.

0.24 400
x 1000 x = 480 mm^2/m
100 2
For thk = 400 mm

Provide
D = 400 mm

12 tor @ 200 c/c @ BOTTOM ALONG SHORT DIRECTIONS


. (Provided Ast. = 565 mm^2/m)
12 tor @ 140 c/c @ TOP ALONG SHORT DIRECTIONS
(Provided Ast. = 807 mm^2/m)
12 tor @ 200 c/c @ BOTTOM ALONG LONG DIRECTIONS
(Provided Ast. = 565 mm^2/m)
12 tor @ 140 c/c @ TOP ALONG LONG DIRECTIONS
807 mm^2/m)
Page 84 of 85
PROJECT: 3MLD STP BASED ON SBR TECHNOLOGY AT
CLIENT: CANTONMENT BOARD JHANSI CONTRACTOR: M/s AQUATECH
JHANSI SOLUTIONS PVT LTD.
DESIGN CALCULATIONS FOR RAW SEWAGE PUMPING
STATION OF SPS-2

CRACK WIDTH CALCULATIONS - FLEXURE

HOOP
B/F
Location For Crack Width Check TOP BOTTOM -@ 2.975
INPUT
fck= 30 N/mm2 500 30
2
fy= 500 N/mm 500 500
Area of reinforcement " As " = 807 mm2 565 1340
b= 1000 mm 1000 1000
h= 400 mm 400 600
d= 334 mm 334 532
Minimum cover to tension reinforcement " CO " = 60 mm 60 60
Bar spacing " S " = 140 mm 200 150
Bar dia " DIA " = 12 mm 12 16
" acr " =(((S/2)^2+(CO+DIA/2)^2)^(1/2)-DIA/2) as default or enter other value = 90.2 mm 113.8 93.2
"acr " is distance from the point considered to the surface of the nearest
longitudinal bar
Applied moment " M "= 5.68 Tm 2.18

Tension- "T"= 4.00 0


CALCULATIONS
moduli of elasticity of concrete " Ec" =0.5 x (5000*√fck) = 13.7 KN/mm2 13.7 13.7
moduli of elasticity of steel " Es " = 200.0 KN/mm2 200.0 200.0
Modular ratio " a " = (Es/Ec) = 14.61 14.61 14.61
" r " = As/bd = 0.002 0.002 0.003
depth to neutral axis, "x" = (-a.r +((a.r)2 + 2.a.r)0.5.d = 77.74 mm 66.46 126.05

" Z " = d-(x/3) = 308 312 490


Reinforcement stress " fs " = Ms/(As*Z) +0.5Ts/As = 253.11 N/mm2 124 0
Concrete stress " fc " = (fs*As)/(0.5*b*x) = 5.26 N/mm2 2.10 0.00
Strain at soffit of concrete beam/slab- " e1 " = (fs/Es)*(h-x)/(d-x) = 0.0016 0.0008 0.0000
Strain due to stiffening effect of concrete between cracks " e2 " =
e2 = b.(h-x)2/(3.Es.As.(d-x)) for crack widths of 0.2 mm Used Used Used
2
e2 = 1.5.b.(h-x) /(3.Es.As.(d-x)) for crack widths of 0.1 mm n/a n/a n/a
e2 = 0.0008 0.0012 0.0007
Average strain for calculation of crack width- " em "= e1-e2 = 0.0008 -0.0005 -0.0007

Calculated crack width, " w " = 3.acr.em/(1+2.(acr-c)/(h-x))


CALCULATED CRACK WIDTH, 'w' = 0.1721 mm -0.1175 -0.2000
Crack width Less than 0.2mm OK OK OK
-ve sign indiactes uncracked section

Page 85 of 85