1 Design Basis 2 TO 3
3 Design of walls
5 Design of Purlin
6 Design of Monorail
7 Design of Staircase
9 STAAD INPUT
11 Schedule of Columns
12 Schedule of beams
DESIGN BASIS
DESIGN CALCULATIONS FOR CRW SUMP & PUMP HOUSE
HINDUSTAN DORR-OLIVER LTD. PAGE
3
CLIENT: BCPL, DIBRUGARH, ASSAM
OF
CONSULTANT: ENGINEERS
INDIA LIMITED PROJECT: BRAHMAPUTRA PETROLEUM COMPLEX LEPEKATA
DIBRUGARH, ASSAM
DESIGN BASIS :
DESIGN DATA :
Concrete grade = M 30
Steel grade = Fe 500
Soil surcharge = 1 T/m2
Bulk density of soil , g = 1.8 T/m2
Co-efficient of Active Earth Pressure (Ks) = 0.33
Density of Liquid = 1 T/m3
Density of Reinforced Concrete = 2.5 T/m3
Density of Screed = 0.125 T/m2
Minimum clear cover to Reinforcement :
a) Liquid retaining Structures
Walls 50 mm on water face
Base slab 50 mm on free face
50 mm on earth face
c) Beams 50 mm
d) Columns 50 mm
3. Seismic Load
Refer IS 1893 - Part IV - 2005
Horizontal Seismic Force ( using site specific spectra - Ref EIL DOC. NO - 6907-9-2554-0157)
Seismic coefficient, Ah = (Sa/g) / (R/I) = (I/R)*(Sa/g)
Sa/g - As per time period for (5% Damping - RCC)
I = 1.5 ( for Cat III ) , R = 5.0 ( SMRF )
I/R = 1.5/5 = 0.3
4. Wind Load
BASIC WIND SPEED, VB = 50 m/s
K1 = 1 (Probability Factor)
K2 = 1 ( As per IS-875 - Part3, Table 2 [For category -2 ,Class A] )
K3 = 1 (Topography factor)
DESIGN WIND SPEED = VB X K1 X K2 X K3
= 50 X 1 X 1 X 1 = 50 m/s
DESIGN WIND PRESSURE, PZ = 0.6 X VZ^2 N/m^2
= 0.6 X 50^2 =1500 N/m^2
= 1.5 KN/m^2
DESIGN CALCULATIONS FOR CRW SUMP & PUMP HOUSE
HINDUSTAN DORR-OLIVER LTD. PAGE
4
CLIENT: BCPL, DIBRUGARH, ASSAM
OF
CONSULTANT: ENGINEERS
INDIA LIMITED PROJECT: BRAHMAPUTRA PETROLEUM COMPLEX LEPEKATA
DIBRUGARH, ASSAM
REFERENCES
DESIGN CALCULATIONS FOR CRW SUMP & PUMP HOUSE
HINDUSTAN DORR-OLIVER LTD. PAGE
5
CLIENT: BCPL, DIBRUGARH, ASSAM
OF
CONSULTANT: ENGINEERS INDIA
LIMITED PROJECT: BRAHMAPUTRA PETROLEUM COMPLEX LEPEKATA
DIBRUGARH, ASSAM
IS 3370 - Part 2:2009 :- Codes of practice for concrete structure for the storages of liquids :
Part 2 Reinforced concrete structures.
IS 3370 - Part 4:1967 :- Codes of practice for concrete structure for the storages of liquids :
Part 4 Design Tables.
MOODY'S Charts
Seismic load as per EIL. Document no. - 6907-9-2554-0157 & As per IS 1893 - Part IV - 2005
DESIGN OF WALLS
DESIGN CALCULATIONS FOR CRW SUMP & PUMP
HINDUSTAN DORR-OLIVER HOUSE PAGE
LTD.
CLIENT: BCPL, DIBRUGARH, ASSAM
OF
CONSULTANT: ENGINEERS
INDIA LIMITED PROJECT: BRAHMAPUTRA PETROLEUM
COMPLEX LEPEKATA DIBRUGARH, ASSAM
h = 5m
w = 10 m
l = 33.5 m
33.5 m
h/w = 0.5 0.5<1<1.5
5
EXTERNAL PRESSURE COEFFICIENT Cpe;
-0.7 0.7
C C
A B A B
D D
-0.7 -0.1
Ө = 00 Ө = 900
-1.4 0
C C
A 0.7 B A 0.7 B
0 -1 -1.2 -1.2
D D
-1.4 -0.8
Ө = 00 Ө = 900
When Cpi = -0.7
0 1.4
C C
A -0.7 B A -0.7 B
D D
0 0.6
Ө = 00 Ө = 900
± 0.7 ± 0.7
Ө = 00 Ө = 900
Net Pressure coefficient Cp = (Cpe- Cpi)
When Cpi = 0.7
± 0.7 ± 0.7
Ө = 00 Ө = 900
± 0.7 ± 0.7
Ө = 00 Ө = 900
Ө = 00 DESIGN Pz = -1.61 on EF
Ө = 00 DESIGN Pz = -1.18 on GH
DESIGN OF PURLIN
DESIGN CALCULATIONS FOR CRW SUMP & PUMP
HINDUSTAN DORR-OLIVER LTD. HOUSE PAGE
PURLIN DESIGN
Weight of G.I sheet + service load= 0.5 kN/m2
slope of rafter (Ѳ) = 14.04 ⁰
= 0.24504423
Live load = 0.6692 kN/m2
Wind load pressure indensity = 2.2 kN/m2
Spacing of purlin = 1.4 m
Span of purlin = 4.5 m
self weight of purlin = 0.127 kN/m
Dead Load on purlin (wd) = 0.827 kN/m
Live load on purlin (wl) = 0.937 kN/m
Wind load on purlin (ww) = 3.080 kN/m
Zreq = (((Mx+6My)*10^6)/165)
Hence safe
Deflection check
Hence safe
HINDUSTAN DORR-OLIVER DESIGN CALCULATIONS FOR CRW SUMP & PUMP HOUSE PAGE
LTD.
CLIENT: BCPL, DIBRUGARH, ASSAM
CONSULTANT: ENGINEERS INDIA
LIMITED PROJECT: BRAHMAPUTRA PETROLEUM COMPLEX LEPEKATA
DIBRUGARH, ASSAM
DESIGN OF MONORAIL
S/w of beam
5.5 T 0.0616 T/m
4.5 m Shear =
5.64 T
(Assuming Load at support)
2
( M x ) max = 5.0 X 4.5 0.0616 X 4.5
+
4 8
= 5.781 T-m
( M y ) max = 0.200 X 4.5 = 0.225 T-m
4
= 0.0075 + 0.243
= 0.251 cm
DESIGN OF STAIRCASE
DESIGN CALCULATIONS FOR SUBSTATION
HINDUSTAN DORR-OLIVER LTD. BUILDING PAGE
W T/m
L= 4
Loading on Staircase:
Dead Load:
a)SW=Dx2.5/CosØ = 0.570 T/m^2
b)Floor Finish = 0.1 T/m^2
c)Steps=1.25xRiser = 0.1875 T/m^2
Total 0.857 T/m^2
Mu/bd^2= 1.24
Summary:
Provide D = 200 mm
STAAD MODEL
DESIGN CALCULATIONS FOR CRW SUMP & PUMP HOUSE
HINDUSTAN DORR-OLIVER LTD. PAGE
63
CLIENT: BCPL, DIBRUGARH, ASSAM
OF
CONSULTANT: ENGINEERS INDIA
PROJECT: BRAHMAPUTRA PETROLEUM COMPLEX LEPEKATA 108
LIMITED
DIBRUGARH, ASSAM
SCHEDULE OF COLUMN
DESIGN CALCULATIONS FOR CRW SUMP & PUMP HOUSE
HINDUSTAN DORR-OLIVER LTD. PAGE
67
CLIENT: BCPL, DIBRUGARH, ASSAM
OF
CONSULTANT: ENGINEERS INDIA
PROJECT: BRAHMAPUTRA PETROLEUM COMPLEX LEPEKATA 108
LIMITED
DIBRUGARH, ASSAM
SCHEDULE OF COLUMNS:
INPUT DATA :
Concrete grade = M 30 Steel grade = Fe 500
Clear cover = 50 mm
NOTE:
MIN. AREA OF STEEL REQ'D. FOR COLUMN = 0.8% OF GROSS AREA
SCHEDULE OF BEAMS
DESIGN CALCULATIONS FOR CRW SUMP & PUMP HOUSE
HINDUSTAN DORR-OLIVER LTD. PAGE
69
CLIENT: BCPL, DIBRUGARH, ASSAM
OF
CONSULTANT: ENGINEERS INDIA LIMITED PROJECT: BRAHMAPUTRA PETROLEUM COMPLEX LEPEKATA 108
DIBRUGARH, ASSAM
Schedule Of Beams:
603
(3nos. 603 #8@100 mm #8@150
C/C mm C/C
TB1 19 TO 32 300 x 450 492 446 611
16mm (3nos. 16mm DIA)
DIA)
33 TO 36 53
54 67 TO 72
603
97 TO 104 129
(3nos. 603 #8@100 mm #8@150
C/C mm C/C
TB2 TO 132 143 300 x 600 277 277 277
16mm (3nos. 16mm DIA)
150 151 158
DIA)
159 166 167 -
174
DESIGN CALCULATIONS FOR CRW SUMP & PUMP HOUSE
HINDUSTAN DORR-OLIVER LTD. PAGE
Lx =
11.250 m Ly / Lx ratio,
3.013 > 2.00
Lx =
16.825 m Ly / Lx ratio,
2.027 > 2.00
Wall moment due to water pressure from W1 = 47.41 T-m/m { Refer Wall design}
Wall moment due to water pressure from W2 = 79.03 T-m/m
Wall moment due to water pressure from W4 = 41.95 T-m/m
LC 1: UPLIFT PRESSURE
LC 2: BASE PRESSURE
LC 3: EARTH MOMENT
LC 4: WATER MOMENT
LC 5: UPLIFT PRESSURE + EARTH MOMENT
Net -ve moment at sup@ Bottom = 26.76 T-m/m Wall moment due to earth pressure from wall W5
(Along Long span) (Tension @ Bottom)
For Sump
Net Moment at suppot @ Top = 41.95 T-m/m Wall moment due to water from wall W4
(Along Long span) (Tension @ Top)
Net -ve moment at sup@ Bottom = 41.71 T-m/m Wall moment due to earth pressure from wall W4
(Along Long span) (Tension @ Bottom)
DESIGN CALCULATIONS FOR CRW SUMP & PUMP HOUSE
HINDUSTAN DORR-OLIVER LTD. PAGE
For Sump
Mmax @ top (Water face) = 65.000 Tm/m
(Ast min.)= 0.092 % = 1372.5 mm2/m ) (each face each way) Ref. Tor Steel Hand book chart 1.1
Provide,D= 1500.00 mm
Provide,
Y 20 @ 200 c/c.TOP along Short Direction
Provide Ast = 1570 mm2/m
Y 25 @ 150 c/c.BOTTOM along Short Direction
Provide Ast = 3273 mm2/m
Y 25 @ 100 c/c.BOTTOM along Short Direction
Provide Ast = 4910 mm2/m
Y 20 @ 200 c/c.TOP along Long Direction
Provide Ast = 1570 mm2/m
Y 20 @ 200 c/c.BOTTOM along Long Direction
Provide Ast = 1570 mm2/m
For Sump
P2 2693.2 T
P3 4445.6 T
Hence Safe