You are on page 1of 79

VEDANTA LIMITED

Cairn Oil & Gas

NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT

FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS


OF FLUID WATER LINE AND THUMBLI WATER LINE

CAIRN DOCUMENT NO.


S247MEL-MPT-C-CAL-0047

A3 05-02-2020 Issue for Review MSN MMN OSR

A2 17-12-2018 Issue for Review MSN MMN OSR

Rev Date Purpose of Issue Prepared By Checked By Approved By Approved By

Engineering Consultant: :

MEGHA ENGINEERING & INFRASTRUCTURES LIMITED.

1
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
DESINGED CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR

FLUID WATER LINE


S NO CONTENT PAGE NO
1 INTRODUCTION 3
2 CODES & REFERENCE DOCUMENTS 3
3 MATERIALS 3
4 LOAD CALCULATION 3-6
5 BASIC LOAD CASES AND LOAD COMBINATIONS 7-8
6 STAAD INPUT 9-20
7 PEDESTAL DESIGN 21
8 RAFT DESIGN 22-29
9 BASE PRESSURE CHECK 30
10 STABILITY CHECK 31
11 APPENDIX - A (REFERENCE DOCUMENTS) 32

2
DATE
05-02-2020
APPROVED
OSR

PAGE NO
3
3
3
3-6
7-8
9-20
21
22-29
30
31
32

3
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
DESINGED CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
1 INTRODUCTION :
This document covers the FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS OF FLUID WATER LINE AND
THUMBLI WATER LINE
This design is applicable for PSL-04 (PS-2, PS-3,G3).
2 CODES & REFERENCE DOCUMENTS :
Codes and standards used : As per the document DECO-MPT-C-BD-1000, Rev No: A1
2.1 DESIGN METHODOLOGY
The analysis and design of foundation is done according to IS 456-2000.
DECO-RX-N-SP-2001-A1 is used for load combinations.
Foundation is modelled in staad as plate elements. Loads are applied at the CG of equipment by creating node at CG
location and assigned as master slave by connecting node on pedestal. All the vertical loads and moments are applied at
CG location and shear loads are applied at the slave node on the pedestal. Maximum moments and shear is taken from
plates summary for design of footing.

3 MATERIALS :
Grade of concrete = M30
Grade of Steel = Fe500D
Unit Weight of soil = 18.00 kN/m3
Unit Weight of water = 10.00 kN/m3
Unit Weight of concrete = 25.00 kN/m3
Unit Weight of steel = 78.50 kN/m3
Width of the Pedestal/Wall = 0.30 m
Height of the Pedestal/Wall above ground = 0.30 m
Total Height of the Pedestal/Wall = 0.60 m
Length of the Pedestal/Wall = 0.300 m
Width of the Raft = 0.90 m
Length of the Raft = 0.90 m
Thickness of the raft = 0.20 m
Level of C.G. above the Pedestal/Raft = 0.50 m S247MEL-MPT-L-DWG-0041-01_Rev.C2
Safe Bearing Capacity of soil at 0.5 m depth = 50.00 kN/m2 DECO-MPT-C-REP-1000-A1 SOIL REPORT
Settlement criteria for safe bearing pressure = 25.00 mm DECO-MPT-C-REP-1000-A1 SOIL REPORT
Subgrade Modulus of soil = 2000 kN/m2/m

4 LOAD CALCULATION :
4.1 DEAD LOAD CALCULATION - (DL)
Empty Load = 35 kg (70% OF INPUT LOAD=0.7*50)
Load Applied = 0.35 kN
Vertical soil Load Applied on raft (ϒ*H) = 5.40 kN/m2

Load Applied (ISMB100) = 0.048 kN (unit wt. = 11.5 kg/m)


(11.5*0.42=4.83kg)

87
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
DESINGED CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
4.2 OPERATION LOAD CALCULATION - (FL)
Operation Load = 15 kg (30% OF INPUT LOAD=0.3*50)
Load Applied = 0.15 kN

4.3 LIVE LOAD CALCULATION - (LL)


Live load on raft = 0.00 kN/m2 REFER DECO-RX-N-SP-2001, Rev No: C1

4.4 LATERAL SOIL LOAD CALCULATION - (EP)


Load Applied on raft = 0.00 kN/m2

4.5 HYDROTEST LOAD CALCULATION - (TL)


Hydro test Load = 0 kg
Load Applied (Hydrotest load - Dead load) = 0.00 kN

4.6 WIND LOAD CALCULATION - (WIND +/- X/Y)

Basic Wind Speed = 47 m/s REFER DECO-RX-N-SP-2001, Rev No: C1


Terrain Category = 1
Class of Structure = A

Length of the member, L = 6.000 m


Width of the member, W = 0.050 m
Height of the member, H = 0.050 m
L/B = 120.00
Factors k1 = 1.00 REFER DECO-RX-N-SP-2001, Rev No: C1
k2 = 1.00 REFER DECO-RX-N-SP-2001, Rev No: C1
k3 = 1.00 REFER DECO-RX-N-SP-2001, Rev No: C1
k4 = 1.15 FROM Clause 6.3.4
Design wind speed, Vz k1 k2 k3 k4 Vb = 54.05 m/s
Wind pressure, Pz 0.6 Vz2 = 1752.84 N/m2
= 1.75 KN/m2

Pressure Coefficient Cf = 1.00 FROM Table 28, IS875-Part3(2015) for L/B=120

Px - Longitudinal side Cf*A*pz = 0.004 kN


(0.05*0.05*1.75*1/1)
Pz - Transverse side Cf*A*pz = 0.53 kN
(6*0.05*1.75*1/1)

88
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
DESINGED CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR

89
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
DESINGED CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR

4.7 SEISMIC LOAD CALCULATION - (SEISMIC +/- X/Y)

Seismic Zone = Zone III REFER DECO-RX-N-SP-2001, Rev No: C1


Zone factor ( Z ) = 0.16 FROM TABLE 14 of IS 1893(PART 4):2015
Building System = OMRF
Response reduction factor = 1.50 FROM TABLE 10 of IS 1893(PART 4):2015
Importance factor = 1.75 REFER DECO-RX-N-SP-2001, Rev No: C1
I / R RATIO = 1.00 FROM Clause 8.6 of IS 1893(PART 4):2015
Type of soil = Medium REFER DECO-RX-N-SP-2001, Rev No: C1
Width of skid in X direction = 6.000 m
Width of skid in Z direction = 0.050 m
Height of the pump = 0.050 m
Seismic Base Shear Calculation
Base Shear
TX = 0.085x0.050.75 = 0.01 sec FROM Clause 7.6.2 of IS 1893(PART 1):2016
(Sa/g)x = 2.50 FROM FIG 1 of IS 1893(PART 4):2015
Tz = 0.085x0.050.75 = 0.01 sec FROM Clause 7.6.2 of IS 1893(PART 1):2016
(Sa/g)z = 2.50 FROM FIG 1 of IS 1893(PART 4):2015

Design Horizontal Seismic Coefficient Ah = Z/2 x I/R x Sa/g


Ahx = 0.16/2 x 1 x 2.5 = 0.200
Ahz = 0.16/2 x 1 x 2.5 = 0.200
VB = AhW

Load Applied (Operational) Fo = 0.10 kN (Fo=Operational Load*Ah)


((35+15)*0.2/100)
Load Applied on each node (Operational) 0.10 kN

90
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
DESINGED CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR

4.8 SEISMIC LOAD CALCULATION FOR EMPTY CONDITION - (SEISMIC EMPTY +/- X/Y)

Load Applied (Empty) Fe = 0.07 kN (Fe=Dead Load*Ah)


(35*0.2/100)
Load Applied on each node(Empty) 0.07 kN

4.9 SOIL REPORT DATA


Document DECO-MPT-C-REP-1000-A1 SOIL REPORT MPT is referred for SOIL DATA

91
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
DESINGED CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR

5 Basic Loads and Load Combinations used : Refer document DECO-RX-N-SP-2001, Rev No: C1

5.1 LOAD CASES


LOAD 1 LOADTYPE Dead TITLE DL
LOAD 2 LOADTYPE Operating TITLE FL
LOAD 3 LOADTYPE Live TITLE LL
LOAD 4 LOADTYPE Dead TITLE EP
LOAD 5 LOADTYPE Dead TITLE TL
LOAD 6 LOADTYPE Wind TITLE WIND +X
LOAD 7 LOADTYPE Wind TITLE WIND -X
LOAD 8 LOADTYPE Wind TITLE WIND +Z
LOAD 9 LOADTYPE Wind TITLE WIND -Z
LOAD 10 LOADTYPE Seismic TITLE SEISMIC +X
LOAD 11 LOADTYPE Seismic TITLE SEISMIC -X
LOAD 12 LOADTYPE Seismic TITLE SEISMIC +Z
LOAD 13 LOADTYPE Seismic TITLE SEISMIC -Z
LOAD 14 LOADTYPE Seismic TITLE SEISMIC-EMPTY +X
LOAD 15 LOADTYPE Seismic TITLE SEISMIC-EMPTY -X
LOAD 16 LOADTYPE Seismic TITLE SEISMIC-EMPTY +Z
LOAD 17 LOADTYPE Seismic TITLE SEISMIC-EMPTY -Z

5.2 FACTORED LOAD COMBINATIONS


101 1.5DL+1.5LL
102 1.5DL+1.5FL
103 1.5DL+1.5TL
104 .9DL+1.5EP+1.5WL+X
105 .9DL+1.5EP+1.5WL-X
106 .9DL+1.5EP+1.5WL+Z
107 .9DL+1.5EP+1.5WL-Z
108 1.2DL+1.2FL+1.6LL+1.6EP
109 1.2DL+.5LL+1.2TL
110 .9DL+1.5EP+1.5EQ-E+X
111 .9DL+1.5EP+1.5EQ-E-X
112 .9DL+1.5EP+1.5EQ-E+Z
113 .9DL+1.5EP+1.5EQ-E-Z
114 1.2DL+1.2FL+0.5LL
115 1.2DL+.5LL+1.2TL+.25WL+X
116 1.2DL+.5LL+1.2TL+.25WL-X
117 1.2DL+.5LL+1.2TL+.25WL+Z
118 1.2DL+.5LL+1.2TL+.25WL-Z
119 1.5DL+1.5EQ-E+X
120 1.5DL+1.5EQ-E-X
121 1.5DL+1.5EQ-E+Z
122 1.5DL+1.5EQ-E-Z
123 1.2DL+1.2FL+.8WL+X
124 1.2DL+1.2FL+.8WL-X
125 1.2DL+1.2FL+.8WL+Z
126 1.2DL+1.2FL+.8WL-Z
127 1.2DL+1.2FL+.5LL+1.6WL+X
128 1.2DL+1.2FL+.5LL+1.6WL-X
129 1.2DL+1.2FL+.5LL+1.6WL+Z
130 1.2DL+1.2FL+.5LL+1.6WL-Z
131 1.5DL+1.5WL+X
132 1.5DL+1.5WL-X
133 1.5DL+1.5WL+Z

91
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
DESINGED CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
134 1.5DL+1.5WL-Z
135 1.2DL+1.2FL+.5LL+1.6EQ+X
136 1.2DL+1.2FL+.5LL+1.6EQ-X
137 1.2DL+1.2FL+.5LL+1.6EQ+Z
138 1.2DL+1.2FL+.5LL+1.6EQ-Z

92
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
DESINGED CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
139 .9DL+.9FL+1.6WL+X
140 .9DL+.9FL+1.6WL-X
141 .9DL+.9FL+1.6WL+Z
142 .9DL+.9FL+1.6WL-Z
143 .9DL+.9FL+1.6EQ+X
144 .9DL+.9FL+1.6EQ-X
145 .9DL+.9FL+1.6EQ+Z
146 .9DL+.9FL+1.6EQ-Z
147 1.2DL+1.2FL+1.2LL+1.2EQ+X
148 1.2DL+1.2FL+1.2LL+1.2EQ-X
149 1.2DL+1.2FL+1.2LL+1.2EQ+Z
150 1.2DL+1.2FL+1.2LL+1.2EQ-Z
151 1.2DL+1.2FL+1.2LL+1.2WL+X
152 1.2DL+1.2FL+1.2LL+1.2WL-X
153 1.2DL+1.2FL+1.2LL+1.2WL+Z
154 1.2DL+1.2FL+1.2LL+1.2WL-Z

5.2 UNFACTORED LOAD COMBINATIONS


201 1DL
202 1DL+1FL+1LL+1EP
203 1DL+1TL
204 1DL+1EP+1WL+X
205 1DL+1EP+1WL-X
206 1DL+1EP+1WL+Z
207 1DL+1EP+1WL-Z
208 1DL+1FL+1EP+1WL+X
209 1DL+1FL+1EP+1WL-X
210 1DL+1FL+1EP+1WL+Z
211 1DL+1FL+1EP+1WL-Z
212 1DL+1LL+1TL
213 1DL+1EP+1EQ-E+X
214 1DL+1EP+1EQ-E-X
215 1DL+1EP+1EQ-E+Z
216 1DL+1EP+1EQ-E-Z
217 1DL+1FL+1EP+1EQ+X
218 1DL+1FL+1EP+1EQ-X
219 1DL+1FL+1EP+1EQ+Z
220 1DL+1FL+1EP+1EQ-Z
221 1DL+1LL+1TL+.25WL+X
222 1DL+1LL+1TL+.25WL-X
223 1DL+1LL+1TL+.25WL+Z
224 1DL+1LL+1TL+.25WL-Z
225 .6DL+1WL+X
226 .6DL+1WL-X
227 .6DL+1WL+Z
228 .6DL+1WL-Z
229 1DL+1FL+.75LL+1EP+.75WL+X
230 1DL+1FL+.75LL+1EP+.75WL-X
231 1DL+1FL+.75LL+1EP+.75WL+Z
232 1DL+1FL+.75LL+1EP+.75WL-Z
233 .6DL+1EQ-E+X
234 .6DL+1EQ-E-X
235 .6DL+1EQ-E+Z
236 .6DL+1EQ-E-Z
237 1DL+1FL+.75LL+1EP+.75EQ+X
238 1DL+1FL+.75LL+1EP+.75EQ-X
239 1DL+1FL+.75LL+1EP+.75EQ+Z

93
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
DESINGED CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
240 1DL+1FL+.75LL+1EP+.75EQ-Z

94
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESINGED CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI WATER
LINE MSN MMN OSR

6 STAAD INPUT

STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 22/2/2019
JOB NAME DESIGN OF PIPE SUPPORTS FOR FLUID WATER LINE AND THUMBLI LINE
JOB CLIENT VEDANTA LIMITED Cairn oil & gas
JOB NO S247MEL-NE-C-CAL-0047-1
JOB REV A3
JOB PART STAAD INPUT
ENGINEER NAME MSN
CHECKER NAME MMN
APPROVED NAME OSR
CHECKER DATE 22/2/2019
APPROVED DATE 22/2/2019
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
6 0.05 0 0.45; 9 0.1 0 0.45; 11 0.15 0 0.45; 13 0.2 0 0.45; 15 0.25 0 0.45;
17 0.3 0 0.45; 19 0.35 0 0.45; 21 0.4 0 0.45; 23 0.45 0 0.45; 25 0.05 0 0.4;
27 0.1 0 0.4; 28 0.15 0 0.4; 29 0.2 0 0.4; 30 0.25 0 0.4; 31 0.3 0 0.4;
32 0.35 0 0.4; 33 0.4 0 0.4; 34 0.45 0 0.4; 36 0.05 0 0.35; 38 0.1 0 0.35;
39 0.15 0 0.35; 40 0.2 0 0.35; 41 0.25 0 0.35; 42 0.3 0 0.35; 43 0.35 0 0.35;
44 0.4 0 0.35; 45 0.45 0 0.35; 47 0.05 0 0.3; 49 0.1 0 0.3; 50 0.15 0 0.3;
51 0.2 0 0.3; 52 0.25 0 0.3; 53 0.3 0 0.3; 54 0.35 0 0.3; 55 0.4 0 0.3;
56 0.45 0 0.3; 58 0.05 0 0.25; 60 0.1 0 0.25; 61 0.15 0 0.25; 62 0.2 0 0.25;
63 0.25 0 0.25; 64 0.3 0 0.25; 65 0.35 0 0.25; 66 0.4 0 0.25; 67 0.45 0 0.25;
69 0.05 0 0.2; 71 0.1 0 0.2; 72 0.15 0 0.2; 73 0.2 0 0.2; 74 0.25 0 0.2;
75 0.3 0 0.2; 76 0.35 0 0.2; 77 0.4 0 0.2; 78 0.45 0 0.2; 80 0.05 0 0.15;
82 0.1 0 0.15; 83 0.15 0 0.15; 84 0.2 0 0.15; 85 0.25 0 0.15; 86 0.3 0 0.15;
87 0.35 0 0.15; 88 0.4 0 0.15; 89 0.45 0 0.15; 91 0.05 0 0.1; 93 0.1 0 0.1;
94 0.15 0 0.1; 95 0.2 0 0.1; 96 0.25 0 0.1; 97 0.3 0 0.1; 98 0.35 0 0.1;
99 0.4 0 0.1; 100 0.45 0 0.1; 102 0.05 0 0.05; 104 0.1 0 0.05; 105 0.15 0 0.05;
106 0.2 0 0.05; 107 0.25 0 0.05; 108 0.3 0 0.05; 109 0.35 0 0.05;
110 0.4 0 0.05; 111 0.45 0 0.05; 122 0.25 0.599999 0.25; 123 -0.2 0 0.05;
124 -0.2 0 -6.51926e-009; 126 -0.05 0 0.05; 127 -0.05 0 -9.31323e-009;
128 -3.72529e-009 0 0.05; 129 -2.79397e-009 0 -1.21072e-008;
130 0.05 0 -1.49012e-008; 131 -0.2 0 -0.05; 133 -0.05 0 -0.05;
134 -1.86265e-009 0 -0.05; 135 0.05 0 -0.05; 136 -0.2 0 -0.2; 138 -0.05 0 -0.2;
139 -9.31323e-010 0 -0.2; 140 0.05 0 -0.2; 145 -0.2 0 0.7; 148 -0.05 0 0.7;
150 -2.79397e-009 0 0.7; 151 0.05 0 0.7; 152 -0.2 0 0.55; 154 -0.05 0 0.55;
155 -1.86265e-009 0 0.55; 156 0.05 0 0.55; 157 -0.2 0 0.5; 159 -0.05 0 0.5;
160 -9.31323e-010 0 0.5; 161 0.05 0 0.5; 162 -0.2 0 0.45; 163 -0.05 0 0.45;
164 0 0 0.45; 165 0.5 0 0.05; 166 0.5 0 -1.39698e-008;
167 0.45 0 -1.86265e-008; 168 0.55 0 0.05; 169 0.55 0 -9.31323e-009;
170 0.7 0 0.05; 171 0.7 0 -4.65661e-009; 173 0.5 0 -0.05; 174 0.45 0 -0.05;
175 0.55 0 -0.05; 176 0.7 0 -0.05; 178 0.5 0 -0.2; 179 0.45 0 -0.2;
180 0.55 0 -0.2; 181 0.7 0 -0.2; 187 0.5 0 0.7; 188 0.45 0 0.7; 190 0.55 0 0.7;
192 0.7 0 0.7; 194 0.5 0 0.55; 195 0.45 0 0.55; 196 0.55 0 0.55;
197 0.7 0 0.55; 199 0.5 0 0.5; 200 0.45 0 0.5; 201 0.55 0 0.5; 202 0.7 0 0.5;
204 0.5 0 0.45; 205 0.55 0 0.45; 206 0.7 0 0.45; 207 -0.2 0 0.4;
208 -0.05 0 0.4; 209 0 0 0.4; 210 0.5 0 0.4; 211 0.55 0 0.4; 212 0.7 0 0.4;
213 -0.2 0 0.35; 214 -0.05 0 0.35; 215 0 0 0.35; 216 0.5 0 0.35;

93
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESINGED CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI WATER
LINE MSN MMN OSR
217 0.55 0 0.35; 218 0.7 0 0.35; 219 -0.2 0 0.3; 220 -0.05 0 0.3; 221 0 0 0.3;
222 0.5 0 0.3; 223 0.55 0 0.3; 224 0.7 0 0.3; 225 -0.2 0 0.25;
226 -0.05 0 0.25; 227 0 0 0.25; 228 0.5 0 0.25; 229 0.55 0 0.25;

94
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESINGED CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI WATER
LINE MSN MMN OSR
230 0.7 0 0.25; 231 -0.2 0 0.2; 232 -0.05 0 0.2; 233 0 0 0.2; 234 0.5 0 0.2;
235 0.55 0 0.2; 236 0.7 0 0.2; 237 -0.2 0 0.15; 238 -0.05 0 0.15; 239 0 0 0.15;
240 0.5 0 0.15; 241 0.55 0 0.15; 242 0.7 0 0.15; 243 -0.2 0 0.1;
244 -0.05 0 0.1; 245 0 0 0.1; 246 0.5 0 0.1; 247 0.55 0 0.1; 248 0.7 0 0.1;
249 0.1 0 0.7; 250 0.1 0 0.55; 251 0.1 0 0.5; 252 0.15 0 0.7; 253 0.15 0 0.55;
254 0.15 0 0.5; 255 0.2 0 0.7; 256 0.2 0 0.55; 257 0.2 0 0.5; 258 0.25 0 0.7;
259 0.25 0 0.55; 260 0.25 0 0.5; 261 0.3 0 0.7; 262 0.3 0 0.55; 263 0.3 0 0.5;
264 0.35 0 0.7; 265 0.35 0 0.55; 266 0.35 0 0.5; 267 0.4 0 0.7; 268 0.4 0 0.55;
269 0.4 0 0.5; 270 0.1 0 -1.49012e-008; 271 0.1 0 -0.05; 272 0.1 0 -0.2;
273 0.15 0 -1.49012e-008; 274 0.15 0 -0.05; 275 0.15 0 -0.2;
276 0.2 0 -1.49012e-008; 277 0.2 0 -0.05; 278 0.2 0 -0.2;
279 0.25 0 -1.49012e-008; 280 0.25 0 -0.05; 281 0.25 0 -0.2;
282 0.3 0 -1.49012e-008; 283 0.3 0 -0.05; 284 0.3 0 -0.2;
285 0.35 0 -1.49012e-008; 286 0.35 0 -0.05; 287 0.35 0 -0.2;
288 0.4 0 -1.49012e-008; 289 0.4 0 -0.05; 290 0.4 0 -0.2; 443 0.25 1.02 0.25;
444 -0.125 0 -0.05; 445 -0.125 0 -0.125; 446 -0.2 0 -0.125; 447 -0.05 0 -0.125;
448 -0.125 0 -0.2; 449 -0.125 0 0.7; 450 -0.125 0 0.625; 451 -0.2 0 0.625;
452 -0.05 0 0.625; 453 -0.125 0 0.55; 454 0.625 0 -0.05; 455 0.625 0 -0.125;
456 0.55 0 -0.125; 457 0.7 0 -0.125; 458 0.625 0 -0.2; 459 0.625 0 0.7;
460 0.625 0 0.625; 461 0.55 0 0.625; 462 0.7 0 0.625; 463 0.625 0 0.55;
464 -0.125 0 0.05; 465 -0.125 0 -8.84757e-009; 466 -0.125 0 0.5;
467 -0.125 0 0.45; 468 0.625 0 0.05; 469 0.625 0 -6.51926e-009;
470 0.625 0 0.5; 471 0.625 0 0.45; 472 -0.125 0 0.4; 473 0.625 0 0.4;
474 -0.125 0 0.35; 475 0.625 0 0.35; 476 -0.125 0 0.3; 477 0.625 0 0.3;
478 -0.125 0 0.25; 479 0.625 0 0.25; 480 -0.125 0 0.2; 481 0.625 0 0.2;
482 -0.125 0 0.15; 483 0.625 0 0.15; 484 -0.125 0 0.1; 485 0.625 0 0.1;
486 -2.32831e-009 0 -0.125; 487 0.05 0 -0.125; 488 -2.79397e-009 0 0.625;
489 0.05 0 0.625; 490 0.5 0 -0.125; 491 0.45 0 -0.125; 492 0.5 0 0.625;
493 0.45 0 0.625; 494 0.1 0 0.625; 495 0.15 0 0.625; 496 0.2 0 0.625;
497 0.25 0 0.625; 498 0.3 0 0.625; 499 0.35 0 0.625; 500 0.4 0 0.625;
501 0.1 0 -0.125; 502 0.15 0 -0.125; 503 0.2 0 -0.125; 504 0.25 0 -0.125;
505 0.3 0 -0.125; 506 0.35 0 -0.125; 507 0.4 0 -0.125;
MEMBER INCIDENCES
102 63 122;
ELEMENT INCIDENCES SHELL
13 6 9 27 25; 14 9 11 28 27; 15 11 13 29 28; 16 13 15 30 29; 17 15 17 31 30;
18 17 19 32 31; 19 19 21 33 32; 20 21 23 34 33; 23 25 27 38 36; 24 27 28 39 38;
25 28 29 40 39; 26 29 30 41 40; 27 30 31 42 41; 28 31 32 43 42; 29 32 33 44 43;
30 33 34 45 44; 33 36 38 49 47; 34 38 39 50 49; 35 39 40 51 50; 36 40 41 52 51;
37 41 42 53 52; 38 42 43 54 53; 39 43 44 55 54; 40 44 45 56 55; 43 47 49 60 58;
44 49 50 61 60; 45 50 51 62 61; 46 51 52 63 62; 47 52 53 64 63; 48 53 54 65 64;
49 54 55 66 65; 50 55 56 67 66; 53 58 60 71 69; 54 60 61 72 71; 55 61 62 73 72;
56 62 63 74 73; 57 63 64 75 74; 58 64 65 76 75; 59 65 66 77 76; 60 66 67 78 77;
63 69 71 82 80; 64 71 72 83 82; 65 72 73 84 83; 66 73 74 85 84; 67 74 75 86 85;
68 75 76 87 86; 69 76 77 88 87; 70 77 78 89 88; 73 80 82 93 91; 74 82 83 94 93;
75 83 84 95 94; 76 84 85 96 95; 77 85 86 97 96; 78 86 87 98 97; 79 87 88 99 98;
80 88 89 100 99; 83 91 93 104 102; 84 93 94 105 104; 85 94 95 106 105;
86 95 96 107 106; 87 96 97 108 107; 88 97 98 109 108; 89 98 99 110 109;
90 99 100 111 110; 105 126 128 129 127; 106 128 102 130 129;
109 127 129 134 133; 110 129 130 135 134; 129 154 155 160 159;
130 155 156 161 160; 133 159 160 164 163; 134 160 161 6 164;
135 111 165 166 167; 136 165 168 169 166; 139 167 166 173 174;
140 166 169 175 173; 159 195 194 199 200; 160 194 196 201 199;
163 200 199 204 23; 164 199 201 205 204; 169 163 164 209 208; 170 164 6 25 209;
171 23 204 210 34; 172 204 205 211 210; 177 208 209 215 214; 178 209 25 36 215;
179 34 210 216 45; 180 210 211 217 216; 185 214 215 221 220; 186 215 36 47 221;
187 45 216 222 56; 188 216 217 223 222; 193 220 221 227 226; 194 221 47 58 227;

95
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESINGED CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI WATER
LINE MSN MMN OSR
195 56 222 228 67; 196 222 223 229 228; 201 226 227 233 232; 202 227 58 69 233;
203 67 228 234 78; 204 228 229 235 234; 209 232 233 239 238; 210 233 69 80 239;

96
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESINGED CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI WATER
LINE MSN MMN OSR
211 78 234 240 89; 212 234 235 241 240; 217 238 239 245 244; 218 239 80 91 245;
219 89 240 246 100; 220 240 241 247 246; 225 244 245 128 126;
226 245 91 102 128; 227 100 246 165 111; 228 246 247 168 165;
233 156 250 251 161; 234 161 251 9 6; 237 250 253 254 251; 238 251 254 11 9;
241 253 256 257 254; 242 254 257 13 11; 245 256 259 260 257; 246 257 260 15 13;
249 259 262 263 260; 250 260 263 17 15; 253 262 265 266 263; 254 263 266 19 17;
257 265 268 269 266; 258 266 269 21 19; 261 268 195 200 269; 262 269 200 23 21;
263 102 104 270 130; 264 130 270 271 135; 267 104 105 273 270;
268 270 273 274 271; 271 105 106 276 273; 272 273 276 277 274;
275 106 107 279 276; 276 276 279 280 277; 279 107 108 282 279;
280 279 282 283 280; 283 108 109 285 282; 284 282 285 286 283;
287 109 110 288 285; 288 285 288 289 286; 291 110 111 167 288;
292 288 167 174 289; 294 131 444 445 446; 295 444 133 447 445;
296 446 445 448 136; 297 445 447 138 448; 298 145 449 450 451;
299 449 148 452 450; 300 451 450 453 152; 301 450 452 154 453;
302 175 454 455 456; 303 454 176 457 455; 304 456 455 458 180;
305 455 457 181 458; 306 190 459 460 461; 307 459 192 462 460;
308 461 460 463 196; 309 460 462 197 463; 310 123 464 465 124;
311 464 126 127 465; 312 124 465 444 131; 313 465 127 133 444;
314 152 453 466 157; 315 453 154 159 466; 316 157 466 467 162;
317 466 159 163 467; 318 168 468 469 169; 319 468 170 171 469;
320 169 469 454 175; 321 469 171 176 454; 322 196 463 470 201;
323 463 197 202 470; 324 201 470 471 205; 325 470 202 206 471;
326 162 467 472 207; 327 467 163 208 472; 328 205 471 473 211;
329 471 206 212 473; 330 207 472 474 213; 331 472 208 214 474;
332 211 473 475 217; 333 473 212 218 475; 334 213 474 476 219;
335 474 214 220 476; 336 217 475 477 223; 337 475 218 224 477;
338 219 476 478 225; 339 476 220 226 478; 340 223 477 479 229;
341 477 224 230 479; 342 225 478 480 231; 343 478 226 232 480;
344 229 479 481 235; 345 479 230 236 481; 346 231 480 482 237;
347 480 232 238 482; 348 235 481 483 241; 349 481 236 242 483;
350 237 482 484 243; 351 482 238 244 484; 352 241 483 485 247;
353 483 242 248 485; 354 243 484 464 123; 355 484 244 126 464;
356 247 485 468 168; 357 485 248 170 468; 358 133 134 486 447;
359 447 486 139 138; 360 134 135 487 486; 361 486 487 140 139;
362 148 150 488 452; 363 452 488 155 154; 364 150 151 489 488;
365 488 489 156 155; 366 174 173 490 491; 367 491 490 178 179;
368 173 175 456 490; 369 490 456 180 178; 370 188 187 492 493;
371 493 492 194 195; 372 187 190 461 492; 373 492 461 196 194;
374 151 249 494 489; 375 489 494 250 156; 376 249 252 495 494;
377 494 495 253 250; 378 252 255 496 495; 379 495 496 256 253;
380 255 258 497 496; 381 496 497 259 256; 382 258 261 498 497;
383 497 498 262 259; 384 261 264 499 498; 385 498 499 265 262;
386 264 267 500 499; 387 499 500 268 265; 388 267 188 493 500;
389 500 493 195 268; 390 135 271 501 487; 391 487 501 272 140;
392 271 274 502 501; 393 501 502 275 272; 394 274 277 503 502;
395 502 503 278 275; 396 277 280 504 503; 397 503 504 281 278;
398 280 283 505 504; 399 504 505 284 281; 400 283 286 506 505;
401 505 506 287 284; 402 286 289 507 506; 403 506 507 290 287;
404 289 174 491 507; 405 507 491 179 290;
ELEMENT PROPERTY
13 TO 20 23 TO 30 33 TO 40 43 TO 50 53 TO 60 63 TO 70 73 TO 80 83 TO 90 105 -
106 109 110 129 130 133 TO 136 139 140 159 160 163 164 169 TO 172 -
177 TO 180 185 TO 188 193 TO 196 201 TO 204 209 TO 212 217 TO 220 -
225 TO 228 233 234 237 238 241 242 245 246 249 250 253 254 257 258 -
261 TO 264 267 268 271 272 275 276 279 280 283 284 287 288 291 292 -
294 TO 405 THICKNESS 0.2

97
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESINGED CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI WATER
LINE MSN MMN OSR
DEFINE MATERIAL START
ISOTROPIC CONCRETE

98
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESINGED CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI WATER
LINE MSN MMN OSR
E 2.17185e+007
POISSON 0.17
DENSITY 23.5616
ALPHA 1e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY AMERICAN
102 PRIS YD 0.3 ZD 0.3
CONSTANTS
MATERIAL CONCRETE ALL
SUPPORTS
6 9 11 13 15 17 19 21 23 25 27 TO 34 36 38 TO 45 47 49 TO 56 58 60 TO 67 69 -
71 TO 78 80 82 TO 89 91 93 TO 100 102 104 TO 111 123 124 126 TO 131 -
133 TO 136 138 TO 140 145 148 150 TO 152 154 TO 157 159 TO 171 173 TO 176 -
178 TO 181 187 188 190 192 194 TO 197 199 TO 202 204 TO 290 444 TO 506 -
507 ELASTIC MAT DIRECT Y SUBGRADE 2000 PRINT
SLAVE RIGID MASTER 443 JOINT 122
LOAD 1 LOADTYPE Dead TITLE DEAD LOAD
JOINT LOAD
443 FY -0.35
JOINT LOAD
122 FY -0.0483
ELEMENT LOAD
13 TO 20 23 TO 30 33 TO 40 43 TO 50 53 TO 60 63 TO 70 73 TO 80 83 TO 90 105 -
106 109 110 129 130 133 TO 136 139 140 159 160 163 164 169 TO 172 -
177 TO 180 185 TO 188 193 TO 196 201 TO 204 209 TO 212 217 TO 220 -
225 TO 228 233 234 237 238 241 242 245 246 249 250 253 254 257 258 -
261 TO 264 267 268 271 272 275 276 279 280 283 284 287 288 291 292 -
294 TO 405 PR GY -5.4
SELFWEIGHT Y -1 LIST 13 TO 20 23 TO 30 33 TO 40 43 TO 50 53 TO 60 63 TO 70 -
73 TO 80 83 TO 90 102 105 106 109 110 129 130 133 TO 136 139 140 159 160 -
163 164 169 TO 172 177 TO 180 185 TO 188 193 TO 196 201 TO 204 209 TO 212 -
217 TO 220 225 TO 228 233 234 237 238 241 242 245 246 249 250 253 254 257 -
258 261 TO 264 267 268 271 272 275 276 279 280 283 284 287 288 291 292 294 -
295 TO 405
LOAD 2 LOADTYPE Dead TITLE OL
JOINT LOAD
443 FY -0.15
LOAD 3 LOADTYPE Live REDUCIBLE TITLE LL
LOAD 4 LOADTYPE Live REDUCIBLE TITLE EP
LOAD 5 LOADTYPE Live TITLE TL
LOAD 6 LOADTYPE Wind TITLE WIND (+X)
JOINT LOAD
443 FX 0.004
LOAD 7 LOADTYPE Wind TITLE WIND (-X)
JOINT LOAD
443 FX -0.004
LOAD 8 LOADTYPE Wind TITLE WIND (+Z)
JOINT LOAD
443 FZ 0.53
LOAD 9 LOADTYPE Wind TITLE WIND (-Z)
JOINT LOAD
443 FZ -0.53
LOAD 10 LOADTYPE Seismic TITLE SEISMIC +X
JOINT LOAD
443 FX 0.1
LOAD 11 LOADTYPE Seismic TITLE SEISMIC -X

99
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESINGED CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI WATER
LINE MSN MMN OSR
JOINT LOAD
443 FX -0.1

100
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESINGED CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI WATER
LINE MSN MMN OSR
LOAD 12 LOADTYPE Seismic TITLE SEISMIC +Z
JOINT LOAD
443 FZ 0.1
LOAD 13 LOADTYPE Seismic TITLE SEISMIC -Z
JOINT LOAD
443 FZ -0.1
LOAD 14 LOADTYPE Seismic TITLE SEISMIC-EMPTY +X
JOINT LOAD
443 FX 0.07
LOAD 15 LOADTYPE Seismic TITLE SEISMIC-EMPTY -X
JOINT LOAD
443 FX -0.07
LOAD 16 LOADTYPE Seismic TITLE SEISMIC EMPTY +Z
JOINT LOAD
443 FZ 0.07
LOAD 17 LOADTYPE Seismic TITLE SEISMIC-EMPTY -Z
JOINT LOAD
443 FZ -0.07
**********************************************************
*++++++++++++++++++++++++++++++++++++++++++++++++++++++*
* ----- FACTORED LOAD COMBINATIONS ---- *
*++++++++++++++++++++++++++++++++++++++++++++++++++++++*
LOAD COMB 101 (1.50 DL + 1.50 LL)
1 1.5 3 1.5
*
LOAD COMB 102 (1.50 DL + 1.50 FL)
1 1.5 2 1.5
*
LOAD COMB 103 (1.50 DL + 1.50 TL)
1 1.5 5 1.5
*
LOAD COMB 104 (0.90 DL + 1.50 EP + 1.50 WL+X)
1 0.9 4 1.5 6 1.5
*
LOAD COMB 105 (0.90 DL + 1.50 EP + 1.50 WL-X)
1 0.9 4 1.5 7 1.5
*
LOAD COMB 106 (0.90 DL + 1.50 EP + 1.50 WL+Z)
1 0.9 4 1.5 8 1.5
*
LOAD COMB 107 (0.90 DL + 1.50 EP + 1.50 WL-Z)
1 0.9 4 1.5 9 1.5
*
LOAD COMB 108 (1.20 DL + 1.20 FL + 1.60 LL + 1.60 EP)
1 1.2 2 1.2 3 1.6 4 1.6
*
LOAD COMB 109 (1.20 DL + 0.50 LL + 1.20 TL)
1 1.2 3 0.5 5 1.2
*
LOAD COMB 110 (0.90 DL + 1.50 EP + 1.50 EQ-E+X)
1 0.9 4 1.5 14 1.5
*
LOAD COMB 111 (0.90 DL + 1.50 EP + 1.50 EQ-E-X)
1 0.9 4 1.5 15 1.5
*
LOAD COMB 112 (0.90 DL + 1.50 EP + 1.50 EQ-E+Z)
1 0.9 4 1.5 16 1.5

101
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESINGED CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI WATER
LINE MSN MMN OSR
*
LOAD COMB 113 (0.90 DL + 1.50 EP + 1.50 EQ-E-Z)

102
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESINGED CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI WATER
LINE MSN MMN OSR
1 0.9 4 1.5 17 1.5
*
LOAD COMB 114 (1.20 DL + 1.20 FL + 0.50 LL)
1 1.2 2 1.2 3 0.5
*
LOAD COMB 115 (1.20 DL + 0.50 LL + 1.20 TL + 0.25 WL+X)
1 1.2 3 0.5 5 1.2 6 0.25
*
LOAD COMB 116 (1.20 DL + 0.50 LL + 1.20 TL + 0.25 WL-X)
1 1.2 3 0.5 5 1.2 7 0.25
*
LOAD COMB 117 (1.20 DL + 0.50 LL + 1.20 TL + 0.25 WL+Z)
1 1.2 3 0.5 5 1.2 8 0.25
*
LOAD COMB 118 (1.20 DL + 0.50 LL + 1.20 TL + 0.25 WL-Z)
1 1.2 3 0.5 5 1.2 9 0.25
*
LOAD COMB 119 (1.50 DL + 1.50 EQ-E+X)
1 1.5 14 1.5
*
LOAD COMB 120 (1.50 DL + 1.50 EQ-E-X)
1 1.5 15 1.5
*
LOAD COMB 121 (1.50 DL + 1.50 EQ-E+Z)
1 1.5 16 1.5
*
LOAD COMB 122 (1.50 DL + 1.50 EQ-E-Z)
1 1.5 17 1.5
*
LOAD COMB 123 (1.20 DL + 1.20 FL + 0.80 WL+X)
1 1.2 2 1.2 6 0.8
*
LOAD COMB 124 (1.20 DL + 1.20 FL + 0.80 WL-X)
1 1.2 2 1.2 7 0.8
*
LOAD COMB 125 (1.20 DL + 1.20 FL + 0.80 WL+Z)
1 1.2 2 1.2 8 0.8
*
LOAD COMB 126 (1.20 DL + 1.20 FL + 0.80 WL-Z)
1 1.2 2 1.2 9 0.8
*
LOAD COMB 127 (1.20 DL + 1.20 FL + 0.50 LL + 1.60 WL+X)
1 1.2 2 1.2 3 0.5 6 1.6
*
LOAD COMB 128 (1.20 DL + 1.20 FL + 0.50 LL + 1.60 WL-X)
1 1.2 2 1.2 3 0.5 7 1.6
*
LOAD COMB 129 (1.20 DL + 1.20 FL + 0.50 LL + 1.60 WL+Z)
1 1.2 2 1.2 3 0.5 8 1.6
*
LOAD COMB 130 (1.20 DL + 1.20 FL + 0.50 LL + 1.60 WL-Z)
1 1.2 2 1.2 3 0.5 9 1.6
*
LOAD COMB 131 (1.50 DL + 1.50 WL+X)
1 1.5 6 1.5
*
LOAD COMB 132 (1.50 DL + 1.50 WL-X)

103
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESINGED CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI WATER
LINE MSN MMN OSR
1 1.5 7 1.5
*
LOAD COMB 133 (1.50 DL + 1.50 WL+Z)

104
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESINGED CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI WATER
LINE MSN MMN OSR
1 1.5 8 1.5
*
LOAD COMB 134 (1.50 DL + 1.50 WL-Z)
1 1.5 9 1.5
*
LOAD COMB 135 (1.20 DL + 1.20 FL + 0.50 LL + 1.60 EQ+X)
1 1.2 2 1.2 3 0.5 10 1.6
*
LOAD COMB 136 (1.20 DL + 1.20 FL + 0.50 LL + 1.60 EQ-X)
1 1.2 2 1.2 3 0.5 11 1.6
*
LOAD COMB 137 (1.20 DL + 1.20 FL + 0.50 LL + 1.60 EQ+Z)
1 1.2 2 1.2 3 0.5 12 1.6
*
LOAD COMB 138 (1.20 DL + 1.20 FL + 0.50 LL + 1.60 EQ-Z)
1 1.2 2 1.2 3 0.5 13 1.6
*
LOAD COMB 139 (0.90 DL + 0.90 FL + 1.60 WL+X)
1 0.9 2 0.9 6 1.6
*
LOAD COMB 140 (0.90 DL + 0.90 FL + 1.60 WL-X)
1 0.9 2 0.9 7 1.6
*
LOAD COMB 141 (0.90 DL + 0.90 FL + 1.60 WL+Z)
1 0.9 2 0.9 8 1.6
*
LOAD COMB 142 (0.90 DL + 0.90 FL + 1.60 WL-Z)
1 0.9 2 0.9 9 1.6
*
LOAD COMB 143 (0.90 DL + 0.90 FL + 1.60 EQ+X)
1 0.9 2 0.9 10 1.6
*
LOAD COMB 144 (0.90 DL + 0.90 FL + 1.60 EQ-X)
1 0.9 2 0.9 11 1.6
*
LOAD COMB 145 (0.90 DL + 0.90 FL + 1.60 EQ+Z)
1 0.9 2 0.9 12 1.6
*
LOAD COMB 146 (0.90 DL + 0.90 FL + 1.60 EQ-Z)
1 0.9 2 0.9 13 1.6
*
LOAD COMB 147 (1.20 DL + 1.20 FL + 1.20 LL + 1.20 EQ+X)
1 1.2 2 1.2 3 1.2 10 1.2
*
LOAD COMB 148 (1.20 DL + 1.20 FL + 1.20 LL + 1.20 EQ-X)
1 1.2 2 1.2 3 1.2 11 1.2
*
LOAD COMB 149 (1.20 DL + 1.20 FL + 1.20 LL + 1.20 EQ+Z)
1 1.2 2 1.2 3 1.2 12 1.2
*
LOAD COMB 150 (1.20 DL + 1.20 FL + 1.20 LL + 1.20 EQ-Z)
1 1.2 2 1.2 3 1.2 13 1.2
*
LOAD COMB 151 (1.20 DL + 1.20 FL + 1.20 LL + 1.20 WL+X)
1 1.2 2 1.2 3 1.2 6 1.2
*
LOAD COMB 152 (1.20 DL + 1.20 FL + 1.20 LL + 1.20 WL-X)

105
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESINGED CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI WATER
LINE MSN MMN OSR
1 1.2 2 1.2 3 1.2 7 1.2
*
LOAD COMB 153 (1.20 DL + 1.20 FL + 1.20 LL + 1.20 WL+Z)

106
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESINGED CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI WATER
LINE MSN MMN OSR
1 1.2 2 1.2 3 1.2 8 1.2
*
LOAD COMB 154 (1.20 DL + 1.20 FL + 1.20 LL + 1.20 WL-Z)
1 1.2 2 1.2 3 1.2 9 1.2
*
*++++++++++++++++++++++++++++++++++++++++++++++++++++++++*
* ----- UNFACTORED LOAD COMBINATIONS ----- *
*++++++++++++++++++++++++++++++++++++++++++++++++++++++++*
LOAD COMB 201 (DL)
1 1.0
*
LOAD COMB 202 (DL + FL + LL + EP)
1 1.0 2 1.0 3 1.0 4 1.0
*
LOAD COMB 203 (DL + TL)
1 1.0 5 1.0
*
LOAD COMB 204 (DL + EP + WL+X)
1 1.0 4 1.0 6 1.0
*
LOAD COMB 205 (DL + EP + WL-X)
1 1.0 4 1.0 7 1.0
*
LOAD COMB 206 (DL + EP + WL+Z)
1 1.0 4 1.0 8 1.0
*
LOAD COMB 207 (DL + EP + WL-Z)
1 1.0 4 1.0 9 1.0
*
LOAD COMB 208 (DL + FL + EP + WL+X)
1 1.0 2 1.0 4 1.0 6 1.0
*
LOAD COMB 209 (DL + FL + EP + WL-X)
1 1.0 2 1.0 4 1.0 7 1.0
*
LOAD COMB 210 (DL + FL + EP + WL+Z)
1 1.0 2 1.0 4 1.0 8 1.0
*
LOAD COMB 211 (DL + FL + EP + WL-Z)
1 1.0 2 1.0 4 1.0 9 1.0
*
LOAD COMB 212 (DL + LL + TL)
1 1.0 3 1.0 5 1.0
*
LOAD COMB 213 (DL + EP + EQ-E+X)
1 1.0 4 1.0 14 1.0
*
LOAD COMB 214 (DL + EP + EQ-E-X)
1 1.0 4 1.0 15 1.0
*
LOAD COMB 215 (DL + EP + EQ-E+Z)
1 1.0 4 1.0 16 1.0
*
LOAD COMB 216 (DL + EP + EQ-E-Z)
1 1.0 4 1.0 17 1.0
*
LOAD COMB 217 (DL + FL + EP + EQ+X)

107
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESINGED CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI WATER
LINE MSN MMN OSR
1 1.0 2 1.0 4 1.0 10 1.0
*
LOAD COMB 218 (DL + FL + EP + EQ-X)

108
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESINGED CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI WATER
LINE MSN MMN OSR
1 1.0 2 1.0 4 1.0 11 1.0
*
LOAD COMB 219 (DL + FL + EP + EQ+Z)
1 1.0 2 1.0 4 1.0 12 1.0
*
LOAD COMB 220 (DL + FL + EP + EQ-Z)
1 1.0 2 1.0 4 1.0 13 1.0
*
LOAD COMB 221 (DL + LL + TL + 0.25 WL+X)
1 1.0 3 1.0 5 1.0 6 0.25
*
LOAD COMB 222 (DL + LL + TL + 0.25 WL-X)
1 1.0 3 1.0 5 1.0 7 0.25
*
LOAD COMB 223 (DL + LL + TL + 0.25 WL+Z)
1 1.0 3 1.0 5 1.0 8 0.25
*
LOAD COMB 224 (DL + LL + TL + 0.25 WL-Z)
1 1.0 3 1.0 5 1.0 9 0.25
*
LOAD COMB 225 (0.60 DL + WL+X)
1 0.6 6 1.0
*
LOAD COMB 226 (0.60 DL + WL-X)
1 0.6 7 1.0
*
LOAD COMB 227 (0.60 DL + WL+Z)
1 0.6 8 1.0
*
LOAD COMB 228 (0.60 DL + WL-Z)
1 0.6 9 1.0
*
LOAD COMB 229 (DL + FL + 0.75 LL + EP + 0.75 WL+X)
1 1.0 2 1.0 3 0.75 4 1.0 6 0.75
*
LOAD COMB 230 (DL + FL + 0.75 LL + EP + 0.75 WL-X)
1 1.0 2 1.0 3 0.75 4 1.0 7 0.75
*
LOAD COMB 231 (DL + FL + 0.75 LL + EP + 0.75 WL+Z)
1 1.0 2 1.0 3 0.75 4 1.0 8 0.75
*
LOAD COMB 232 (DL + FL + 0.75 LL + EP + 0.75 WL-Z)
1 1.0 2 1.0 3 0.75 4 1.0 9 0.75
*
LOAD COMB 233 (0.60 DL + EQ-E+X)
1 0.6 14 1.0
*
LOAD COMB 234 (0.60 DL + EQ-E-X)
1 0.6 15 1.0
*
LOAD COMB 235 (0.60 DL + EQ-E+Z)
1 0.6 16 1.0
*
LOAD COMB 236 (0.60 DL + EQ-E-Z)
1 0.6 17 1.0
*
LOAD COMB 237 (DL + FL + 0.75 LL + EP + 0.75 EQ+X)

109
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESINGED CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI WATER
LINE MSN MMN OSR
1 1.0 2 1.0 3 0.75 4 1.0 10 0.75
*
LOAD COMB 238 (DL + FL + 0.75 LL + EP + 0.75 EQ-X)

110
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESINGED CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI WATER
LINE MSN MMN OSR
1 1.0 2 1.0 3 0.75 4 1.0 11 0.75
*
LOAD COMB 239 (DL + FL + 0.75 LL + EP + 0.75 EQ+Z)
1 1.0 2 1.0 3 0.75 4 1.0 12 0.75
*
LOAD COMB 240 (DL + FL + 0.75 LL + EP + 0.75 EQ-Z)
1 1.0 2 1.0 3 0.75 4 1.0 13 0.75
*
*
PERFORM ANALYSIS
DEFINE ENVELOP
101 TO 154 ENVELOP 1 TYPE STRESS
201 TO 240 ENVELOP 2 TYPE SERVICEABILITY
END DEFINE ENVELOP
LOAD LIST ENV 1
PERFORM ANALYSIS
START CONCRETE DESIGN
CODE INDIAN
FC 30000 MEMB 102
DESIGN COLUMN 102
END CONCRETE DESIGN
FINISH
1 1.2 2 1.2 3 1.2 7 1.2
*
LOAD COMB 153 (1.20 DL + 1.20 FL + 1.20 LL + 1.20 WL+Z)
1 1.2 2 1.2 3 1.2 8 1.2
*
LOAD COMB 154 (1.20 DL + 1.20 FL + 1.20 LL + 1.20 WL-Z)
1 1.2 2 1.2 3 1.2 9 1.2
*
*++++++++++++++++++++++++++++++++++++++++++++++++++++++++*
* ----- UNFACTORED LOAD COMBINATIONS ----- *
*++++++++++++++++++++++++++++++++++++++++++++++++++++++++*
LOAD COMB 201 (DL)
1 1.0
*
LOAD COMB 202 (DL + FL + LL + EP)
1 1.0 2 1.0 3 1.0 4 1.0
*
LOAD COMB 203 (DL + TL)
1 1.0 5 1.0
*
LOAD COMB 204 (DL + EP + WL+X)
1 1.0 4 1.0 6 1.0
*
LOAD COMB 205 (DL + EP + WL-X)
1 1.0 4 1.0 7 1.0
*
LOAD COMB 206 (DL + EP + WL+Z)
1 1.0 4 1.0 8 1.0
*
LOAD COMB 207 (DL + EP + WL-Z)
1 1.0 4 1.0 9 1.0
*
LOAD COMB 208 (DL + FL + EP + WL+X)
1 1.0 2 1.0 4 1.0 6 1.0
*

111
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESINGED CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI WATER
LINE MSN MMN OSR
LOAD COMB 209 (DL + FL + EP + WL-X)
1 1.0 2 1.0 4 1.0 7 1.0
*
LOAD COMB 210 (DL + FL + EP + WL+Z)
1 1.0 2 1.0 4 1.0 8 1.0
*
LOAD COMB 211 (DL + FL + EP + WL-Z)
1 1.0 2 1.0 4 1.0 9 1.0
*
LOAD COMB 212 (DL + LL + TL)
1 1.0 3 1.0 5 1.0
*
LOAD COMB 213 (DL + EP + EQ-E+X)
1 1.0 4 1.0 14 1.0
*
LOAD COMB 214 (DL + EP + EQ-E-X)
1 1.0 4 1.0 15 1.0
*
LOAD COMB 215 (DL + EP + EQ-E+Z)
1 1.0 4 1.0 16 1.0
*
LOAD COMB 216 (DL + EP + EQ-E-Z)
1 1.0 4 1.0 17 1.0
*
LOAD COMB 217 (DL + FL + EP + EQ+X)
1 1.0 2 1.0 4 1.0 10 1.0
*
LOAD COMB 218 (DL + FL + EP + EQ-X)
1 1.0 2 1.0 4 1.0 11 1.0
*
LOAD COMB 219 (DL + FL + EP + EQ+Z)
1 1.0 2 1.0 4 1.0 12 1.0
*
LOAD COMB 220 (DL + FL + EP + EQ-Z)
1 1.0 2 1.0 4 1.0 13 1.0
*
LOAD COMB 221 (DL + LL + TL + 0.25 WL+X)
1 1.0 3 1.0 5 1.0 6 0.25
*
LOAD COMB 222 (DL + LL + TL + 0.25 WL-X)
1 1.0 3 1.0 5 1.0 7 0.25
*
LOAD COMB 223 (DL + LL + TL + 0.25 WL+Z)
1 1.0 3 1.0 5 1.0 8 0.25
*
LOAD COMB 224 (DL + LL + TL + 0.25 WL-Z)
1 1.0 3 1.0 5 1.0 9 0.25
*
LOAD COMB 225 (0.60 DL + WL+X)
1 0.6 6 1.0
*
LOAD COMB 226 (0.60 DL + WL-X)
1 0.6 7 1.0
*
LOAD COMB 227 (0.60 DL + WL+Z)
1 0.6 8 1.0
*

112
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESINGED CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI WATER
LINE MSN MMN OSR
LOAD COMB 228 (0.60 DL + WL-Z)
1 0.6 9 1.0
*
LOAD COMB 229 (DL + FL + 0.75 LL + EP + 0.75 WL+X)
1 1.0 2 1.0 3 0.75 4 1.0 6 0.75
*
LOAD COMB 230 (DL + FL + 0.75 LL + EP + 0.75 WL-X)
1 1.0 2 1.0 3 0.75 4 1.0 7 0.75
*
LOAD COMB 231 (DL + FL + 0.75 LL + EP + 0.75 WL+Z)
1 1.0 2 1.0 3 0.75 4 1.0 8 0.75
*
LOAD COMB 232 (DL + FL + 0.75 LL + EP + 0.75 WL-Z)
1 1.0 2 1.0 3 0.75 4 1.0 9 0.75
*
LOAD COMB 233 (0.60 DL + EQ-E+X)
1 0.6 14 1.0
*
LOAD COMB 234 (0.60 DL + EQ-E-X)
1 0.6 15 1.0
*
LOAD COMB 235 (0.60 DL + EQ-E+Z)
1 0.6 16 1.0
*
LOAD COMB 236 (0.60 DL + EQ-E-Z)
1 0.6 17 1.0
*
LOAD COMB 237 (DL + FL + 0.75 LL + EP + 0.75 EQ+X)
1 1.0 2 1.0 3 0.75 4 1.0 10 0.75
*
LOAD COMB 238 (DL + FL + 0.75 LL + EP + 0.75 EQ-X)
1 1.0 2 1.0 3 0.75 4 1.0 11 0.75
*
LOAD COMB 239 (DL + FL + 0.75 LL + EP + 0.75 EQ+Z)
1 1.0 2 1.0 3 0.75 4 1.0 12 0.75
*
LOAD COMB 240 (DL + FL + 0.75 LL + EP + 0.75 EQ-Z)
1 1.0 2 1.0 3 0.75 4 1.0 13 0.75
*
*
PERFORM ANALYSIS
DEFINE ENVELOPE
101 TO 154 ENVELOP 1 TYPE STRESS
201 TO 240 ENVELOP 2 TYPE SERVICEABILITY
END DEFINE ENVELOPE
LOAD LIST ENV 1
PERFORM ANALYSIS
START CONCRETE DESIGN
CODE INDIAN
FC 30000 MEMB 102
DESIGN COLUMN 102
END CONCRETE DESIGN
FINISH

113
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR

Plate Stresses summary for Pedestal Design (Limit state of strength)


Moment (Input from STAAD) - PEDESTAL
SQY SXY
Shear(local) (local)
SQX Membrane
SX (local) SY (local) (local) Bending Moment
My
Plate L/C N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 Mx kNm/m kNm/m Mxy kNm/m
Max Qx 3374 131 (1.50 D 0.029 0.056 0 -0.054 -0.022 0.786 4.983 2.703
Min Qx 3377 131 (1.50 D -0.029 0.056 0 -0.054 0.022 0.785 4.983 -2.702
Max Qy 3377 131 (1.50 D -0.029 0.056 0 -0.054 0.022 0.785 4.983 -2.702
Min Qy 3441 132 (1.50 D 0.029 -0.055 0 -0.054 0.023 -0.781 -4.955 2.687
Max Sx 3429 144 (0.90 DL 0.001 -0.032 0.009 -0.012 0.009 -0.026 0.494 -0.122
Min Sx 3429 135 (1.20 DL 0 -0.021 -0.012 -0.068 -0.007 0.028 2.456 -0.076
Max Sy 3340 146 (0.90 DL -0.001 0.021 0 0.064 0.005 -0.038 -5.719 -0.019
Min Sy 3340 137 (1.20 DL -0.001 0.031 -0.001 -0.175 -0.007 -0.054 -7.874 -0.066
Max Sxy 3441 102 (1.50 DL 0.026 -0.048 0 -0.073 0.031 -0.567 -3.07 1.763
Min Sxy 3438 102 (1.50 DL -0.026 -0.048 0 -0.074 -0.031 -0.567 -3.069 -1.764
Max Mx 3374 131 (1.50 D 0.029 0.056 0 -0.054 -0.022 0.786 4.983 2.703
Min Mx 3438 132 (1.50 D -0.029 -0.055 0 -0.055 -0.023 -0.781 -4.955 -2.688
Max My 3405 132 (1.50 D 0 -0.044 -0.005 -0.066 -0.004 0.564 9.826 0.269
Min My 3338 131 (1.50 D 0 0.044 -0.004 -0.067 0.003 -0.563 -9.849 0.269
Max Mxy 3374 135 (1.20 DL 0.028 0.053 0 -0.053 -0.022 0.774 5.024 2.704
Min Mxy 3377 135 (1.20 DL -0.028 0.053 0 -0.053 0.022 0.774 5.024 -2.703

23
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR
Shear Oneway
SQY
(Input from STAAD) - PEDESTAL
SXY
Shear
SQX (local) (local) Membrane
SX (local) SY (local) (local) Bending Moment
My
Plate L/C N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 Mx kNm/m kNm/m Mxy kNm/m
Max Qx 3374 131 (1.50 D 0.029 0.056 0 -0.054 -0.022 0.786 4.983 2.703
Min Qx 3377 131 (1.50 D -0.029 0.056 0 -0.054 0.022 0.785 4.983 -2.702
Max Qy 3377 131 (1.50 D -0.029 0.056 0 -0.054 0.022 0.785 4.983 -2.702
Min Qy 3441 132 (1.50 D 0.029 -0.055 0 -0.054 0.023 -0.781 -4.955 2.687
Max Sx 3429 144 (0.90 DL 0.001 -0.032 0.009 -0.012 0.009 -0.026 0.494 -0.122
Min Sx 3429 135 (1.20 DL 0 -0.021 -0.012 -0.068 -0.007 0.028 2.456 -0.076
Max Sy 3340 146 (0.90 DL -0.001 0.021 0 0.064 0.005 -0.038 -5.719 -0.019
Min Sy 3340 137 (1.20 DL -0.001 0.031 -0.001 -0.175 -0.007 -0.054 -7.874 -0.066
Max Sxy 3441 102 (1.50 DL 0.026 -0.048 0 -0.073 0.031 -0.567 -3.07 1.763
Min Sxy 3438 102 (1.50 DL -0.026 -0.048 0 -0.074 -0.031 -0.567 -3.069 -1.764
Max Mx 3374 131 (1.50 D 0.029 0.056 0 -0.054 -0.022 0.786 4.983 2.703
Min Mx 3438 132 (1.50 D -0.029 -0.055 0 -0.055 -0.023 -0.781 -4.955 -2.688
Max My 3405 132 (1.50 D 0 -0.044 -0.005 -0.066 -0.004 0.564 9.826 0.269
Min My 3338 131 (1.50 D 0 0.044 -0.004 -0.067 0.003 -0.563 -9.849 0.269
Max Mxy 3374 135 (1.20 DL 0.028 0.053 0 -0.053 -0.022 0.774 5.024 2.704
Min Mxy 3377 135 (1.20 DL -0.028 0.053 0 -0.053 0.022 0.774 5.024 -2.703

24
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR

Plate Stresses summary for max moments


Plate L/C DES SQX SQY MX MY MXY SX SY SXY
MX Max 3374 131 (1.50 DL + 0.029 0.056 0.786 4.983 2.703 0.000 -0.054 -0.022
MX Min 3438 132 (1.50 DL + -0.029 -0.055 -0.781 -4.955 -2.688 0.000 -0.055 -0.023
MY Max 3405 132 (1.50 DL + 0.000 -0.044 0.564 9.826 0.269 -0.005 -0.066 -0.004
MY Min 3338 131 (1.50 DL + 0.000 0.044 -0.563 -9.849 0.269 -0.004 -0.067 0.003

Plate Stresses summary for max shear


Plate L/C DES SQX SQY MX MY MXY SX SY SXY
Max Qx 3374 131 (1.50 DL + 0.029 0.056 0.786 4.983 2.703 0.000 -0.054 -0.022
Min Qx 3377 131 (1.50 DL + -0.029 0.056 0.785 4.983 -2.702 0.000 -0.054 0.022
Max Qy 3377 131 (1.50 DL + -0.029 0.056 0.785 4.983 -2.702 0.000 -0.054 0.022
Min Qy 3441 132 (1.50 DL + 0.029 -0.055 -0.781 -4.955 2.687 0.000 -0.054 0.023

Enter Loads from STAAD WOODS CRITERIA


Plate L/C SQX SQY MX MY MXY SX SY SXY M* S*
N/mm2 N/mm2 kNm/m kNm/m kNm/m N/mm2 N/mm2 N/mm2 kNm/m N/mm2
+ve 3374 131 0.029 0.056 0.786 4.983 2.703 0.000 -0.054 -0.022 3.489 0.000
Mx
-ve 3438 132 -0.029 0.056 -0.781 -4.955 -2.688 0.000 -0.055 -0.023 3.469 0.000
+ve 3405 132 -0.029 0.056 0.564 9.826 0.269 -0.005 -0.066 -0.004 10.095 0.000
My
-ve 3338 131 0.029 -0.055 -0.563 -9.849 0.269 -0.004 -0.067 0.003 10.118 0.000

25
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR

PLATES CONSIDERED FOR PEDESTAL DESIGN

26
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR

Design for Mx +ve (Horizontal) Design for Mx +ve (Horizontal)


Limit State Design Calculation of Crack Width as per IS 456
% Steel Calculation Unfactored Moment 2.33 kNm
fck 30 N/mm 2
Overall depth of section h = a 400 mm
fy 500 N/mm 2
Grade of concrete fck = 30 N/mm2
Mu = 3.489 kNm FROM STAAD, PLATE NO. 3374 Max SR R
M= 2.326 kNm R= 0.029 3.99 SR Grade of steel fy = 500 N/mm2
Clear cover to reinforcement Cmin = 50 mm
B= 1000 mm Dia of reinforcement bar db = 12 mm
D= 400 mm Spacing of reinforcement s = 150 mm
d= 344 mm Allowable Crack Width 0.25 mm
ptreqd = 0.007 % Ast reqd = 23 mm2 Calculations
ptprov = 0.219 % Ast prov = 754 mm 2
Area of steel provided Ast = 754 mm2
Ast MIN = 480 mm2 effective cover dc = 56 mm
Min Ast = 0.12% (Refer IS 456 : 2000, Clause 26.5.2.1) Effective depth deff = 344 mm
mm2 pt = 0.22 %
Final Astreqd = 480 mm 2
rho = 0.0022
sigma cbc = 10 N/mm2
Dia Reqd Sp Prov Spa m= 9.33
12 235 150 ast = 113 mm2 rho * m = 0.0205
Crack Width 0.000 OK Y12 - 150 OK k= 0.183
x= 62.90
Shear Stress Check jd = 323.03
Beta = 15.89 Tou' C = 1.37 N/mm2 fst = 9.55
fy = 500 N/mm 2
0.25*fck^0.5 Modulus of Elasticity Es = 200000 N/mm2
Tou Cmax = 3.5 N/mm2 (IS 456:2000 Table 20) OK epsilon 1 = 5.7262E-05
Tou C = 0.348 N/mm 2
(IS 456:2000 Table 19) epsilon 2 = 0.0008936
Tou V = 0.029 N/mm2 FROM STAAD, PLATE NO. 3374 epsilon m = epsilon 1 - epsilon 2 = -0.0008363
av= 0.000 mm mm < 688 a, critical = 87.60 mm

27
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR

Enhanced Tau C = - N/mm2 OK W, cr = -0.1797 mm


Width of Crack = 0.000 OK

28
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR

Design for Mx +ve (Horizontal) Design for Mx +ve (Horizontal)


Limit State Design Calculation of Crack Width as per IS 456
% Steel Calculation Unfactored Moment 2.31 kNm
fck 30 N/mm 2
Overall depth of section h = a 400 mm
fy 500 N/mm 2
Grade of concrete fck = 30 N/mm2
Mu = 3.469 kNm FROM STAAD, PLATE NO. 3438 Max SR R
M= 2.313 kNm R= 0.029 3.99 SR Grade of steel fy = 500 N/mm2
Clear cover to reinforcement Cmin = 50 mm
B= 1000 mm Dia of reinforcement bar db = 12 mm
D= 400 mm Spacing of reinforcement s = 150 mm
d= 344 mm Allowable Crack Width 0.25 mm
ptreqd = 0.007 % Ast reqd = 23 mm2 Calculations
ptprov = 0.219 % Ast prov = 754 mm 2
Area of steel provided Ast = 754 mm2
Ast MIN = 480 mm2 effective cover dc = 56 mm
Min Ast = 0.12% (Refer IS 456 : 2000, Clause 26.5.2.1) Effective depth deff = 344 mm
mm2 pt = 0.22 %
Final Astreqd = 480 mm 2
rho = 0.0022
sigma cbc = 10 N/mm2
Dia Reqd Sp Prov Spa m= 9.33
12 235 150 ast = 113 mm2 rho * m = 0.0205
Crack Width 0.018 OK Y12 - 150 OK k= 0.183
x= 62.90
Shear Stress Check jd = 323.03
Beta = 15.89 Tou' C = 1.37 N/mm2 fst = 9.50
fy = 500 N/mm 2
0.25*fck^0.5 Modulus of Elasticity Es = 200000 N/mm2
Tou Cmax = 3.5 N/mm2 (IS 456:2000 Table 20) OK epsilon 1 = -5.556E-06
Tou C = 0.348 N/mm 2
(IS 456:2000 Table 19) epsilon 2 = -8.721E-05
Tou V = 0.029 N/mm 2
FROM STAAD, PLATE NO. 3374 epsilon m = epsilon 1 - epsilon 2 = 8.1654E-05
av= 0.000 mm mm < 688 a, critical = 87.60 mm

29
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR

Enhanced Tau C = - N/mm2 OK W, cr = 0.0175 mm


Width of Crack = 0.018 OK

30
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR

Design for My +ve (Vertical) Design for My +ve (Vertical)


Limit State Design Calculation of Crack Width as per IS 456
% Steel Calculation Unfactored Moment 6.75 kNm
fck 30 N/mm 2
Overall depth of section h = a 400 mm
fy 500 N/mm 2
Grade of concrete fck = 30 N/mm2
Mu = 10.118 kNm FROM STAAD, PLATE NO. 3338 Max SR R
M= 6.745 kNm R= 0.092 3.99 SR Grade of steel fy = 500 N/mm2
Clear cover to reinforcement Cmin = 50 mm
B= 1000 mm Dia of reinforcement bar db = 12 mm
D= 400 mm Spacing of reinforcement s = 150 mm
d= 332 mm Allowable Crack Width 0.25 mm
ptreqd = 0.021 % Ast reqd = 70 mm2 Calculations
ptprov = 0.227 % Ast prov = 754 mm 2
Area of steel provided Ast = 754 mm2
Ast MIN = 480 mm2 effective cover dc = 56 mm
Min Ast = 0.12% (Refer IS 456 : 2000, Clause 26.5.2.1) Effective depth deff = 344 mm
mm2 pt = 0.22 %
Final Astreqd = 480 mm 2
rho = 0.0022
sigma cbc = 10 N/mm2
Dia Reqd Sp Prov Spa m= 9.33
12 235 150 ast = 113 mm2 rho * m = 0.0205
Crack Width 0.015 OK Y12 - 150 OK k= 0.183
x= 62.90
Shear Stress Check jd = 323.03
Beta = 15.34 Tou' C = 1.37 N/mm2 fst = 27.69
fy = 500 N/mm 2
0.25*fck^0.5 Modulus of Elasticity Es = 200000 N/mm2
Tou Cmax = 3.5 N/mm2 (IS 456:2000 Table 20) OK epsilon 1 = -1.621E-05
Tou C = 0.354 N/mm 2
(IS 456:2000 Table 19) epsilon 2 = -8.721E-05
Tou V = 0.056 N/mm 2
FROM STAAD, PLATE NO. 3377 epsilon m = epsilon 1 - epsilon 2 = 7.1004E-05
av= 0.000 mm mm < 664 a, critical = 87.60 mm

31
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR

Enhanced Tau C = - N/mm2 OK W, cr = 0.0153 mm


Width of Crack = 0.015 OK

32
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR

Design for My +ve (Vertical) Design for My +ve (Vertical)


Limit State Design Calculation of Crack Width as per IS 456
% Steel Calculation Unfactored Moment 6.75 kNm
fck 30 N/mm 2
Overall depth of section h = a 400 mm
fy 500 N/mm 2
Grade of concrete fck = 30 N/mm2
Mu = 10.118 kNm FROM STAAD, PLATE NO. 3338 Max SR R
M= 6.745 kNm R= 0.092 3.99 SR Grade of steel fy = 500 N/mm2
Clear cover to reinforcement Cmin = 50 mm
B= 1000 mm Dia of reinforcement bar db = 12 mm
D= 400 mm Spacing of reinforcement s = 150 mm
d= 332 mm Allowable Crack Width 0.25 mm
ptreqd = 0.021 % Ast reqd = 70 mm2 Calculations
ptprov = 0.227 % Ast prov = 754 mm 2
Area of steel provided Ast = 754 mm2
Ast MIN = 480 mm2 effective cover dc = 56 mm
Min Ast = 0.12% (Refer IS 456 : 2000, Clause 26.5.2.1) Effective depth deff = 344 mm
mm2 pt = 0.22 %
Final Astreqd = 480 mm 2
rho = 0.0022
sigma cbc = 10 N/mm2
Dia Reqd Sp Prov Spa m= 9.33
12 235 150 ast = 113 mm2 rho * m = 0.0205
Crack Width 0.015 OK Y12 - 150 OK k= 0.183
x= 62.90
Shear Stress Check jd = 323.03
Beta = 15.34 Tou' C = 1.37 N/mm2 fst = 27.69
fy = 500 N/mm2 0.25*fck^0.5 Modulus of Elasticity Es = 200000 N/mm2
Tou Cmax = 3.5 N/mm2 (IS 456:2000 Table 20) OK epsilon 1 = -1.621E-05
Tou C = 0.354 N/mm2 (IS 456:2000 Table 19) epsilon 2 = -8.721E-05
Tou V = 0.055 N/mm 2
FROM STAAD, PLATE NO. 3441 epsilon m = epsilon 1 - epsilon 2 = 7.1004E-05
av= 0.000 mm mm < 664 a, critical = 87.60 mm

33
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR

Enhanced Tau C = - N/mm2 OK W, cr = 0.0153 mm


Width of Crack = 0.015 OK

34
DATE
05-02-2020
APPROVED
OSR

35
DATE
05-02-2020
APPROVED
OSR

36
DATE
05-02-2020
APPROVED
OSR

37
DATE
05-02-2020
APPROVED
OSR

38
DATE
05-02-2020
APPROVED
OSR

39
DATE
05-02-2020
APPROVED
OSR

40
DATE
05-02-2020
APPROVED
OSR

41
DATE
05-02-2020
APPROVED
OSR

42
DATE
05-02-2020
APPROVED
OSR

43
DATE
05-02-2020
APPROVED
OSR

44
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR

7 PEDESTAL DESIGN
Designed as Biaxially Loaded Rect by Limit-State Method conforming to IS:456-2000

Characteric Strength of Concrete M30 N/mm2


Yield stress of steel ( Fe 500) Fe500 N/mm2
Unsupported length of member in X direction lex= 600.00 mm
Unsupported length of member in Y direction ley= 600.00 mm
Member Depth(D) 300.00 mm
Member width(b) 300.00 mm
Assumed Diameter of bar 16 mm
Permissible stress in concrete in direct compression for 30 σcc 8 N/mm^2 σCC
Permissible cmpressive stress in PEDESTAL bars for 500 σsc 190 σSC
Clear cover 50 mm
effective cover d' 58.0 mm
Calculation of slenderness ratio :
Effective length factor taken as 1.2
lex/d = 2.40 Hence PEDESTAL
ley/b = 2.40 Hence PEDESTAL
Since lex/D <= 12 Member is designed as PEDESTAL about x Hence member is designed as a
Since ley/B <= 12 Member is designed as PEDESTAL about y PEDESTAL
Calculation of Moments due to Minimum eccentricity :
Minimum eccentricity (ex) =l/500+D/30 subject to a minimum of 20mm 20 mm
Minimum eccentricity (ey) =l/500+b/30 subject to a minimum of 20mm 20 mm
Moment due to Minimum eccentricity Mex = 0.01 KN-M
Moment due to Minimum eccentricity Mey = 0.01 KN-M
Vertical Load on PEDESTAL KN 0.052
Moment in X-direction ( Parallel to larger dimension ) Mx ( or Mz ) KN-M 0
Moment in Y-direction ( Parallel to shorter dimension ) My KN-M 0
KN 0.052
Assumed number of bars 4
Area of reinforcement Asc 803.84 mm^2
Area of concrete Acc 89196.2 mm^2
Load Capacity P 866.30 kN Err:508
Check for Minimum Reinforcement (0.15%; As per clause 26.5.3.1 a-IS 456) 135 mm^2 OK
Hence Provide 4 No of 16mm dia bars

Spacing of Ties
The spacing of ties should be least of the following
Least Lateral dimension 300.00 mm
16*d 150 mm
300 mm atleast 300 mm
Hence provide 8 mm dia ties at 150 mm c/c

105
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR

8 RAFT DESIGN
Plate Stresses summary for Raft (Base slab) Design (Limit state of strength)
Moment (Input from STAAD) - RAFT
Shear Membrane Bending Moment
Plate L/C SQX (local SQY (local SX (local) SY (local) SXY (loca Mx kNm/m My kNm/mMxy kNm/m
Max Qx 47 210 (DL + F 0.062 -0.095 0 0 0 -0.615 -2.793 1.434
Min Qx 56 211 (DL + FL -0.062 0.095 0 0 0 -0.615 -2.793 1.434
Max Qy 56 211 (DL + FL -0.062 0.095 0 0 0 -0.615 -2.793 1.434
Min Qy 46 210 (DL + F -0.062 -0.095 0 0 0 -0.615 -2.793 -1.434
Max Sx 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Min Sx 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Max Sy 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Min Sy 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Max Sxy 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Min Sxy 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Max Mx 35 228 (0.60 D 0.014 0.009 0 0 0 0.15 0.379 0.417
Min Mx 47 217 (DL + FL 0.046 -0.04 0 0 0 -0.857 -0.446 0.26
Max My 56 227 (0.60 D 0.007 -0.041 0 0 0 -0.017 2.162 -1.456
Min My 46 210 (DL + F -0.062 -0.095 0 0 0 -0.615 -2.793 -1.434
Max Mxy 46 211 (DL + FL -0.008 0.025 0 0 0 -0.2 1.979 1.462
Min Mxy 56 210 (DL + F -0.008 -0.025 0 0 0 -0.2 1.979 -1.462

106
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
Shear Oneway (Input from STAAD) - RAFT
Shear Membrane Bending Moment
Plate L/C SQX (local SQY (local SX (local) SY (local) SXY (loca Mx kNm/m My kNm/mMxy kNm/m
Max Qx 47 210 (DL + F 0.062 -0.095 0 0 0 -0.615 -2.793 1.434
Min Qx 56 211 (DL + FL -0.062 0.095 0 0 0 -0.615 -2.793 1.434
Max Qy 56 211 (DL + FL -0.062 0.095 0 0 0 -0.615 -2.793 1.434
Min Qy 46 210 (DL + F -0.062 -0.095 0 0 0 -0.615 -2.793 -1.434
Max Sx 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Min Sx 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Max Sy 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Min Sy 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Max Sxy 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Min Sxy 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Max Mx 35 228 (0.60 D 0.014 0.009 0 0 0 0.15 0.379 0.417
Min Mx 47 217 (DL + FL 0.046 -0.04 0 0 0 -0.857 -0.446 0.26
Max My 56 227 (0.60 D 0.007 -0.041 0 0 0 -0.017 2.162 -1.456
Min My 46 210 (DL + F -0.062 -0.095 0 0 0 -0.615 -2.793 -1.434
Max Mxy 46 211 (DL + FL -0.008 0.025 0 0 0 -0.2 1.979 1.462
Min Mxy 56 210 (DL + F -0.008 -0.025 0 0 0 -0.2 1.979 -1.462

107
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR

Plate Stresses summary for max moments


Plate L/C DES SQX SQY MX MY MXY SX SY SXY
MX Max 35 228 (0.60 DL + 0.014 0.009 0.150 0.379 0.417 0.000 0.000 0.000
MX Min 47 217 (DL + FL + 0.046 -0.040 -0.857 -0.446 0.260 0.000 0.000 0.000
MY Max 56 227 (0.60 DL + 0.007 -0.041 -0.017 2.162 -1.456 0.000 0.000 0.000
MY Min 46 210 (DL + FL + -0.062 -0.095 -0.615 -2.793 -1.434 0.000 0.000 0.000

Plate Stresses summary for max shear


Plate L/C DES SQX SQY MX MY MXY SX SY SXY
Max Qx 47 210 (DL + FL + 0.062 -0.095 -0.615 -2.793 1.434 0.000 0.000 0.000
Min Qx 56 211 (DL + FL + -0.062 0.095 -0.615 -2.793 1.434 0.000 0.000 0.000
Max Qy 56 211 (DL + FL + -0.062 0.095 -0.615 -2.793 1.434 0.000 0.000 0.000
Min Qy 46 210 (DL + FL + -0.062 -0.095 -0.615 -2.793 -1.434 0.000 0.000 0.000

Enter Loads from STAAD WOODS CRITERIA


Plate L/C SQX SQY MX MY MXY SX SY SXY M* S*
N/mm2 N/mm2 kNm/m kNm/m kNm/m N/mm2 N/mm2 N/mm2 kNm/m N/mm2
+ve 35 228 0.062 -0.095 0.150 0.379 0.417 0.000 0.000 0.000 0.567 0.000
Mx
-ve 47 217 -0.062 0.095 -0.857 -0.446 0.260 0.000 0.000 0.000 1.117 0.000
+ve 56 227 -0.062 0.095 -0.017 2.162 -1.456 0.000 0.000 0.000 3.618 0.000
My
-ve 46 210 -0.062 -0.095 -0.615 -2.793 -1.434 0.000 0.000 0.000 4.227 0.000

108
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR

PLATES CONSIDERED FOR RAFT DESIGN

109
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR

Design for Mx +ve (Soil face) - Main Design for Mx +ve (Soil face) - Main
Limit State Design Calculation of Crack Width as per IS 456
% Steel Calculation Unfactored Moment 0.38 kNm
fck 30 N/mm2 Overall depth of section h = a 200 mm
fy 500 N/mm2 Grade of concrete fck = 30 N/mm2
Mu = 0.567 kNm FROM STAAD, PLATE NO. 35 Max SR R
M= 0.378 kNm R= 0.033 3.99 SR Grade of steel fy = 500 N/mm2
Clear cover to reinforcement Cmin = 50 mm
B= 1000 mm Dia of reinforcement bar db = 12 mm
D= 200 mm Spacing of reinforcement s = 150 mm
d= 132 mm Allowable Crack Width 0.25 mm
ptreqd = 0.007 % Ast reqd = 10 mm2 Calculations
ptprov = 0.571 % Ast prov = 754 mm2 Area of steel provided Ast = 754 mm2

Ast MIN = 240 mm2 effective cover dc = 56 mm

Min Ast = 0.12% (Refer IS 456 : 2000, Clause 26.5.2.1) Effective depth deff = 144 mm
mm2 pt = 0.52 %

Final Astreqd = 240 mm2 rho = 0.0052

sigma cbc = 10 N/mm2


Dia Reqd Sp Prov Spa m= 9.33
12 471 150 ast = 113 mm2 rho * m = 0.0489
Crack Width 0.000 OK Y12 - 150 OK k= 0.268
x= 38.53
Shear Stress Check jd = 131.16
Beta = 6.10 Tou' C = 1.37 N/mm2 fst = 3.82
fy = 500 N/mm 2
0.25*fck^0.5 Modulus of Elasticity Es = 200000 N/mm2
Tou Cmax = 3.5 N/mm2 (IS 456:2000 Table 20) OK epsilon 1 = 2.926E-05
Tou C = 0.525 N/mm 2
(IS 456:2000 Table 19) epsilon 2 = 0.0005464
Tou V = 0.062 N/mm 2
FROM STAAD, PLATE NO. 47 epsilon m = epsilon 1 - epsilon 2 = -0.0005172

110
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
av= 0.000 mm mm < 264 a, critical = 87.60 mm
Enhanced Tau C = - N/mm2 OK W, cr = -0.0927 mm
Width of Crack = 0.000 OK

111
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR

Design for Mx -ve (Top Face) - Main Design for Mx -ve (Top Face) - Main
Limit State Design Calculation of Crack Width as per IS 456
% Steel Calculation Unfactored Moment 0.74 kNm
fck 30 N/mm2 Overall depth of section h = a 200 mm
fy 500 N/mm 2
Grade of concrete fck = 30 N/mm2
Mu = 1.117 kNm FROM STAAD, PLATE NO. 47 Max SR R
M= 0.745 kNm R= 0.064 3.99 SR Grade of steel fy = 500 N/mm2
Clear cover to reinforcement Cmin = 50 mm
B= 1000 mm Dia of reinforcement bar db = 12 mm
D= 200 mm Spacing of reinforcement s = 150 mm
d= 132 mm Allowable Crack Width 0.25 mm
ptreqd = 0.015 % Ast reqd = 20 mm2 Calculations
ptprov = 0.571 % Ast prov = 754 mm2 Area of steel provided Ast = 754 mm2
Ast MIN = 240 mm 2
effective cover dc = 56 mm
Min Ast = 0.12% (Refer IS 456 : 2000, Clause 26.5.2.1) Effective depth deff = 144 mm
mm2 pt = 0.52 %
Final Astreqd = 240 mm2 rho = 0.0052
sigma cbc = 10 N/mm2
Dia Reqd Sp Prov Spa m= 9.33
12 471 150 ast = 113 mm2 rho * m = 0.0489
Crack Width 0.005 OK Y12 - 150 OK k= 0.268
x= 38.53
Shear Stress Check jd = 131.16
Beta = 6.10 Tou' C = 1.37 N/mm2 fst = 7.53
fy = 500 N/mm2 0.25*fck^0.5 Modulus of Elasticity Es = 200000 N/mm2
Tou Cmax = 3.5 N/mm 2
(IS 456:2000 Table 20) OK epsilon 1 = -3.044E-06
Tou C = 0.525 N/mm2 (IS 456:2000 Table 19) epsilon 2 = -2.886E-05
Tou V = 0.062 N/mm 2
FROM STAAD, PLATE NO. 47 epsilon m = epsilon 1 - epsilon 2 = 2.5817E-05
av= 0.000 mm mm < 264 a, critical = 87.60 mm
Enhanced Tau C = - N/mm2 OK W, cr = 0.0046 mm

112
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
Width of Crack = 0.005 OK

113
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR

Design for My +ve (Soil face) - Dist Design for My +ve (Soil face) - Dist
Limit State Design Calculation of Crack Width as per IS 456
% Steel Calculation Unfactored Moment 2.82 kNm
fck 30 N/mm2 Overall depth of section h = a 200 mm
fy 500 N/mm 2
Grade of concrete fck = 30 N/mm2
Mu = 4.227 kNm FROM STAAD, PLATE NO. 46 Max SR R
M= 2.818 kNm R= 0.204 3.99 SR Grade of steel fy = 500 N/mm2
Clear cover to reinforcement Cmin = 50 mm
B= 1000 mm Dia of reinforcement bar db = 12 mm
D= 200 mm Spacing of reinforcement s = 150 mm
d= 144 mm Allowable Crack Width 0.25 mm
ptreqd = 0.047 % Ast reqd = 68 mm2 Calculations
ptprov = 0.524 % Ast prov = 754 mm2 Area of steel provided Ast = 754 mm2
Ast MIN = 240 mm 2
effective cover dc = 56 mm
Min Ast = 0.12% (Refer IS 456 : 2000, Clause 26.5.2.1) Effective depth deff = 144 mm
mm2 pt = 0.52 %
Final Astreqd = 240 mm2 rho = 0.0052
sigma cbc = 10 N/mm2
Dia Reqd Sp Prov Spa m= 9.33
12 471 150 ast = 113 mm2 rho * m = 0.0489
Crack Width 0.003 OK Y12 - 150 OK k= 0.268
x= 38.53
Shear Stress Check jd = 131.16
Beta = 6.65 Tou' C = 1.37 N/mm2 fst = 28.50
fy = 500 N/mm2 0.25*fck^0.5 Modulus of Elasticity Es = 200000 N/mm2
Tou Cmax = 3.5 N/mm 2
(IS 456:2000 Table 20) OK epsilon 1 = -1.152E-05
Tou C = 0.506 N/mm 2
(IS 456:2000 Table 19) epsilon 2 = -2.886E-05
Tou V = 0.095 N/mm2 FROM STAAD, PLATE NO. 56 epsilon m = epsilon 1 - epsilon 2 = 1.734E-05
av= 0.000 mm mm < 288 a, critical = 87.60 mm
Enhanced Tau C = - N/mm2 OK W, cr = 0.0031 mm

114
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
Width of Crack = 0.003 OK

115
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR

Design for My -ve (Top Face) - Dist Design for My -ve (Top Face) - Dist
Limit State Design Calculation of Crack Width as per IS 456
% Steel Calculation Unfactored Moment 2.82 kNm
fck 30 N/mm2 Overall depth of section h = a 200 mm
fy 500 N/mm 2
Grade of concrete fck = 30 N/mm2
Mu = 4.227 kNm FROM STAAD, PLATE NO. 46 Max SR R
M= 2.818 kNm R= 0.204 3.99 SR Grade of steel fy = 500 N/mm2
Clear cover to reinforcement Cmin = 50 mm
B= 1000 mm Dia of reinforcement bar db = 12 mm
D= 200 mm Spacing of reinforcement s = 150 mm
d= 144 mm Allowable Crack Width 0.25 mm
ptreqd = 0.047 % Ast reqd = 68 mm2 Calculations
ptprov = 0.524 % Ast prov = 754 mm2 Area of steel provided Ast = 754 mm2
Ast MIN = 240 mm 2
effective cover dc = 56 mm
Min Ast = 0.12% (Refer IS 456 : 2000, Clause 26.5.2.1) Effective depth deff = 144 mm
mm2 pt = 0.52 %
Final Astreqd = 240 mm2 rho = 0.0052
sigma cbc = 10 N/mm2
Dia Reqd Sp Prov Spa m= 9.33
12 471 150 ast = 113 mm2 rho * m = 0.0489
Crack Width 0.003 OK Y12 - 150 OK k= 0.268
x= 38.53
Shear Stress Check jd = 131.16
Beta = 6.65 Tou' C = 1.37 N/mm2 fst = 28.50
fy = 500 N/mm2 0.25*fck^0.5 Modulus of Elasticity Es = 200000 N/mm2
Tou Cmax = 3.5 N/mm2 (IS 456:2000 Table 20) OK epsilon 1 = -1.152E-05
Tou C = 0.506 N/mm 2
(IS 456:2000 Table 19) epsilon 2 = -2.886E-05
Tou V = 0.095 N/mm 2
FROM STAAD, PLATE NO. 56 epsilon m = epsilon 1 - epsilon 2 = 1.734E-05
av= 0.000 mm mm < 288 a, critical = 87.60 mm

116
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
Enhanced Tau C = - N/mm2 OK W, cr = 0.0031 mm
Width of Crack = 0.003 OK

117
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS OF FLUID
WATER LINE AND THUMBLI WATER LINE MSN MMN OSR

9 BASE PRESSURE CHECK SBC 50.00 kN/m2

Horizontal Vertical Horizontal


Node L/C Fx N/mm2 Fy N/mm2 Fz N/mm2
Max Px 6 201 (DL) 0 0.012 0
Min Px 6 201 (DL) 0 0.012 0
Max Py 258 210 (DL + FL + EP + WL+Z) 0 0.017 0
Min Py 281 227 (0.60 DL + WL+Z) 0 0.003 0
Max Pz 6 201 (DL) 0 0.012 0
Min Pz 6 201 (DL) 0 0.012 0
max 17.00 kN/m2
OK < 50 kN/m2
min 3.00 kN/m2
OK > 0 kN/m2

114
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 CAIRN DOCUMENT NO.
DEVELOPMENT PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF DESIGN CHECKED APPROVED


PIPE SUPPORTS OF FLUID WATER LINE
AND THUMBLI WATER LINE MSN MMN OSR

9 STABILITY CHECK
Front batter = 0.30 m
Rear batter = 0.30 m
Thickness of foundation = 0.20 m
Total bottom width of foundation = 0.60 m

Load
intensity Lever arm Moment
Sl.No. Load Force (m) (kN-m)
(kN)

1 V₁ Operational load (Vertical) 0.050 0.300 0.015

2 W2 Weight of Raf 4.050 0.300 1.215

Operational load
3 H₁ (Horizontal, seismic and 7.362 0.700 5.154
wind forces)

Sum of vertical loads ΣV = 4.10 KN


Sum of horizontal loads ΣH = 7.36 KN

Check for sliding: = μ ΣV / ΣH


= 0.4 x 4.1 / 7.362
= 0.223 <
UNSAFE
Check for over turning: = ΣMR / ΣMO
= 1.23 / 5.154
= 0.239 <
UNSAFE

115
DATE
05-02-2020
APPROVED
OSR

1.5

116
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESIGN CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI
MSN MMN OSR
WATER LINE

10 MTO
CONCRETE Unit Weight of Concrete = 2500 kg/m3
SL. NO. QUANTITY DESCRIPTION LENGTH WIDTH DEPTH VOLUME
NO'S m m m m3
1 RAFT
A. 1 PCC 1.10 1.10 0.10 0.121
B. 1 RCC 0.90 0.90 0.20 0.162
C. 1 GROUT-TOP 0.90 0.90 0.025 0.021
D. 14 GROUT-POCKETS 0.10 0.10 0.350 0.051

Cover = 50 mm
STEEL Unit Weight of Steel= 7850 kg/m3
SL. NO. QUANTITY DESCRIPTION Length Spacing 12 16 WEGHT
NO'S mm mm mm2 mm2 Kg
1 RAFT 113 201
A. 14 LONGER DIR_(T/B)_16# 936 125 188194 20.683
B. 14 SHORTER DIR_(T/B)_16# 936 125 188194 20.683
C. 0 SIDE FACE_12# 3800 250 429769.88 0.000
D. 23 VERTICAL RIF_16# (PERIPHERY) 100 125 11309.734 2.042
E. 1 VERTICAL INTERNAL_12# 100 500 11309.734 0.089
F. 0 HORIZONTAL INTERNAL_12# 800 500 90477.868 0.000
43.496 Kg
BILL OF MATERIAL 0.043 Ton
SL. NO. DESCRIPTION QUANTITY UNITS
1 PCC 0.121 m3
2 RCC 0.162 m3
3 STEEL (16 dia) 0.043 Ton
4 STEEL (12 dia) 0.000 Ton
5 GROUT 0.073 m3

117
PROJECT : NE STAGE -2 & NL STAGE-1 CAIRN DOCUMENT NO.
DEVELOPMENT PROJECT S247MEL-MPT-C-CAL-0047

FOUNDATION DESIGN CALCULATIONS OF PIPE DESIGN CHECKED


SUPPORTS OF FLUID WATER LINE AND
THUMBLI WATER LINE MSN MMN

10 STABILITY CHECK
Width of pedestal = 0.30 m
Front batter = 0.300 m
Rear batter = 0.300 m
Thickness of foundation = 0.20 m
Height of pedestal = 0.60 m
Total bottom width of foundation = 0.90 m

Load
intensity Lever arm
Sl.No. Load Force (m)
(kN)

1 V₁ Operational load (Vertical) 0.500 0.450

2 W1 Weight of Pedestal 1.350 0.450

3 W2 Weight of the soil 3.402 0.450

4 W2 Weight of Raf 4.050 0.450

Operational load
5 H₁ (Horizontal, seismic and 0.526 1.300
wind forces)

Sum of vertical loads ΣV = 9.30 KN


Sum of horizontal loads ΣH = 0.53 KN

115
Check for sliding: = μ ΣV / ΣH
= 0.4 x 9.302 / 0.526
= 7.076

Check for over turning: = ΣMR / ΣMO


= 4.186 / 0.684
= 6.123

116
DATE
05-02-2020
APPROVED
OSR

Moment
(kN-m)

0.225

0.608

1.531

1.823

0.684

117
> 1.5
Hence SAFE

> 2
Hence SAFE

118
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020

FOUNDATION DESIGN CALCULATIONS OF PIPE DESIGN CHECKED APPROVED


SUPPORTS OF FLUID WATER LINE AND THUMBLI
MSN MMN OSR
WATER LINE

11 MTO
CONCRETE Unit Weight of Concrete = 2500 kg/m3
SL. NO. QUANTITY DESCRIPTION LENGTH WIDTH DEPTH VOLUME
NO'S m m m m3
1 RAFT
A. 1 PCC 1.10 1.10 0.10 0.121
B. 1 RCC 0.90 0.90 0.20 0.162
2 PEDESTAL
A. 1 RCC 0.30 0.30 0.60 0.054

Cover = 50 mm
STEEL Unit Weight of Steel= 7850 kg/m3
SL. NO. QUANTITY DESCRIPTION Length Spacing 8 12 16 WEGHT
NO'S mm mm mm 2
mm2 mm2 Kg
1 RAFT 50 113 201
A. 16 LONGER DIR_(T/B)_12# 952 100 107668.66 13.523
B. 16 SHORTER DIR_(T/B)_12# 952 100 107668.66 13.523
C. 6 SIDE FACE_12# 3800 150 429769.88 43.745
2 PEDESTAL
A. 2 VERTICAL_LONGER_12# 900 150 16964.6 0.266
B. 2 VERTICAL_SHORTER_12# 900 150 16964.6 0.266
C. 3 HORIZONTAL_(B/W)_8# 800 150 40212.386 0.947
D. 2 HORIZONTAL_CROSS_TIES_8# 300 150 15079.645 0.237
72.508 Kg
0.073 Ton
BILL OF MATERIAL
SL. NO. DESCRIPTION QUANTITY UNITS
1 PCC 0.121 m3
2 RCC 0.216 m3
3 STEEL (12 dia) 0.071 Ton

63
4 STEEL(8 dia) 0.001 Ton

64
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE
SUPPORTS OF FLUID WATER LINE AND THUMBLI
MSN MMN OSR
WATER LINE

11.0 APPENDIX - A ( REFERENCE DOCUMENTS )