FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
2
DATE
05-02-2020
APPROVED
OSR
PAGE NO
3
3
3
3-6
7-8
9-20
21
22-29
30
31
32
3
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
DESINGED CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
1 INTRODUCTION :
This document covers the FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS OF FLUID WATER LINE AND
THUMBLI WATER LINE
This design is applicable for PSL-04 (PS-2, PS-3,G3).
2 CODES & REFERENCE DOCUMENTS :
Codes and standards used : As per the document DECO-MPT-C-BD-1000, Rev No: A1
2.1 DESIGN METHODOLOGY
The analysis and design of foundation is done according to IS 456-2000.
DECO-RX-N-SP-2001-A1 is used for load combinations.
Foundation is modelled in staad as plate elements. Loads are applied at the CG of equipment by creating node at CG
location and assigned as master slave by connecting node on pedestal. All the vertical loads and moments are applied at
CG location and shear loads are applied at the slave node on the pedestal. Maximum moments and shear is taken from
plates summary for design of footing.
3 MATERIALS :
Grade of concrete = M30
Grade of Steel = Fe500D
Unit Weight of soil = 18.00 kN/m3
Unit Weight of water = 10.00 kN/m3
Unit Weight of concrete = 25.00 kN/m3
Unit Weight of steel = 78.50 kN/m3
Width of the Pedestal/Wall = 0.30 m
Height of the Pedestal/Wall above ground = 0.30 m
Total Height of the Pedestal/Wall = 0.60 m
Length of the Pedestal/Wall = 0.300 m
Width of the Raft = 0.90 m
Length of the Raft = 0.90 m
Thickness of the raft = 0.20 m
Level of C.G. above the Pedestal/Raft = 0.50 m S247MEL-MPT-L-DWG-0041-01_Rev.C2
Safe Bearing Capacity of soil at 0.5 m depth = 50.00 kN/m2 DECO-MPT-C-REP-1000-A1 SOIL REPORT
Settlement criteria for safe bearing pressure = 25.00 mm DECO-MPT-C-REP-1000-A1 SOIL REPORT
Subgrade Modulus of soil = 2000 kN/m2/m
4 LOAD CALCULATION :
4.1 DEAD LOAD CALCULATION - (DL)
Empty Load = 35 kg (70% OF INPUT LOAD=0.7*50)
Load Applied = 0.35 kN
Vertical soil Load Applied on raft (ϒ*H) = 5.40 kN/m2
87
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
DESINGED CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
4.2 OPERATION LOAD CALCULATION - (FL)
Operation Load = 15 kg (30% OF INPUT LOAD=0.3*50)
Load Applied = 0.15 kN
88
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
DESINGED CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
89
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
DESINGED CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
90
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
DESINGED CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
4.8 SEISMIC LOAD CALCULATION FOR EMPTY CONDITION - (SEISMIC EMPTY +/- X/Y)
91
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
DESINGED CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
5 Basic Loads and Load Combinations used : Refer document DECO-RX-N-SP-2001, Rev No: C1
91
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
DESINGED CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
134 1.5DL+1.5WL-Z
135 1.2DL+1.2FL+.5LL+1.6EQ+X
136 1.2DL+1.2FL+.5LL+1.6EQ-X
137 1.2DL+1.2FL+.5LL+1.6EQ+Z
138 1.2DL+1.2FL+.5LL+1.6EQ-Z
92
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
DESINGED CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
139 .9DL+.9FL+1.6WL+X
140 .9DL+.9FL+1.6WL-X
141 .9DL+.9FL+1.6WL+Z
142 .9DL+.9FL+1.6WL-Z
143 .9DL+.9FL+1.6EQ+X
144 .9DL+.9FL+1.6EQ-X
145 .9DL+.9FL+1.6EQ+Z
146 .9DL+.9FL+1.6EQ-Z
147 1.2DL+1.2FL+1.2LL+1.2EQ+X
148 1.2DL+1.2FL+1.2LL+1.2EQ-X
149 1.2DL+1.2FL+1.2LL+1.2EQ+Z
150 1.2DL+1.2FL+1.2LL+1.2EQ-Z
151 1.2DL+1.2FL+1.2LL+1.2WL+X
152 1.2DL+1.2FL+1.2LL+1.2WL-X
153 1.2DL+1.2FL+1.2LL+1.2WL+Z
154 1.2DL+1.2FL+1.2LL+1.2WL-Z
93
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
DESINGED CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
240 1DL+1FL+.75LL+1EP+.75EQ-Z
94
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
6 STAAD INPUT
STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 22/2/2019
JOB NAME DESIGN OF PIPE SUPPORTS FOR FLUID WATER LINE AND THUMBLI LINE
JOB CLIENT VEDANTA LIMITED Cairn oil & gas
JOB NO S247MEL-NE-C-CAL-0047-1
JOB REV A3
JOB PART STAAD INPUT
ENGINEER NAME MSN
CHECKER NAME MMN
APPROVED NAME OSR
CHECKER DATE 22/2/2019
APPROVED DATE 22/2/2019
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
6 0.05 0 0.45; 9 0.1 0 0.45; 11 0.15 0 0.45; 13 0.2 0 0.45; 15 0.25 0 0.45;
17 0.3 0 0.45; 19 0.35 0 0.45; 21 0.4 0 0.45; 23 0.45 0 0.45; 25 0.05 0 0.4;
27 0.1 0 0.4; 28 0.15 0 0.4; 29 0.2 0 0.4; 30 0.25 0 0.4; 31 0.3 0 0.4;
32 0.35 0 0.4; 33 0.4 0 0.4; 34 0.45 0 0.4; 36 0.05 0 0.35; 38 0.1 0 0.35;
39 0.15 0 0.35; 40 0.2 0 0.35; 41 0.25 0 0.35; 42 0.3 0 0.35; 43 0.35 0 0.35;
44 0.4 0 0.35; 45 0.45 0 0.35; 47 0.05 0 0.3; 49 0.1 0 0.3; 50 0.15 0 0.3;
51 0.2 0 0.3; 52 0.25 0 0.3; 53 0.3 0 0.3; 54 0.35 0 0.3; 55 0.4 0 0.3;
56 0.45 0 0.3; 58 0.05 0 0.25; 60 0.1 0 0.25; 61 0.15 0 0.25; 62 0.2 0 0.25;
63 0.25 0 0.25; 64 0.3 0 0.25; 65 0.35 0 0.25; 66 0.4 0 0.25; 67 0.45 0 0.25;
69 0.05 0 0.2; 71 0.1 0 0.2; 72 0.15 0 0.2; 73 0.2 0 0.2; 74 0.25 0 0.2;
75 0.3 0 0.2; 76 0.35 0 0.2; 77 0.4 0 0.2; 78 0.45 0 0.2; 80 0.05 0 0.15;
82 0.1 0 0.15; 83 0.15 0 0.15; 84 0.2 0 0.15; 85 0.25 0 0.15; 86 0.3 0 0.15;
87 0.35 0 0.15; 88 0.4 0 0.15; 89 0.45 0 0.15; 91 0.05 0 0.1; 93 0.1 0 0.1;
94 0.15 0 0.1; 95 0.2 0 0.1; 96 0.25 0 0.1; 97 0.3 0 0.1; 98 0.35 0 0.1;
99 0.4 0 0.1; 100 0.45 0 0.1; 102 0.05 0 0.05; 104 0.1 0 0.05; 105 0.15 0 0.05;
106 0.2 0 0.05; 107 0.25 0 0.05; 108 0.3 0 0.05; 109 0.35 0 0.05;
110 0.4 0 0.05; 111 0.45 0 0.05; 122 0.25 0.599999 0.25; 123 -0.2 0 0.05;
124 -0.2 0 -6.51926e-009; 126 -0.05 0 0.05; 127 -0.05 0 -9.31323e-009;
128 -3.72529e-009 0 0.05; 129 -2.79397e-009 0 -1.21072e-008;
130 0.05 0 -1.49012e-008; 131 -0.2 0 -0.05; 133 -0.05 0 -0.05;
134 -1.86265e-009 0 -0.05; 135 0.05 0 -0.05; 136 -0.2 0 -0.2; 138 -0.05 0 -0.2;
139 -9.31323e-010 0 -0.2; 140 0.05 0 -0.2; 145 -0.2 0 0.7; 148 -0.05 0 0.7;
150 -2.79397e-009 0 0.7; 151 0.05 0 0.7; 152 -0.2 0 0.55; 154 -0.05 0 0.55;
155 -1.86265e-009 0 0.55; 156 0.05 0 0.55; 157 -0.2 0 0.5; 159 -0.05 0 0.5;
160 -9.31323e-010 0 0.5; 161 0.05 0 0.5; 162 -0.2 0 0.45; 163 -0.05 0 0.45;
164 0 0 0.45; 165 0.5 0 0.05; 166 0.5 0 -1.39698e-008;
167 0.45 0 -1.86265e-008; 168 0.55 0 0.05; 169 0.55 0 -9.31323e-009;
170 0.7 0 0.05; 171 0.7 0 -4.65661e-009; 173 0.5 0 -0.05; 174 0.45 0 -0.05;
175 0.55 0 -0.05; 176 0.7 0 -0.05; 178 0.5 0 -0.2; 179 0.45 0 -0.2;
180 0.55 0 -0.2; 181 0.7 0 -0.2; 187 0.5 0 0.7; 188 0.45 0 0.7; 190 0.55 0 0.7;
192 0.7 0 0.7; 194 0.5 0 0.55; 195 0.45 0 0.55; 196 0.55 0 0.55;
197 0.7 0 0.55; 199 0.5 0 0.5; 200 0.45 0 0.5; 201 0.55 0 0.5; 202 0.7 0 0.5;
204 0.5 0 0.45; 205 0.55 0 0.45; 206 0.7 0 0.45; 207 -0.2 0 0.4;
208 -0.05 0 0.4; 209 0 0 0.4; 210 0.5 0 0.4; 211 0.55 0 0.4; 212 0.7 0 0.4;
213 -0.2 0 0.35; 214 -0.05 0 0.35; 215 0 0 0.35; 216 0.5 0 0.35;
93
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
94
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
95
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
96
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
97
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
98
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
99
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
100
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
101
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
102
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
103
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
104
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
105
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
106
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
107
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
108
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
109
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
110
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
111
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
112
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
113
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR
23
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR
Shear Oneway
SQY
(Input from STAAD) - PEDESTAL
SXY
Shear
SQX (local) (local) Membrane
SX (local) SY (local) (local) Bending Moment
My
Plate L/C N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 Mx kNm/m kNm/m Mxy kNm/m
Max Qx 3374 131 (1.50 D 0.029 0.056 0 -0.054 -0.022 0.786 4.983 2.703
Min Qx 3377 131 (1.50 D -0.029 0.056 0 -0.054 0.022 0.785 4.983 -2.702
Max Qy 3377 131 (1.50 D -0.029 0.056 0 -0.054 0.022 0.785 4.983 -2.702
Min Qy 3441 132 (1.50 D 0.029 -0.055 0 -0.054 0.023 -0.781 -4.955 2.687
Max Sx 3429 144 (0.90 DL 0.001 -0.032 0.009 -0.012 0.009 -0.026 0.494 -0.122
Min Sx 3429 135 (1.20 DL 0 -0.021 -0.012 -0.068 -0.007 0.028 2.456 -0.076
Max Sy 3340 146 (0.90 DL -0.001 0.021 0 0.064 0.005 -0.038 -5.719 -0.019
Min Sy 3340 137 (1.20 DL -0.001 0.031 -0.001 -0.175 -0.007 -0.054 -7.874 -0.066
Max Sxy 3441 102 (1.50 DL 0.026 -0.048 0 -0.073 0.031 -0.567 -3.07 1.763
Min Sxy 3438 102 (1.50 DL -0.026 -0.048 0 -0.074 -0.031 -0.567 -3.069 -1.764
Max Mx 3374 131 (1.50 D 0.029 0.056 0 -0.054 -0.022 0.786 4.983 2.703
Min Mx 3438 132 (1.50 D -0.029 -0.055 0 -0.055 -0.023 -0.781 -4.955 -2.688
Max My 3405 132 (1.50 D 0 -0.044 -0.005 -0.066 -0.004 0.564 9.826 0.269
Min My 3338 131 (1.50 D 0 0.044 -0.004 -0.067 0.003 -0.563 -9.849 0.269
Max Mxy 3374 135 (1.20 DL 0.028 0.053 0 -0.053 -0.022 0.774 5.024 2.704
Min Mxy 3377 135 (1.20 DL -0.028 0.053 0 -0.053 0.022 0.774 5.024 -2.703
24
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR
25
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR
26
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR
27
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR
28
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR
29
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR
30
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR
31
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR
32
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR
33
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
TITLE : PEDESTAL DESIGN
MSN MMN OSR
34
DATE
05-02-2020
APPROVED
OSR
35
DATE
05-02-2020
APPROVED
OSR
36
DATE
05-02-2020
APPROVED
OSR
37
DATE
05-02-2020
APPROVED
OSR
38
DATE
05-02-2020
APPROVED
OSR
39
DATE
05-02-2020
APPROVED
OSR
40
DATE
05-02-2020
APPROVED
OSR
41
DATE
05-02-2020
APPROVED
OSR
42
DATE
05-02-2020
APPROVED
OSR
43
DATE
05-02-2020
APPROVED
OSR
44
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
7 PEDESTAL DESIGN
Designed as Biaxially Loaded Rect by Limit-State Method conforming to IS:456-2000
Spacing of Ties
The spacing of ties should be least of the following
Least Lateral dimension 300.00 mm
16*d 150 mm
300 mm atleast 300 mm
Hence provide 8 mm dia ties at 150 mm c/c
105
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
8 RAFT DESIGN
Plate Stresses summary for Raft (Base slab) Design (Limit state of strength)
Moment (Input from STAAD) - RAFT
Shear Membrane Bending Moment
Plate L/C SQX (local SQY (local SX (local) SY (local) SXY (loca Mx kNm/m My kNm/mMxy kNm/m
Max Qx 47 210 (DL + F 0.062 -0.095 0 0 0 -0.615 -2.793 1.434
Min Qx 56 211 (DL + FL -0.062 0.095 0 0 0 -0.615 -2.793 1.434
Max Qy 56 211 (DL + FL -0.062 0.095 0 0 0 -0.615 -2.793 1.434
Min Qy 46 210 (DL + F -0.062 -0.095 0 0 0 -0.615 -2.793 -1.434
Max Sx 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Min Sx 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Max Sy 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Min Sy 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Max Sxy 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Min Sxy 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Max Mx 35 228 (0.60 D 0.014 0.009 0 0 0 0.15 0.379 0.417
Min Mx 47 217 (DL + FL 0.046 -0.04 0 0 0 -0.857 -0.446 0.26
Max My 56 227 (0.60 D 0.007 -0.041 0 0 0 -0.017 2.162 -1.456
Min My 46 210 (DL + F -0.062 -0.095 0 0 0 -0.615 -2.793 -1.434
Max Mxy 46 211 (DL + FL -0.008 0.025 0 0 0 -0.2 1.979 1.462
Min Mxy 56 210 (DL + F -0.008 -0.025 0 0 0 -0.2 1.979 -1.462
106
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
Shear Oneway (Input from STAAD) - RAFT
Shear Membrane Bending Moment
Plate L/C SQX (local SQY (local SX (local) SY (local) SXY (loca Mx kNm/m My kNm/mMxy kNm/m
Max Qx 47 210 (DL + F 0.062 -0.095 0 0 0 -0.615 -2.793 1.434
Min Qx 56 211 (DL + FL -0.062 0.095 0 0 0 -0.615 -2.793 1.434
Max Qy 56 211 (DL + FL -0.062 0.095 0 0 0 -0.615 -2.793 1.434
Min Qy 46 210 (DL + F -0.062 -0.095 0 0 0 -0.615 -2.793 -1.434
Max Sx 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Min Sx 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Max Sy 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Min Sy 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Max Sxy 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Min Sxy 13 201 (DL) -0.003 -0.003 0 0 0 -0.086 -0.086 0.042
Max Mx 35 228 (0.60 D 0.014 0.009 0 0 0 0.15 0.379 0.417
Min Mx 47 217 (DL + FL 0.046 -0.04 0 0 0 -0.857 -0.446 0.26
Max My 56 227 (0.60 D 0.007 -0.041 0 0 0 -0.017 2.162 -1.456
Min My 46 210 (DL + F -0.062 -0.095 0 0 0 -0.615 -2.793 -1.434
Max Mxy 46 211 (DL + FL -0.008 0.025 0 0 0 -0.2 1.979 1.462
Min Mxy 56 210 (DL + F -0.008 -0.025 0 0 0 -0.2 1.979 -1.462
107
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
108
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
109
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
Design for Mx +ve (Soil face) - Main Design for Mx +ve (Soil face) - Main
Limit State Design Calculation of Crack Width as per IS 456
% Steel Calculation Unfactored Moment 0.38 kNm
fck 30 N/mm2 Overall depth of section h = a 200 mm
fy 500 N/mm2 Grade of concrete fck = 30 N/mm2
Mu = 0.567 kNm FROM STAAD, PLATE NO. 35 Max SR R
M= 0.378 kNm R= 0.033 3.99 SR Grade of steel fy = 500 N/mm2
Clear cover to reinforcement Cmin = 50 mm
B= 1000 mm Dia of reinforcement bar db = 12 mm
D= 200 mm Spacing of reinforcement s = 150 mm
d= 132 mm Allowable Crack Width 0.25 mm
ptreqd = 0.007 % Ast reqd = 10 mm2 Calculations
ptprov = 0.571 % Ast prov = 754 mm2 Area of steel provided Ast = 754 mm2
Min Ast = 0.12% (Refer IS 456 : 2000, Clause 26.5.2.1) Effective depth deff = 144 mm
mm2 pt = 0.52 %
110
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
av= 0.000 mm mm < 264 a, critical = 87.60 mm
Enhanced Tau C = - N/mm2 OK W, cr = -0.0927 mm
Width of Crack = 0.000 OK
111
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
Design for Mx -ve (Top Face) - Main Design for Mx -ve (Top Face) - Main
Limit State Design Calculation of Crack Width as per IS 456
% Steel Calculation Unfactored Moment 0.74 kNm
fck 30 N/mm2 Overall depth of section h = a 200 mm
fy 500 N/mm 2
Grade of concrete fck = 30 N/mm2
Mu = 1.117 kNm FROM STAAD, PLATE NO. 47 Max SR R
M= 0.745 kNm R= 0.064 3.99 SR Grade of steel fy = 500 N/mm2
Clear cover to reinforcement Cmin = 50 mm
B= 1000 mm Dia of reinforcement bar db = 12 mm
D= 200 mm Spacing of reinforcement s = 150 mm
d= 132 mm Allowable Crack Width 0.25 mm
ptreqd = 0.015 % Ast reqd = 20 mm2 Calculations
ptprov = 0.571 % Ast prov = 754 mm2 Area of steel provided Ast = 754 mm2
Ast MIN = 240 mm 2
effective cover dc = 56 mm
Min Ast = 0.12% (Refer IS 456 : 2000, Clause 26.5.2.1) Effective depth deff = 144 mm
mm2 pt = 0.52 %
Final Astreqd = 240 mm2 rho = 0.0052
sigma cbc = 10 N/mm2
Dia Reqd Sp Prov Spa m= 9.33
12 471 150 ast = 113 mm2 rho * m = 0.0489
Crack Width 0.005 OK Y12 - 150 OK k= 0.268
x= 38.53
Shear Stress Check jd = 131.16
Beta = 6.10 Tou' C = 1.37 N/mm2 fst = 7.53
fy = 500 N/mm2 0.25*fck^0.5 Modulus of Elasticity Es = 200000 N/mm2
Tou Cmax = 3.5 N/mm 2
(IS 456:2000 Table 20) OK epsilon 1 = -3.044E-06
Tou C = 0.525 N/mm2 (IS 456:2000 Table 19) epsilon 2 = -2.886E-05
Tou V = 0.062 N/mm 2
FROM STAAD, PLATE NO. 47 epsilon m = epsilon 1 - epsilon 2 = 2.5817E-05
av= 0.000 mm mm < 264 a, critical = 87.60 mm
Enhanced Tau C = - N/mm2 OK W, cr = 0.0046 mm
112
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
Width of Crack = 0.005 OK
113
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
Design for My +ve (Soil face) - Dist Design for My +ve (Soil face) - Dist
Limit State Design Calculation of Crack Width as per IS 456
% Steel Calculation Unfactored Moment 2.82 kNm
fck 30 N/mm2 Overall depth of section h = a 200 mm
fy 500 N/mm 2
Grade of concrete fck = 30 N/mm2
Mu = 4.227 kNm FROM STAAD, PLATE NO. 46 Max SR R
M= 2.818 kNm R= 0.204 3.99 SR Grade of steel fy = 500 N/mm2
Clear cover to reinforcement Cmin = 50 mm
B= 1000 mm Dia of reinforcement bar db = 12 mm
D= 200 mm Spacing of reinforcement s = 150 mm
d= 144 mm Allowable Crack Width 0.25 mm
ptreqd = 0.047 % Ast reqd = 68 mm2 Calculations
ptprov = 0.524 % Ast prov = 754 mm2 Area of steel provided Ast = 754 mm2
Ast MIN = 240 mm 2
effective cover dc = 56 mm
Min Ast = 0.12% (Refer IS 456 : 2000, Clause 26.5.2.1) Effective depth deff = 144 mm
mm2 pt = 0.52 %
Final Astreqd = 240 mm2 rho = 0.0052
sigma cbc = 10 N/mm2
Dia Reqd Sp Prov Spa m= 9.33
12 471 150 ast = 113 mm2 rho * m = 0.0489
Crack Width 0.003 OK Y12 - 150 OK k= 0.268
x= 38.53
Shear Stress Check jd = 131.16
Beta = 6.65 Tou' C = 1.37 N/mm2 fst = 28.50
fy = 500 N/mm2 0.25*fck^0.5 Modulus of Elasticity Es = 200000 N/mm2
Tou Cmax = 3.5 N/mm 2
(IS 456:2000 Table 20) OK epsilon 1 = -1.152E-05
Tou C = 0.506 N/mm 2
(IS 456:2000 Table 19) epsilon 2 = -2.886E-05
Tou V = 0.095 N/mm2 FROM STAAD, PLATE NO. 56 epsilon m = epsilon 1 - epsilon 2 = 1.734E-05
av= 0.000 mm mm < 288 a, critical = 87.60 mm
Enhanced Tau C = - N/mm2 OK W, cr = 0.0031 mm
114
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
Width of Crack = 0.003 OK
115
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
Design for My -ve (Top Face) - Dist Design for My -ve (Top Face) - Dist
Limit State Design Calculation of Crack Width as per IS 456
% Steel Calculation Unfactored Moment 2.82 kNm
fck 30 N/mm2 Overall depth of section h = a 200 mm
fy 500 N/mm 2
Grade of concrete fck = 30 N/mm2
Mu = 4.227 kNm FROM STAAD, PLATE NO. 46 Max SR R
M= 2.818 kNm R= 0.204 3.99 SR Grade of steel fy = 500 N/mm2
Clear cover to reinforcement Cmin = 50 mm
B= 1000 mm Dia of reinforcement bar db = 12 mm
D= 200 mm Spacing of reinforcement s = 150 mm
d= 144 mm Allowable Crack Width 0.25 mm
ptreqd = 0.047 % Ast reqd = 68 mm2 Calculations
ptprov = 0.524 % Ast prov = 754 mm2 Area of steel provided Ast = 754 mm2
Ast MIN = 240 mm 2
effective cover dc = 56 mm
Min Ast = 0.12% (Refer IS 456 : 2000, Clause 26.5.2.1) Effective depth deff = 144 mm
mm2 pt = 0.52 %
Final Astreqd = 240 mm2 rho = 0.0052
sigma cbc = 10 N/mm2
Dia Reqd Sp Prov Spa m= 9.33
12 471 150 ast = 113 mm2 rho * m = 0.0489
Crack Width 0.003 OK Y12 - 150 OK k= 0.268
x= 38.53
Shear Stress Check jd = 131.16
Beta = 6.65 Tou' C = 1.37 N/mm2 fst = 28.50
fy = 500 N/mm2 0.25*fck^0.5 Modulus of Elasticity Es = 200000 N/mm2
Tou Cmax = 3.5 N/mm2 (IS 456:2000 Table 20) OK epsilon 1 = -1.152E-05
Tou C = 0.506 N/mm 2
(IS 456:2000 Table 19) epsilon 2 = -2.886E-05
Tou V = 0.095 N/mm 2
FROM STAAD, PLATE NO. 56 epsilon m = epsilon 1 - epsilon 2 = 1.734E-05
av= 0.000 mm mm < 288 a, critical = 87.60 mm
116
CAIRN DOCUMENT NO. DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS DESIGN CHECKED APPROVED
OF FLUID WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
Enhanced Tau C = - N/mm2 OK W, cr = 0.0031 mm
Width of Crack = 0.003 OK
117
DATE
CAIRN DOCUMENT NO.
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT PROJECT
S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE SUPPORTS OF FLUID
WATER LINE AND THUMBLI WATER LINE MSN MMN OSR
114
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 CAIRN DOCUMENT NO.
DEVELOPMENT PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
9 STABILITY CHECK
Front batter = 0.30 m
Rear batter = 0.30 m
Thickness of foundation = 0.20 m
Total bottom width of foundation = 0.60 m
Load
intensity Lever arm Moment
Sl.No. Load Force (m) (kN-m)
(kN)
Operational load
3 H₁ (Horizontal, seismic and 7.362 0.700 5.154
wind forces)
115
DATE
05-02-2020
APPROVED
OSR
1.5
116
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
10 MTO
CONCRETE Unit Weight of Concrete = 2500 kg/m3
SL. NO. QUANTITY DESCRIPTION LENGTH WIDTH DEPTH VOLUME
NO'S m m m m3
1 RAFT
A. 1 PCC 1.10 1.10 0.10 0.121
B. 1 RCC 0.90 0.90 0.20 0.162
C. 1 GROUT-TOP 0.90 0.90 0.025 0.021
D. 14 GROUT-POCKETS 0.10 0.10 0.350 0.051
Cover = 50 mm
STEEL Unit Weight of Steel= 7850 kg/m3
SL. NO. QUANTITY DESCRIPTION Length Spacing 12 16 WEGHT
NO'S mm mm mm2 mm2 Kg
1 RAFT 113 201
A. 14 LONGER DIR_(T/B)_16# 936 125 188194 20.683
B. 14 SHORTER DIR_(T/B)_16# 936 125 188194 20.683
C. 0 SIDE FACE_12# 3800 250 429769.88 0.000
D. 23 VERTICAL RIF_16# (PERIPHERY) 100 125 11309.734 2.042
E. 1 VERTICAL INTERNAL_12# 100 500 11309.734 0.089
F. 0 HORIZONTAL INTERNAL_12# 800 500 90477.868 0.000
43.496 Kg
BILL OF MATERIAL 0.043 Ton
SL. NO. DESCRIPTION QUANTITY UNITS
1 PCC 0.121 m3
2 RCC 0.162 m3
3 STEEL (16 dia) 0.043 Ton
4 STEEL (12 dia) 0.000 Ton
5 GROUT 0.073 m3
117
PROJECT : NE STAGE -2 & NL STAGE-1 CAIRN DOCUMENT NO.
DEVELOPMENT PROJECT S247MEL-MPT-C-CAL-0047
10 STABILITY CHECK
Width of pedestal = 0.30 m
Front batter = 0.300 m
Rear batter = 0.300 m
Thickness of foundation = 0.20 m
Height of pedestal = 0.60 m
Total bottom width of foundation = 0.90 m
Load
intensity Lever arm
Sl.No. Load Force (m)
(kN)
Operational load
5 H₁ (Horizontal, seismic and 0.526 1.300
wind forces)
115
Check for sliding: = μ ΣV / ΣH
= 0.4 x 9.302 / 0.526
= 7.076
116
DATE
05-02-2020
APPROVED
OSR
Moment
(kN-m)
0.225
0.608
1.531
1.823
0.684
117
> 1.5
Hence SAFE
> 2
Hence SAFE
118
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
11 MTO
CONCRETE Unit Weight of Concrete = 2500 kg/m3
SL. NO. QUANTITY DESCRIPTION LENGTH WIDTH DEPTH VOLUME
NO'S m m m m3
1 RAFT
A. 1 PCC 1.10 1.10 0.10 0.121
B. 1 RCC 0.90 0.90 0.20 0.162
2 PEDESTAL
A. 1 RCC 0.30 0.30 0.60 0.054
Cover = 50 mm
STEEL Unit Weight of Steel= 7850 kg/m3
SL. NO. QUANTITY DESCRIPTION Length Spacing 8 12 16 WEGHT
NO'S mm mm mm 2
mm2 mm2 Kg
1 RAFT 50 113 201
A. 16 LONGER DIR_(T/B)_12# 952 100 107668.66 13.523
B. 16 SHORTER DIR_(T/B)_12# 952 100 107668.66 13.523
C. 6 SIDE FACE_12# 3800 150 429769.88 43.745
2 PEDESTAL
A. 2 VERTICAL_LONGER_12# 900 150 16964.6 0.266
B. 2 VERTICAL_SHORTER_12# 900 150 16964.6 0.266
C. 3 HORIZONTAL_(B/W)_8# 800 150 40212.386 0.947
D. 2 HORIZONTAL_CROSS_TIES_8# 300 150 15079.645 0.237
72.508 Kg
0.073 Ton
BILL OF MATERIAL
SL. NO. DESCRIPTION QUANTITY UNITS
1 PCC 0.121 m3
2 RCC 0.216 m3
3 STEEL (12 dia) 0.071 Ton
63
4 STEEL(8 dia) 0.001 Ton
64
DATE
PROJECT : NE STAGE -2 & NL STAGE-1 DEVELOPMENT CAIRN DOCUMENT NO.
PROJECT S247MEL-MPT-C-CAL-0047 05-02-2020
DESIGN CHECKED APPROVED
FOUNDATION DESIGN CALCULATIONS OF PIPE
SUPPORTS OF FLUID WATER LINE AND THUMBLI
MSN MMN OSR
WATER LINE
32