COST CALCULATION SUMMARIES

CALC BY

S.P.

23/11/2015

UNIT RATE OF M20

INCLUDING LABOUR

4000 per m3

UNIT RATE OF REBA

55 kg

INCLUDING BENDING

UNIT RATE OF FORM

50 Rs/m2

200 rs/sq m without repitions. 4 repeatitions.

COLUMNS
CONC(M3)
FOUNDATION

STEEL(KG_)

--

PLINTH
FIRST

CONC(M3)

STEEL(KG_)

--

BASEMENT

SLABS INC.
FOUNDATION

SHEAR WALLS

CONC(M3)

BEAMS

STEEL(KG_)

12.40

CONC(M3)

302.97

Formwork Area (All


Elements)
SLABWISE COSTS

LEVELWISE CONSUMPTION

STEEL(KG_)

TOTAL CONC TOTAL STEEL

RCC + STEEL + FORM

(M2)

13.02058212

334.0212318

30.46

71976.26623
0

10.686712

1694.008262

15.72

1,858.90

58.63436534

6168.902576

295.83

588618.377

12.43851

1754.184735

29.43

1,533.80

21.85

2,848.79

66.91100997

7442.373036

610.57

707503.2969

SECOND

7.5728328

1063.633175

35.30

1,677.27

22.43

4,601.29

96.83721285

10487.01709

575.85

992927.4573

TERRACE

7.5728328

1063.633175

62.22

2,982.38

21.91

3,139.30

96.28899767

8713.989035

788.42

903846.3206

40.18

6,761.64

0.00

0.00

146.32

7,845.13

86.01

15,096.64

331.6921679

33146.30297

160737.7279

371890.1078

585288.362

431482.156

344051.9914

830315.0735

2,301.13

3264871.718

TOTAL
CONSUMTIONS
TOTAL COSTS

CONTINGENCIES FOR STEEL


ADDED

10% FOR LAP LENGTHS FOR SLABS, COLUMNS, BEAMS, NO NEED FOR ISOLATED FOOTINGS WHICH DO NOT HAVE LAPS

ADDED

5% FOR WASTAGE

ADDED

5% FOR MISCELLANEOUS FACTORS LIKE TOLERANCES IN STEEL MANUFACTURE

CONTINGENCIES FOR CONCRETE


ADDED

5% FOR WASTAGE

DESIGN PERFORMANCE INDICATORS


kg/m2
PERFORMANCE FACTOR 1
PERFORMANCE FACTOR 2

35.455873
30.39074829

kg/sq.ft
3.295155484

AREA 1 (HABITABLE FLOORS ONLY)

837.7570093 m2

2.824418986

AREA 2 (HABITABLE FLOORS AND


0.5*TERRACE)

977.3831776 m2

WHAT THIS MEANS?


The consumption of steel per sq feet is a good indicator of design. Typically good designs lie in the range of 2.5 - 3.5 kg/sq feet. Above numbers are similar, and s
design seems typical and sound.
CONSTRUCTION COST (Rs/psf)

362.189437

TOTAL COST OF RCC+STEEL+FORMWORK DIVIDED BY HABITABLE AREA 1

WHAT THIS MEANS?


In an around boisar, the cost of construction of RCC hovers around 500 Rs per square feet. For a small building with good framing a slightly lower cost is expected
However please ensure the design is earthquake resistant, for even that could account for the slightly lower price.