Professional Documents
Culture Documents
734
675
200 CAST IN SITU RCC SLAB TREATED WITH A WATER
PROOFING SYSTEM. AS PER STANDARD
SPECIFICATION. CLAUSE NO:- 2.4.10.7.
6. ALL FINISHING ITEMS SHALL BE AS PER STANDARD
675 SPECIFICATION GIVEN IN ARCHITECTURAL PLAN.
7. NECESSARY ANTI TERMITE TREATMENT SHALL BE
PROVIDED FOR MCR BUILDING AS PER STANDARD
SPEC.
3307
8. ALL WINDOW & VENTILATORS OF BUILDING SHALL
3103
5000 BE PROVIDED WITH SUITABLE MS GRILLS.
2896
9. LAP/ DEVELOPMENT LENGTH FOR ALL REINF. BARS,
SHALL BE 50XDIA OF THE BARS FOR M25 MIX OF
CONC. LAPS SHALL BE STAGGERED AND AVOIDED
AT THE POINT OF MAXIMUM BENDING MOMENT.
10. NOT MORE THAN 50% OF TOTAL COL. BARS SHALL
BE LAPPED AT ANY SECTION OF COLUMN.
LAPS SHALL BE STAGGERED AND AVOIDED AT THE
PLACES OF MAX. STRESS. LAP SHALL BE CONSIDERED
STAGGERED
11. BRICK WORK 230 MM THK. ALL ROUND TO FFL.
12. MINIMUM CLEAR COVER TO MAIN REINFORCEMENT
2504
SHALL BE FOLLOWS
FFL
NOTES :-
1. PCC :- M10 -1 : 3 : 6
RCC :- M25 - 1 : 1: 2 AS PER IS 456: 2000
2. PLASTER MORTAR :- 1 : 5
3. CEMENT SHALL BE MIN. OPC 43 GRADE OF
ACC/ULTRATECH MAKE OR APPROVED BY PROJECT
MANAGER AT SITE
PATH WAY
600
CLIENT :
CONSULTANT :
3659
SOLAR MODULE
EPC CONTRACTOR:
DRAWING NO. :