Technical ebid number 296 Rev. 0


Electricity provided by the
Project number 13033 Bulilding No. 1 NO
customer
Water provided by the
Project name COVESTRO INDIA PVT. LTD. NO
customer
Date of bid 26-Jul-2019 Site roll forming NO
Last date of bid 02-Aug-2019 Mobilisation date 16 - Aug - 2019
18 - Aug -
GA dwawing no. GA Structure erection From 2019 To
07 - Sep - 2019
From 07 - Sep - 2019 To
Drawing revision no. R0 Roofing installation
15 - Sep - 2019
Nature of work Erection & Sheeting Deck sheet From To
Site location(complete From 15 - Sep - 2019 To
Greater Noida Cladding installation
address.) 25 - Sep - 2019
Regions NCR Handover 30 - Sep - 2019
Contact name Aftab Saifi Erector zone PAN INDIA
Contact number 85270-22661 Project add on NO
Approximate duration to
6 weeks Site condition BROWN FIELD
complete the project
Review [yes/no] YES
Bid Created Date 23-Jul-2019

Building/Area Information
LENGTH WIDTH CLEAR HEIGHT UNDER THE KNEE (PL.
BUILDING/AREA NAME TYPE OF BUILDING BUILDING AREA (SQM) SLOPE
(c/c-o/o) (c/c-0/0) CHECK IN GA DWG.) MTRS.
Production Block TCCS 47.73 23.50 1121.655 16.45 1:10

Total Building Area : 1121.655

Erector Type
DESCRIPTION OF
S.NO. Erector Type UNITS Quantity REQUIREMENT RATE AMOUNT(Rs.) SPECIAL NOTES, IF ANY.
WORK
STRUCTURE
CHECKING OF
1 SUPERVISION OF ANCHOR BOLT
ANCHOR BOLTS
M.T YES
APPLICATION OF Paint Touch-up must be start immediately after unloading of structure material.Paint for
ALKYD BASE PAINT touch-up will be supplied by Interarch
2 PAINTING M.T
(SPRAY APPLIED )
AT SITE
SUPPLY OF
PREMIUM QUALITY
3 PAINTING SYNTHETIC M.T
ENAMEL PAINT
APPLIED AT SITE
APPLICATION OF Paint Touch-up must be start immediately after unloading of structure material.Paint for
4 PAINTING
EPOXY COATING
M.T 160.793 YES touch-up will be supplied by Interarch
(SPRAY APPLIED ) TOUCH UP
AT SITE
SUPPLY OF
PREMIUM QUALITY
5 PAINTING M.T
EPOXY PAINT
APPLIED AT SITE
6 STRUCTURAL ERECTION BUILT-UP M.T 120.43 YES
YES
7 STRUCTURAL ERECTION COLD FORM M.T 27.947 PRE
GALVANIZED
8 STRUCTURAL ERECTION HOT ROLL STEEL M.T 40.363 YES
9 STRUCTURAL ERECTION PIPE M.T

10 CABLE TRAY
ROOF PLAT FORM / WALKWAYS
11
WITH HAND RAILING
HEADER PIPE SYSTEM WITH
12
PAINTING MS
13 CRANE BEAM (EOT / MONO) YES
CRANE WALKWAY WITH HAND
14
RAIL
YES
15 FRAMED OPENINGS YES
16 CAGE LADDER YES
17 MEZZANINE WITH HAND RAIL CHEQUERED PLATE YES
STAIRCASE WITH HANDRAIL
OFFICE / INDUSTRIAL TYPE AND
18
CHEQUERED PLATE (WITH TOE
GUARD)
19 MONKEY LADDER

20 FASCIA

TOTAL STRUCTURE 188.74


SHEETING
21 ROOF SHEETING + FLASHING SINGLE-KILPPON M2

22 ROOF SHEETING + FLASHING SINGLE-HI RIB M2 360 YES

192.192.192.225:88/erector/pt.aspx 1/3
8/7/2019 192.192.192.225:88/erector/pt.aspx
23 ROOF SHEETING + FLASHING SINGLE- SS-2000 M2 SEAMING MACHINE SHALL BE PROVIDED ON RENTAL BASIS AND RENT
WILL BE DEDUCTED FROM YOUR ACCOUNT.

24 ROOF SHEETING + FLASHING PUFF PANEL M2 2428 YES


25 ROOF SHEETING + FLASHING DOUBLE SKIN-HR M2

26 WALL CLADDING + FLASHING FASCIA-HR M2

27 WALL CLADDING + FLASHING PUFF PANEL M2

28 WALL CLADDING + FLASHING SINGLE-HR M2

29 WALL CLADDING + FLASHING DOUBLE SKIN -HR M2

30 WALL CLADDING + FLASHING PARTITION


DECKING SHEET
31 MEZZANINE WITH HAND RAIL
(GI)
M2 200 YES
SHEAR STUDS FOR
32 MEZZANINE WITH HAND RAIL NOS
DECKING SHEET
BARE GALVALUME /
33 GUTTER
GI
M 60 YES
INTERNAL BOX /
34 GUTTER VALLEY GUTTER M
MS
ALUMININUM
35 GUTTER M
GUTTER
36 GUTTER SS GUTTER M

37 DOWN TAKE PIPE HDPE M

38 DOWN TAKE PIPE SMP (GALVALUME) M 105 YES


39 DOWN TAKE PIPE PVC M

40 DOWN TAKE PIPE MS(MILD STEEL) M

41 DAYLIGHT PANEL M2 145 YES


ROOF & WALL
FALL PROTECTION
42 DAYLIGHT PANEL FRAME GI WITH YES
MESH
43 INSULATION WITH WELD MESH M2
WITHOUT WELD
44 INSULATION M2
MESH (FSK)
RIDGEVENT(MM
45 VENTILATOR M
THROAT)

46 VENTILATOR TURBO (MM DIA) NOS 10 YES


600
POWER VENT WITH
47 VENTILATOR NOS
TIG WELDING
48 INDUSTRIAL LOUVER M2

49 LOUVER (S-TYPE) M2

50 DEKSTRIP FLASHING M

51 CEMENT BOARD M2

52 FALSE CEILING M2

53 CRIMP-CURVED SHEET NOS

54 SAFETY NET M2
BIRD MESH/WELD MESH/INSECT
55 MESH(ROOF/WALL)-
(25*25*1.6/50*50*2.0/75*75*1.6MM)
56 WINDOW (ALLUMINIUM) M2

57 SLIDING DOOR M2

58 MS DOOR(POWDER COATED) M2

59 ROLLING SHUTTER M2

60 ROOF LIFE LINE SYSTEM M

61 SUB GIRTS GI

62 SOFFIT SHEET

63 CANOPY YES
64 ROOF MONITOR

65 ROOF EXTENSION
TRANSVERSE MONITOR WITH
66
TIG WELDING
67 PARTITION WALL

68 FRAMED OPENINGS YES


69 LEAN-TO

70 FASCIA
OTHERS
71 SPECIALS, IF ANY YES

192.192.192.225:88/erector/pt.aspx 2/3
8/7/2019 192.192.192.225:88/erector/pt.aspx
Expansion of 12005.
End wall sheet along Grid 4 & 10 of existing Bldg FG &
RM warehouse need to be removed.
PUF panel on existing sidewall Grid A of IA-PB-1004 to
be removed.
Roof panels as per requirement to be removed while
execution.
Rafters along Grid 4 & 10 shall support on existing
Rafters.
Boomlift required for erection.