Professional Documents
Culture Documents
Failure of Wheel Loader Transmission
Failure of Wheel Loader Transmission
IRIR
26-10-
NAME : (UM / Incharge) Hamza Nouman SIGN: DATE:
16
Note: This initial report should reach PRF secretary within 02 working day of the incident