REKAPITULASI INVENTARISASI JALAN

KONSTRUKSI JALAN GORONG -


SALURAN DRAINASE SALURAN DRAINASE GORONG -GORONG GORONG -GORONG
RUMIJA (m) BAHU JALAN (m) TPT KIRI (m) TPT KANAN (m) GORONG BULAT
STATIONING KIRI (m) KANAN (m) PERSEGI PAS. BATU (m) PERSEGI BETON (m)
(m)
HOTMIX (m) BETON (m)
L LUAS P L T P L T Ki Ka P L T P L T P T P T P L T P L T P

0 + 000 8.20 14.00 0.04 - - 1.80 0.50 2.20 0.50 -


473.75 50.00 - 50.00 50.00 - - - - - - - -
0 + 050 10.75 14.00 0.04 - - 1.80 0.50 2.20 0.50 -
460.00 50.00 - 50.00 50.00 - - - - - - - -
0 + 100 7.65 14.00 0.04 - - 1.80 0.50 2.20 0.50 -
445.00 50.00 - 50.00 50.00 - - - - - - - - -
0 + 150 10.15 14.00 0.04 - - 1.80 0.50 2.20 0.50 - -
437.50 40.00 - 14.00 14.00 - - - - - - - - -
0 + 190 14.00 0.04 1.80 0.50 2.20 0.50
10.00 10.00
0 + 200 7.35 7.00 0.04 - - 1.80 0.50 1.80 0.50 - -
432.50 50.00 - 50.00 50.00 - - - - - - - - -
0 + 250 9.95 7.00 0.04 - - 1.80 0.50 1.80 0.50 - -
407.75 50.00 - 50.00 50.00 - - - - - - 10.00
0 + 300 6.36 7.00 0.04 - - 1.80 0.50 1.80 0.50 - -
449.00 50.00 - 50.00 50.00 - - - - - - - - -
0 + 350 11.60 7.00 0.04 - - 1.80 0.50 1.80 0.50 - -

JUMLAH 3,105.50 350.00 - 324.00 314.00 - - - - 10.00

SKETSA JALAN 170.00


0 + 000 0 + 050 0 + 100 0 + 150 0 + 200 0 + 250 0 + 300 0 + 350
SEJALUR TANAH
SALURAN + Trotoar
RUMIJA

JALUR LALU LINTAS

SALURAN + Trotoar
SEJALUR TANAH

HOTMIX SALURAN PERMANEN JEMBATAN GORONG - GORONG PERSEGI BETON


BETON TEMBOK PENAHAN TANAH (TPT) GORONG - GORONG BULAT BETON GORONG - GORONG PAS. BATU
REKAPITULASI INVENTARISASI JALAN

KONSTRUKSI JALAN GORONG -


SALURAN DRAINASE SALURAN DRAINASE GORONG -GORONG GORONG -GORONG
RUMIJA (m) BAHU JALAN (m) TPT KIRI (m) TPT KANAN (m) GORONG BULAT
STATIONING KIRI (m) KANAN (m) PERSEGI PAS. BATU (m) PERSEGI BETON (m)
(m)
HOTMIX (m) BETON (m)
L LUAS P L T P L T Ki Ka P L T P L T P T P T P L T P L T P

0 + 350 8.20 7.00 0.04 - - 1.80 0.50 1.80 0.50 -


473.75 50.00 - 50.00 50.00 - - - - - - - -
0 + 400 10.75 7.00 0.04 - - 1.80 0.50 1.80 0.50 -
460.00 50.00 - 50.00 50.00 - - - - - - - -
0 + 450 7.65 7.00 0.04 - - 1.80 0.50 1.80 0.50 -
178.00 20.00 - 20.00 20.00 - - - - - - - - -
0 + 470 10.15 7.00 0.04 - - 1.80 0.50 1.80 0.50 - -
(4,112.50) - - - - - - - - - -
7.35 - - - - - -
- - - - - - - - - - -
9.95 - - - - - -
- - - - - - - - - - -
6.36 - - - - - -
- - - - - - - - - - -
11.60 - - - - - -

JUMLAH (3,000.75) 120.00 - 120.00 120.00 - - - - -

SKETSA JALAN
0 + 350 0 + 400 0 + 450 0 + 500 0 + 550 0 + 600 0 + 650 0 + 700
SEJALUR TANAH
BAHU JALAN
RUMIJA

JALUR LALU LINTAS

BAHU JALAN
SEJALUR TANAH

HOTMIX SALURAN PERMANEN JEMBATAN GORONG - GORONG PERSEGI BETON


BETON TEMBOK PENAHAN TANAH (TPT) GORONG - GORONG BULAT BETON GORONG - GORONG PAS. BATU
GORONG -
RONG BULAT JEMBATAN (m)
(m)

D P L TINGGI PLAT KE DASAR

- - - -

- - - -

- -

- -

30.00 -

- -

GORONG - GORONG PERSEGI BETON


GORONG - GORONG PAS. BATU
GORONG -
RONG BULAT JEMBATAN (m)
(m)

D P L TINGGI PLAT KE DASAR

- - - -

- - - -

- - - -

- - - -

- - - -

-
FORMULIR 5.13 DATA RAMBU - RAMBU JALAN / LALU LIN
NOMOR RUAS :
NAMA RUAS : TANGGAL :
LOKASI POSISI
SKETSA TYPE
( KM ) KI/KA

120 KI 3

185 KA 3

190 KI 2
TOTAL / SUB TOTAL
N / LALU LINTAS

JUMLAH
TYPE
( BUAH )

3 4

3 2

2 1
L
Kiri Kanan
Tiang Lampu 3 4
Tiang Listrik 2 10
Tiang Telepon 12 3