List of Contents: Station: NTPC Simhadri BHEL REF NO: PS-DC-186-500-Ntpc Ref No: Sim/1/Ts/1
List of Contents: Station: NTPC Simhadri BHEL REF NO: PS-DC-186-500-Ntpc Ref No: Sim/1/Ts/1
LIST OF CONTENTS
1. PLANT DETAILS
2. TESTING OBJECTIVES
3. TESTING PROPOSALS
4. SERVICES REQUIRED
5. SAFETY PRECAUTIONS
6. EMERGENCY PROCEDURES
8. COMMISSIONING PROCEDURE
9. COMPLETION CRITERIA
10. APPENDICES
STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500- Page 2 of 19
NTPC REF NO : SIM/1/TS/1/
PLANT AREA : 400 KV SWITCHYARD
TESTING SCHEDULE : 400 KV SWITCHYARD FEEDER
1. PLANT DETAILS:
ii. Isolators
415 V AC MOTOR
3. EARTH SWITCHES
4. CURRENT TRANSFORMER:
60 mA(s1-s2)
6. LIGHTNING ARRESTORS:
2. TESTING OBJECTIVE:
3. TESTING PROPOSAL:
The 400 KV Switchyard feeder will be checked and tested as per the standard
ii. Isolators
4. SERVICES REQUIRED:
a. 5 KV Hand/Motorised Megger
b. 500 V Megger
c. Earth Megger
f. Digital Multimeter
i. Operational analyzer(Optional)
5. SAFETY PRECAUTIONS:
5.1 The engineer-in-charge of the testing team will inform each member of
5.2 Only nominated persons will take part in the tests. All others will remain
5.3 All persons must acquaint themselves with use and location of fire
5.4 Each test will be carried out under the control of test team leader
5.5 A strict and safe method of applying test leads shall be practiced. Bare
wires should not be used in stead proper lugs must be used. All test
5.6 A record of any alterations made during the tests such as shorts or
procedures.
5.8 Test area will be kept clean ,clearly defined and cardoned off.
5.9 When high voltage test are being made Danger/Warning notices shall
be fixed at relevant points to ensure safety and a sanction for test taken.
6. EMERGENCY PROCEDURE:
6.1 Shock treatment chart and first-aid box will be made available.
6.2 Emergency telephone numbers for hospital and fire services shall be
prominently displayed.
7.5 Clearance from erection department for carrying out various tests obtained.
8. COMMISSIONING PROCEDURE:
CT TESTS
Lastly, it must be ensured that the power factor testing terminal earthing link
is in its proper position and CT must be energized only if earthing link is
firmly connected.
CVT TESTS
8.5 ISOLATORS:
8.6 EARTHSWITCHES:
The above tests are carried out as same as that of isolators as mentioned
above.
9. COMPLETION CRITERIA:
10. APPENDICES:
DRAWINGS :
0296/R03)
9. O&M MANUAL OF CT, CVT, ISO, LA (No: TB OM 186 316 0250, 260,
297, 362)