Advance Turbine Tech For High Efficiency Coal Fired Power Plants PDF
Advance Turbine Tech For High Efficiency Coal Fired Power Plants PDF
Mitsubishi Business Confidential
CONTENTS
16.7 24.2
Steam Pressure (MPa abs.)
1050 MW
1000 MW
1000 NUCLEAR
SUPERCRITICAL SUPERCRITICAL
600 MW 1000 MW
SUPERCRITICAL
1050MW
FOSSIL
500
75 MW REHEAT NUCLEAR
STEAM TURBINE 340 MW
156 MW
0
1950 1960 1970 1980 1990 2000
OPERATION YEAR
Mitsubishi Business Confidential
HISTORY OF MHI LARGE STEAM TURBINES
DEVELOPMENT OF STEAM PRESSURE & TEMPERATURE
WAKAMATSU
STEP2 (649/593 ) TACHIBANAWAN #2
50MW MATSUURA #2
650 OSAKA #3 (593/593 ) (600/610 )
1050MW
kg/cm2g (566/538 )
WAKAMATSU 1000MW
156.25MW STEP1 (593/593 )
400 GOI #5
600 SHIN-TOKYO #4 (566/566 )
50MW
(538/538 )
350MW 566 MISUMI #1
350 75MW
(600/600 )
TEMPERATURE HEKINAN #3 1000MW
550 300 (538/593 )
538 700MW
250 255
510 246
250
500 PRESSURE
480 190
200
169
450 150 127
102
100 88
400 59 60
50 42
350 0
1950 1960 1970 1980 1990 2000 2010
Mitsubishi Business Confidential OPERATION YEAR
MHI EXPERIENCE OF SUPER
CRITICAL LARGE STEAM TURBINE
LARGE CAPACITY ( 600MW)
: 28 UNITS
(ALL UNITS IN SERVICE)
LONG TERM OPERATION : MORE THAN 34 YEARS
EXPERIENCE
ADVANCED STEAM CONDITION
HEKINAN #3 700MW 24.1MPa 538/593 C
NANAO-OTA #1 500MW 24.1MPa 566/593 C
MATSUURA #2 1000MW 24.1MPa 593/593 C
MISUMI #1 1000MW 24.5MPa 600/600 C
TACHIBANAWAN #2 1050MW 25.0MPa 600/610 C
HIRONO #5 600MW 24.5MPa 600/600 C
MAIZURU #1 900MW 24.5MPa 595/595 C
Mitsubishi Business Confidential
HIGHEST STEAM TURBINE
THERMAL PERFORMANCE
J-POWER TACHIBANAWAN #2 1050MW
Advanced
flow guide
Advanced direct
support LP frame
4 Casings
1200 (Cross Compound)
2 Casings
1100
Application Range (MW)
1000
1000MW
900 1LP+HIP
800
800MW
HIP Turbine
HIP Turbine
Generator
LP Turbine IP Turbine HP Turbine
Mitsubishi Business Confidential
HP-IP Combined Turbine
F3D ISB
Features of HP-IP Combined Turbine
Reaction Blade
Shorter longitudinal span
Smaller differential expansion
Easy maintenance
IP Inlet Cooling
Cooling
Steam Path
Mitsubishi Business Confidential
ADVANTAGES OF ISB LP END BLADES
ISB GB
Larger damping is generated by the
contact at the shrouds and snubbers, Damping
which is caused by the twist-back
deformation due to centrifugal force.
ISB Conventional
Grouped Blade
Reduction
in Vibration Stress
Mitsubishi Business Confidential
3. MHI ADVANCED TECHNOLOGY FOR
HIGH EFFICIENCY
Measured Measured
Blade Exit Blade Exit
Base Base
CFD CFD
Measurement
Stationary blade
CFD
Sectional View Loss Coefficient
Mitsubishi Business Confidential Rotating blade
COLLABORATION WITH ETH
Measuring at MHI Model Test Turbine
with Fast Response Aerodynamic Probe (FRAP)
Steam
Temp 566
610 630 650
Turbine Parts
Inner
12CrMoVNb 3Co12CrMoWVNbB
Casing 2.25CrMo Type 316H
(MJC-12) (MTC10A)
Nozzle Box
12CrMoWV 12CrMoWVNb 3Co12CrMoWVNbB
Blade W545
(Type 422) (10705MBU) (MTB10A)
Developed by MHI
Mitsubishi Business Confidential
WAKAMATSU HIGH TEMPERATURE TURBINE J-POWER
New heat-resistant material were tested in the actual turbine in 1986-91
Turbine Casing
Model Turbine Test
&%
Field Telemetry Test (700mmHg)
!
)
'(
"#
$
$
Vibratory Stress
!
)
'(
"#
&%
$
$
Test Result
500mmHg
600mmHg Design Value
722mmHg
2nd Mode
Frequency (Hz)
1st Mode
ACC
Steam Turbine
HRSG
Gas Turbine
WIRING WIRING
(LOWER CASING & ROTOR INSTALLATION) (UPPER CASING INSTALLATION)
500/600/800/1000MW
Supercritical Steam Turbine
Generator
and
150/300MW Steam Turbine
Generator for
Gas Turbine
Combined Cycle
Assembly of 1000MW Turbine in MHI Nagasaki
JV can;
(1) Solve Huge Electric
Demand
JV Should be Qualified,
Because;
(1) Fully Supported by MHI, MELCO and L&T Financially and
Technically