: MOBILISASI
JENIS ALAT
PERALATAN
: 1.2
: MOBILISASI
URAIAN
Sewa Tanah
PERALATAN
Periksa lembar 1.2-2
FASILITAS KONTRAKTOR
Base Camp
Kantor
Barak
Bengkel
Gudang, dan lain-lain
.......................................
FASILITAS LABORATORIUM
Ruang Laboratorium (sesuai Gambar)
Bituminous Testing
Marshall Asphalt Test
Extraction Test, Centrifuge/Refflux Me
Specific Gravity for Coarse Aggregate
Specific Gravity for Fine Aggregate
Mix Air Viod Content (Accurate Method
Core Drill
Metal Thermometer
Accessories and Tolls
Penetration Test
Softening Point
Refusal Density Compactor
Concrete Testing
Slump Cone
Cylinder/Cube Mould for Compressive
Beam Mould for Flexural Strength (RIG
Crushing Machine
MOBILISASI LAINNYA
PEKERJAAN DARURAT
Perkuatan Jembatan Lama
Pemeriksaan Jalan Kerja/Samping
............................................................
............................................................
............................................................
............................................................
LAIN-LAIN
Komunikasi Lapangan Lengkap
...........................................................
...........................................................
...........................................................
...........................................................
...........................................................
DEMOBILISASI
SATUAN PENGUKURAN
HARGA SATUAN
No
II
2
3
4
5
6
7
8
III
1
2
3
4
5
6
7
8
9
10
11
IV
1
2
3
4
V
1
2
3
VI
VII
1.
2.
: 1.2
: MOBILISASI
E01 unit 1
E02 unit 1
E03 unit 1
E04 unit 1
E05 unit 1
E06 unit 1
E07 unit 1
E08 unit 18
E09 unit 5
E10 unit 3
E11 unit 1
E12 unit 1
E13 unit 1
E14 unit 1
E15 unit 1
E16 unit 2
E17 unit 1
E18 unit 1
E19 unit 1
E20 unit 5
E21 unit 1
E22 unit 2
E23 unit 1
E24 unit 1
E25 unit 1
E26 unit 2
E27 unit 1
E28 unit 2
E29 unit 2
E30 unit 2
E31 unit 2
E32 unit 2
E33 unit 1
E34 unit 1
E35 unit
E36 unit
E37 unit
E38 unit
E39 unit
E40 unit
E41 unit
E42 unit
E43 unit
E44 unit
E45 unit
E46 unit
E47 unit
E48 unit
E49 unit
E50 unit
E51 unit
Lembar 1
: 1.2
: MOBILISASI
SATUAN VOL.
HARGA SATUAN (Rp.)
M2 20,000
M2 150
M2 60
M2 60
M2 100
M2 100
..... 0
M2 108
Set 1
Set 1
Set 1
Set 1
Set 1
Set 2
Set 2
Bln 2
Set 1
Set 1
Set 1
Set 1
Set 1
Set 1
Set 1
Set 1
Bln 6
Set 1
Set 1
Set 1
Set 1
Set 1
Set 1
Laboratorium)
s Laboratorium)
LS 1
LS 1
.....
.....
.....
.....
Set 1
..... 0
..... 0
..... 0
..... 0
..... 0
LS 1
a masing-masing item mobilisasi diatas dudah termasuk over-head dan laba
cukai (kecuali PPn), dan pengeluaran lainnya.
: Lump Sum
: Rp.
URAIAN SATUAN VOLUME
Laboratory Building
Bituminos Testing
Marshall Asphalt Test Set 1.00
Extraction Test, Centrifuge/Reflux Method Set 1.00
Specific Gravity of Coarse Aggregate Set 1.00
Specific Gravity of Fine Aggregate Set 1.00
Mix Air Viod Content (Accurate Method) Set 1.00
Core Drill Set 1.00
Meta Thermometer Set 1.00
Accessories and Tolls Set 1.00
Penetration Test Bln 6.00
Softening Point Set 1.00
Refusal Density Compactor Set 1.00
Concrete Testing
Slump Cone Set 1.00
Cylinder/Cube Mould for Compreesive Strength Set 1.00
Beam Mould for Flexural Strength Set 1.00
Crushing Machine Set 1.00
Peralatan pendukung
Mobil Pick Up Unit 2.00
Komputer + Printer Set 1.00
Furniture Set 1.00
Operasional
Teknis Laboratorium Bln 12.00
Tenaga Kerja Terampil Bln 60.00
Test Luar
Test Luar, sesuai kebutuhan atau atas Ls 1.00
perintah Direksi
Catatan :
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termas
yang dibayar kontrak) dan biaya lain-lainnya.
Test luar adalah tes ke lembaga pengujian yang disetujui oleh Konsultan Pengawas.
Lembar 1.2-2
SUB TOTAL
Beli
Beli
Beli
Beli
Beli
Beli
Sewa
SUB TOTAL
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
SUB TOTAL
Beli
Beli
Beli
Beli
SUB TOTAL
Beli
Beli
Beli
SUB TOTAL
SUB TOTAL
0.00 0.00
SUB TOTAL 0.00
Rp
ultan Pengawas.
URAIAN PEKERJAAN
I. PERSIAPAN
1.1 Pembersihan
1.2 Mobilisasi dan Demobilisasi Alat
V. PEKERJAAN ASPAL
5.1 Lapis Resap Pengikat
5.2 Lapis Perekat
5.3 Laston Lapis Aus (AC-WC)
5.4 Laston Lapis Antara (AC-BC)
I PEMBERSIHAN
II PEKERJAAN TANAH
IV PEKERJAAN URUGAN
V PEKERJAAN ASPAL
5.1 Lapis Resap Pengikat
5.2 Lapis Perekat
5.3 Laston Lapis Aus (AC-WC)
5.4 Laston Lapis Antara (AC-BC)
678,7 M^3 1
297,35 M^3 1
3300
678.700
297.350
168
12
24
157.5
262.5
42
63
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I
DAFTAR HARGA SATUAN UPAH, BAHAN BANGU
TAHUN 2010 SEMESTER
NO URAIAN SATUAN
A UPAH
1 Kepala Tukang Oh
2 Tukang Oh
3 Mandor Oh
4 Pekerja Oh
5 Masinis Oh
6 Operator Oh
7 Sopir Oh
8 Pembantu Masinis/Operator Oh
9 Supervisor Oh
10 Pemasak Aspal Oh
11 Penjaga Oh
12 Pembantu Sopir Oh
13 Mekanik Oh
14 Surveyor Oh
B BAHAN/MATERIAL
1 Agregat Halus m3
2 Agregat Kasar m3
3 Agregat Kelas A m3
4 Agregat Kelas B m3
5 Agregat Kelas C m3
6 Aluminium Foil m2
7 Alcubond m2
8 Amplas Biasa Lbr
9 Amplas Niken Lbr
10 Bambu dia. 6-8 cm/6m Btg
11 Batako buah
12 Batu Andesit hitam kecoklatan m2
13 Batu alam kecoklatan (Sangarong) m2
14 Batu Bata lobang m3
15 Batu Bata Kecil buah
16 Batu Bata Lobang buah
17 Batu Candi hitam m2
18 Batu Kali m3
19 Batu Kali tempel m2
20 Batu Karang Pilang m2
21 Batu Kerikil m3
22 Batu Koral beton m3
23 Batu Koral Jagung m3
24 Batu Krokos m3
25 Batu Palimanan kuning/hijau m2
- 24 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I
NO URAIAN SATUAN
26 Batu Palimanan kuning/hijau + bevel m2
27 Batu Pecah 0.5 - 1 (screen) m3
28 Batu Abu 0.00 - 0.5 (filler) m3
29 Batu Pecah 1.3 - 1.9 (spilt) m3
30 Batu Pecah 2/3 m3
31 Batu Pecah 3/5 m3
32 Batu Pecah 5/7 m3
33 Batu Marmer m2
34 Batu Roster / Terawang keramik buah
35 Besi dia. 5 mm Batang
36 Besi dia. 6 mm KS Batang
37 Besi dia. 8 mm KS TI Batang
38 Besi dia. 10 mm KS TI Batang
39 Besi dia. 12 mm KS TI Batang
40 Besi dia. 14 mm KS TI Batang
41 Besi dia. 16 mm KS TI Batang
42 Besi dia. 19 mm KS TI Batang
43 Besi Beton Polos kg
44 Besi Baja Profil WF, I dan H kg
45 Besi Baja Konstruksi ( CNP, INP,dan besi L) kg
46 Besi Beam Clamp dan Plat Siku m2
47 Besi Hollow baja 20 X 40, tb. 2mm Batang
48 Besi Hollow baja 40 X 40, tb. 2mm Batang
49 Besi Hollow baja 30 X 60, tb. 2mm Batang
50 Besi Hollow Plafond 2 X 4 Batang
51 Besi Strip kg
52 Besi Strip 2 X 3 M'
53 Beton Ready Mix K - 125 m3
54 Beton Ready Mix K - 175 m3
55 Beton Ready Mix K - 225 m3
56 Beton Ready Mix K - 250 m3
57 Beton Ready Mix K - 275 m3
58 Beton Ready Mix K - 300 m3
59 Beton Ready Mix K - 350 m3
60 Beton Ready Mix K - 400 m4
61 Kabel NYA 1,5 mm m'
62 Kabel NYA 2,5 mm m'
63 Kabel NYA 4.0 mm m'
64 Kabel NYM 2 X 1,5 mm m'
65 Kabel NYM 2 X 2,5 mm m'
66 Kabel NYM 2 X 4,0 mm m'
67 Kawat Beton kg
68 Kawat Burung m2
69 Kawat Duri m'
70 Kawat Harmonika m2
71 Kawat Jaring pagar lbr
- 25 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I
NO URAIAN SATUAN
72 Kawat Kassa m2
73 Kawat Las Dos
74 Kawat Nyamuk m2
75 Kawat Seng Polos kg
76 Kayu Gelam dia. 6-8 btg
77 Kayu Gelam dia. 10-12 btg
78 Kayu Hek btg
79 Kayu Lis 1/3 m'
80 Kayu Lis 1/4 m'
81 Kayu Lis Profil kecil m'
82 Kayu Lis Profil sedang m'
83 Kayu Lis Profil besar m'
84 Kayu Mosaik 30 x 30 cm Buah
85 Kayu Kaso 5/7 kelas III (Meranti dan sejenis) Btg
86 Kayu Kelas I (Unglen, Jati) m3
87 Kayu Kelas II (Petanang dan sejenis) m3
88 Kayu Kelas III (Meranti dan sejenis) m3
89 Kayu Papan 3/20 Kls. III m3
90 Kayu Kelas IV (Racuk dan sejenis) m3
91 Kayu Papan kelas IV keping
92 Kayu Racuk m3
93 Kayu Reng btg
94 Minyak solar untuk industri / Minyak aspal liter
95 Minyak Gardan liter
96 Minyak Hidrolik liter
97 Minyak Selinder liter
98 Mozaik kayu lantai Uk. 30 x 30 cm buah
99 Pagar BRC, uk. 240 cm X 120 cm, dia. 5,5 mm Unit
100 Pagar BRC, uk. 240 cm X 90 cm, dia. 6 mm Unit
101 Paku Biasa bermacam ukuran 2" - 5" kg
102 Paku Biasa 1/2" - 1" kg
103 Paku Sumbat buah
104 Paku Beton buah
105 Paku Asbes buah
106 Paku Sekrup 3,5" Kg
107 Paku Sekrup 3,5" buah
108 Parquet Jati m2
109 Pasir Beton / Pasang m3
110 Pasir Urug m3
111 Pewarna nat Bks
112 Plywood warna/Jabarwood Lbr
113 Plywood Jati 3 mm Lbr
114 Plywood Sungkay 3 mm/ megatick Lbr
115 Plywood 3 mm Lbr
116 Plywood 4 mm Lbr
117 Plywood 6 mm Lbr
- 26 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I
NO URAIAN SATUAN
118 Plywood 9 mm Lbr
119 Plywood 12 mm Lbr
120 Plywood 20 mm Lbr
121 Politur dasar ltr
122 Politur Jadi ltr
123 Porselin Putih Uk. 10 x 10 cm buah
124 Porselin Warna Uk. 10 x 10 cm buah
C PERALATAN
1 Asphalt Finisher jam
2 Asphalt Mixing Plan jam
3 Asphalt Sprayer jam
4 Compresor jam
5 Concrete Mixer jam
6 Concrete Pump jam
7 Concrete Vibrator jam
8 Dump Truck jam
9 Excavator jam
10 Filter jam
11 Genset jam
12 Grader jam
13 Loader jam
14 Pneumatic Tired Roller jam
15 Tandem Roller jam
16 Flatbed Truck 3,5 ton jam
17 Water Tank Truck jam
18 Generator jam
19 Alat Bantu jam
20 Roller 3 roda jam
21 Sprayer, Selfprof jam
22 Buldozer jam
23 Scaffolding 177cm X 177 cm, Tg. 177 cm Set/Bulan
24 Stone Crusher (Pemecah batu) jam
25 Pengaduk beton jam
26 Stemper jam
27 Roller, Vibrator Pneu jam
28 Water Pump jam
- 27 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I
NO URAIAN SATUAN
- 28 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I
PAH, BAHAN BANGUNAN DAN PERALATAN
UN 2010 SEMESTER I
- 29 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I
HRG SATUAN HARGA HARGA
(RUPIAH) Swakelola (Rp) DASAR (Rp)
227,150.00 231,280.00 206,500.00
309,650.00 315,280.00 281,500.00
309,650.00 315,280.00 281,500.00
364,650.00 371,280.00 331,500.00
265,650.00 270,480.00 241,500.00
254,650.00 259,280.00 231,500.00
243,650.00 248,080.00 221,500.00
283,200.00 295,680.00 264,000.00
51,150.00 52,080.00 46,500.00
20,350.00 20,720.00 18,500.00
25,300.00 25,760.00 23,000.00
51,150.00 52,080.00 46,500.00
74,250.00 75,600.00 67,500.00
101,750.00 103,600.00 92,500.00
166,650.00 169,680.00 151,500.00
174,900.00 178,080.00 159,000.00
350,900.00 357,280.00 319,000.00
18,700.00 19,040.00 17,000.00
23,100.00 23,520.00 21,000.00
20,900.00 21,280.00 19,000.00
31,900.00 32,480.00 29,000.00
185,900.00 189,280.00 169,000.00
207,900.00 211,680.00 189,000.00
221,650.00 225,680.00 201,500.00
30,800.00 31,360.00 28,000.00
15,400.00 15,680.00 14,000.00
10,450.00 10,640.00 9,500.00
672,650.00 684,880.00 611,500.00
696,483.33 709,146.67 633,166.67
730,400.00 743,680.00 664,000.00
752,400.00 766,080.00 684,000.00
786,316.67 800,613.33 714,833.33
807,400.00 822,080.00 734,000.00
840,400.00 855,680.00 764,000.00
843,150.00 858,480.00 766,500.00
9,350.00 9,520.00 8,500.00
10,450.00 10,640.00 9,500.00
11,550.00 11,760.00 10,500.00
12,100.00 12,320.00 11,000.00
14,850.00 15,120.00 13,500.00
23,100.00 23,520.00 21,000.00
25,850.00 26,320.00 23,500.00
18,150.00 18,480.00 16,500.00
9,790.00 9,968.00 8,900.00
45,650.00 46,480.00 41,500.00
34,650.00 35,280.00 31,500.00
- 30 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I
HRG SATUAN HARGA HARGA
(RUPIAH) Swakelola (Rp) DASAR (Rp)
18,150.00 18,480.00 16,500.00
64,900.00 66,080.00 59,000.00
25,850.00 26,320.00 23,500.00
24,200.00 24,640.00 22,000.00
12,650.00 12,880.00 11,500.00
14,300.00 14,560.00 13,000.00
16,500.00 16,800.00 15,000.00
8,387.50 8,540.00 7,625.00
8,662.50 8,820.00 7,875.00
8,800.00 8,960.00 8,000.00
10,450.00 10,640.00 9,500.00
14,300.00 14,560.00 13,000.00
13,200.00 13,440.00 12,000.00
61,050.00 62,160.00 55,500.00
6,057,150.00 6,167,280.00 5,506,500.00
4,297,150.00 4,375,280.00 3,906,500.00
3,252,150.00 3,311,280.00 2,956,500.00
2,069,650.00 2,107,280.00 1,881,500.00
1,217,150.00 1,239,280.00 1,106,500.00
23,650.00 24,080.00 21,500.00
942,150.00 959,280.00 856,500.00
20,350.00 20,720.00 18,500.00
11,770.00 11,984.00 10,700.00
24,200.00 24,640.00 22,000.00
33,000.00 33,600.00 30,000.00
24,200.00 24,640.00 22,000.00
15,400.00 15,680.00 14,000.00
348,150.00 354,480.00 316,500.00
381,150.00 388,080.00 346,500.00
25,300.00 25,760.00 23,000.00
25,300.00 25,760.00 23,000.00
7,672.50 7,812.00 6,975.00
7,755.00 7,896.00 7,050.00
7,672.50 7,812.00 6,975.00
48,400.00 49,280.00 44,000.00
7,562.50 7,700.00 6,875.00
430,650.00 438,480.00 391,500.00
89,650.00 91,280.00 81,500.00
78,650.00 80,080.00 71,500.00
8,800.00 8,960.00 8,000.00
75,900.00 77,280.00 69,000.00
128,150.00 130,480.00 116,500.00
128,150.00 130,480.00 116,500.00
52,250.00 53,200.00 47,500.00
68,750.00 70,000.00 62,500.00
89,650.00 91,280.00 81,500.00
- 31 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I
HRG SATUAN HARGA HARGA
(RUPIAH) Swakelola (Rp) DASAR (Rp)
133,650.00 136,080.00 121,500.00
169,400.00 172,480.00 154,000.00
202,400.00 206,080.00 184,000.00
36,850.00 37,520.00 33,500.00
50,050.00 50,960.00 45,500.00
7,590.00 7,728.00 6,900.00
8,002.50 8,148.00 7,275.00
- 32 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2010 Semester I
HRG SATUAN HARGA HARGA
(RUPIAH) Swakelola (Rp) DASAR (Rp)
- 33 -
0.00
0.00
67,153.90
SATUAN H
NO. Harga
URAIAN
Analisa Satuan
(Rp)
1 2 3
I PEKERJAAN PERSIAPAN
a. Tenaga Kerja
0.0298 oh Pekerja 67,153.90
0.0075 oh Mandor 870.78
Jumlah
II PEKERJAAN TANAH
2.1 Galian
a. Tenaga Kerja
0.0149 oh Pekerja 67,153.90
0.0075 oh Mandor 870.78
Jumlah
b. Peralatan
0.0075 oh Excavator 5,655.78
0.3064 oh Dump Truck (E10) 117,980.51
1 oh Alat Bantu (E08) 113,549.00
Jumlah
2.2 Timbunan
a. Tenaga Kerja
0.0298 oh Pekerja 67,153.90
0.0075 oh Mandor 870.78
Jumlah
b. Bahan
1.2 M^3 Bahan timbunan 161608.97
Jumlah
c. Peralatan
0.0075 oh Excaavator 5,655.78
0.4267 oh Dump Truck 164,302.50
0.119 oh Motor Grader 548,049.00
0.0109 oh Vibro Roller 130,049.00
1 oh Alat Bantu 113,549.00
Jumlah
Jumlah
b. Bahan
1.08 oh Batu 314,500.00
0.4829 oh Pasir 89,000.00
c. Peralatan
0.4016 Concrete Mixer 21,005.25
1 Alat Bantu 113,549.00
PEKERJAAN DRAINASE
III 3.1 Galian Drainase
a. Tenaga Kerja
0.0298 oh Pekerja 67,153.90
0.0075 oh Mandor 870.78
Jumlah
b. Peralatan
0.007462 oh Excavator 5,627.22
0.1302 oh Dump Truck 50,134.02
Jumlah
Jumlah
b. Bahan
1.08 M^3 Batu 314,500.00
0.4829 M^3 Pasir 89,000.00
Jumlah
c. Peralatan
0.4016 jam Concrete Mixer 21,005.25
1 jam Alat Bantu 113,549.00
Jumlah
Jumlah
b. Bahan
1.08 M^3 Batu 314,500.00
0.4829 M^3 Pasir 89,000.00
Jumlah
c. Peralatan
0.4016 jam Concrete Mixer 21,005.25
1 jam Alat Bantu 113,549.00
Jumlah
PEKERJAAN URUGAN
4.1 Pengangkutan Material
Jumlah
b. Bahan
1.2586 M^3 Agg Kelas A 397,340.02
Jumlah
c. Peralatan
0.0085 oh Wheel Loader (E15) 443,549.00
0.5043 oh Dump Truck (E08) Err:522
0.0039 oh Motor Grader (E13) 548,049.00
0.0357 oh Tandem Roller (E17) Err:522
0.0141 oh Water Tanker (E23) Err:522
1 oh Alat Bantu 113,549.00
Jumlah
Jumlah
b. Bahan
1.2586 oh Agg Kelas B 385,639.95
Jumlah
c. Peralatan
0.0085 oh Wheel Loader (E15) 443,549.00
0.5043 oh Dump Truck (E08) Err:522
0.0039 oh Motor Grader (E13) 548,049.00
0.0357 oh Tandem Roller (E17) Err:522
0.0141 oh Water Tanker (E23) Err:522
1 oh Alat Bantu 113,549.00
Jumlah
Jumlah
Jumlah
b. Peralatan
0.0003 oh Motor Grader (E13) 548,049.00
0.0016 oh Vibro Roller (E19) 130,049.00
1 oh Alat Bantu 113,549.00
Jumlah
PEKERJAAN ASPAL
5.1 Lapis Resap Pengikat
a. Tenaga Kerja
V 0.0021 oh Pekerja 67,153.90
0.0004 oh Mandor 138,653.90
Jumlah
b. Bahan
0.679 oh Aspal 17,500.00
Jumlah
c. Peralatan
0.0002 oh Asp. Distributor 102,549.00
0.0002 oh Compressoe 174,049.00
Jumlah
Jumlah
b. Bahan
0.8487 oh Aspal 17,500.00
Jumlah
c. Peralatan
0.0002 oh Asp. Distrubutor 102,549.00
0.0002 oh Compressor 174,049.00
Jumlah
Jumlah
b. Bahan
0.0307 oh Agr 5-10 & 1C 298,000.00
0.0298 oh Agr 0-5 304,600.00
5.1615 oh Aspal 17,500.00
Jumlah
c. Peralatan
0.0009 oh Wheel Loader 443,549.00
0.0019 oh AMP Err:522
0.0343 oh Dump Truck Err:522
0.0013 oh Asp. Finisher 270,653.90
0.0033 oh Tandem Roller Err:522
0.0015 oh P.Tyre Roller Err:522
1 oh Alat Bantu 113,549.00
Jumlah
Jumlah
b. Tenaga Kerja
0.0186 oh Pekerja 67,153.90
0.0019 oh Mandor 138,653.90
Jumlah
c. Peralatan
0.0218 oh WHEEL LOADER 443,549.00
0.0466 oh ASPHALT MIXING PLANT (AMP) 1,794,153.90
0.8579 oh DUMP TRUCK (DT) 353,153.90
0.0255 oh ASPHALT 270,653.90
0.0651 oh TANDEM ROLLER 298,153.90
0.0291 oh PNEUMATIC TIRE ROLLER 435,653.90
1 oh ALAT BANTU 113,549.00
Jumlah
PEKERJAAN AKHIR
6.1 Dokumentasi dan Pelaporan
2001.18622 2001.18622
791.6175 791.6175
2792.80372
1000.59311 1000.59311
791.62 791.62
1792.21061
5141.6175 5141.6175
107255.0136 107255.0136
113549 113549
225945.6311
227737.84171
2001.18622 2001.18622
791.6175 791.6175
2792.80372
193930.764 193930.764
193930.764
5141.6175 5141.6175
149365.9083 149365.9083
65217.831 65217.831
1417.5341 1417.5341
113549 113549
334691.8909
531415.45862
42388.4784 42388.4784
124620.631 94033.4352
269696.7778 269696.77779
406118.69139
339660 339660
42978.1 42978.1
382638.1
19095.6784 19095.6784
113549 113549
132644.6784
921401.46979
2001.18622 2001.18622
791.6175 791.6175
2792.80372
5115.655548 5115.655548093
45576.3798 45576.3798
50692.0353481
53484.8390681
42388.4784 42388.4784
94033.4352 94033.4352
269696.7778 269696.77779
406118.69139
339660 339660
42,978.10 42,978.10
382638.1
19095.6784 19095.6784
113549 113549
132644.6784
921401.4698
42388.4784 42388.4784
94033.4352 94033.4352
269696.7778 269696.77779
406118.69139
339660 339660
42978.1 42978.1
382638.1
19095.6784 19095.6784
113549 113549
132644.6784
921401.3698
3995.65705 3995.65705
897.1665 897.1665
4892.82355
361218.2 361218.2
361218.2
3770.1665 3770.1665
Err:522 Err:522
2137.3911 2137.3911
Err:522 Err:522
Err:522 Err:522
113549 113549
311610.3085
677721.33205
3995.65705 3995.65705
897.1665 897.1665
4892.82355
350581.7714 350581.7714
350581.7714
3770.1665 3770.1665
Err:522 Err:522
2,137.39 2,137.39
Err:522 Err:522
Err:522 Err:522
113549 113549
311610.3085
667084.90345
3995.65705 3995.65705
897.1665 897.1665
4892.82355
80.58468
41.59617 80.58468
41.59617
122.18085
164.4147
208.0784 164.4147
113549 208.0784
113549
113921.4931
114043.67395
141.02319
55.46156 141.02319
55.46156
196.48475
11882.5
11882.5
20.5098
34.8098 20.5098
34.8098
55.3196 12134.30435
141.02319
55.46156 141.02319
55.46156
196.48475
14852.25
14852.25
20.5098
34.8098 20.5098
34.8098
55.3196 15104.0543
1249.06254 1249.06254
263.44241 263.44241
1512.50495
9148.6 9148.6
9077.08 9077.08
90326.25 90326.25
108551.93
399.1941 399.1941
Err:522 Err:522
Err:522 Err:522
351.85007 351.85007
Err:522 Err:522
Err:522 Err:522
113549 113549
131460.3099
241524.74485
268736.4
192811.8 268736.4
2132725 192811.8
2132725
2594273.2
1249.06254 1249.06254
263.44241 263.44241
1512.50495
9669.3682 9669.3682
83607.5717 83607.5717
302970.7308 302970.73081
6901.67445 6901.67445
19409.81889 19409.81889
12677.52849 12677.52849
113549 113549
548785.69254
3144571.39749
RENCANA ANGGARAN BIAYA
NO URAIAN
1 2
I PEKERJAAN PERSIAPAN
1 Pembersihan
Jumlah
II PEKERJAAN TANAH
1 Galian tanah
2 Timbunan Tanah
Jumlah
IV PEKERJAAN URUGAN
1 lapis pondasi Agg kelas A
2 Lapis Pondasi Agg Kelas B
3 Penyiapan Badan Jalan
Jumlah
V PEKERJAAN ASPAL
1 Lapis Resap Pengikat
2 Lapis Perekat
3 Laston Lapis Aus (AC-WC)
4 Lapis Antara (AC-BC)
Rp 227,737.84 678.700 M3
Rp 531,415.46 297.350 M3
M3
Rp 53,484.84 168.000 M3
Rp 921,401.47 12.000 M3
Rp 921,401.37 24.000
Rp 241,524.74 42.000
Rp 3,144,571.40 63.000
Rp 9,216,252.28
Rp 9,216,252.28
Rp -
Rp 158,016,386.62
Rp -
Rp 312,582,059.79
Rp 8,985,452.96
Rp 11,056,817.64
Rp 22,113,632.88
Rp 39,803,665.88
Rp 106,741,109.80
Rp 175,109,787.16
Rp 281,850,896.95
Rp 10,144,039.28
Rp 198,107,998.04
Rp 208,652,129.38
No URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
IV PEKERJAAN URUGAN
V PEKERJAAN ASPAL
Rp 9,216,252.28
Rp 312,582,059.79
Rp 39,803,665.88
Rp 281,850,896.95
Rp 208,652,129.38
Rp 852,102,362.50
Rp 85,210,236.25
Rp 85,210,236.25
Rp 1,022,522,835.01
Rp 1,350,000,000.00
JUTA RUPIAH
ITEM PEMBAYARAN NO. : 2.1
JENIS PEKERJAAN : Galian Utk Drainase, Saluran dan Saluran Air
SATUAN PEMBAYARAN : M3
No.
I.
1
2
3
4
5
6
II.
1
4
III.
1.
2.
2.a.
2.b.
ITEM PEMBAYARAN NO.: 2.1
JENIS PEKERJAAN : Galian Utk Drainase, Saluran dan Saluran Air
SATUAN PEMBAYARAN : M3
No.
2.d.
3.
4.
5.
6.
7.
No.
I.
1
2
4
5
6
II.
1
III.
1
1.a.
1.b.
1.c.
2
2.a.
2.a.
No.
3.
4.
5.
6.
7.
NO.PAKET KONTRAK :
NAMA PAKET :
PROV/KAB/KOTA :
ITEM PEMBAYARAN NO. :
JENIS PEKERJAAN :
SATUAN PEMBAYARAN :
NO.
A
.
B.
C.
1
2
3
D.
E.
F.
Note. 1
2
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO
A.
1.
2.
3.
B.
1.
2.
3.
C.
1.
2.
D.
E.
F.
Note: 1
2
3
4
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP/KAB/KOTA
ITEM PEMN=BAYRAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
A.
1.
2.
B.
C.
1.
2.
3.
D.
E.
F.
Note: 1
3
4
No.
I.
1
2
3
4
5
6
II.
1
2
4
III.
1.
2.
2.a.
2.b.
2.d.
NO.
6
7
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO
NO
A.
1.
2.
B.
1.
C.
1.
2.
3.
4.
5.
D.
E.
F.
Note: 1
3
4
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP/ KAB/ KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
No.
A.
1.
2.
B.
C.
1.
2.
3.
D.
E.
F.
Note : 1
2
3
4
NO.
I
1
2
3
4
5
II
1
2
III
1.
2.
2.a.
2.b.
2.d.
3.
NO.
4
7
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP/ KAB/ KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
A.
1.
2.
B.
1.
C.
1.
2.
3.
4.
5.
6.
7.
D.
E.
F.
Note : 1
3
4
NO.
I
1
2
3
4
5
6
7
8
II
1
III
1
2
2.a.
2.b.
ITEM PEMBAYARAN NO. : 5.1 (1)
JENIS PEKERJAAN : Lps. Pond. Agg. Kls. A
SATUAN PEMBAYARAN : M3
NO.
2.c.
2.d.
2.e.
2.g.
NO.
5
6
7
PROYEK
No.PAKET KONTRAK
NAMA PAKET
PROP/ KAB/ KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
A.
1.
2.
B.
1.
C.
1.
2.
3.
4.
5.
6.
D.
E.
F.
Note: 1
3
4
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO
A.
1.
2.
B.
1.
C.
1.
2.
3.
4.
5.
6.
D.
E.
F.
Note: 1
3
4
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO
A.
1.
2.
B.
1.
2.
C.
1.
2.
D.
E.
F.
Note: 1
3
4
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO
A.
1.
2.
B.
1.
2.
3.
4.
C.
1.
2.
3.
4.
5.
6.
7.
8.
D.
E.
F.
Note: 1
3
4
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO
A.
1.
2.
B.
1.
2.
C.
1.
2.
D.
E.
F.
Note: 1
2
3
4
PROYEK
No. PAKET KONTRAK
NAMA PAKET
NO
A.
1.
2.
B.
1.
2.
3.
4.
C.
1.
2.
3.
4.
5.
6.
7.
8..
D.
E.
F.
Note: 1
3
4
No
I.
1
2
3
4
5
6
II.
1
III.
A1
A1.a.
A1.b.
A2
A2.a.
A2.b.
A3
No
4
5
7
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
No
I.
1
2
3
4
5
6
II
1
III
1.a.
1.b.
2
2.1
2.b.
No
6
7
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
No
I.
1
2
3
4
5
6
7
8
9
10
11
12
II.
III.
1
1.a.
1.b.
1.c.
1.d.
2
2.a.
No
2.b.
2.c.
2.d.
2.e.
2.f.
2.g.
URAIAN
ALAT BANTU
- Rambu = 2 buah
- kereta dorong = 2 buah
- Sekop = 3 buah
- Garpu = 2 buah
- Tongkat Kontrol ketebalan hanparan
TENAGA
Produksi menentukan : A M P
Produksi AC-WC / hari = Tk x Q5
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt
- Mandor = (Tk x M) / Qt
Rp. 71846,43 / M2
Koefisien = 1 : Q1 0.00746213
DUMP TRUCK (E08)
Kapasitas bak V 3.5
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20
Kecepatan rata-rata kosong v2 30
Waktu siklus : Ts2
- Muat + (V X 60)/ D X Q1 X Fk T1 0.82
- Waktu temouh isi + (L : v1) x 60 T2 6
- Waktu tempuh kosong + (L : v2) x 60 T3 4
- Lain-lain T4 1
Koefisian = 1 : Q2 0.1302
ase, Saluran dan Saluran Air
TENAGA
Produksi menentukan : EXCAVATOR Q1 134.01
Produksi Galian/hari = Tk x Q1 Qt 938.07
Kebutuhan tenaga :
- Pekerja P 4
- Mandor M 1
Koefisien tenaga / M3
- Pekerja = (Tk x P) : Qt (L01) 0.0298
- Mandor = (Tk x M) : Qt (L03) 0.0075
URUTAN KERJA
Semen, pasir dan air dicampur dan diaduk menjadi
mortar deng menggunalan alat bantu
Batu dibersihkan dan dibasahi seluruh permukaannya
sebelum dipasang
Penyelesaian dan perapihan setelah pemasangan
BAHAN
Batu ---- {(Bt x D1 x 1 M3) : D2} x 1.2 (M02) 1.08
Semen -- Sm x {(Mr x d1 x 1 M3} : D3} x 1,05 0.112
x {D5 x (1000)} (M12) 161
Pasir ---- Ps x {(Mr x D1 x 1 M3) : D4} x 1,05 (M01) 0.4829
ALAT
CONCRETE MIXER (E60)
Kapasitas Alat V 500
Faktor efisiensi Alat Fa 0.83
Waktu siklus (T1 + T2 + T3 + T4)
- Memuat T1 5
- Mengaduk T2 3
- Menuang T3 1
- Menunggu, dll. T4 1
Ts1 10
Kap. Prod. Q1 2.49
Koefisien Tenaga / M3
- Mandor = (Tk x M) : Qt (L03) 0.40
- Tukang = (TkxTb) : Qt (L02) 1.20
- Pekerja = (Tk x P) : Qt (L01) 4.02
TENAGA
BAHAN
PERALATAN
FORMULIR STANDAR UN
PEREKAMAN ANALISA MASING-M
: 2.2
: Pasangan Batu Dengan M
: M3
KOMPONEN
TENAGA
Pekerja (L01)
Tukang Batu (L02)
Mandor (L03)
BAHAN
Batu (M02)
Semen (PC) (M12)
Pasir (M01)
PERALATAN
Conc Mixer
Alat bantu
FORMULIR STANDAR UN
PEREKAMAN ANALISA MASING-M
:
:
:
:
: 3.1 (1)
: Galian Biasa
: M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
TENAGA
Produksi menentukan : EXCAVATOR Q1 134.01
Produksi Galian / hari = Tk x Q1 Qt 938.07
Kebutuhan Tenaga :
- Pekerja P 2.00
- Mandor M 1.00
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0149
- Mandor = (Tk x M) : Qt (L03) 0.0075
FORMULIR STANDAR UN
PEREKAMAN ANALISA MASING-M
: 3.2 (1)
: Timbunan Biasa dari sela
: M3
KOMPONEN
KOMPONEN
TENAGA
Pekerja (L01)
Mandor (L03)
BAHAN
PERALATAN
Excaavator (E15)
Dump Truck (E08)
Motor Grader (E13)
Vibro Roller (E19)
Alat Bantu
FORMULIR STANDAR UN
PEREKAMAN ANALISA MASING-M
:
:
:
:
: 3.3
: Penyiapan Badan Jalan
: M2
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN 0.0003
Motor Grader (E13) jam 0.0016
Vibro Roller (E19) jam 1.0000
Alat Bantu Ls
URUTAN KERJA
Motor Grader meratakan permukaan hasil galian
Vibro Roller memadatkan permukaan yang telah
dipotong/diratakan oleh Motor Grader
Sekelompok pekerja akan membantu meratakan
badan jalan dengan alat bantu
ALAT
MOTOR GRADER (E13)
Panjang operasi grader sekali jalan Lh 50.00
Lebar Efektif kerja Blade b 2.6
Lebar overlap bo 0.30
Faktor Efisiensi Alat Fa 0.80
Kecepatan rata-rata alat v 4.00
Jumlah lintasan n 4.00
Waktu siklus Ts1
Peralatan 1 kali lintasan = Lh : (v x 1000) x 60 T1 0.75
Lain-lain T2 1.00
Ts1 1.75
TENAGA
Produksi menentukan : MOTOR GRADER Q1 3,257.14
Produksi pekerjaan / hari = Tk x Q1 Qt 22,800.00
Kebutuhan tenaga :
Pekerja P 4.00
Mandor M 1.00
Koefisien tenaga / M2
Pekerja = (Tk x P) : Qt (L01) 0.0012
mandor = (Tk x M) : Qt (L02) 0.0003
an Badan Jalan
:
:
:
:
: 5.1 (1)
: Lps. Pond. Agg. Kls. A
: M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, volume dan/atau uk
berat untuk bahan- bahan.
Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan p
mata pembayaran. Harga satuan yang disampaikan Penyedia jasa tidak dapat diubah kecuali terd
Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( te
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak terma
kontrak) dan biaya-biaya lainnya.
d. Agg. Kls. A
URUTAN KERJA
Wheel Loader memuat agregat campuran ke
dalam Dump Truck di Base Camp
Dump Truck mengangkut Agregat kelas A ke lokasi
pekerjaan dan dihampar dengan Motor Grader
Hamparan Agregat dibasahi dengan Water Tank Truck
sebelum dipadatkan dengan Tandem Roller
Selama Pemadatan, sekelompok pekerja akan
merapikan tapi hamparan dan level permukaan
dengan menggunakan Alat Bantu
ALAT
WHEEL LOADER (E15)
Kapasitas bucket V 1.5
Faktor bucket Fb 0.85
Faktor Efisiensi alat Fa 0.83
Waktu siklus :
Memuat dan lain lain T1 0.45
ALAT BANTU
Diperlukan :
Kereta do = 2 buah
Sekop = 3 buah
Garpu = 2 buah
TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71
Produksi agregat / hari = Tk x Q1 Qt 823.99
Kebutuhan tenaga :
Pekerja P 7.00
Mandor M 1.00
Koefisisen tenaga / M3 :
Pekerja = (Tk x P) : Qt (L01) 0.0595
Mandor = (Tk x M) : Qt (L03) 0.0085
:
:
:
:
: 5.1 (2)
: Lps. Pond. Agg. Kls. B
: M3
PERKIRAAN
KOMPONEN SATUAN KUANTITAS
TENAGA
BAHAN
PERALATAN
Wheel Loader (E15) jam
Dump Truck (E08) jam
Motor Grader (E13) jam
Tandem Roller (E17) jam
Water Tanker (E23) jam
Alat Bantu Ls
FORMULIR STANDAR UN
PEREKAMAN ANALISA MASING-M
: 5.2 (1)
: Lapis Pondasi Agregat Ke
: M3
KOMPONEN
TENAGA
Pekerja (L01)
Mandor (L03)
BAHAN
FORMULIR STANDAR UN
PEREKAMAN ANALISA MASING-M
: 6.1 (1)
: Lapis Resap Pengikat
: Liter
KOMPONEN
TENAGA
Pekerja (L01)
Mandor (L03)
Aspal (M10)
Kerosene (M11)
PERALATAN
FORMULIR STANDAR UN
PEREKAMAN ANALISA MASING-M
: 6.1 (1)
: Lapis Resap Pengikat
: Liter
KOMPONEN
TENAGA
Pekerja (L01)
Mandor (L03)
BAHAN
FORMULIR STANDAR UN
PEREKAMAN ANALISA MASING-M
: 6.1 (2)
: Lapis Perekat
: Liter
KOMPONEN
TENAGA
Pekerja (L01)
Mandor (L03)
BAHAN
Aspal (M10)
Kerosene (M11)
PERALATAN
FORMULIR STANDAR UN
PEREKAMAN ANALISA MASING-M
: 6..3 (5a)
: Laston Lapis Aus (AC-WC
: M2
KOMPONEN
TENAGA
Pekerja (L01)
Mandor (L03)
BAHAN
: 6.1 (1)
: Lapis Resap Pengikat
: Liter
Uraian
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Komposisi campuran
- Aspal Pen 60 atau pen 80
- Kerosene
Berat isi bahan
- Aspal Pen 60 atau pen 80
- Kerosene
Bahan dasar (aspal & minyak pencair) semuanya diterim
di lokasi pekerjaan
URUTAN KERJA
Aspal dan Minyak Flux dicampur dan dipanaskan
sehingga menjadi campuran aspal cair
Permukaan yang akan dilapis dibersihkan dari debu
dan kotoran dengan Air Compressor
Campuran aspal cair disemprotkan dengan Asphalt
Distributor ke atas permukaan yang dilapis
BAHAN
Untuk mendapatkan 1 liter lapis Resap Pengikat
diperlukan ( 1 liter x Fh )
Aspal = As x PC x D1
Kerosene = Kx PC
ALAT
ASPALT DISTRIBUTOR
Lebar penyemprotan
Kecepatan penyemprotan
Kapasitas pompa aspal
Faktor effisiensi kerja
Kap. Prod.
Koefisien = 1 : Q1
AIR COMPRESSOR
Koefisien = 1 : Q2
TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR
Produksi Lapis Resep Pengikat/hari = Tk x Q4
Kebutuhan tenaga :
- Pekerja
- Mandor
: 6.1 (1)
: Lapis Resap Pengikat
: Liter
Uraian
Uraian
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Komposisi campuran
- Aspan Pen 60 atau Pen 80
- Kerosene
Berat isi Bahan
- Aspan Pen 60 atau Pen 80
- Kerosene
Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
URUTAN KERJA
Aspal dan Minyak flux dicampur dan dipanaskan
sehingga menjadi campuran aspal cair
Permukaan yang akan dilapis dibersihkan dari debu
dan kotoran dengan Air Compressor
Campuran aspal cair disemprotkan dengan Asphlat
Distributor ke atas permukaan yang akan dilapis
BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan ( 1 liter x Fh )
Aspal = As x PC x D1
Kerosene = K x PC
ALAT
ASPHALT DISTIBUTOR
Lebar penyemprotan
Kecepatan penyemprotan
Kapasitas pompa aspal
Faktor effisiensi kerja
Kap. Prod.
Koefisien = 1 : Q1
AIR COMPRESSOR
Koefisien = 1 : Q2
TENAGA
Produksi menentukan : ASPHALT SPRAYER
Produksi Lapis Resap Pengikat / hari = Tk x Q4
Kebutuhan tenaga :
- Pekerja
- Mandor
: 6.1 (2)
: Lapis Resap Pengikat
: Liter
Uraian
Uraian
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal Lapis (AC-WC) padat
Jam kerja efektif per-hari
Faktpr kehilangan material
URUTAN KERJA
BAHAN
Agr 5-10 & = ("5-10 & 10-15" x (D1 x tM3) x Fh1) :
Agr 0-5 = ("0-5" x (D1 x tM3) x Fh1) : D3
Semen = (FF x (D1 x tM3) x Fh1) x 1000
Aspal = (As x (D1 x tM3) x Fh2) x 1000
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor effisiensi alat
Waktu siklus T1 + T2 + T3
- Kecepatan maju rata-rata
- Kecepatan mundur rata-rata
- Muat ke E (I x 60) / Vf
- Kembali ke Stock pile = (I x 60) / Vr
- Lain-lain (waktu pasti)
Kap. Prod. V
txT
Koefisien = 1 : Q1
: 6.3 (5a)
: Laston Lapis Aus (AC-WC)
: M2
Uraian
Kap. Prod. Vx Fa
D1 x t
Koefisien = 1 : Q2
GENERATORSET ( GENSET )
Kap. Prod. / Jam = SAMA DENGAN AMP
Koefisien = 1 : Q3
Kap. Prod.
Koefisien = 1 : Q4
ASPHALT
Kecepatan menghampar
Faktor efisiensi alat
Lebar hampar
Kap. Prod. /
Koefisien = 1 : Q5
TANDEM ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Kap. Prod. (v
Koefisien = 1 : Q6
Kap. Prod./j (v
Koefisien = 1 : Q7
: 6.3 (5a)
: Laston Lapis Aus (AC-WC)
: M2
KODE
Q2
Qt
P
M
(L01)
(L03)
ITEM PEMBAYARAN NO. : 6.3 (6a)
JENIS PEKERJAAN : Laston Lapis Antara (AC-BC)
SATUAN PEMBAYARAN : M3
1. BAHAN
1.a. Agr 5-10 & = ("5-10
(M92)
& 10-20" x (D1 x 1M3) x F
1.b. Agr 0-5 = ("0-5"
(M91)x (D1 x 1M3) x Fh1) : D3
1.c. Semen = (FF (M05)
x (D1 x 1M3) x Fh1) x 1000
1.d. Aspal = (As(M10)
x (D1 x 1M3) x Fh2) x 1000
2. ALAT
2.a WHEEL LOADE (E15)
Kapasitas buck V
Faktor bucket Fb
Faktor efisiensi Fa
Waktu Sikli T1 Ts1
- Kecepatan ma Vf
- Kecepatan ke Vr
- Muat ke E T1
- Kembali ke St T2
- Lain-lain (wa T3
Ts1
Kap. Prod. D2 x Q1
Ts1 x Fh1 x (Bip/Bil)
Koefisien = 1 : (E15)
ITEM PEMBAYAR
: 6.3 (6a)
JENIS PEKERJAA: Laston Lapis Antara (AC-BC)
SATUAN PEMBA: M3
Koefisien = 1 : (E08)
Koefisien = 1 : (E02)
Koefisien (E17)
Koefisien = 1 : (E18)
ITEM PEMBAYAR
: 6.3 (6a)
JENIS PEKERJAA: Laston Lapis Antara (AC-BC)
SATUAN PEMBA: M3
3 TENAGA
Produksi menen Q2
Produksi AC-WC Qt
Kebutuhan tenaga :
- Pekerja P
- Mandor M
Koefisien Tenaga / M2 :
- Pekerja = (Tk (L01)
- Mandor = (Tk (L03)
Rp.
1.734.269,48 / M3
jam
-
Ton/M3
Km
M3
-
-
menit
menit
M3
jam
ton
-
Km/Jam
Km/Jam
menit
menit
menit
menit
M3
Jam
Berlanjut ke hal. Berikut
Analisa EI-21
SATUAN KETERANGAN
M3/Jam
M3
orang
orang
Jam
Jam
Analisa EI-22
%
%
ton/m3
ton/m3
ton/m3
ton/m3
ton/m3
M3
Lepas
Kg
M3
Liter
-
menit
menit
menit
menit
menit
M3
jam
Lump Sum
Analisa EI-22
M3/Jam
M3
orang
orang
orang
jam
jam
jam
ANDAR UNTUK
ALISA MASING-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN (Rp.) HARGA
(Rp.)
AN
ATAN
n, volume dan/atau
saikan satu-satuan
nyedia Jasa tidak dapat
Jam 4.0161
Jam 1.2048
Jam 0.4016
M3 1.0800
zak 161.0000
M3 0.4829
Jam 0.4016
Ls 1.0000
ERALATAN
PERKIRAAN VOL.PEK :
TOTAL HARGA (Rp.) :
% THD. BIAYA PROYEK :
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
GA
AN
ATAN
SATUAN KETERANGAN
jam
-
Ton/M3 1.40-1.80
Km
M3
-
-
lihat panduan
menit
menit
menit
M3/jam
jam
ton
-
Km/Jam
Km/Jam
menit
menit
menit
menit
menit
M3
Jam
Lump Sump
SATUAN KETERANGAN
M3/jam
M3
orang
orang
Jam
Jam
MULIR STANDAR UNTUK
ANALISA MASING-MASING HARGA SATUAN
Jam 0.0298
Jam 0.0075
M3 1.2000
Jam 0.0075
Jam 0.4267
Jam 0.1190
Jam 0.0109
Ls 1.0000
ERALATAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
GA
AN
SATUAN KETERANGAN
Jam
M
M
Km / Jam
lintasan
menit
menit
menit
M2
Jam
Km/Jam
M
lintasan
M2
Jam
Lump Sum
M2/Jam
M2
orang
orang
Jam
Jam
SATUAN KETERANGAN
MULIR STANDAR UNTUK
ANALISA MASING MASING HARGA SATUAN
PERKIRAAN VOL. PEK :
TOTAL HARGA :
% THD. BIAYA PROYEK :
HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)
GA
AN
ATAN
SATUAN KETERANGAN
KM
M
jam
% Gradasi harus
% memenuhi
% spec
ton/m3
M3
M3 (lepas)
kondisi sdg
menit panduan
M3
ton
KM/jam
KM/jam
menit
menit
menit
menit
menit
M3
jam
SATUAN KETERANGAN
M
M
KM/jam
lintasan 1 x pp
menit
menit
menit
M3
jam
KM/jam
M
lintasan
M3
jam
M3
M3
liter/mnt
M3
jam
Lump sum
M3/jam
M3
orang
orang
jam
jam
SATUAN KETERANGAN
FORMULIR STANDAR UNTUK
EKAMAN ANALISA MASING-MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
GA
AN
n, volume dan/atau ukuran
Jam 0.0898
Jam 0.0128
M3 1.2586
Jam 0.0021
Jam 0.0004
Jam 0.0002
Jam 0.0002
ERALATAN
M3 0.9018
M3 0.6330
Kg 46.2840
Kg 121.8696
Jam 0.0128
Jam 0.0466
Jam 0.0466
Jam 0.8579
Jam 0.0255
Jam 0.6510
Jam 0.0291
Ls 1.0000
ERALATAN
Jam 0.0021
Jam 0.0004
Kg 0.8487
liter 0.2060
ERALATAN
Jam 0.0186
Jam 0.0019
M3 0.0307
M3 0.0298
Kg 1.8514
Kg 5.1615
Jam 0.0009
Jam 0.0019
Jam 0.0019
Jam 0.0343
Jam 0.0013
Jam 0.0033
Jam 0.0015
Ls 1.0000
ERALATAN
Resap Pengikat
KODE
t (cara mekanik)
njang jalan
mp ke lokasi pekerjaan L
ri Tk
n Fh
n 80 As
K
n 80 D1
D2
inyak pencair) semuanya diterima
(M10)
(M11)
(E41)
b
an V
pas
Fa
Pas x Fa x 60 Q1
(E41)
(E05)
alt Distributor Q2
(E05)
ASPHALT DISTRIBUTOR Q4
engikat/hari = Tk x Q4 Qt
P
M
Resap Pengikat
KODE
:
= (Tk x P) : Qt
= (Tk x M) : Qt
Pekerjaan :
N YANG DIPERLUKAN
... Bulan
YANG DIPERLUKAN
1,00 Liter
KODE
t (cara mekanik)
mp ke lokasi pekerjaan L
Tk
Fh
As
K
D1
D2
inyak pencair) semuanya
(M10)
(M11)
(E41)
b
V
pas
Fa
pas x Fa x 60 Q1
(E41)
(E05)
Q2
(E05)
ASPHALT SPRAYER Q4
engikat / hari = Tk x Q4 Qt
= (Tk x P) :Qt P
= (Tk x M) :Qt M
Resap Pengikat
KODE
UAN PEKERJAAN
FORMULIS STANDAR UNTUK
MASING-MASING HARGA
N YANG DIPERLUKAN
... Bulan
YANG DIPERLUKAN
1,00 Liter
n Lapis Aus (AC-WC)
KODE
t (cara mekanik)
mp ke lokasi pekerjaan L
t
Tk
- Agregat Fh1
- Aspal Fh2
Bip
Bil
0-5
FF
As
D1
D2
D3
I
Agregat ke dalam
(E15)
V
Fb
Fa
Ts1
Vf
Vr
T1
= (I x 60) / Vr T2
T3
Ts1
V x Fb x Fa x 60 Q1
t x Ts1 x (Bip/Bil) x Fh1
(E15)
KODE
(E01)
v
Fa
Vx Fa Q2
D1 x t
(E01)
(E12)
A DENGAN AMP Q3
(E12)
(E08)
V
Fa
v1
v2
Q2b
Tb
Ts2
T1
T2
T3
T4
Ts2
V x Fa x 60 Q4
D1 x Ts2 x t
(E08)
(E02)
V
Fa
b
V x b x 60 x Fa Q5
(E02)
(E17)
v
b
n
Fa
(v x 1000) x b x Fa Q6
n
(E17)
(E18)
v
b
n
Fa
(v x 1000) x b x Fa Q7
n
(E18)
Lump Sum
536.64 M2
3756.47 M2
10.00 orang
1.00 orang
0.0186 Jam
0.0019 Jam
on Lapis Antara (AC-BC)
8.73 KM
0.05 M
7 Jam
1.05 -
1.03 -
1.81 ton/m3
1.51 ton/m3
2.32 ton/M3
1.41 ton/M3
1.57 ton/M3
0.05 km
0.9018 M3
0.633 M3
46.2824 Kg
121.87 Kg
1.5 M3 panduan
0.85 -
0.83 -
1.1 menit
15 km/jam panduan
20 km/jam panduan
0.2 menit
0.15 menit
0.75 menit
1.1 menit
45.86 ton
0.0218 jam
60 ton/ Jam
0.83 -
21.47 M3
0.0466 Jam
21.47 M3
0.0466 Jam
3.5 ton
0.80 -
20.00 Km / Jam
30.00 Km/ Jam
1.00 ton
1.00 menit
3.5 menit
26.18 menit
15.00 menit
17.45 menit
62.13 menit
1.17 M3
0.8579 Jam
5.00 m/menit
0.83 -
3.15 meter
39.22 M3
0.0255 Jam
15.36 M3
0.0651 Jam
2.50 Km / Jam
1.99 M
6.00 Lintasan
0.83 -
34.41 M3
0.0291 Jam
on Lapis Antara (AC-BC)
Lump Sum
ebalan hanparan
21.47 M3
150.26 M3
7.00 orang
1.00 orang
0.3261 Jam
0.0466 Jam
ATUAN PEKERJAAN
am FORMULIR STANDAR UNTUK
MASING-MASING HARGA SATUAN
34.269,48 / M3
N YANG DIPERLUKAN
1,00 M3
1.00
155108.97
0.01
1.00
71846.43
Analisa EI-611
8,73 KM
7,00 Jam
1,03 -
64 % Terhadap volume
36 % Terhadap volume
1,03 Kg/liter
0,80
1,03 liter
0,6790 Kg.
0,3708 Liter
3,00 M
30,00 m/menit Asumsi
100 liter/menit Panduan
0,80 Sedang
4.800,00 Liter
0,0002 Jam
4.800,00 Liter
0,0002 Jam
4.800,00 Liter
33.600,00 Jam
10,00 orang
2,00 orang
Analisa EI-611
Lanjutan
8,73 KM
7,00 Jam
1,03 -
64 % Terhadap volume
36 % Terhadap volume
1,03 Kg/liter
0,80
1,03 liter
0,8487 Kg.
0,2060 Liter
3,00 M
30,00 m/menit Asumsi
100 liter/menit Panduan
0,80 Sedang
4.800,00 Liter
0,0002 Jam
4.800,00 Liter
0,0002 Jam
4.800,00 Liter
33.600,00 Jam
10,00 orang
2,00 orang
Analisa EI-612
Lanjutan
8,73 KM
0,04 M
7,00 Jam
1,05 -
1,03 -
1,81 ton/m3
1,51 ton/m3
44,70 %
48,00 %
1,90 %
5,40 %
2,32 ton/m3
1,42 ton/m3
1,57 ton/m3
0,05 km
0,0307 M3
0,0298 M3
1.8514 Kg
5.1615 Kg
1,50 M3
0,85 -
0,83 -
1,10 menit
15,00 km/jam
20,00 km/jam
0,20 menit
0,15 menit
0,75 menit
1,10 menit
1.146,56 M2
0,0009 Jam
Analisa EI-635(a)
Lanjutan
536,64 M2
0,0019 Jam
536,64 M2
0,0019 Jam
3,50 Ton
0,80 -
20,00 KM / Jam
30,00 KM / Jam
1,00 ton
1,00 menit
3,50 menit
26,18 menit
15,00 menit
17,45 menit
62,13 menit
29,14 M2
0,0343 Jam
5,00 m/menit
0,83 -
3,15 meter
784,35 M2
0,0013 Jam
1,50 Km / Jam
1,48 M
6,00 lintasan 2 Awal & 4 Akhir
0,83 -
307,10 M2
0,0033 Jam
2,50 KM / Jam
1,99 M
6,00 lintasan
0,83 -
688,21 M2
0,0015 Jam
II URUTAN KERJA
1 Excavator menggali dan memuat ke dalam drump truck
2 Dump Truck mengangkut ke lapangan dengan L 8.70
3 Material diratakan dengan menggunakan Motor Grader
4 Material dipadatkan menggunakan Vibratory Roller
5 Selama pemadatan sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu
2 ALAT
2.a. EXCAVATOR (E15)
Kapasitas Bucket V 0.93
Faktor Bucket Fb 1.00
Faktor Efisiensi Alat Fa 0.83
Faktor Konvensi Fv 0.90
Waktu siklus Ts1
- Muat T1 0.32
Waktu Siklus= T1 x Fv Ts1 0.29
Kapasitas = _________(v
Q4 x 1000) x b x 92.13
t x Fa_________
M3
M3 n
-
- Koefisien = 1 : Q4 (E19) 0.0109 Jam
Lihat panduan
2.e. ALAT BANTU
menit Diperlukan alat-alat bantu kecil
menit - Sekop = 3 buah
M3 3 TENAGA
Prooduksi men Q1 134.01 M3/Jam
Produksi Timbu Qt 938.07 M3
Jam Kebutuhan tenaga:
P 4.00 orang
M 1.00 orang
Ton
- Koefisien tenaga / M3 :
KM/Jam (L01) 0.0298 Jam
KM/Jam (L02) 0.0075 Jam
M3
Jam
ITEM PEMBAYAR
: 3.2 (1)
JENIS PEKERJAA: Timbunan Biasa dari selain Sumber Galian
SATUAN PEMBA: M3
Rp . 155.108,97
/ M3
Lump Sump