Niveli I sheshit te ndertimit sipas kartogrames m3 57 57 2651

Germim dheu dhe transport me buldozer


Ho=1/4*9[(27.66+29.6+24.18+21.21)+2(28.2+28.93+27.45+25.4+23.33+22.5+23.57+25.72)+4(26.19+26.66+24.18+24.7)]=25.55m

V=361/4[(2.11+4.05+4.34+1.37)+2(2.65+3.38+0.17+1.9+1.98+0.15+3.05+2.22)+4(0.64+1.11+1.37+0.85)]=5302m3

Vg=Vmb=5302/2=2651m3

Germim dheu per themele

Aksi 1-1 m3 9.24 0.9 1.3 10.8 10.8


Aksi 2-2 m3 10.24 0.9 1.3 11.98 11.98
Aksi 3-3 m3 2.78 0.7 1.3 2.53 2.53
Aksi 4-4 (cope 2) m3 6.3 0.7 1.3 11.47 11.47
Aksi 5-5 m3 13.95 0.9 1.3 16.32 16.32
Aksi 6-6 m3 11.71 0.9 1.3 13.7 13.7
Aksi A-A m3 5.69 1 1.3 7.4 7.4
Aksi A-A m3 2.7 0.7 1.3 2.46 2.46
Aksi C-C m3 7.86 1.2 1.3 12.26 12.26
Aksi c-c m3 2.7 0.7 1.3 2.46 2.46
Aksi D-D (cope 2) m3 12.3 1 1.3 31.54 31.54
Aksi D-D m3 2.7 0.7 1.3 2.46 2.46
Pa aks m3 8.18 0.7 1.3 7.44 7.44
Pa aks m3 2.87 1 1.3 3.73 3.73
Pa aks m3 1.65 0.5 0.5 0.41 0.41
=137 Totali= 137m3
Teknike Kantieri Studenti:

Mure guri per themele


Aksi 1-1 m3 7.84 1.17 9.17 9.17
Aksi 2-2 m3 9.64 1.17 11.28
Aksi 3-3 m3 1.5 1.1 1.65
Aksi 4-4 (cope 3) m3 6.3 1.1 20.79
Aksi 5-5 m3 11.17 1.17 13.06
Aksi 6-6 m3 10.51 1.17 12.29
Pa aks m3 5.05 1.1 5.55
Pa aks m3 1.65 0.5 0.83
Aksi A-A m3 4.83 1.375 6.64
Aksi A-A m3 2.7 1.1 2.97
Aksi c-c (cope 2) m3 2.7 1.1 5.94
Aksi C-C m3 7.86 1.47 11.55
Aksi D-D m3 11.43 1.47 16.8
Aksi D-D m3 4.83 1.375 6.64
Pa aks m3 2.17 1.375 2.98
Aksi E-E m3 12.13 1.375 16.68
Brez betoni 15cm ne kuoten -0.04m
Aksi 1-1 m3 9.24 0.6 0.15 0.83
Aksi 2-2 m3 10.24 0.6 0.15 0.92
Aksi 3-3 m3 2.78 0.6 0.15 0.25
Aksi 4-4 (cope 3) m3 6.3 0.6 0.15 1.71
Aksi 5-5 m3 14.25 0.6 0.15 1.28
Aksi 6-6 m3 11.71 0.6 0.15 1.05
Pa aks m3 5.05 0.6 0.15 0.45
Pa aks m3 1.65 0.6 0.15 0.12
Aksi A-A m3 5.57 0.6 0.15 0.5
Aksi A-A (cope 2) m3 2.7 0.6 0.15 0.48
Aksi c-c (cope 2) m3 2.7 0.6 0.15 0.48
Aksi C-C m3 7.86 0.6 0.15 0.7
Aksi D-D m3 11.43 0.6 0.15 1.03
Aksi E-E m3 11.13 0.6 0.15 1
Pa aks m3 2.17 0.6 0.15 0.19
Pa aks m3 1.09 0.6 0.15 0.1
Totali= 11.09 m3
Teknike Kantieri Studenti:

Brez betoni 10 cm , kuota -0.65


Aksi 1-1 m3 9.24 0.6 0.1 0.554
Aksi 2-2 m3 10.24 0.6 0.1 0.614
Aksi 3-3 m3 2.78 0.6 0.1 0.614
Aksi 4-4 (cope 3) m3 6.3 0.6 0.1 1.134
Aksi 5-5 m3 14.25 0.6 0.1 0.855
Aksi 6-6 m3 11.71 0.6 0.1 0.703
Pa aks m3 5.05 0.6 0.1 0.303
Aksi A-A m3 5.57 0.6 0.1 0.334
Totali= 5.111 m3